FHWA Contact: Mark Swanlund, HIPT-20, (202) 366-1323Introduction
Pavement smoothness is a key factor in determining highway user satisfaction. To adequately represent drivers' opinions of roadway conditions, many highway agencies are transitioning to the International Roughness Index (IRI) or to the Profile Index (PI) using a 0.0-millimeter (mm) blanking band (PI0.0) from the PI using a 5-mm or 2.5-mm blanking band (PI5-mm or PI2.5-mm). This has led to the need for correlation equations to relate the current PI5-mm or PI2.5-mm smoothness specification levels with those to be used in the new specifications.
To address this issue, research was initiated to develop a practical tool to assist in the transition from PI5-mm or PI2.5-mm to IRI or PI0.0. Information developed in this research can be used by highway agencies to estimate the level of IRI and PI0.0 smoothness associated with their current pavement smoothness specifications.
Key Findings
Key findings of this research include:
- Linear equations for converting from PI5-mm and PI2.5-mm to PI0.0 and IRI indices.
- Modified equations to account for effects of climate and pavement type, where statistically appropriate.
- Quantified variability information for each correlation.
- IRI and PI0.0 specification levels converted from currently reported agency full-pay levels.
Data
The FHWA Long-Term Pavement Performance (LTPP) Program provided profile data used in this research. Since 1996, LTPP has collected pavement surface profile data from more than 1,700 test sections (typically 152.5 meters (m) long) across the United States and Canada. LTPP uses a high-speed inertial profiler, rated as class I according to ASTM E-950-98, to record profile data at 25-mm intervals. IRI values for each profile are computed using LTPP software according to the ASTM E-1926-98 protocols. Researchers obtained climatic and pavement type information from the LTPP database.
Analysis
To determine the PI values from the profiles, researchers employed a commonly used simulation method. Lightweight profilers simulating PI values have been in use for more than 5 years, and several manufacturers have proven that they can correlate well with PIs obtained from profilographs. For this study, researchers used the algorithm employed by the lightweight profiler that the LTPP profiler manufacturer developed. Because the same sensors, filtering, and sampling interval are used for the manufacturer's high-speed profiler and lightweight profiler, this simulation held the best promise of matching profilograph PI output.
Results
Based on the data shown in figures 1 and 2, a linear relationship is evident between IRI and PI0.0 for both asphalt concrete (AC) and portland cement concrete (PCC) pavements. Rather good correlation coefficients result from these direct comparisons, with an R2 of 0.87 and 0.83 for AC and PCC pavements, respectively.
Figure 1. IRI vs. PI0.0 for AC pavements.
![]()
Figure 2. IRI vs. PI0.0 for PCC pavements.
Statistical analysis reveals that, in certain instances, a small portion of the variability in the relationships between IRI and PI can be related to climate and pavement type. To provide agencies with the most accurate equations, these variables were included in the PI to IRI models shown in table 1.
Table 1. PI-to-IRI index conversion equations and variability indices.
Pavement Type Climatea Blanking Band (mm) Correlation Equation (IRI = mm/km, PI = mm/km) N SEE R2 AC 1,2,3,4 0.0 IRI = 2.66543*PI0.0 + 213.01 14,170 200.17 0.89 AC 1,2,3,4 5.0 IRI = 3.78601*PI5-mm + 887.51 13,775 292.26 0.77 AC/AC 1 0.0 IRI = 2.74599*PI0.0 + 265.42 1,854 191.97 0.91 AC/AC 2 0.0 IRI = 2.68169*PI0.0 + 274.67 1,494 184.64 0.81 AC/AC 3,4 0.0 IRI = 2.42295*PI0.0 + 301.90 5,126 178.81 0.84 AC/AC 1 5.0 IRI = 4.25316*PI5-mm + 957.80 1,824 288.17 0.79 AC/AC 2 5.0 IRI = 4.39478*PI5-mm + 883.20 1,345 308.23 0.45 AC/AC 3,4 5.0 IRI = 3.42671*PI5-mm + 876.80 4,906 265.85 0.63 AC/PCC 1,2,3,4 0.0 IRI = 2.40300*PI0.0 + 292.93 4,156 205.58 0.79 PCC 1,3 0.0 IRI = 2.12173*PI0.0 + 439.76 12,039 259.63 0.84 PCC 2 0.0 IRI = 2.58454*PI0.0 + 423.09 1,448 176.54 0.88 PCC 4 0.0 IRI = 2.3582*PI0.0 + 317.19 2,888 236.51 0.84 PCC 1,3 5.0 IRI = 2.62558*PI5-mm + 1,205.73 11,946 305.96 0.77 PCC 2 5.0 IRI = 3.51673*PI5-mm + 1,226.35 1,364 268.70 0.72 PCC 4 5.0 IRI = 2.87407*PI5-mm + 1,229.63 2,885 297.37 0.74 aClimatic zones: 1=DF, 2=DNF, 3=WF, 4=WNF.
Climatic regions used in these tables are defined as dry freeze (DF), dry non-freeze (DNF), wet freeze (WF), and wet non-freeze (WNF). Climates with average annual rainfall of more than 508 mm per year were considered as wet. Freezing climates were designated as having a freezing index of more than 66°C-days per year.
As expected, the relationship between PI5-mm and PI0.0 is also linear, as figures 3 and 4 illustrate. The variability in these relationships is an indication of the pavement roughness data that is lost when a wider blanking band is used. The R2 value for all AC pavements is 0.85, while it is increased to 0.90 for all PCC pavements.
Figure 3. PI0.0 vs. PI5.0 for AC pavements.
![]()
Figure 4. PI0.0 vs. PI5.0 for PCC pavements.
![]()
No statistical differences in the correlations were noted for jointed-plain, jointed-reinforced, and continuously reinforced concrete (JPC, JRC, and CRC) pavements. However, statistical differences were noted between original AC pavements, AC overlays of AC, and AC overlays of PCC. Also, climatic effects accounted for some of the variability in the equations. Therefore, the correlations in table 2 include several pavement types and climatic regions.
Table 2. PI-to-PI 0.0 index conversion equations and variability. PI-to-IRI index conversion equations and varibility indices.
Pavement Type Climatea Correlation Equation(PI = mm/km) N SEE R2 AC 1,3 PI0.0 = 1.35776*PI5-mm + 275.48 5,684 83.58 0.88 AC 2,4 PI0.0 = 1.46417*PI5-mm + 240.09 8,093 71.73 0.86 AC/AC 1 PI0.0 = 1.56038*PI5-mm + 250.89 1,826 73.74 0.88 AC/AC 2 PI0.0 = 1.75837*PI5-mm + 222.84 1,347 79.32 0.66 AC/AC 3,4 PI0.0 = 1.45876*PI5-mm + 233.59 4,908 71.53 0.81 PCC 1 PI0.0 = 1.39512*PI5-mm + 343.08 2,182 71.19 0.87 PCC 2 PI0.0 = 1.36715*PI5-mm + 313.25 1,366 66.42 0.86 PCC 3 PI0.0 = 1.20723*PI5-mm + 367.91 9,764 86.73 0.91 PCC 4 PI0.0 = 1.19909*PI5-mm + 390.49 2,885 85.19 0.85 aClimatic zones: 1=DF, 2=DNF, 3=WF, 4=WNF.
Applications
These correlation equations can be used to assist agencies transition from the PI5-mm smoothness index to IRI or to PI0.0. For example, a wet-freeze State has specified a full-pay range for new PCC pavements of PI5-mm between 79 and 110 mm/kilometer (km). State officials can use equations 14 and 25 to determine that a comparable IRI range would be 1,413 to 1,495 mm/km and a comparable PI0.0 range would be 463 to 501 mm/km.
Similarly, for AC pavement smoothness specifications (full-pay is 64 to 110 mm/km), the State could use equations 2 and 17 to estimate a comparable IRI range of 1,130 to 1,304 mm/km and a comparable PI0.0 range of 362 to 425 mm/km.
Recommendations
To make this research useful, it is recommended that agencies:
- Evaluate the validity of the research results based on agency conditions and experience.
- Use the correlation equations and variability information to estimate the required level of smoothness for a specification that transitions to IRI or PI0.0. It is recommended that the derived specification limits be adjusted to reflect agency implementation practices such as segment length, segment averaging, scope of application, and index computation method.
- Track the results of the new smoothness specification and adjust agency smoothness requirements to meet the abilities of contractors and the benefit-cost of smoother roadway surfaces.
Additional Information
Researcher -- This study was performed by ERES Consultants, 505 West University Avenue, Champaign, Illinois 61820-3915, (217) 356-4500. Contract No. GS-10F-0298K.
Distribution -- This TechBrief is being distributed according to a standard distribution. Direct distribution is being made to the Resource Centers and Divisions.
Availability -- The publication linked to this TechBrief is Pavement Smoothness Index Relationships, Final Report (Report No. FHWA-RD-02-057). It is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. A limited number of copies will be available from the R&T Report Center, FHWA, 9701 Philadelphia Court, Unit Q, Lanham, MD 20706, telephone: (301) 577-0818, fax: (301) 577-1421.
Key Words -- International Roughness Index, Profile Index, correlation, specification, smoothness.
Notice -- This TechBrief is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. This TechBrief provides a synopsis of the study's final publication. The TechBrief does not establish policies or regulations, nor does it imply FHWA endorsement of the conclusions or recommendations. The U.S. Government assumes no liability for the contents or their use.
FHWA-RD-02-112
NOVEMBER 2002U.S. Department of Transportation
Federal Highway Administration
Research, Development, and Technology
Turner-Fairbank Highway Research Center
6300 Georgetown Pike
McLean, VA 22101
www.tfhrc.govThis RD&T TechBrief summarizes an experiment, its results, data collected from analysis, or findings and recommendations.
![]() |