RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
New York | NY 112 RECONS BETWEEN I-495(LIE) AND GRANNY ROAD | $32,490,601.00 |
$39,208,126.00 |
|
New York | SMITHTOWN:RECONSTRUCTION OF ROUTE 347 FROM TERRY ROAD TO GIBBS POND ROAD. | $30,497,801.00 |
$37,508,188.00 |
|
New York | SMITHTOWN:RECONSTRUCT ROUTE 347 FROM ROUTE 111 TO MOUNT PLEASANT ROAD. | $18,837,225.00 |
$32,046,532.00 |
|
New York | BROOKHAVEN:ROUTE 347 & ROUTE 112 INTERSECTION RECONSTRUCTION. | $22,124,679.00 |
$38,399,446.00 |
|
New York | RECONSTRUCT NY 347 FROM GIBBS POND ROAD TO HALLOCK ROAD | $64,871,544.00 |
$79,952,032.72 |
|
New York | I495/CROOKED HILL RD INTRCHNG CONST | $24,311,883.00 |
$37,054,138.00 |
|
New York | I495 PAVEMENT REHAB NASS LINE TO EXIT 55 | $24,642,324.00 |
$39,585,726.00 |
|
New York | I495 Pavement Resurfacing Exit 55 to Exit 64 | $43,400,357.00 |
$48,222,620.00 |
|
New York | NORTH HEMPSTEAD AND ROSLYN:THE ROSLYN VIADUCT ON STATE ROUTE 25A OVER HEMPSTEAD HARBOR FOR BRIDGE REPLACEMENT. | $63,725,107.00 |
$79,656,384.00 |
|
New York | SSP Pavement Resurfacing Exit 20 to Exit 32 | $22,255,154.00 |
$27,818,944.00 |
|
New York | NASSAU COUNTY BRIDGE REHAB | $7,361,840.00 |
$29,700,001.00 |
|
New York | HOSP RD/NY27 BRID WIDEN & INTERSECT IMPROV - CONST | $19,663,954.00 |
$26,312,338.00 |
|
New York | WALT WHITMAN RD OVER I495 BRIDGE WIDENING | $24,258,614.29 |
$30,323,268.29 |
|
New York | HEMPSTEAD:REPAIRS ON TWO DRAW BRIDGES, MEADOWBROOK STATE PARKWAY OVER SLOOP CHANNEL AND LOOP PARKWAY OVER LONG CREEK. | $20,473,758.00 |
$27,605,074.00 |
|
New York | RT. 7 OVER THE HUDSON RIVER, BRIDGE REPAIR | $25,732,635.00 |
$32,315,797.00 |
|
New York | COLONIE:INTERSTATE 87 EXIT 4 ACCESS IMPROVEMENTS (PHASE 1) I-87 OVER ALBANY SHAKER RD-PAVEMENT RECONSTRUCTION & BRIDGE REPLACEMENT | $22,580,577.00 |
$25,389,497.00 |
|
New York | I-87: EXIT 4, AIRPORT CONNECTOR, PART2 | $34,440,343.00 |
$38,317,048.00 |
|
New York | UTICA:ROUTES 5, 8, & 12/NORTH SOUTH ARTERIAL & VIADUCT FROM BURRSTONE ROAD TO ORISKANY CIRCLE FOR RECONSTRUCTION. | $54,772,250.00 |
$68,465,313.00 |
|
New York | UTICA:ROUTES 5A & 5S FROM CAR CRAFT COLLISION TO PLATT ST-SEPARATE SANITARY SEWER FROM STORM SEWER. | $19,993,060.00 |
$25,053,826.00 |
|
New York | I-81 VIADUCT - I-481 CONVERSION TO I-81 NORTH OF KIRKVILLE RD | $20,720,000.00 |
$296,386,501.00 |
|
New York | I-81 VIADUCT - I-481 CONVERSION TO I-81 SOUTH OF KIRKVILLE RD | $292,568,442.00 |
$384,516,115.00 |
|
New York | I-81 VIADUCT - BL 81 NORTHERN SECTION PHASE 1 | $121,481,113.00 |
||
New York | SYRACUSE:INTERSTATE 690 OVER TEALL AVENUE AND BEECH STREET-BRIDGE REPLACEMENT PROJECT. | $67,257,000.00 |
$74,730,000.00 |
|
New York | RT 104 FROM RIDGEWAY AVE TO CULVER RD | $27,321,430.00 |
||
New York | I390/490 NORTHBOUND RAMPS REALIGNMENT | $53,678,092.00 |
$61,012,624.00 |
|
New York | I-390 from Rt 20A (Exit 8 - Geneseo) To Exit 10 (Avon | $9,021,006.00 |
$29,288,812.00 |
|
New York | RT 19 AND RT 98 OVER ERIE CANAL LIFT BRIDGE REHAB | $6,427,455.00 |
$29,557,974.00 |
|
New York | I-86/CHAUTAUQUA LAKE; BRIDGE REHAB | $5,437,373.00 |
$86,041,526.00 |
|
New York | BUFFALO:NY GATEWAY CONNECTIONS IMPROVEMENT TO THE US PEACE BRIDGE PLAZA. | $46,087,513.00 |
$66,198,804.00 |
|
New York | BRIDGE REPLACEMENT, NY Route 12E over Chaumont River | $27,763,102.00 |
$28,123,102.00 |
|
New York | WARWICK:ROUTE 17 EXIT 122 INTERCHANGE RECONSTRUCTION. | $39,617,125.00 |
$81,971,616.00 |
|
New York | ROUTE 17 @ ROUTE 32 (EXIT 131) INTERCHANGE RECONSTRUCTION TOWNS OF MONROE AND WOODBURY ORANGE COUNTY. NY DEMO #583 | $113,157,814.00 |
$142,642,639.00 |
|
New York | 801846 - ROUTE 28 / ESOPUS CREEK-BRIDGE REPLACEMENT - BIN 1091290, CIN C870151 | $20,837,454.00 |
$26,054,894.00 |
|
New York | DEERPARK:INTERSTATE 84 OVER THE DELAWARE RIVER BETWEEN NEW YORK AND PENNSYLVANIA AND COUNTY ROUTE 16 FOR BRIDGE REHABILITATION. | $29,316,541.00 |
$47,201,137.00 |
|
New York | WESTCHESTER COUNTY BRIDGES: HRP, SMRP, ROUTE 1 | $92,932,000.00 |
$121,852,241.00 |
|
New York | TACONIC STATE PARKWAY @ PUDDING STREET INTERCHANGE, NEW GRADE SEPARATED INTERCHANGE, TOWN OF PUTNAM VALLEY PUTNAM COUNTY | $25,271,363.00 |
$32,453,463.00 |
|
New York | ROUTE 9W: SEVEN BRIDGE REPLACEMENTS AND REHABILITATIONS IN THE TOWNS OF HIGHLANDS, CORNWALL, AND NEW WINDSOR, ORANGE COUNTY | $23,580,000.00 |
$29,475,000.00 |
|
New York | WHITE PLAINS:INTERSTATE 287/CROSS WESTCHESTER EXPRESSWAY INTERCHANGE 8 AT WESTCHESTER AVENUE FOR INTERCHANGE RECONSTRUCTION. | $15,520,044.00 |
$65,776,634.00 |
|
New York | I-287 BRIDGE DECK REPLACEMENTS OVER MIDLAND AVE AND METRO-NORTH RAILROAD, CITY OF RYE, WESTCHESTER CO. | $27,343,363.00 |
$30,381,516.00 |
|
New York | WURTS STREET / DOCK STREET & RONDOUT CREEK | $51,540,670.00 |
$54,440,670.00 |
|
New York | BRIDGE REHABILITATION: SIX BRIDGES IN WESTCHESTER COUNTY. | $22,446,847.00 |
$28,090,237.00 |
|
New York | BRIDGE REHABILITATION/REPLACE: WESTCHESTER COUNTY | $19,943,281.00 |
$33,844,144.00 |
|
New York | I-684 PMI PAVING: HUTCHINSON RIVER PARKWAY TO ROUTE 172 OVERPASS, TOWN OF BEDFORD, WESTCHESTER COUNTY | $26,384,140.00 |
$29,319,932.00 |
|
New York | Lower Hudson Transit Link (8823.50 & 8823.51) | $70,987,368.00 |
$119,616,998.00 |
|
New York | ROCKLAND AND WESTCHESTER COUNTIES:TAPPEN ZEE BRIDGE OVER THE HUDSON RIVER FOR BRIDGE REPLACEMENT (DESIGN/BUILD CONTRACT). | $3,216,685,500.00 |
||
New York | RT 17 INTERCHANGE 105 RECONSTRUCTION AND RT 42 IMPROVEMENTS | $23,899,455.23 |
$30,255,619.23 |
|
New York | RTE.434 GREENWAY: PENNSYLVANIA AVENUE TO MURRAY HILL ROAD | $19,479,630.00 |
$27,619,539.00 |
|
New York | LIBERTY:ROUTE 17 @ PARKSVILLE BETWEEN MORRSTON EB ENT RAMP & FOX MOUNTAIN RD END 2 KM E OF COOLEY RD FOR RECONSTRUCT & NEW CONST. | $59,444,048.00 |
$96,596,293.00 |
|
New York | RT 17 APALACHIN TO BROOME COUNTY LINE, CRACK & SEAT, TIOGA COUNTY | $34,413,016.00 |
$57,666,719.00 |
|
New York | I-88 PAVEMENT & BRIDGE PROJECT, OTSEGO AND SCHOHARIE COUNTIES | $45,917,313.00 |
$51,019,239.00 |
|
New York | I-88 EXIT 17 TO 18, CRACK & SEAT | $31,827,708.00 |
$37,014,123.00 |
|
New York | BINGHAMTON:INTERSTATE 81/ROUTE 17 INTERCHANGE RECONSTRUCTION (PROSPECT MOUNTAIN PHASE 2) RECONST INTERCHANGE 4, INCL NEW BRIDGES, | $23,444,954.00 |
$167,243,863.00 |
|
New York | 950124 - I81, EXIT 7 TO CORTLAND COUNTY LINE, MILLING AND RESURFACING | $21,418,673.25 |
$25,017,869.00 |
|
New York | NEW YORK CITY:VARIOUS HIGHWAYS IN THE VICINITY OF THE WORLD TRADE CENTER FOR AN ER PROJECT (9/11/2001 ATTACK). | $97,604,976.00 |
$97,604,976.00 |
|
New York | NEW YORK CITY (BROOKLYN):REPLACEMENT OF THE BELT PARKWAY BRIDGE OVER MILL BASIN IN BROOKLYN, NY TO BRING TO A STATE OF GOOD REPAIR | $174,589,918.00 |
$296,237,398.00 |
|
New York | NEW YORK CITY:REHABILITATION OF THE BELT PARKWAY BRIDGE OVER GERRITSON INLET. | $84,883,281.00 |
$106,104,105.00 |
|
New York | BRONX RIVER GREENWAY SEGMENT PHASE 2 | $29,875,863.00 |
$37,344,830.00 |
|
New York | Rehab of 7 Grand Central Parkway Bridges, Queens County - Design Build | $138,576,279.00 |
||
New York | KGI INFRASTRUCTURE & OPERATIONAL IMPROVEMENT IN QUEENS CO. | $4,624,336.00 |
$365,706,001.00 |
|
New York | NEW YORK CITY:RECONSTRUCT THE HARLEM RIVER DRIVE VIADUCT BETWEEN E 125th & E 132nd ST INCLUDE CONST OF ENTRANCE RAMP FROM 3rd AVE ONTO SOUTHBOUND HRD. | $72,857,883.00 |
$108,306,433.00 |
|
New York | REPLACEMENT OF BRONX RIVER PARKWAY BRIDGES OVER MNRR, BRONX CO. (BINS 1075049 & 1075059) | $62,932,000.00 |
$78,665,001.00 |
|
New York | Replacement of Bronx River Parkway Bridge over Amtrak/CSX Railroad, Bronx County | $87,425,290.00 |
$147,966,213.00 |
|
New York | Bronx River Parkway: REPLACEMENT OF 2 BRIDGES OVER E TREMONT AVE AND MTA YARD, BRONX COUNTY | $354,302,788.00 |
||
New York | MOBILITY IMPROVEMENT ON LIE EB B/T CLEARVIEW EXPWY & SPRINGFIELD BLVD, REPLACEMENT OF OCEANIA ST BRIDGE OVER LIE IN QUEENS COUNTY, NYC (BIN: 1055300) | $67,765,170.00 |
$88,327,758.00 |
|
New York | REPLACEMENT OF EAST 138TH STREET BRIDGE OVER MAJOR DEEGAN EXPRESSWAY | $40,433,862.00 |
$52,860,002.00 |
|
New York | Rehab of Major Deegan Expy Between W.161st St & Highbridge Interchange (BINS 1067451, 1066840) & Depot Pl Bridge Rehab over MDE (BIN 1067452) in Bronx | $114,254,833.00 |
$131,115,051.00 |
|
New York | NEW YORK CITY:REHAB 3 BRIDGES ALONG THE CROSS BRONX EXPRESSWAY HIGH-BRIDGE INTERCHANGE. | $45,350,697.00 |
$84,509,372.00 |
|
New York | REPLACEMENT OF RAMP OCH, SHERIDAN BLVD. NORTH TO CBE WEST | $40,915,929.00 |
$55,164,912.00 |
|
New York | NEW YORK CITY:KOSCIUSZKO BRIDGE REPLACEMENT - Phase II. | $351,382,006.00 |
$357,780,360.00 |
|
New York | BRUCKNER EXPWY-HUTCHINSON PKWY MOBILITY IMPROVEMENT PROJECT, BRONX CO., NYC | $20,633,360.00 |
$38,841,023.00 |
|
New York | REHABILITATION OF BRUCKNER BLVD VIADUCT (278I). BRONX, NYC | $32,752,000.00 |
$209,100,000.00 |
|
New York | BRIDGE REHABILITATION OF BRUCKNER EXPRESSWAY (I-278) OVER ROSEDALE AVENUE, BRONX COUNTY | $46,396,800.00 |
$52,411,000.00 |
|
New York | GOWANUS EXPRESSWAY STEEL REPAIRS & RAMP D DECK REPLACEMENT, KINGS COUNTY | $28,725,858.00 |
$32,472,621.00 |
|
New York | HUNTS POINT TRUCK ACCESS IMPROVEMENT PROJECT PHASE 1, BRONX CO. NYC | $331,874,646.00 |
$571,215,162.00 |
|
New York | HUNTS POINT INTERSTATE ACCESS IMPROVEMENT PROJECT, CONTRACT 3, BRONX COUNTY | $44,360,980.21 |
$458,164,897.00 |
|
New York | REHABILITATION OF THE WOOLLEY AVE AND BRADLEY AVE BRIDGES OVER STATEN ISLAND EXPRESSWAY IN RICHMOND COUNTY, NY | $11,076,646.00 |
$32,790,856.00 |
|
New York | Gowanus Expressway Viaduct Painting and Steel Repairs, Kings County, NYC | $71,004,032.00 |
$179,238,040.00 |
|
New York | NYC:REPL OF VAN WYCK EXPWY VIADUCTS AT THE KGI, NB VAN WYCK EXPWY/ GRAND CENTRAL PKWY, UNION TPKE & JACKIE ROBINSON PKWY. | $109,009,471.00 |
$138,658,347.00 |
|
New York | VAN WYCK EXPRESSWAY VIADUCT REHABILITATION, QUEENS COUNTY | $122,861,857.79 |
$133,064,009.00 |
|
New York | X73584 - (DB CONTRACT 3) VAN WYCK EXPRESSWAY CAPACITY IMPROVEMENTS | $523,149,654.00 |
$815,463,265.00 |
|
New York | NEW YORK CITY:WILLIS AVENUE OVER THE HARLEM RIVER FOR BRIDGE REPLACEMENT. | $217,541,858.00 |
$538,557,994.00 |
|
New York | BROADWAY BRIDGE REHABILITATION (2240137) | $88,720,000.00 |
$110,900,000.00 |
|
New York | MADISON AVE. BRIDGE REHAB (BIN 2240079) | $21,400,000.00 |
$30,353,000.00 |
|
New York | NEW YORK CITY (QUEENS):ROOSEVELT AVENUE OVER THE VAN WYCK EXPRESSWAY/INTERSTATE 678 FOR BRIDGE REHABILITATION. | $53,333,335.00 |
$70,266,669.00 |
|
New York | NYC, ER EVENT 01-02, SEPTEMBERR 11, 2001, RECONSTRUCTION OF WORTH ST, HUDSON ST. TO EAST BROADWAY | $12,000,000.00 |
$95,000,000.00 |
|
New York | ER EVENT NY2001-02, 9/11, NYC, MANHATTAN RECONSTRUCTION OF WARREN AND JOHN STREETS. | $11,300,000.00 |
$30,700,000.00 |
|
New York | NEW YORK CITY:ROUTE 9A WEST STREET PROMENADE - SITE PROJECT FOR RECONSTRUCTION. | $105,415,792.00 |
$119,050,170.00 |
|
New York | NEW YORK CITY:ROUTE 9A NORTH AND WEST PROMENADE PROJECT EXTRA TASKS FOR CONSTRUCTION INSPECTION AND CONSTRUCTION SUPPORT SERVICES. | $38,781,817.00 |
$38,781,817.00 |
|
New York | IMPLEMENT PHASE FOUR OF GRAND CONCOURSE SAFETY IMPROVEMENTS | $18,456,401.00 |
$60,566,864.00 |
|
New York | REHAB BROOKLYN BRIDGE, MANHATTAN APPROACHES (CONTRACT 7) | $58,987,703.13 |
$159,040,843.00 |
|
New York | REHABILITATE THE MANHATTAN APPROACHES TO THE BROOKLYN BRIDGE IN NY COUNTY | $39,200,000.00 |
$41,263,158.00 |
|
New York | TMC OPERATIONAL SUPPORT FOR FFY 19 | $36,250,000.00 |
$62,556,415.00 |
|
New York | PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES | $16,038,203.30 |
$25,444,626.00 |
|
New York | WILLIAMSBURG BRIDGE REHABILITATION CONTRACT # 9 (BIN2240039), NEW YORK COUNTY | $134,072,000.00 |
$196,085,937.00 |
|
New York | PREVENTIVE MAINTENANCE INITIATIVE FOR THE EAST RIVER BRIDGES | $26,402,880.00 |
||
New York | NEW YORK CITY:GRAND CONCOURSE IMPROVEMENTS FROM EAST 166th STREET TO EAST 171st STREET. | $19,894,600.00 |
$26,176,750.00 |
|
New York | NYC:REPLACEMENT OF CITY ISLAND ROAD BRIDGE OVER EASTCHESTER BAY WITH A SINGLE SPAN CABLE-STAYED STRUCTURE. | $99,612,848.00 |
$124,516,060.00 |
|
New York | NEW YORK CITY:UNIONPORT BRIDGE REPLACEMENT | $148,897,916.00 |
$219,825,398.00 |
|
New York | NEW YORK CITY:REHABILITATION OF ATLANTIC AVENUE BRIDGE | $31,734,325.00 |
$71,648,780.00 |
|
New York | REHABILITATE RIVERSIDE DRIVE BRIDGE/W 158TH STREET (2246720) | $53,333,600.00 |
$82,758,144.00 |
|
New York | NEW YORK CITY:REHABILITATE THE WESTCHESTER AVENUE BRIDGE OVER THE HUTCHINSON RIVER PARKWAY. | $34,859,000.00 |
$45,408,750.00 |
|
New York | REHABILITATION MANHATTAN BRIDGE STRUCTURAL COMPONENTS (2240028) | $37,336,000.00 |
$73,019,628.00 |
|
New York | NEW YORK CITY:THE MACOMBS DAM BRIDGE OVER THE HARLEM RIVER FOR BRIDGE REHABILITATION. | $32,109,825.00 |
$49,652,282.00 |
|
New York | BROOKLYN WATERFRONT GREENWAY GOWANUS CONNECTOR | $30,948,284.00 |
||
New York | SAFETY IMPROVEMENTS ON 4TH AVENUE IN BROOKLYN (REPURPOSED EARMARK NY650 - PROGRAM CODE RPS9) | $15,774,175.00 |
$50,677,414.00 |
|
New York | RECONSTRUCTION OF TILLARY STREET (PHASE 2) (BROOKLYN), NEW YORK CITY. | $14,667,000.00 |
$41,600,000.00 |
|
New York | RECONSTRUCTION OF 5TH AVENUE BRIDGE OVER LIRR & SEA BEACH (Bridge NY), KINGS COUNTY | $50,802,516.00 |
||
New York | EMERGENCY RELIEF NY2013-01, HURRICANE SANDY, NYCDOT (QUEENS COUNTY) PERMANENT FLOOD REPAIRS TO METROPOLITAN AVE BRIDGE BY CONTRACT | $22,600,000.00 |
$28,250,000.00 |
|
New York | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO MOVEABLE BRIDGES BY CONTRACT FORCES. | $41,673,232.00 |
$52,091,540.00 |
|
New York | ER EVENT NY 13-01, HURRICANE SANDY, NYCDOT PERMANENT REPAIRS TO BATTERY PARK AND WEST STREET UNDERPASSES BY CONTRACT FORCES. | $53,418,887.00 |
$66,773,609.00 |
|
New York | Flood Mitigation Improvements for Battery Park and West Street Underpasses in Manhattan- ER Event #NY 1301 | $36,373,971.00 |
$45,467,464.00 |
|
New York | LIE Active Traffic and Demand Management, I-495 between Queens-Midtown Tunnel and Main Street, Queens County | $18,052,572.00 |
$27,582,000.00 |
|
New York | NEW YORK CITY:BRIDGE CORRECTIVE MAINTENANCE AT VARIOUS LOCATIONS. | $26,323,738.00 |
$71,485,914.00 |
|
New York | BRIDGE EXPANSION JOINTS REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN NYC | $23,289,640.00 |
$31,963,325.00 |
|
New York | FDR Drive Cleaning and Painting - South Street, NY, NY | $4,122,656.00 |
$38,123,007.00 |
|
New York | RETAINING WALL REHABILITATION & CORRECTIVE MAINTENANCE, ALL COUNTIES, NYC | $19,050,967.00 |
$31,008,207.00 |
|
New York | BRIDGE PAINTING AT VARIOUS LOCATIONS IN BRONX, KINGS, QUEENS, AND RICHMOND COUNTIES, NYC | $18,764,261.00 |
$43,729,045.00 |