RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Virginia | Statewide | $10,599,950.08 |
$37,826,697.13 |
|
Virginia | Statewide ATMS FY17-20; Sole Source | $195,916.00 |
$29,845,582.00 |
|
Virginia | Statewide ITS maintenance | $9,433,082.00 |
$50,118,727.00 |
|
Virginia | Statewide Transportation Operations Center for Safety Services Patrol Program - Eastern, Central, Northern, Northwest and Southwest Regional Offices | $50,185,098.97 |
$256,289,578.00 |
|
Virginia | Statewide - I-95 Express Lanes Extension Exit 160 to Exit 133 | $40,000,000.00 |
$50,000,000.00 |
|
Virginia | Accomack Co, State Rte 175: Bridge over Black Narrows, Chincoteague, & Lewis Creek Channels -- Bridge Replacement (1 of 2 fed #) | $54,809,537.00 |
$75,645,366.00 |
|
Virginia | Decel/Accel Lane w/Bridges | $70,191,220.00 |
||
Virginia | BUCHANAN COUNTY | $147,776,624.10 |
$178,879,832.00 |
|
Virginia | Buchanan Co; Rt 460 Connector Phase II FR: Rt. 460 Conn Phase I Approx 7 Mi to Rt 121/460 Connection; Design-Build to Rough Grade | $108,817,409.00 |
$120,000,000.00 |
|
Virginia | Buchanan County; Route 460; Corridor Q - 460 Connector Phase II Finish Grade | $24,672,344.00 |
$33,810,731.00 |
|
Virginia | CFX - Poplar Creek Phase B - VDOT Oversight and RW Acq. Cost | $13,349,796.00 |
$25,099,684.00 |
|
Virginia | Buchanan County; Route 460 (Coalfield Expressway); Poplar Creek Phase B | $171,299,543.00 |
||
Virginia | City of Chesapeake: rte 13 - 0.417 Mi W - 0.356 Mi E of Gilmerton Bridge Bridge Replacement | $133,825,981.00 |
$166,271,747.00 |
|
Virginia | Culpeper District - Design Build for CONST INTERCHANGE U.S. RTE 15/17/29 AT U.S. RTE 15/17/29 BUS | $9,083,854.92 |
$36,005,329.83 |
|
Virginia | Hampton City, I-64: From: Rte 143 To: Rte 199; PE for capacity improvements from Newport News to Williamsburg; also design-build | $57,817,215.75 |
$138,003,915.26 |
|
Virginia | Chesapeake City, I-64; From I-464 to I-664/I-264; Design-Build for Southside widening - including high rise bridge. | $40,837,945.00 |
$558,139,606.00 |
|
Virginia | Hampton Roads Districtwide capacity improvements | $118,022,660.00 |
$261,874,144.00 |
|
Virginia | Henrico County; I-64 | $30,804,281.24 |
$74,343,299.07 |
|
Virginia | City of Newport News-Replace Denbigh Blvd Bridge i-64 and CSX Railroad. | $18,676,601.00 |
$29,529,369.00 |
|
Virginia | Henrico County-RTE 64 replace bridges over RTE 156. | $6,917,053.70 |
$31,637,013.00 |
|
Virginia | I-64/I-464 INTERCHANGE Exit 291 Ramp Improvements | $43,688,871.00 |
$180,862,923.00 |
|
Virginia | Hampton Roads Express Lanes, Segment 1A | $61,784,784.91 |
$197,612,207.00 |
|
Virginia | City of Hampton; I-64; Hampton Roads express lanes, segment 4C - Phase 1 PE; | $429,754,878.00 |
||
Virginia | I-64 Widening- Segment A | $8,640,960.00 |
$277,828,079.00 |
|
Virginia | Capital Beltway HOT Lanes Project, Route 66 & 495 Access Improvement & Flyover & Pavement Rehab & Other CN | $103,860,943.00 |
$1,792,214,461.00 |
|
Virginia | Prince William Co.- Fr: Rt1 15 To: I-66 DESIGN BUILD to reconstruct interchange at Rt 15 and I-66 | $36,381,671.74 |
$66,407,816.52 |
|
Virginia | NORTHERN VIRGINIA | $42,320,173.93 |
$153,063,015.71 |
|
Virginia | MONTGOMERY COUNTY | $48,307,190.12 |
$60,095,798.00 |
|
Virginia | SB MM 8.1 WIDEN TO THREE LANES | $32,838,627.00 |
||
Virginia | Roanoke County, I-81; NB auxilary lane | $7,844,463.81 |
$31,473,308.56 |
|
Virginia | #SMART18 - I-81 SB Auxiliary Lane from Exit 143 to 141 | $1,652,450.00 |
$47,892,990.00 |
|
Virginia | North Bound & South Bound I-81 Mile Marker 221 to 225, 3-Lane Wideing | $140,523,329.00 |
||
Virginia | Roanoke County: I-81;Corridor Improvement Plan (CIP) ADD LANE IN EACH DIRECTION (ID #39) | $227,671,728.00 |
||
Virginia | Montgomery Co. Fr I81 SB over Rte 8 PE for Rte 81 -SBL Bridge Over Route 8 | $31,045,852.00 |
$34,014,401.00 |
|
Virginia | Warren Co;Rte 340; Fr: .105 Mi. S.Int. 18th St. To: .115 Mi. N. Int. Rte 55;Bridge replacement & approac over South Fork Shenandoah | $46,336,492.71 |
$55,085,896.14 |
|
Virginia | Northern Virginia Region - I95 HOV/HOT Lanes; I95 HOV/HOT Lanes Debt Service | $81,624,859.44 |
$110,089,071.24 |
|
Virginia | STAFFORD COUNTY | $63,560,472.13 |
$232,355,064.22 |
|
Virginia | I-95 Rappahannock River Crossing - Northbound | $41,201,366.00 |
$127,000,000.00 |
|
Virginia | #SMART20 - Progress Park Connector | $2,500,000.00 |
$38,835,437.14 |
|
Virginia | I-264/Witchduck Road interchange and ramp | $23,707,384.00 |
$126,028,464.00 |
|
Virginia | Elizabeth River Crossings I-264 Noise Barriers | $31,865,040.00 |
||
Virginia | I-395 Design Build | $87,093,966.00 |
$602,647,237.00 |
|
Virginia | Buchanan Co Rte 460 Connector Phase 1-KY State Line approx 1 mile to Rte 460 Connector Phase II=Design Build PE, RW, CN | $98,959,280.00 |
$129,218,501.26 |
|
Virginia | DESIGN BUILD PROJECT FOR 29 SOLUTIONS PROJECTS | $90,746,013.55 |
$185,572,992.00 |
|
Virginia | #SGR19LB - RT 20 - BRIDGE REPLACEMENT | $1,207,494.00 |
$31,088,610.00 |
|
Virginia | Culpeper District: Hydraulic Road and Route 29 | $23,899,259.00 |
$29,518,719.00 |
|
Virginia | City of Fredericksburg-I95 Southbound-Rappahannock River Crossing | $85,587,857.00 |
$146,212,597.20 |
|
Virginia | Lynchburg - 1.6 Mi W, to: 0.6 Mi W Rte 501 - DB: extend OddFellows Rd to new intrchnge w/ Rte 29/460 & related options on Odd F.Rd | $24,845,708.05 |
$48,627,369.08 |
|
Virginia | Botetourt County – Fr South of Int. Rte 43 To Int. Rte 727; PE, RW, CN for Route 220 Reconstruction and Safety – Ph. 1, 2, & 3 | $78,025,833.03 |
$80,450,448.00 |
|
Virginia | Frederick County - Route 277 - Widen to 5 lanes | $11,794,740.15 |
$58,757,386.73 |
|
Virginia | Montgomery Co; Rte 460; Fr: .156 Mi. W. Int. Southgate Dr To: .799 Mi. E. Int. Southgate Dr.; CN: Interchange & Connector | $31,291,811.20 |
$44,596,240.00 |
|
Virginia | NORTHERN VA DISTRICTWIDE: FR: ROUTE 28 TO: POLAND ROAD - CN for 6-LANE WIDENING- DESIGN BUILD | $38,228,546.00 |
$94,912,504.00 |
|
Virginia | City of Norfolk: Rte 337- Fr. 0.005 KM N Rogers Ave - 0.011 KM S "B" Ave Reconstruction | $27,543,727.00 |
$66,639,279.00 |
|
Virginia | Loudoun Co. - From Old Ox Road, Rt. 621 to Rt. 267, All phases Rte 606,, Dulles Loop. Design Build | $23,263,136.00 |
$118,470,918.00 |
|
Virginia | Fredericksburg Dist.; D-B job on Fall Hill Ave., 0.12 mi W of Gordon Shel. Blvd. to Int. of Mary W.Blvd. & Rte.1, incl. I-95 BR | $20,590,313.77 |
$52,841,781.78 |
|
Virginia | Loudun Co; CN For Rte 7; Fr:0.7 Mi. W. Of Rte 659 To:0.8 Mi. E. of Rte 659 | $16,248,900.82 |
$62,737,749.00 |
|
Virginia | Arlington Co; Route 27; Major Bridge Rehabilitation | $13,982,315.87 |
$29,024,382.50 |
|
Virginia | Loudoun Co; Rte 659; Fr: Hay Rd To: Gloucester Parkway; CN : Reconstruct to 4 lanes: Design Buildi | $1,831,436.00 |
$51,449,852.72 |
|
Virginia | Prince William County | $49,534,343.00 |
$59,490,380.00 |
|
Virginia | Town of Leesburg; Route 7 Interchange at Battlefield Parkway | $11,335,520.00 |
$77,288,540.00 |
|
Virginia | HB2 FY17 RTE 7 CORRIDOR IMPROVEMENTS - PHASE 1 and PHASE 2 | $87,187,666.02 |
$225,779,197.26 |
|
Virginia | Fairfax County - FY17 Route 7 Corridor Improvements - Phase 2 | $64,105,919.66 |
$132,672,243.94 |
|
Virginia | Potomac Town Center Garage | $20,786,672.00 |
$66,332,355.90 |
|
Virginia | Route 29 Widening - Phase II | $2,636,250.00 |
$109,352,876.00 |
|
Virginia | SPRINGFIELD CBC COMMUTER PARKING GARAGE | $40,132,000.00 |
$54,140,000.00 |
|
Virginia | CITY OF VIRGINIA BEACH-FROM E STRAFORD RD TO VISTA CIRCLE. CN FOR LESNER BRIDGE REPLACEMENT PROJECT. | $8,688,303.00 |
$95,885,692.00 |
|
Virginia | CITY OF VIRGINIA BEACH-FROM 0.207 MI NORTH OF DAM NECK RD TO 0.152 MI SOUTH OF NIMMO PWY. CN FOR HOLLAND RD-UPGRADE TO 4 LANES. | $30,722,001.00 |
||
Virginia | City of Norfolk; Military Highway; Design Build | $51,549,342.78 |
$105,193,209.68 |
|
Virginia | City of Suffolk Rte 58; From Rte 58/13/32 bypass to .7 Mi West of Manning Bridge Rd: RW for Holland Rd Corridor Improvements. | $1,407,679.80 |
$94,293,184.30 |
|
Virginia | Elbows Road Phase 2B | $9,481,864.00 |
$41,053,820.00 |
|
Virginia | CITY OF VIRGINIA BEACH | $700,008.00 |
$26,927,288.00 |
|
Virginia | City of Newport News - #HB2 Atkinson Boulevard - 4 lanes | $37,095,844.00 |
$60,537,493.00 |
|
Virginia | #SMART18 - Laskin Road Phase 1-A | $27,754,965.00 |
$49,616,391.00 |
|
Virginia | #HB2.FY17 RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY | $12,515,031.00 |
$43,711,511.00 |
|
Virginia | #SMART18 - SKIFFES CREEK CONNECTOR | $29,481,144.00 |
$36,851,433.00 |
|
Virginia | I-64 HRBT Expansion Project - Design-Build Contract | $228,316,356.12 |
$3,935,409,912.00 |
|
Virginia | Chesterfield Co, FR: 1.73 Miles W TO: 0.27 MIles E of Rte 618 (Old Bermuda Hundred Road), Rte 10 Major Widening | $27,229,752.57 |
$69,763,455.06 |
|
Virginia | COMMERCE ROAD WIDENING | $13,520,759.25 |
$33,181,888.00 |
|
Virginia | Widen Route 28 from 4 to 6 Lanes Divided | $28,159,471.35 |
$73,982,000.00 |
|
Virginia | NORTHSTAR BLVD EXTENSION SHREVEPORT DR TO ROUTE 50 | $25,000,000.00 |
$89,996,999.40 |
|
Virginia | #HB2.FY17 WIDEN ROUTE 1 TO SIX LANES | $30,421,827.91 |
$39,492,681.00 |
|
Virginia | POPES HEAD ROAD INTERCHANGE | $27,671,595.55 |
$79,589,105.00 |
|
Virginia | Fairfax County Parkway Widening - Southern Segment | $280,000.00 |
$128,770,360.00 |
|
Virginia | Wythe Creek Road-Widen 3 Lanes | $28,974,096.00 |
$51,327,424.00 |
|
Virginia | City of Bristol; Various Locations I-81 | $14,696,928.80 |
$40,740,494.05 |
|
Virginia | Hampton Rds Districtwide - Rte 58 - Downtown & Midtown Tunnels; extension of MLK to I-264 - PE for DT/MT/MLK Primary Debt Service | $409,105,204.68 |
$564,265,078.23 |
|
Virginia | Hampton Rds PPTA: Interstate/Primary Design/ROW/Upgrade and Construction of Downtown & Midtown Tunnels; extension of MLK to I-264 | $2,139,358,000.00 |
||
Virginia | Fairfax Co: WWB - TAMS Contract- I-95 Fr: Eisenhower Ave Connector - Rte 414 Marlyland; Interstate TAMS Contract for maintenance | $8,944,144.00 |
$36,404,057.00 |
|
Virginia | Statewide: Contract for Pavement data collection -- condition of roadway - Multi-year contract | $26,043,832.10 |
$35,273,320.55 |
|
Virginia | Bristol Districtwide Paving | $57,906,559.36 |
$57,969,907.36 |
|
Virginia | Bristol Districtwide Paving | $5,930,720.00 |
$98,000,000.00 |
|
Virginia | Bristol Districtwide Paving | $13,130,966.00 |
$95,000,000.00 |
|
Virginia | Bristol Districtwide Paving | $98,000,000.00 |
||
Virginia | Salem Districtwide Paving; Interstate and Secondary | $49,885,946.00 |
$52,186,185.00 |
|
Virginia | Salem Districtwide Paving; Primary | $49,309,100.00 |
$49,317,183.16 |
|
Virginia | Salem Districtwide Paving - Plant mix | $43,857,564.68 |
$98,000,000.00 |
|
Virginia | Salem Districtwide Paving | $10,147,238.00 |
$95,000,000.00 |
|
Virginia | Salem Districtwide Paving | $98,000,000.00 |
||
Virginia | Lynchburg Districtwide Paving | $59,764,178.30 |
$90,000,000.00 |
|
Virginia | Lynchburg Districtwide Paving | $2,576,347.00 |
$56,000,000.00 |
|
Virginia | Lynchburg Districtwide Paving | $4,873,608.00 |
$60,000,000.00 |
|
Virginia | Lynchburg Districtwide Paving | $60,000,000.00 |
||
Virginia | Richmond Districtwide Paving; Interstate and Secondary | $47,925,339.00 |
$49,981,025.16 |
|
Virginia | Richmond Districtwide Paving; Primary | $62,980,300.00 |
$90,148,885.85 |
|
Virginia | Richmond Districtwide Paving: Interstate and Primary | $6,291,400.00 |
$84,000,000.00 |
|
Virginia | Richmond Districtwide Paving: Secondary | $40,000,000.00 |
||
Virginia | Richmond Districtwide Paving | $3,862,833.15 |
$110,000,000.00 |
|
Virginia | Richmond Disrtictwide Paving | $98,000,000.00 |
||
Virginia | Hampton Roads Districtwide Paving | $32,590,560.00 |
$90,000,000.00 |
|
Virginia | Hampton Roads Districtwide Paving | $1,339,223.15 |
$98,000,000.00 |
|
Virginia | Hampton Roads Districtwide Paving | $10,340,635.00 |
$90,000,000.00 |
|
Virginia | Hampton Roads Districtwide Paving | $98,000,000.00 |
||
Virginia | Fredericksburg Districtwide Paving | $39,344,729.73 |
$39,880,371.73 |
|
Virginia | Fredericksburg Districtwide Paving | $5,554,397.00 |
$98,000,000.00 |
|
Virginia | Fredericksburg Districtwide Paving | $1,750,000.00 |
$90,000,000.00 |
|
Virginia | Fredericksburg Districtwide Paving | $98,000,000.00 |
||
Virginia | Culpeper Districtwide Paving | $45,275,193.00 |
$47,711,814.12 |
|
Virginia | Culpeper Districtwide Paving | $70,000,000.00 |
||
Virginia | Culpeper Districtwide Paving | $1,750,000.00 |
$57,363,739.42 |
|
Virginia | Culpeper Districtwide Paving | $60,000,000.00 |
||
Virginia | Staunton Districtwide Paving | $72,955,400.00 |
$90,000,000.00 |
|
Virginia | Staunton Districtwide Paving | $66,782,188.91 |
$88,228,490.68 |
|
Virginia | Staunton Districtwide Paving | $12,135,954.00 |
$95,000,000.00 |
|
Virginia | Staunton Districtwide Paving | $98,000,000.00 |
||
Virginia | Northern Virginia Districtwide Paving; Interstate and Primary; NHS Routes | $23,629,711.00 |
$52,604,908.17 |
|
Virginia | Northern Virginia Districtwide Paving; Secondary | $90,000,000.00 |
||
Virginia | Northern Virginia Districtwide Paving: Interstate and Primary | $9,824,700.15 |
$85,000,000.00 |
|
Virginia | Northern Virginia Districtwide Paving: Secondary | $90,000,000.00 |
||
Virginia | Northern Virginia Districtwide Paving | $7,536,455.00 |
$90,000,000.00 |
|
Virginia | Northern Virginia Districtwide Paving | $90,000,000.00 |
||
Virginia | Northen Virginia Districtwide Paving | $90,000,000.00 |
||
Virginia | Northern Virginia Districtwide Paving | $98,000,000.00 |
||
Virginia | Statewide- Multiple Districts- Various Locations- Project to support Statewide TOCs, SSP, and ITS | $263,845,620.36 |
$280,142,584.15 |
|
Virginia | Statewide;Multiple Districts; Statewide TOC, SSP, & ITS Devices Contract-Statewide Task Order | $67,392,068.00 |
||
Virginia | CITY OF HAMPTON-FROM HRBT SOUTH SHORE NORFOLK TO HRBT NORTH SHORE-HAMPTON. CN FOR HRBT SWITCHGEAR INSTALLATION. | $15,739,002.00 |
$26,633,756.00 |
|
Virginia | Tunnels and Movable Bridge Staff Augmentation | $8,120,900.00 |
$87,500,000.00 |
|
Virginia | CONTROL ROOM & FIELD OPS FOR MONITOR MERRIMAC BRIDGE TUNNEL | $35,816,875.00 |
||
Virginia | CONTROL ROOM & FIELD OPS FOR HAMPTON RDS BRIDGE TUNNEL | $55,083,125.00 |