| Table E4: Application of Decision Rules (Step 3) | |||||||||||
| Rest Area | Parameter Values | ||||||||||
| P | DH | Dt | PF | VHS | |||||||
| XYZ001
XYZ002 XYZ003 |
0.16
0.15 0.14 |
0.15
0.1 0.075 |
0.25
0.25 0.25 |
1.8
1.8 1.8 |
2.0
2.0 2.0 |
||||||
Table E5: Estimation of Truck Parking Spaces (Step 4)
Base Estimation Formula
| NTSPACES = | ADT
x P x DH x Dt x PF VHS |
| Rest Area | Formula Inputs | Estimated Spaces | |
| XYZ001 | NTSPACES = | 8.650
x 0.16 x 0.15 x 0.25 x 1.8 2.0 |
47 |
| XYZ002 | NTSPACES = | 16.565
x 0.15 x 0.10 x 0.25 x 1.8 2.0 |
56 |
| XYZ003 | NTSPACES = | 31,100
x 0.14 x 0.075 x 0.25 x 1.8 2.0 |
73 |