U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content
Facebook iconYouTube iconTwitter iconFlickr iconLinkedInInstagram

Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations

 
REPORT
This report is an archived publication and may contain dated technical, contact, and link information
Back to Publication List        
Publication Number:  FHWA-HRT-16-072    Date:  December 2016
Publication Number: FHWA-HRT-16-072
Date: December 2016

 

FHWA LTPP Guidelines For Measuring Bridge Approach Transitions Using Inertial Profilers

Chapter 2. Profile Measurements

Profile measurements should be performed with the LTPP inertial profilers survey units in accordance with the data collection and processing guidelines and procedures described in the draft LTPP Manual for Profile Measurements and Processing or any subsequent updates or replacements that occur for this manual.(5) The exception is that the setup options are modified for Long-Term Bridge Performance data collection as identified in these guidelines, which outline the procedure for profiling a bridge section and the number of acceptable runs that are required.

Inertial Profiler Setup

The FHWA LTPP profilers are set up for data collection for the LTPP Program as defined in the draft LTPP Manual for Profile Measurements and Process using the LTPP header format.(5) This header format has some limitation for use in collecting profiles for measuring bridge approach transitions. The main limitations are the ability to increment in both the positive and negative direction, input a start location other than zero, and add custom comments for all header information inputs. The long header format will accommodate the input information that is required for the bridge transition profile data collection with some interpretation of the header descriptions. This header format is compatible with the ProVAL software with output format in both the Engineering Research Division (ERD) and pavement profile format (PPF).

The profiler setup procedure for the bridge profile is as follows:

  1. Enter the Setup screen from the main menu and select the Analysis Options tab and make the following key changes:

    • English Units—check “feet.”

      It is not necessary to update or modify any of the analysis parameters. Figure 8 shows an example of a screen capture of the Analysis setting in the software program.

  2. Select the Report Options tab and make the following key changes:

    • Header Format—long.
    • Profile Data Output Files—ERD, ProVAL PPF.

      Figure 9 shows an example of a screen capture of the Report setting in the program.

  3. Select the Profile Analysis tab and make the following key changes:

    • Profile Filter Setting—set high pass filter to 300 ft.
    • Profile Filter Setting—set low pass filter to 0 ft.

      Figure 10 shows an example of a screen capture of the Report setting in the program.

  4. Select the Texture Analysis tab and make the following key change:

    • Texture Indices Produced—mean profile depth, ASTM 1845.(6) “Spike removal” should be unchecked.

      Figure 11 shows an example of a screen capture of the Report setting in the program.

Click for description

1 ft = 0.305 m.

Figure 8. Screen capture. Analysis options.



Click for description

Figure 9. Screen capture. Report options.



Click for description

1 ft = 0.305 m.

1 inch = 25.4 mm.

1 inch/mi = 15.8 mm/km.

Figure 10. Screen capture. Profile analysis.



Click for description

1 inch = 25.4 mm.

Figure 11. Screen capture. Texture analysis.



Profiler Survey Procedure

Profile surveys should be done in both directions using the following conventions:

The above instructions are based on general industry practice to increment stations from south to north and west to east. Site location and conditions may indicate that an alternative approach may be more practical, and this decision should be made at the discretion of the profiler crew. The road signage may not always be consistent with the direction of travel. For example, it is possible to be travelling in an easterly direction with the route signs indicating north. Because the profile data will be geo-tagged, it is not necessary to record the test direction information. The operator should indicate the direction from the route sign or general direction if there is no route signage. This information is included in the profile header and on the site information form.

Procedures for profiling a bridge section and the number of profile runs that are required at a bridge section are described in the next section.

Profiling Paths and File Naming Convention

The profile data should be collected with the profiler centered in the wheelpaths. If no defined wheelpath is visible, then the profiler will be centered between the centerline of the road and edge of the pavement. The operator should follow the same path when traversing the bridge.

The SSNNNDLV convention should be followed for naming files. The acronym is defined as follows:

For example, the following data file names would be valid:

Information on the roadway for which the bridge is located, the bridge name, ID number, start location, and end length should be contained within the header discussed in the Inertial Profiler Setup subsection. An end of run comment should be completed by the operator for each run that will identify the run status or any conditions that could have an effect on the profile data. The operator comment field should be used for any additional comments regarding site conditions or pavement features. As previously noted, the information regarding the bridge is recorded on form 1A (see figure 4) or 1B (see figure 5) along with photos as recorded on form 2A (see figure 6).

Data Collection Procedure

Before collecting data at bridge sections, the operator should either perform or take steps to ensure the following conditions are met:

By selecting Start within the main menu, access to the header menu is obtained. Before starting the profile data collection, the header information needs to be entered or modified to represent the run data that will be collected. The following list outlines the required inputs for the header file:

Figure 12 shows an example of a screen capture of the header inputs. With the header information input, the user should initiate profile data using the procedures as outlined in the draft LTPP Manual for Profile Measurements and Processing.(5)

Click for description

1 ft = 0.305 m.

Figure 12. Screen capture. Profiler system software header fields.



On completion of the previously mentioned steps, the following procedure should be followed to obtain an acceptable set of profile runs at bridge sections:

  1. Profile data should only be collected when traffic, weather, and pavement conditions (i.e., pavement surface is dry and clear of debris) will not hamper or affect the profile data. If conditions are not acceptable, the profile crew will be required to adjust or reschedule the profile data collection.

  2. The operator should ensure that the end of the bridge section length (i.e., 700 ft (213 m) from the end of the bridge interface) is passed before terminating profile data collection.

  3. The operator should obtain at least three runs by driving the profiler along the wheelpaths.

  4. After completing the data collection, the operator should review the profile runs that were collected. The operator should evaluate the profiles for equipment-related spikes by following the procedures described in section 2.9.4 of the draft LTPP Manual for Profile Measurements and Processing.(5) If the operator determines that at least three error-free runs along the wheelpaths have been obtained at the site, data collection should be terminated. Runs are considered error free if there are none of the following:

    • Sensor issues.
    • Distance-measuring instrument (DMI) issues, including DMI shift.
    • Other equipment issues.
    • Operator issues, including testing out of the wheelpath.
    • Variability that is not pavement related.
    • Unexplained run-to-run variability of profiles and/or IRI.

    If the operator believes that three error-free runs along the wheelpaths have not been obtained, the operator should repeat the data collection and evaluate the profile data using the procedures described previously. A maximum of five runs along the wheelpaths can be performed. If the additional runs do not satisfy the criteria established for profile acceptance (defined in the LTPP manual), then the profile operator needs to provide an explanation for why the profile data is suspect. If the issue is equipment-related, then the operator should terminate the data collection and have the equipment serviced or repaired and calibrated before collecting any further profile data. The profile data can be retained or discarded at the discretion of the profile analyst.

  5. The profile sensors in the left wheel and right wheelpath and midlane along with two texture lasers located in the left and right wheelpath should be checked for operation and accuracy prior to profiling. The profile acceptance criteria are based on the profile sensors in the left and right wheelpath. The profile operator should perform a visual observation of the profiles in the midlane and those collected by the texture lasers by reviewing the profile graphs. In general, if the left and right profiles are of acceptable quality, then the texture lasers will also produce acceptable results.

  6. Note that fewer than three runs can be accepted if conditions at the site result in excessive delay in the schedule. This may occur if it starts to rain during the data collection or if there are other local interruptions such as accidents or farm machinery using the roadway.

  7. The operator should generate ERD and PPF files from the .ARD data following the instructions in the user manual.(8)

  8. The operator is encouraged to use ProVAL cross-correlation analysis to determine run-to-run acceptability, time permitting. A correlation of 92 percent for three runs would be the target for acceptable repeatability between runs. It is possible that three error-free runs may not meet the criteria because of transverse variability within the section limits. In this instance, a comment on either form 1A or 1B would be sufficient to explain the variability.

  9. The operator should maintain a log of the runs on the daily progress report.

  10. The operator should back up the data before leaving the site following procedures described in section 2.9.6 of the draft LTPP Manual for Profile Measurements and Processing.(5)

An acceptable set of profile runs is three error-free runs in the wheelpaths.

 

 