RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Illinois | 000S658 | I-70 - Bridge replacement and new interchange on I-55/70 under IL 162 at Troy in Madison County. | $26,155,295.30 |
$27,110,914.46 |
Illinois | 000V127 | 0.72 miles reconstruction/widening of I-290 EB mainline pavmt. from Racine to Congress Parkway (i-9094) retain wall, lighting | $29,610,659.43 |
$33,360,580.97 |
Illinois | 0020074 | CREATE - Construction on CREATE project EW1: Plan number EW1-BRC-TSX-001-Z-BD | $58,652,208.00 |
|
Illinois | 0055455 | Resurfacing, bridge repairs etc on I-55 through Will, DuPage and Cook Counties | $29,478,421.41 |
$33,182,785.81 |
Illinois | 0057309 | Bourbonnais road improvements, Bourbonnais. 1.42 miles of a new structure an interchange on I-57 at 6000N and improvements at** | $46,105,899.29 |
$51,787,033.35 |
Illinois | 0057312 | 9.28 mi of milling, rubblizing & 11.75" of HMA resurf, guardrail, striping etc on I-57 from Old IL 13 to Johnson Cty | $26,438,888.53 |
$30,285,436.37 |
Illinois | 0064403 | 0.711 mi of proposed bridge & additional lane on I-64 from MLK Bridge EB to I-55/64 WB | $29,321,246.02 |
$32,620,141.26 |
Illinois | 0070027 | 6.6 miles of resurfacing, bridge repairs etc. on I 70 in Bond and Madison Counties | $24,125,747.26 |
$27,555,390.52 |
Illinois | 0070047 | 9.05 miles of rebbilization/overlay of I-70 - starts at abandoned RR bridge in Altamont to Little Wabash River W of Effingham | $53,447,701.06 |
$59,386,335.32 |
Illinois | 0070405 | Appr 9 mi of milling, patching, resurfacing, grdrl & bridge repair on I-70 from 2.5 mi east of I-55/70 int just west of Prairie Rd | $28,064,642.27 |
$31,284,519.13 |
Illinois | 0074324 | 0.5 miles added lanes & ramps, bridge replacement/rehab, lighting & drainage improvements on I-74 from Mississippi River to 7th Ave Moline | $83,228,205.05 |
$94,651,112.00 |
Illinois | 0074326 | 2 miles of reconstruction of I-74 starting (7th ave) south to (Avenue in Cities) - within the City of Moline | $84,587,618.00 |
$96,169,621.00 |
Illinois | 0075156 | Construct 4 lane ext. of IL.Rte.29 from Rochester to Taylorville - new 4 lanes expressway around Edinburg incl. ** | $34,925,049.85 |
$43,952,254.25 |
Illinois | 0090403 | 2.67 miles of a new lane on I-90 from Cumberland Ave to Harlem Ave in Chicago | $22,695,886.00 |
$28,671,955.41 |
Illinois | 0290201 | 0.49 miles of the construction of 2 new WB expressway lanes along I-290 from Peoria to Racine St inc 4 new retaining walls and** | $27,346,416.25 |
$33,212,207.99 |
Illinois | 0310139 | 5.5 miles of new 4-lane roadway; Seminary Road to US 67 in Godfrey including grading, paving, box culvert and signing. | $23,502,425.43 |
$29,378,031.79 |
Illinois | 0321015 | TIGER PROJECT-US 54, PIKE CO. REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA | $25,182,100.00 |
$29,626,000.00 |
Illinois | 0322096 | 4.5 mi of grading, paving, new bridge and an additional lane to an existing bridge on US.51 from 1.4 mi S.of Assumption ** | $22,203,584.77 |
$27,764,886.77 |
Illinois | 0326088 | 4.47 mi of addition of 2 or more lanes on IL 47 from N of I-80 in Morris to just N of Sherrill Rd in Kendall Cty inc 32' median * | $31,582,122.16 |
$40,090,294.93 |
Illinois | 0326093 | Const. of the US. I-80 to I-88 North-South Connector in Illinois - 7.023 mi of reconst. of IL.47 from 2-4 lanes inc. pvmnt, ** | $37,657,049.75 |
$49,931,255.13 |
Illinois | 0330073 | 1.8 miles of reconstruction on US 45 from 143rd St. to 159th St., including signals, culverts, pavement marking, additional** | $20,188,052.73 |
$29,964,765.33 |
Illinois | 0330074 | 2.8 miles of additional lanes and roadway reconstruction inc signals, lighting, pavement marking, etc. on US 45 from 159th to** | $24,374,900.08 |
$32,592,125.68 |
Illinois | 0332119 | 6.02 miles of the reconstruction of the existing 2-lanes and the addition of two more on US 45 beginning in Eldorado from just** | $20,948,092.99 |
$26,195,055.45 |
Illinois | 0341025 | Lakefront Bike Trail: Navy Pier Flyover consisting of new pedestrian bridge, furnishing structural steel, lighting, concrete** | $20,933,600.00 |
$28,952,200.00 |
Illinois | 0345056 | 1.33 mi of interchange reconst. on US.20 inc lghtng, traff sgnls, structure work, retaining wall etc from Fleetwood Dr. to ** | $30,568,574.44 |
$40,041,517.55 |
Illinois | 0351027 | 5.15 mi of roadway reconst inc adding lanes, multi-use path, traffic signals lighting etc on IL 7 from Gougar Rd to Will-Cook* | $49,078,337.36 |
$67,903,453.66 |
Illinois | 0351028 | 2.5 mi of rdwy reconst, add lanes, add multi-use path, drainage improvements, signals, lighting, landscaping etc on US6/IL7* | $42,102,475.81 |
$59,421,594.51 |
Illinois | 0365012 | Wide for add. lanes, reconst. & bridge repl, lndscpng, etc on IL.56 from W.of IL.59 (Joliet Rd.) toE.of Winfield Rd in Wrrnvlle | $23,572,903.42 |
$29,936,368.31 |
Illinois | 0373028 | 2.03 mi of bridge rehab, widening, ramp modification & lighting on IL 171 through Vil of McCook, Lyons & Summit | $24,625,889.44 |
$27,402,112.79 |
Illinois | 0556246 | 2.3 mi of relocate I-55 @ Arsenal Rd. interchange inc new Arsenal bridge, fly-over bridge, lighting, rem exist ** | $34,252,726.00 |
$38,075,577.17 |
Illinois | 0557203 | STEVENSON EXPWY W DAMEN TO S FORK S.BRANCH, PAVEMENT RECONS & BR REHAB | $31,051,347.32 |
$37,488,163.87 |
Illinois | 0591028 | Construction of Route 34 Interchange and improvements. 3.65 miles of reconstructing US 34 to 5 lanes inc storm sewers, curb &** | $30,158,245.00 |
$38,193,683.00 |
Illinois | 0698037 | 0.83 mile of the removal and replacement of the structure carrying IL 89 over the Illinois River located 1 mile south of US 6 in** | $35,413,629.00 |
$44,396,158.00 |
Illinois | 0745305 | 7.957 mi of repl of bridge carrying IL104 over IL Rvr in Meredosia, bridge rehab, earthwork, lighting, sidewalks, landscaping etc | $60,920,779.61 |
$77,541,730.59 |
Illinois | 0JQ6496 | Removal and replacement of structures carrying IL Route 2 over the Rock River in Rockton | $28,000,000.00 |
|
Illinois | 0VCS038 | Roadway reconstruction, construction of new path and various ADA improvements on Wood St from N of Little Calumet River to S of US 6 (159th St) | $52,485,749.00 |
$65,785,819.75 |
Illinois | 1279114 | 5,110' of the removal and replacement of the structure carrying IL 178 over the Illinois River in Utica | $22,899,350.00 |
$29,317,862.00 |
Illinois | 16I9181 | Bridge rehab, drainage improvements, pavement removal and replacement, and traffic signal improvements on IL 40 over Bob Michael Bridge at IL River | $21,608,264.00 |
$27,112,486.00 |
Illinois | 1987002 | New I-74 Mississippi River Bridges | $243,904,120.53 |
$272,420,287.76 |
Illinois | 202X000 | Milling/resurfacing and deck replacements on I-55 from 1.3 Mi S of Waggoner to Macoupin Creek, 0.4 Mi S of CH 17 | $24,536,266.00 |
$27,262,520.02 |
Illinois | 2081100 | Pre-construction and construction activities on US 45/La Grange Road from 131st Street to 179th Street. 1.8 miles of additional** | $24,231,153.57 |
$32,886,784.24 |
Illinois | 34FV643 | Bridge replacement of four structures on I-57 in Kankakee County | $22,574,795.00 |
$25,088,206.00 |
Illinois | 3ELT222 | CONSTRUCTION OF A GRADE SEPARATION STRUCTURE TO CARRY FAU 7448 (BRUSH COLLEGE RD.) OVER THE NORFOLK SOUTHERN RAILROAD & FAIRIES PKWY. IN DECATUR. | $62,589,265.00 |
|
Illinois | 47CA169 | Replace four structures within Lincoln Park near Montrose Harbor in the City of Chicago. | $31,425,000.00 |
|
Illinois | 5181057 | MCORE PROJECTS 1, 2 & 3. | $15,705,327.00 |
$26,176,116.00 |
Illinois | 5JZQ983 | CREATE Project P3: Stage II construction of a rail-to-rail flyover and for a rail grade separation CREATE Project GS19 at 71st street. | $85,785,037.00 |
$297,717,362.00 |
Illinois | 6000238 | Undertake access improvements to US.Rte.41, Chicago | $13,600,000.00 |
$30,150,000.00 |
Illinois | 6000325 | FAU 2889/WACKER DR., WACKER DR. @ MONROE TO VAN BUREN. | $82,943,758.95 |
$103,767,063.08 |
Illinois | 6000326 | 130th and Torrence Intersection Improvement, Chicago | $76,606,782.66 |
$141,855,478.60 |
Illinois | 6000418 | The improvement of Bloomingdale Trail, Ridgeway Av. to the Kennedy Expressway | $49,656,683.73 |
$71,628,503.13 |
Illinois | 6000443 | For the improvement of 35th St bicycle & pedestrian bridge over south Lake Shore Drive. | $22,845,000.00 |
$28,556,250.00 |
Illinois | 6000448 | For the improvement of the Adams Street Viaduct over Union Station | $18,155,400.00 |
$42,183,000.00 |
Illinois | 622K195 | Intersection and roadway reconstruction, bridge rehab, lighting and sidewalk on Wood Street, N of Little Calumet River to S of US 6 (159th St) | $32,409,613.50 |
$45,844,819.01 |
Illinois | 64F1960 | Roadway reconstruction and ADA improvements on US 40 from W of Raney St to Banker St in Effingham | $20,055,997.00 |
$25,070,000.00 |
Illinois | 69NC103 | Interchange reconstruction on I-55 from I-80 to US 52 | $20,000,000.00 |
$65,466,095.00 |
Illinois | 6BY3902 | Roadway reconstruction and bridge preservation on I-74 from W of the Tazewell County line to e of the Carlock Interchange. | $52,920,176.01 |
$59,005,011.67 |
Illinois | 6FQN827 | RECONSTRUCTION OF FAU 2755 (80TH AVE.) FROM GREENWAY BLVD. TO TIMBER DR. AND REPLACE THE BRIDGE CARRYING 80TH AVE. OVER I-80. | $19,618,077.00 |
$49,723,996.00 |
Illinois | 6FXA534 | Pavement reconstruction, bridge replacement and widening and lighting on I-80 from Gardner St to Roswell Ave (Group A Structures WB) | $36,492,111.00 |
$43,720,157.00 |
Illinois | 6V3V956 | Roadway reconstruction on I-57 from 0.5 mi N of IL 146 to I-24 | $39,600,000.00 |
$44,000,000.00 |
Illinois | 8012014 | Demo IL416: City of Springfield, IL for improvements to Cockrell Lane; Demo IL512: Improvements to Cockrell Lane in the City of** | $20,830,431.40 |
$26,299,325.65 |
Illinois | 8SAC171 | Rehab project for Jefferson Barracks on I-255 | $21,375,000.00 |
$47,500,000.00 |
Illinois | 9TJY262 | NEW ROADWAY, INTERSECTION RECONSTRUCTION (LONGMEADOW PARKWAY CORRIDOR) | $4,222,377.00 |
$27,777,277.00 |
Illinois | A2HA541 | REPLACE THE STRUCTURES CARRYING FAU 7355 (REAS BRIDGE ROAD) OVER LAKE DECATUR IN THE CITY OF DECATUR. | $3,500,000.00 |
$29,000,000.47 |
Illinois | APXQ831 | Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd to Lake/Madison St in Chicago. | $63,269,788.76 |
$70,548,455.65 |
Illinois | BWWL183 | Construct structure to carry relocated Iron Bridge Rd. over the UP RR, construct two structures to carry UP RR & Interurban Trail over Woodside Rd. | $36,288,483.32 |
|
Illinois | C9B9786 | Reconstruction, designed overlay, bridge deck overlay and repair on I-74 from US 150 W of Danville to Vermilion River in Danville | $62,672,779.00 |
$69,636,424.00 |
Illinois | CLGU392 | Additional lane work with bridge replacement on I-57 over Middle Fork Big Muddy River N of West Frankfurt to 2.5 Mi S of IL 154 | $42,253,518.25 |
$71,592,762.00 |
Illinois | CRP1462 | Single bridge replacement with dual bridges carrying I-270 over the Mississippi River | $198,000,000.00 |
$220,000,000.00 |
Illinois | CW1X704 | Reconstruction and widening of I-80 from Rowell Ave to Gougar Road, including traffic signal modernization, lighting and other improvements | $101,877,000.00 |
|
Illinois | F866342 | Bridge rehabilitation on I-74 over the IC RR/TR 158 and over FAU 7169 (Market St.) in Champaign. | $32,537,559.00 |
$36,152,848.00 |
Illinois | FB4M631 | Reconstruction, ramp modification and retaining walls on I-90/94/290. | $50,298,647.99 |
$56,939,765.12 |
Illinois | FF3X145 | CREATE Project P3: Stage I construction of a rail-to-rail flyover at Forest Hill Junction and for a grade separation at 71st street. | $15,000,000.00 |
$27,800,000.00 |
Illinois | G3Q5348 | Designed overlay with patching, pavement markings, drainage and ITS improvements on I-55 from S of I-80 to S of Weber Road (SB) | $26,773,734.00 |
$27,087,166.00 |
Illinois | GYUQ685 | Resurfacing project with bridge improvements on I-39 from 1 Mi N of IL 116 to 2 MI S of IL 17 | $25,709,179.00 |
$28,565,756.00 |
Illinois | H8EV623 | Rubblization and overlay on I-72 from 4.4 Mi W to 0.3 Mi W of Piatt County Line | $27,451,603.00 |
$30,501,782.00 |
Illinois | HB1K096 | Pavement reconstruction, bridge replacement and widening and lighting improvements on I-80 from IL 53 (Chicago St) to Roswell Ave | $42,357,942.00 |
$47,064,381.00 |
Illinois | HCTJ498 | Reconstruction of the I-39/US 20 Interchange | $97,622,575.00 |
$108,478,381.78 |
Illinois | HJVN698 | RECONSTRUCTION | $22,747,966.79 |
$28,650,326.24 |
Illinois | HTBZ252 | Add dual right turn lanes, roadway reconstruction, superstructure replacement, retaining walls, lighting & traffic signals, at Old Orchard Rd. & I-94. | $17,682,326.00 |
$27,851,819.00 |
Illinois | I4WJ714 | Pavement reconstruction and culvert replacement on I-80 from Ridge Rd to River Rd | $58,690,421.05 |
$65,523,927.96 |
Illinois | IH44562 | Reconstruction with drainage improvements on US 20 from Gear Street to Main Street in Galena | $36,229,402.16 |
$36,254,516.16 |
Illinois | J7VU032 | Reconstruction of the Adams St and Jackson Blvd bridges over I-90/94, includes ramps, retaining walls, and lighting, in Chicago. | $44,058,083.00 |
$49,005,558.00 |
Illinois | J86L198 | CONSTRUCTION OF A GRADE SEPERATED STRUCTURE TO CARRY THE BELT RAILWAY COMPANY OF CHICAGO OVER FAU 3578 (COLUMBUS AVE.) IN CHICAGO. CREATE PROJECT GS11 | $76,000,000.00 |
|
Illinois | K6CZ725 | REPLACE THE STRUCTURE / VIADUCT CARRYING FAU 2885 (CANAL ST.) OVER CHICAGO UNION STATION TRACKS BETWEEN MADISON AND ADAMS ST. IN THE CITY OF CHICAGO. | $30,000,000.00 |
|
Illinois | KC9D768 | Pavement reconstruction and bridge repairs on I-57 from Jefferson County Line to 0.7 Mi N of IL 161 | $67,870,217.00 |
$75,411,353.25 |
Illinois | KENY416 | Bridge replacement, Bridge rehabilitations, Retaining walls, and lighting on The MLK ramps in East St. Louis. | $25,136,277.64 |
$30,519,201.75 |
Illinois | KKGI625 | Bridge rehabilitation on I-180 over the Illinois River. | $26,237,423.50 |
$29,152,694.22 |
Illinois | L3MU512 | Rehab of Reversible Lane Access Control System on I-90/94 at Foster Avenue and Lawrence Avenue to Ohio Street | $31,537,194.00 |
$35,046,686.00 |
Illinois | LPYF801 | Interchange reconstruction and bridge replacement on I-80 at US 30 in the Village of New Lenox. | $48,712,786.00 |
$54,458,468.00 |
Illinois | MAMH434 | Resurfacing and Bridge rehabilitation on I-55 from 0.8 mile N of IL 16 to 0.6 mile N of IL 108. | $31,032,181.33 |
$34,480,201.51 |
Illinois | MID2911 | Interchange rehabilitation and reconstruction at I-57 and I-74 | $80,000,000.00 |
$130,299,740.00 |
Illinois | N60V808 | Roadway reconstruction and bridge repairs on I-55 from 1.7 miles S of IL 116 to 0.6 mile N of IL 23 in Pontiac. | $39,452,582.65 |
$43,850,609.42 |
Illinois | N8RC715 | Designed overlay on US 51 from Dewitt County Line to 0.1 mi N of Forsyth Road | $23,472,000.00 |
$29,340,000.00 |
Illinois | NI5S589 | NEW CONSTRUCTION, RECONSTRUCTION, NEW BRIDGE | $5,000,450.00 |
$49,068,150.00 |
Illinois | NUW3186 | 43rd Street Pedestrian Bridge over Metra and South Lake Shore Drive | $29,600,000.00 |
$37,000,000.00 |
Illinois | NWQA467 | Widening, resurfacing, lighting, and retaining walls on I-90 fron Cumberland Ave to Harlem Ave in Chicago. | $47,019,728.16 |
$57,457,326.39 |
Illinois | PW2V306 | RECONSTRUCTION | $23,248,831.00 |
$42,993,892.00 |
Illinois | Q8NN046 | Resurfacing on I-74/IL 110 from N of Woodhull to N of US 34 | $23,400,000.00 |
$26,000,000.00 |
Illinois | R0J4100 | Concrete overlay, patching, deck replacement and expansion joints on I-55/I-64, Poplar Street Collector-Distributor ramps | $29,546,377.00 |
$32,829,306.00 |
Illinois | RTYU738 | Resurfacing and bridge repairss at various locations on I-55 from S of Bus 55 to N of IL 10, west of Lincoln. | $23,153,391.70 |
$25,895,986.00 |
Illinois | SBVK122 | Roadway reconstruction on IL 79 from 0.5 Mi E of IL 126 to W of Orchard Road W of Oswego | $28,388,024.00 |
$35,493,338.00 |
Illinois | SQHC418 | Roadway reconstruction and bridge rehabilitation on I-64 from Washington County Line to I-57 | $93,133,027.00 |
$103,481,144.00 |
Illinois | T8V5526 | Reconstruction, superstructure replacement, culvert (new), drainage, lighting and traffic signals on I-80 from Houbolt Rd to Joliet Junction Trail | $59,000,000.00 |
|
Illinois | TJQZ898 | 1.55 miles interchange reconstruction & additional lanes I-55 at Weber Road and 1.6 M recon Weber Road from Normantown Rd to Rodeo Dr. | $39,536,657.00 |
$53,708,837.00 |
Illinois | TRTJ747 | Pump station reconstruction on I-290 at the DesPlaines River in the Village of Forrest Park. | $53,454,760.75 |
$53,454,760.75 |
Illinois | UH3A902 | Bridge deck overlay and joint repair, patching, sign replacement and lighting on I-90 from I-94(Edens Expwy) to Hubbard St (Express/Reversible Lanes) | $67,334,194.00 |
$78,351,874.00 |
Illinois | UI98917 | Resurfacing and bridge rehabilitation on I-255 from IL 15 to collinsville Road in East St. Louis. | $66,666,043.00 |
$74,073,382.00 |
Illinois | V02M043 | County Line Road, I-294 to North Avenue | $23,921,870.00 |
$29,902,337.51 |
Illinois | V5RS781 | Bridge replacement, new bridge construction and pavement reconstruction on I-80 from River Road to Houbolt Road | $94,148,000.00 |
|
Illinois | VDCD210 | Interchange reconstruction and bridge replacement reconstruction on I-57 at I-74 Interchange | $124,739,991.00 |
$138,599,992.00 |
Illinois | VMQP214 | Designed overlay with bridge repairs on I-80 from Henry County Line to 0.5 mi E of IL 40 | $34,307,898.25 |
$38,119,889.06 |
Illinois | VQ14255 | Bridge replacement/rehabilitation, reconstruction, retaining walls at various locations on I-90/94 from SB taylor exit ramp to EB Taylo exit ramp. | $71,552,443.45 |
$80,087,903.94 |
Illinois | W166112 | Designed overlay with pavement markings, drainage, ITS and landscaping improvements on I-55 from S of I-80 to S of Weber Road (NB) | $26,555,512.00 |
$26,868,944.00 |
Illinois | W46U596 | Lakefront Bicycle Trail #3 over the Chicago River | $29,820,000.00 |
$50,598,000.00 |
Illinois | W793945 | Roadway reconstruction and bridge replacement on US 20 from Simson Road to Rock River and S of Southrock Dr to S of US 20 in Rockford. | $22,196,891.00 |
$27,819,048.00 |
Illinois | X0VJ339 | Chester Bridge Replacement IL 150 | $260,052,000.00 |
|
Illinois | X5LE481 | NEW ROADWAY AND BRIDGE CONSTRUCTION | $32,000,000.00 |
$45,000,000.00 |
Illinois | X8AF608 | RECONSTRUCTION OF FAU 3533 (FRANKLIN AVENUE) FROM RUNGE ST. TO MANNHEIM RD. | $22,511,723.00 |
$28,146,404.00 |
Illinois | XBRG797 | Rubblization and overlay with culvert removal and replacement and bridge deck replacement on I-70 from 1 Mi E of I-57 Intchg to Cumberland County Line | $49,774,242.92 |
$55,304,717.14 |
Illinois | XIL3358 | Standard Overlay, Resurfacing, Rest Area Improvements, Weigh Station Repairs, and Bridge Deck Sealing on I-57 from Kankakee Co Rd to Steger Rd | $41,843,831.40 |
$46,722,371.00 |
Illinois | XPV5974 | Resurfacing and bridge rehabilitation on I-70 from W of Sugar Loaf Rd to the BNSF railroad. | $26,718,410.86 |
$30,163,716.10 |
Illinois | Y4TH575 | Bridge rehabilitation on I-74/IL 29 (Murray Baker Bridge) over the Illinois River in Peoria. | $37,070,509.00 |
$45,965,496.00 |
Illinois | YA23869 | Patching, resurfacing and bridge repairs on I-24 from Johnson County Line to Ohio River | $27,622,633.20 |
$30,691,817.73 |
Illinois | YJLB572 | Removal and replacement of concrete bridge deck and resurfacing on I-280 from the Mississippi River Bridge to east of the IL 92 interchange | $30,593,481.00 |
$52,818,817.00 |
Illinois | YQT9213 | Standard overlay resurfacing and various bridge repairs on I-70/ 270 from I-55 to 2.5 miles east of the I-55/70/270 interchange | $24,970,789.19 |
$27,765,321.33 |
Illinois | YRP3905 | Bridge replacement on US 150 (McClugage Bridge) over the Illinois River in Peoria. | $144,184,306.00 |
$185,853,828.00 |
Illinois | ZDW0068 | Standard overlay, Class A patching, drainage, ITS improvements and bridge deck sealing on I-57 from S of I-294 (Tri-State Tlwy) to IL 1 (Halstad St) | $34,096,996.00 |
$37,895,552.00 |
Illinois | ZEC3030 | Widening, reconstruction, bridge
replacement, and retaining walls on I-290/Congress Pkwy (Jane Byrne Intchg(EB
ramp to I-90/94 (NB). |
$38,506,218.67 |
$43,080,093.71 |
Illinois | ZZKI017 | Lake Cook Road, Raupp Boulevard to Hasting Lane | $19,973,978.84 |
$27,611,430.05 |