SEP-14 Active Project List (not including design-build prior to 1/1/2003)
SEP-14 Archived Project List for Operational Methods
SEP-14 Local Labor Hiring Pilot Program Project list
Sort table by clicking on column header
State | Contracting / Project Delivery Technique | Brief Description / Location | Workplan | FHWA Approval | Evaluations |
---|---|---|---|---|---|
OR | Best Value, A + D contracting method | OR58: Salt Creek Half Viaducts - Phase 2 Project | November 24, 2014 | June, 2016 (.pdf) |
|
ME | Best Value Contractor Selection | Penobscot River Bridge | October 23, 2003 | October 28, 2003 (.pdf) | June 01, 2009 (.pdf) |
TX | Design-Build CDA | I-35 Corridor | December 22, 2003 | ||
NJ | Lump sum bidding | Route 46, Delaware County | April 27, 2004 | ||
MI | No Excuse Incentive | I-94 Accepted for Traffic Incentive | July 01, 2004 | August 02, 2006
October 15, 2007 |
|
DC | Best Value contractor selection | lighting asset management contract | August 16, 2004 | September 01, 2004 (.pdf) | July 24, 2011 (.pdf) |
FL | Best Value contractor selection | City of Treasure Island Causeway Bascule Bridge | September 20, 2004 | ||
DE | Design-Build CDA | PPP Delaware Turnpike | March 17, 2005 (.pdf) | March 25, 2005 (.pdf) | |
VA | Public Private Partnership Project Delivery | Capitol Beltway HOT Lanes Project | April 22, 2005 | September 01, 2008
March 01, 2009 (.pdf) |
|
DC | Best Value contractor selection | Tunnel asset management contract | August 18, 2005 | February 16, 2017 (.pdf) | |
NC | Best Value / Fixed Price | Fixed price-best value contracting method to award a traditional reconstruction project, near the intersection of US-17/Curtis Road at the New River Air Station, in Jacksonville, NC. | May 12, 2006 | ||
VT | No Excuse Incentive | Widening of I 89 Exit 14 Ramp C and US Rte. 2 (Williston Road) | May 19, 2006 | June 06, 2006 (.pdf) | January 20, 2009 (.pdf) |
MO | Waiver of design-build limitations for discussions in 636.507(b) | I-64 | June 08, 2006 | May 14, 2007 | |
IA | Best Value "A-D Bidding" | Statewide use of best value selection using bid options | June 08, 2006 | June 22, 2008 (.pdf) | October 21, 2008 |
ID | No Excuse Incentives | I-84, Broadway Interchange to Eisenman Interchange, Boise, ID | June 26, 2007 (.pdf) | July 16, 2007 (.pdf) | July 10, 2009 (.pdf) |
MN | No Excuse Incentive | St. Anthony Falls Bridge (I-35 W) Replacement | August 17, 2007 (.pdf) | August 17, 2007 (.pdf) | December 06, 2010 (.pdf) |
MI | Best Value Selection / Performance Contracting | M-115, Clare County, Michigan | September 13, 2007 | September 21, 2007 (.pdf) | June 16, 2008
June 12, 2009 |
FL | Waiver of requirements in 23 CFR 636.507(b) and 636.513 | Programmatic concept approval with Division Office project approvals | February 22, 2008 | March 25, 2008 (.pdf) | |
TX | Waiver of requirements in 23 CFR 636.507(b) and 636.513 | DFW Connector | March 05, 2008 | March 10, 2008 (.pdf) | |
MO | Alternate Technical Concepts for Design-Bid-Build Contract | New Mississippi River Bridge, St. Louis MO | April 01, 2008 | March 25, 2010 | |
PA | No Excuse Incentive Contract Clause | State Route 22, Section B10 (Westinghouse to County Line) | April 29, 2008 | May 02, 2008 (.pdf) | |
RI | No Excuse Incentive | Sakonnet River Bridge Replacement Contract | September 30, 2008 | October 01, 2008 (.pdf) | |
CO | Best Value Contracting | City of Colorado Springs, Woodman Road Widening Project | January 23, 2009 | March 06, 2009 (.pdf) | |
PA | No Excuse Incentives | State Route 119, Section 12M , Fayette County | January 30, 2009 | February 06, 2009 (.pdf) | |
TX | Lump Sum Bidding and No Excuse Incentive | Central Texas Regional Mobility Authority's 290 East Toll Project | April 20, 2009 | April 24, 2009 (.pdf) | January 03, 2014 (.pdf) |
TX | Lump sum bidding and No Excuse Incentive | 183A North Extension Project | May 28, 2009 (.pdf) | July 07, 2009 (.pdf) | |
CO | Best Value / Fixed Price | Clear Creek County, Colorado | October 08, 2009 (.pdf) | December 03, 2009 (.pdf) | |
OR | Best Value, A+C+D contracting method | I-84: Sandy River - Jordan Rd Project - Bundle 210 | November 25, 2009 (.pdf) | September 06, 2005 (.pdf) | August 16, 2012
(.pdf) January 09, 2014 (.pdf) June 20, 2014 (.pdf) |
ID | Fixed Price Variable Scope (FPVS) Contracting | various locations on SH-21, Idaho | February 17, 2010 (.pdf) | February 24, 2010 (.pdf) | December 12, 2011 (.pdf) |
MI | Best Value Selection / Performance Contracting | Rehabilitation of M-39 (Southfield Freeway) in Southfield, Detroit, Dearborn, Dearborn Heights, and Allen Park Michigan | June 08, 2010 (.pdf) | July 06, 2010 (.pdf) | April 27, 2011
(.pdf) Interim Report July 31, 2012 (.pdf, 2 mb) Final Report |
MN | No Excuse Incentive (Locked Incentive Date) | Three-Year Programmatic Evaluation | December 06, 2010 (.pdf) | February 16, 2011 (.pdf) | February 27, 2015
(.pdf) Follow up January 22, 2021 (.pdf) |
DC | Best Value contractor selection | Second City-Wide Lighting Asset Management Contract | June 16, 2011 (.pdf) | June 21, 2011 (.pdf) | |
FL | Modified Two-Phase Design-Build - deviate from 23 CFR 636.207 and 23 CFR 636.303(a) | Program-wide | December 12, 2011 (.pdf) | December 22, 2011 (.pdf) | |
MI | Best Value /Fixed Price Award | Pavement Rehabilitation at various locations | February 03, 2012 (.pdf) | February 07, 2012 (.pdf) | May 06, 2013 (.pdf) |
NY | Best Value Design Bid Build Procurement | Programmatic Approval | April 16, 2012 (.pdf) | April 19, 2012 (.pdf) | 2012-2013 (.pdf) 2013-2014 (.pdf) 2014-2015 (.pdf) Tracking Report (.pdf) |
ID | Fixed Price Variable Scope (FPVS) Contracting | Aggregate resurfacing of SH-7 between MP36.783 and MP48.869 | June 27, 2012 (.pdf) | July 18, 2012 (.pdf) | January 08, 2015 (.pdf) |
MI | Fixed Price Variable Scope (FPVS) Contracting | US-2 over the Cut River | July 11, 2012 (.pdf) | July 12, 2012 (.pdf) | August 19, 2015 (.pdf) |
ID | Best Value | US-20 Weigh-in-Motion Station | August 27, 2012 (.pdf) | August 31, 2012 (.pdf) | January 31, 2014 (.pdf) |
ID | Best Value Contractor Selection Fixed Price Variable Scope Contracting | Corridor fencing I-15 / US 20 in District 6 | September 20, 2012 (.pdf) | October 24, 2012 (.pdf) | January 13, 2015 (.pdf) |
MI | Fixed Price Variable Scope (FPVS) Contracting | I-696 Replacement of Existing Freeway Lighting | December 20, 2012 (.pdf) | February 22, 2013 (.pdf) | MDOT did not construct this project |
ID | Fixed Price Variable Scope (FPVS) Contracting | Statewide Programmatic approval for selected project types |
January 11, 2013 (.pdf) February 6, 2014 (expanded list of project types) (.pdf) April 1, 2022 (expanded list of project types) (.pdf) |
February 04, 2013 (.pdf)
April 28, 2022 (.pdf) |
January 02, 2015
(.pdf) October 23, 2015 (.pdf) January 26, 2016 (.pdf) January 17, 2017 (.pdf) December 7, 2017 (.pdf) November 19, 2020 (.pdf) |
MI | Fixed Price Variable Scope (FPVS) Contracting | Port Huron Wayfinding Signs | January 24, 2013 (.pdf) | February 22, 2012 (.pdf) | February 14, 2014 (.pdf) |
MI | Alternative Technical Concepts for Staging and Maintaining Traffic | US-10 Midland/Isabella County Line to M-18 | February 12, 2013 (.pdf) | February 22, 2013 (.pdf) | September 14, 2014 (.pdf) |
MI | Alternative Technical Concepts for Staging and Maintaining Traffic | I-75 from Pinconning Road to the Bay/Arenac County Line | July 08, 2013 (.pdf) | July 17, 2013 (.pdf) | June 01, 2016 (.pdf) |
VT | Use of State Procurement Procedures for Small Procurements | Rest area Preventive maintenance | October 04, 2013 (.pdf) | January 27, 2021 (.pdf) | |
MI | Fixed Price Variable Scope Contracting | ITS Camera Sites on US-23, University Region | May 13, 2014 (.pdf) | May 14, 2014 (.pdf) | June 01, 2016 (.pdf) |
MI | Fixed Price Variable Scope (FPVS) Contracting | Programmatic Approval - Type 1, 2, & 3 FPVS Contracting |
August 13, 2014 (.pdf) Types 1 & 2: August 13, 2014 Type 3 (.pdf) |
December 19, 2012 (.pdf) |
2013 - Types 1, 2, & 3 (.pdf) 2014 - Types 1 & 2 (.pdf) 2014 - Type 3 (.pdf) 2015 - Types 1, 2, & 3 (.pdf) 2016 - Types 1, 2, & 3 (.pdf) 2017 - Types 1, 2, & 3 (.pdf) 2018 - Types 1, 2, & 3 (.pdf) 2019 - Types 1, 2, & 3 (.pdf) 2020 - Types 1, 2, & 3 (.pdf) 2021 - Types 1, 2, & 3 (.pdf) 2022 - Types 1, 2, & 3 (.pdf) |
MI | No Excuse Incentive Contract Provision | I-75, from Dixie Highway to Hess Road | October 08, 2014 (.pdf) | October 10, 2014 (.pdf) | |
NM | Performance-Based Contractor Prequalification and Procurement | First iteration of Statewide implementation of performance-based contractor evaluation in 2015; implementation of procurement procedures in 2016. Six-year evaluation period expired in March 2021. | February 26, 2015 | February 26, 2015 (.pdf) | September 12, 2015
(.pdf) December 2, 2015 (.pdf) March 16, 2016 (.pdf) July 18, 2016 (.pdf) |
MI | Fixed Price Variable Scope (FPVS) Contracting | Installation of Environmental Sensor Stations at various locations in MDOT’s Southwest Region | April 10, 2015 (.pdf) | April 29, 2015 (.pdf) | November 13, 2017 (.pdf) |
NY | Best Value Design Bid Build Procurement | Programmatic Approval |
June 22, 2015 (.pdf) Procedure (.pdf) Template (.pdf) |
August 18, 2015 (.pdf) | 2015-2016 (.pdf) |
MN | Alternate Technical Concepts for Design-Bid Build Contracts | Programmatic approval for three projects | August 17, 2015 (.pdf) | January 08, 2016 (.pdf) | |
CO | Best Value Procurement | El Paso County, Black Forest Road Culverts Replacement Project | November 17, 2015 (.pdf) | December 17, 2015 (.pdf) | |
MD | No Excuse Bonus Provision | MD 404 from US 50 to East of Holly | November 18, 2015 (.pdf) | December 17, 2015 (.pdf) | |
UT | Quality Bid Factor | Use of a bid factor to account for past performance for asphalt producers on two projects | November 27, 2015 (.pdf) | December 10, 2015 (.pdf) | September 21, 2016 (.pdf) |
MI | Fixed Budget Variable Scope Best Value Selection | Procurement of Environmental Sensor Stations at various locations within MDOT’s North Region | December 01, 2015 (.pdf) | December 17, 2015 (.pdf) | November 13, 2017 (.pdf) |
AL | No Excuse Incentive | Use of a no excuse incentive clause for the reconstruction of the I-59/I-20 interchange in Birmingham. | December 04, 2015 (.pdf) | December 10, 2015 (.pdf) | |
CO | Lump sum bidding | Accessibility Improvements for the City of Trinidad's Welcome Center | February 22, 2016 (.pdf) | March 03, 2016 (.pdf) | |
MN | Best Value Award on Design Bid Build Project | I-35W Lake Street Project | September 06, 2016 (.pdf) | March 15, 2017 (.pdf) | |
KY | Multistep Competitive Sealed Bidding (Reverse Auction) | Applicable only to Statewide Commodities Contracts | September 19, 2016 (.pdf) | November 03, 2016 (.pdf) | |
MI | On-the-Job-Training (OJT) Voluntary Incentive Program (VIP) | Select MDOT Federal-aid projects | October 05, 2016 (.pdf) | January 31, 2017 (.pdf) | No Evaluations Not Implemented |
MI | Fixed Price Variable Scope Contracting | Construct at least 20 to and up to 23 ITS/ Environmental Sensor Station (ESS) sites and the related Fiber Optic Network with $4 Million in funding. The project is located at various sites within Muskegon and Ottawa Counties in the Grand Region. | November 14, 2016 (.pdf) | January 05, 2017 (.pdf) | January 22, 2018 (.pdf) |
AL | Alternate Technical Concepts for Design-Bid-Build Contract | Remove and replace bridges in Birmingham Central Business District along I-59/20 | January 23, 2017 (.pdf) | March 17, 2017 (.pdf) | |
KY | Alternate Technical Concepts for Design-Bid-Build Contract | Programmatic Request for 2-4 projects over a 2 year period | February 16, 2017 (.pdf) | March 07, 2017 (.pdf) | |
NY | Best Value Design Bid Build Procurement | Programmatic Approval | April 26, 2017 (.pdf) | May 17, 2017 (.pdf) | 2018-2019 (.pdf) |
MI | On-the-Job-Training (OJT) Voluntary Incentive Program (VIP) | Select MDOT Federal-aid projects |
December 06, 2017 (.pdf) December 08, 2020 (Extension Request) (.pdf) |
February 06, 2018 (.pdf)
December 22, 2020 Extension (.pdf) |
January 01, 2020
(.pdf) FHWA/MDOT Case Study (January 2022) (.pdf) |
HI | Indefinite Delivery / Indefinite Quantity (ID/IQ) Contracting | Three-year programmatic approval of IDIQ contracting in each of Hawaii's four districts (Oahu, Kauai, Maui, and Hawaii) for various safety and preventive maintenance work |
March 13, 2018 (.pdf) Revised May 18, 2018 |
April 04, 2018 (.pdf)
Revised June 19, 2018 |
|
MO | Fixed Price Variable Scope (FPVS) Contracting | Installation of Wrong Way Countermeasures along Interstate 70, US Highway 63, and US Highway 61 in Central and Northeast Missouri | February 07, 2019 (.pdf) | March 12, 2019 (.pdf) | February 19, 2020 (.pdf) |
CO | No Excuse Bonus | I-70 Mountain Corridor - Westbound Peak Period Shoulder Lane | February 19, 2019 (.pdf) | March 12, 2019 (.pdf) | |
MO | Fixed Price Variable Scope (FPVS) Contracting | Installation of Wrong Way Countermeasures and chevron signs on the maximum number of locations as MoDOT's budget will allow | March 28, 2019 (.pdf) | March 28, 2019 (.pdf) | May 28, 2020 (.pdf) |
NY | Best Value Design Bid Build Procurement | Programmatic Approval | April 01, 2019 (.pdf) | May 30, 2019 (.pdf) | 2019-2020 (.pdf) |
MO | Alternative Technical Concepts for Design- Bid-Build Construction Projects | Programmatic Approval | August 26, 2019 (.pdf) | September 10, 2019 (.pdf) | November 06, 2020
(.pdf) November 4, 2022 (.pdf) |
CO | Best Value Procurement | US 36 Flood Repair Site, Larimer County, MP 7-8 | September 05, 2019 (.pdf) | September 24, 2019 (.pdf) | October 29, 2021
(.pdf) June 15, 2022 (.pdf) Attachments A-E |
DE | No Excuse Incentive Contract Provision | Ramp B Closure, Rehabilitation of I-95, 2nd Street On-Ramp Improvements project | September 05, 2019 (.pdf) | October 02, 2019 (.pdf) | Post approval, DelDOT modified the SEP-14 workplan (with FHWA HQ approval) to remove the no excuse disincentive clause and change it to a standard liquidated damages clause that is not tied to a no excuse clause |
RI | Indefinite Delivery / Indefinite Quantity (ID/IQ) Contracting | 3 IDIQ Contracts for Bridge Preservation: (1) General Bridge Preservation; (2) Painting; and (3) In-Water Work; each contract will have a base 3 year duration with 2 one-year options | February 07, 2020 (.pdf) | March 19, 2020 (.pdf) | |
RI | Indefinite Delivery / Indefinite Quantity (ID/IQ) Contracting | An ID/IQ Contract for On-Call Steel Bridge Repairs. The contract will have a base 3 year duration with 2 one-year options | February 07, 2020 (.pdf) | April 06, 2020 (.pdf) | |
MD | Indefinite Delivery / Indefinite Quantity (ID/IQ) Contracting - Time & Materials Method | Two Federal-aid highway construction contracts for preservation and minor rehabilitation of fixed bridges, culverts and retaining walls. | February 21, 2020 (.pdf) | March 11, 2020 (.pdf) | 2022 (.pdf) |
CT | Indefinite Delivery / Indefinite Quantity Contracting - Job Order Contracting - Multiple Award- Task Order Contracting (MA-TOC) | Continuation of three-year Epoxy Resin Pavement Markings (furnish and apply) contract | October 02, 2020 (.pdf) | November 10, 2020 (.pdf) | |
IN | Indefinite Delivery / Indefinite Quantity (ID/IQ) Contracting | Statewide contract for the repair of Mechanically Stabilized Embankment (MSE) walls | November 13, 2020 (.pdf) | November 23, 2020 (.pdf) | |
MO | Fixed Price Variable Scope (FPVS) Contracting | For seal coat (chip seal) projects along various routes in Franklin County, Missouri. | November 23, 2020 (.pdf) | December 17, 2020 (.pdf) | November 03, 2022 (.pdf) |
NY | Best Value Design Bid Build Procurement | Programmatic Approval | March 03, 2021 (.pdf) | March 24, 2021 (.pdf) | |
VT | Use of State Procurement Procedures for Small Procurements | Rest area Preventive maintenance |
March 16, 2021 Appendices A-I |
June 07, 2021 (.pdf) | |
MN | No Excuse Incentive (Locked Incentive Date) | Expedite construction of concrete pavement preservation project at I-94/I-35E interchange in downtown St. Paul, MN | March 18, 2021 (.pdf) | April 06, 2021 (.pdf) | |
IN | Indefinite Delivery / Indefinite Quantity (ID/IQ) Markup Contracting | Bridge Preservation Projects in the Fort Wayne District | May 17, 2021 (.pdf) | July 14, 2021 (.pdf) | June 2022 (.pdf) |
MO | Fixed Price Variable Scope (FPVS) Contracting | Programmatic use for preventive maintenance and traffic control device installation | June 17, 2021 (.pdf) | July 01, 2021 (.pdf) | October 20, 2022 (.pdf) |
NM | Performance-Based Contractor Prequalification and Procurement | Second iteration: Statewide implementation of performance-based contractor evaluation in 2021; implementation of procurement procedures in 2022. Six-year evaluation period. | November 08, 2021 (.pdf) | February 24, 2022 (.pdf) | |
PA | Pre-Development / Progressive Public-Private Partnership | Rehabilitate or replace nine major Interstate bridges and related facilities located throughout the Commonwealth of Pennsylvania and convert them to toll facilities. | January 26, 2022 (.pdf) | March 09, 2022 (.pdf) | August 04, 2023 (.pdf) |
MD | Indefinite Delivery / Indefinite Quantity (ID/IQ) Contracting - Time & Materials Method | Federal-aid highway construction contracts for preservation and minor rehabilitation of fixed bridges, culverts and retaining walls. Two-year evaluation period. | February 17, 2022 (.pdf) | March 04, 2022 (.pdf) | |
MI | Alternative Technical Concepts on a Design-Bid-Build Project | Superstructure replacement for a bridge span carrying Warren Road over northbound U.S. 23 in Ann Arbor Charter Township, Washtenaw County | March 22, 2022 (.pdf) | March 28, 2022 (.pdf) | August 22, 2022 - Michigan DOT has elected to use State funds only for this project, so FHWA will not receive a final report. |
AL | Progressive Design-Build (PDB) Project Delivery | Design and construct the I-10 Mobile River Bridge and Bayway Project. | April 27, 2022 (.pdf) | May 31, 2022 (.pdf) | |
MN | No Excuse Incentive (Locked Incentive Date) | Expedite construction of an Unbonded Concrete Overlay project on TH 52 from north of CSAH 42 to CSAH 86 near Cannon Falls, MN | August 02, 2022 (.pdf) | August 26, 2022 (.pdf) | |
FL | Qualification-Based Phased Design Build (Phased DB) Selection Process | For the planning, preconstruction, and construction phase services of the Tampa Westshore Interchange Project (I-275/ SR 60) | September 16, 2022 (.pdf) | October 06, 2022 (.pdf) | |
OH/KY | Progressive Design-Build Project Delivery | Planning, preconstruction, and construction phase services for the Brent Spence Bridge Corridor Projects (I-71/75). | November 17, 2022 (.pdf) | December 19, 2022 (.pdf) | |
NY | Best Value Design Bid Build Procurement | Programmatic Approval | November 22, 2022 (.pdf) | January 24, 2023 (.pdf) | |
TN | No-Excuse Bonus/Disincentive | Construct new access to University of Tennessee-Knoxville Medical Center | March 16, 2023 (.pdf) | April 13, 2023 (.pdf) | |
AK | Progressive Design-Build Project Delivery | Sterling Safety Corridor Improvements Project between MP 82.5 - MP 94 | June 14, 2023 (.pdf) | July 11, 2023 (.pdf) | |
KY | Progressive Design-Build Project Delivery | Implementation of Wrong Way Driving prevention technology on selected corridors in Lexington and Louisville, Kentucky | June 29, 2023 (.pdf) | August 10, 2023 (.pdf) | |
MI | Progressive Design-Build Project Delivery | I-375 Reconnecting Communities Project, Detroit, MI | July 06, 2023 (.pdf) | July 12, 2023 (.pdf) | |
WA | Progressive Design-Build Project Delivery | Confluence Parkway Project, Wenatchee, WA | July 11, 2023 (.pdf) | July 11, 2023 (.pdf) | |
MN | Best Value Award on Design Bid Build Project | Stone Arch Bridge Project, Minneapolis, MN | July 11, 2023 (.pdf) | July 27, 2023 (.pdf) |