U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Alabama

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Alabama
0001610
Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$35,323,246.66
$44,154,058.33
Alabama
0001610
Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$5,768,908.74
$7,211,135.93
Alabama
0002516
Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$13,371,939.74
$16,714,924.68
Alabama
0002516
Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,261,832.45
$1,577,290.57
Alabama
0002516
Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,917,477.00
$3,646,846.25
Alabama
0002516
Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$4,651,761.49
$5,814,701.86
Alabama
0002516
Lauderdale >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity
$11,675,077.00
$14,593,846.25
Alabama
0002516
Lauderdale >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way
$3,204,923.00
$4,006,153.75
Alabama
0005512
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$20,586,000.59
$25,732,500.74
Alabama
0005512
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,382,572.89
$3,020,591.93
Alabama
0005512
Jefferson >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$2,733,827.82
$3,417,284.77
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$29,008,396.42
$36,260,495.52
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$5,734.61
$7,168.26
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$347,983.40
$434,979.25
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$6,015,791.59
$8,319,024.82
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$3,718,244.33
$4,647,963.41
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,165,279.24
$1,456,441.05
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$2,608,800.00
$3,261,000.00
Alabama
0006521
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities
$4,796.28
$5,995.35
Alabama
0006562
Pickens >= 5,000 AND < 50,000 State FAST ACT NATIONAL FREIGHT New Construction Roadway
$21,744,588.00
$27,180,735.00
Alabama
0006562
Pickens >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP New Construction Roadway
$3,223,186.98
$3,223,186.98
Alabama
0006562
Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$25,807,253.39
$32,259,066.74
Alabama
0006562
Pickens >= 5,000 AND < 50,000 State TECHNOLOGY DEPLOYMENT GRANTS T New Construction Roadway
$524,348.58
$655,435.73
Alabama
0007549
Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Preliminary Engineering
$1,365,146.76
$1,365,146.76
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Preliminary Engineering
$871,755.24
$871,755.24
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way
$1,099,510.02
$1,099,510.02
Alabama
0007549
Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way
$1,721,804.98
$1,721,804.98
Alabama
0007549
Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$663,339.62
$829,174.52
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$423,595.33
$529,494.17
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$21,279,895.19
$26,610,682.19
Alabama
0007549
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$33,323,779.53
$41,671,657.60
Alabama
0007549
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,419,639.69
$1,774,549.61
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$906,553.34
$1,133,191.68
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,748,117.40
$3,435,146.75
Alabama
0007549
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$4,303,482.60
$5,379,353.25
Alabama
0007549
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$2,714,890.98
$3,393,613.72
Alabama
0007549
Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,733,674.75
$2,167,093.45
Alabama
0013568
Tuscaloosa >= 200,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity
$34,109.25
$42,636.56
Alabama
0013568
Tuscaloosa >= 200,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity
$360,000.00
$450,000.00
Alabama
0013568
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$6,118,821.09
$13,373,512.65
Alabama
0013568
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$466,248.18
$582,810.23
Alabama
0013568
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$5,002,287.88
$6,252,859.87
Alabama
0013568
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$466,312.19
$582,890.24
Alabama
0013568
Tuscaloosa >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity
$8,265.00
$10,331.25
Alabama
0013568
Tuscaloosa >= 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity
$965,135.00
$1,206,418.75
Alabama
0013568
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$3,639,295.49
$4,549,119.36
Alabama
0014509
Elmore >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way
$602,400.00
$753,000.00
Alabama
0014509
Elmore >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$18,961,538.61
$23,701,923.26
Alabama
0014509
Elmore >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,361,763.87
$1,702,204.84
Alabama
0014509
Elmore >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,847,281.09
$3,559,101.36
Alabama
0014509
Elmore >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,057,337.67
$1,321,672.09
Alabama
0025556
Etowah >= 50,000 AND < 200,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity
$3,137,568.00
$3,941,644.40
Alabama
0025556
Cherokee >= 5,000 AND < 50,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity
$1,502,432.00
$1,887,465.92
Alabama
0025556
Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$10,091,385.96
$12,882,389.56
Alabama
0025556
Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$21,074,104.96
$26,902,630.71
Alabama
0025556
Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,737,240.12
$2,171,550.15
Alabama
0025556
Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$831,881.62
$1,039,852.03
Alabama
0025556
Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$664,479.48
$842,526.93
Alabama
0025556
Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,387,649.85
$1,759,471.00
Alabama
0035504
Jackson >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity
$5,352,192.88
$6,690,241.10
Alabama
0035504
Jackson >= 50,000 AND < 200,000 State HIGHWAY BRIDGE PROGRAM (PLUS) Bridge Replacement - No Added Capacity
$15,555,494.00
$19,444,367.50
Alabama
0035504
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$659,069.62
$823,837.02
Alabama
0035521
Montgomery >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Bridge New Construction
$2,197,328.09
$2,746,660.11
Alabama
0035521
Montgomery >= 200,000 N/A TRANSPORTATION IMP PROJ New Construction Roadway
$26,972,965.90
$33,716,207.38
Alabama
0042501
Mobile >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way
$57,407.50
$71,759.37
Alabama
0042501
Mobile >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge New Construction
$48,863,096.60
$61,078,870.75
Alabama
0042501
Mobile >= 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway
$1,118,654.77
$1,398,318.47
Alabama
0042501
Mobile >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way
$3,641,610.82
$4,552,013.53
Alabama
0042501
Mobile >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities
$1,355,024.56
$1,693,780.71
Alabama
0042501
Mobile >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$11,637,990.40
$14,547,488.00
Alabama
0042501
Mobile >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$296,985.77
$371,232.21
Alabama
0042509
Mobile >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$26,753,873.44
$33,442,341.80
Alabama
0042509
Mobile >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$23,883.26
$29,854.08
Alabama
0042509
Mobile >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$156,118.53
$195,148.16
Alabama
0042509
Mobile >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$324,592.94
$405,741.18
Alabama
0042509
Mobile >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$216,784.12
$270,980.15
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Utilities
$49,526.09
$49,526.09
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State ARRA AMERICAN RECOV & REINV AC Bridge New Construction
$36,100,378.68
$36,100,378.68
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State ARRA AMERICAN RECOV & REINV AC New Construction Roadway
$606,307.15
$606,307.15
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECTS-TEA-21 New Construction Roadway
$228,222.01
$285,277.51
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Preliminary Engineering
$1,826,640.00
$2,283,300.00
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Right of Way
$5,966,693.43
$7,458,366.79
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Utilities
$78,168.49
$97,710.61
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$4,426,994.55
$5,533,743.19
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$80,000.00
$100,000.00
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$347,375.20
$423,571.06
Alabama
0192901
Calhoun >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$589,224.38
$736,530.47
Alabama
0210509
Houston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$44,400,505.74
$55,500,632.18
Alabama
0220253
Baldwin >= 200,000 N/A NATL INTRASTRUCTURE INVESTMENT Other
$14,404,831.00
$25,060,134.88
Alabama
0355503
Franklin >= 5,000 AND < 50,000 State APPALACHIA DEVELOPMENT HWY Utilities
$270,080.01
$337,600.01
Alabama
0355503
Franklin >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - No Added Capacity
$24,522,247.28
$29,587,447.28
Alabama
0355503
Franklin >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering
$624,800.00
$781,000.00
Alabama
0355503
Franklin >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities
$220,898.42
$276,123.03
Alabama
0355503
Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$72,800.00
$91,000.00
Alabama
0471500
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Bridge New Construction
$12,404,795.42
$15,505,994.28
Alabama
0471500
Jefferson >= 200,000 N/A APPALACHIAN DEVEL HWY New Construction Roadway
$22,027,586.08
$27,534,482.60
Alabama
0471500
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Preliminary Engineering
$115,541.47
$130,484.84
Alabama
0471500
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Utilities
$347,418.30
$434,272.88
Alabama
0471500
Jefferson >= 200,000 N/A APPALCHIAN DEV HWY DEMO'S Preliminary Engineering
$1,642,000.00
$1,642,000.00
Alabama
0471501
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Bridge New Construction
$116,541,075.78
$145,676,344.73
Alabama
0471501
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY New Construction Roadway
$18,485,189.51
$23,106,486.89
Alabama
0471501
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Preliminary Engineering
$3,123,827.36
$3,904,784.20
Alabama
0471501
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Utilities
$5,544,572.72
$6,930,715.90
Alabama
0471501
Jefferson >= 200,000 State APPALCHIAN DEV HWY DEMO'S Preliminary Engineering
$1,853,555.96
$1,853,555.96
Alabama
1602551
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY New Construction Roadway
$58,908,477.92
$58,984,942.50
Alabama
1602551
Jefferson >= 200,000 State APPALACHIAN DEVEL HWY Utilities
$4,095,822.30
$5,119,777.87
Alabama
1602551
Jefferson >= 200,000 State HIGH PRIORITY PROJECTS-TEA-21 New Construction Roadway
$1,309,229.92
$1,636,537.40
Alabama
1602551
Jefferson >= 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Utilities
$5,492,680.58
$7,488,906.66
Alabama
3716258
Jefferson >= 200,000 Other CONGESTION AIR QUALITY Facilities for Pedestrians and Bicycles
$8,000,000.00
$10,000,000.02
Alabama
3716258
Statewide N/A Other FAST ACT NATIONAL FREIGHT Debt Service
$719,942.22
$899,927.78
Alabama
3716258
Jefferson >= 200,000 Other HIGHWAY INFRA PRGM - COVID APP Facilities for Pedestrians and Bicycles
$2,500,000.00
$2,500,000.00
Alabama
3716258
Statewide N/A Other NATIONAL HIGHWAY PERF PROGRAM Debt Service
$817,600.00
$1,022,000.00
Alabama
3716258
Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles
$33,170,923.52
Alabama
4517252
Madison >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity
$4,936,028.31
$17,911,760.64
Alabama
4517252
Madison >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT Right of Way
$938,138.00
$1,200,000.00
Alabama
4517252
Madison >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT Utilities
$3,394,637.69
$4,243,297.11
Alabama
4517252
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$2,378,889.66
$2,973,612.08
Alabama
4520251
Madison >= 200,000 N/A HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$2,807,251.00
$2,807,251.00
Alabama
4520251
Madison >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$12,342,017.55
$15,427,521.94
Alabama
4520251
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$8,724,983.17
$10,906,228.96
Alabama
4520251
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,297,444.82
$1,621,806.03
Alabama
7002600
Jefferson >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$3,284,740.11
$4,105,925.14
Alabama
7002600
Jefferson >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Utilities
$1,183,133.89
$1,478,917.37
Alabama
7002600
Jefferson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$17,571,934.71
$21,964,918.39
Alabama
7002600
Jefferson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$5,426,842.49
$6,783,553.11
Alabama
7002600
Jefferson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$455,560.00
$569,450.00
Alabama
7009600
Jefferson >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Right of Way
$1,571,648.38
$1,964,560.48
Alabama
7009600
Jefferson >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities
$78,599.33
$98,249.17
Alabama
7009600
Jefferson >= 200,000 State HIGHWAY BRIDGE PROGRAM Right of Way
$652,432.00
$815,540.00
Alabama
7009600
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$19,742,764.18
$24,678,455.22
Alabama
7009600
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$518,432.67
$673,849.26
Alabama
7503600
Mobile >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$853,635.00
$1,067,043.75
Alabama
7503600
Mobile >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$1,100,000.00
$1,375,000.00
Alabama
7503600
Mobile >= 200,000 Local NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$500,000.00
$625,000.00
Alabama
7503600
Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$8,580,754.71
$10,729,545.00
Alabama
7503600
Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$1,195,188.70
$1,497,162.57
Alabama
7503600
Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$11,363,000.00
$14,204,800.66
Alabama
7503600
Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,313,819.48
$1,642,274.35
Alabama
7503600
Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$5,193,362.08
$6,491,702.60
Alabama
7503600
Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,263,530.41
$1,579,413.02
Alabama
9070900
Morgan >= 50,000 AND < 200,000 State EMERGENCY RELIEF 4R - Restoration & Rehabilitation
$20,950,118.45
$26,187,648.07
Alabama
9070900
Morgan >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering
$1,073,447.97
$1,341,809.96
Alabama
9070900
Morgan >= 50,000 AND < 200,000 State EMERGENCY RELIEF Right of Way
$13,607.25
$17,009.06
Alabama
9070900
Morgan >= 50,000 AND < 200,000 State TECHNOLOGY DEPLOYMENT GRANTS T 4R - Restoration & Rehabilitation
$741,493.00
$926,866.25
Alabama
A115900
Coffee >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Utilities
$291,525.42
$364,406.78
Alabama
A115900
Coffee >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$1,699,133.00
$2,123,916.25
Alabama
A115900
Coffee >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$7,529,662.00
$9,412,077.50
Alabama
A115900
Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$5,939,494.66
$7,424,368.32
Alabama
A115900
Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$238,451.00
$298,063.75
Alabama
A115900
Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$4,988,112.15
$6,235,140.19
Alabama
ATRP001
Statewide N/A N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way
$270,111.39
$337,639.24
Alabama
ATRP001
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$18,611,317.52
$21,335,563.70
Alabama
ATRP001
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$7,002,879.84
$8,753,679.82
Alabama
ATRP001
Geneva >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$30,430.46
$38,038.08
Alabama
ATRP001
Russell >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$345,253.18
$431,566.48
Alabama
ATRP001
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$4,172,213.00
$5,215,228.30
Alabama
ATRP001
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$448,444,304.96
$563,952,324.48
Alabama
ATRP002
Shelby >= 200,000 Local BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity
$1,008,976.87
Alabama
ATRP002
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$688,107.82
$45,656,093.71
Alabama
ATRP002
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,315,926.24
Alabama
ATRP002
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$6,236,035.81
Alabama
ATRP002
Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$516,703.04
$929,643.56
Alabama
ATRP002
Fayette >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$516,703.04
$929,643.56
Alabama
ATRP002
Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$2,782,205.51
$3,477,856.59
Alabama
ATRP002
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$3,941,236.24
$5,379,283.65
Alabama
ATRP002
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$378,541.44
Alabama
ATRP003
Statewide N/A State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity
$577,413.66
Alabama
ATRP003
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$1,821,408.00
$2,277,287.22
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$9,120,842.83
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$2,073,901.18
$32,660,818.93
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$10,099,993.60
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$685,997.02
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$12,106,875.54
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$4,789,441.95
Alabama
ATRP003
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$2,027,094.15
$3,142,843.69
Alabama
ATRP003
Statewide N/A State TECHNOLOGY DEPLOYMENT GRANTS T Bridge Replacement - Added Capacity
$479,670.00
$599,587.50
Alabama
ATRP004
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$2,021,192.82
$34,414,981.73
Alabama
ATRP004
Lowndes >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$1,053,326.02
$1,316,657.53
Alabama
ATRP004
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$52,931.90
$1,776,164.69
Alabama
ATRP004
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,630,835.85
Alabama
ATRP004
Lawrence >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$267,054.08
$4,894,814.51
Alabama
ATRP004
Fayette >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,466,873.54
Alabama
ATRP004
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$147,038.56
Alabama
ATRP005
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$922,052.03
$34,697,227.08
Alabama
ATRP005
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,654,928.21
Alabama
ATRP005
Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$474,853.48
$602,846.47
Alabama
ATRP005
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction
$481,648.46
Alabama
ATRP005
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$196,168.00
$12,901,171.61
Alabama
ATRP006
Statewide N/A State CARBON REDUCTION PROGRAM Safety
$257,615.07
$514,256.38
Alabama
ATRP006
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$522,124.30
$22,899,184.66
Alabama
ATRP006
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$2,476,376.79
Alabama
ATRP006
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,246,330.23
Alabama
ATRP006
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$6,057,406.57
Alabama
ATRP006
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$847,457.84
$2,979,182.43
Alabama
ATRP007
Macon >= 5,000 AND < 50,000 Local BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity
$1,640,908.85
Alabama
ATRP007
Statewide N/A State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$4,311,305.81
Alabama
ATRP007
Russell >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM -APPOR Debt Service
$13,499,999.98
$13,499,999.98
Alabama
ATRP007
Russell >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Debt Service
$402,800.00
$476,416.67
Alabama
ATRP007
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$1,191,218.40
$28,984,962.07
Alabama
ATRP007
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$8,707,394.35
Alabama
ATRP007
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$2,236,103.57
Alabama
ATRP007
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$649,822.86
$10,995,583.53
Alabama
ATRP007
Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$9,348,622.67
Alabama
ATRP007
Russell >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$3,274,800.95
Alabama
ATRP007
Russell >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$6,065,734.78
$7,582,168.48
Alabama
ATRP008
Statewide N/A N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$855,402.96
Alabama
ATRP008
Statewide N/A N/A CONGESTION AIR QUALITY 4R - Maintenance Resurfacing
$222,884.77
$278,605.96
Alabama
ATRP008
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$5,551,524.16
Alabama
ATRP008
Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$940,284.07
$1,175,355.09
Alabama
ATRP008
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$712,374.02
$25,425,846.15
Alabama
ATRP008
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,902,156.33
$20,726,049.12
Alabama
ATRP008
Marion >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$21,675.18
$27,093.98
Alabama
ATRP009
Statewide N/A N/A BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity
$597,911.60
Alabama
ATRP009
Shelby >= 200,000 Local CONGESTION AIR QUALITY 4R - Maintenance Resurfacing
$114.20
$142.75
Alabama
ATRP009
Jefferson >= 200,000 Local CONGESTION AIR QUALITY 4R - Maintenance Resurfacing
$380,546.47
$475,683.09
Alabama
ATRP009
Statewide N/A N/A RAIL HWY CROSSING HAZ ELI Rail/Hwy Crossing
$742,707.00
$742,707.00
Alabama
ATRP009
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$4,852,097.15
Alabama
ATRP009
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$20,461,887.75
Alabama
ATRP009
Jefferson >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$629,726.06
$787,158.86
Alabama
ATRP009
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$9,111,429.06
Alabama
ATRP009
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,537,349.95
$22,081,736.76
Alabama
ATRP009
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$436,177.30
Alabama
ATRP010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$20,082,561.22
Alabama
ATRP010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$3,537,723.51
Alabama
ATRP010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$7,828,137.12
Alabama
ATRP010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$2,837,073.16
$27,137,006.73
Alabama
ATRP010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$5,306,625.50
Alabama
ATRP010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$199,405.88
$291,498.60
Alabama
ATRP011
Russell >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation
$262,806.00
$328,507.50
Alabama
ATRP011
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$18,481,370.75
Alabama
ATRP011
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$2,970,332.10
Alabama
ATRP011
Russell >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$2,835,571.01
$3,544,463.76
Alabama
ATRP011
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$17,206,474.72
Alabama
ATRP011
Lamar >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$624,955.71
Alabama
ATRP011
Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$113,678.63
$147,964.43
Alabama
ATRP012
Statewide N/A N/A BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity
$279,272.14
Alabama
ATRP012
Statewide N/A N/A CONGESTION AIR QUALITY 4R - Maintenance Resurfacing
$420,363.85
$525,454.82
Alabama
ATRP012
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$9,664,310.00
Alabama
ATRP012
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,086,972.60
Alabama
ATRP012
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$29,677,115.97
Alabama
ATRP012
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,627,049.28
$3,225,994.37
Alabama
ATRP012
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$6,927,714.66
Alabama
ATRP012
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$923,351.76
Alabama
ATRP012
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$2,400,561.33
$10,803,628.27
Alabama
ATRP012
Shelby >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$5,288,820.81
$6,611,026.01
Alabama
ATRP012
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,086,112.70
Alabama
ATRP013
Cleburne >= 5,000 AND < 50,000 Local HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$2,815,132.20
$3,758,211.13
Alabama
ATRP013
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$9,515,402.99
$11,216,231.01
Alabama
ATRP013
Limestone >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$1,212,240.10
Alabama
ATRP013
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$2,425,224.95
Alabama
ATRP013
Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$31,438.09
Alabama
ATRP013
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$932,852.08
$14,270,111.78
Alabama
ATRP013
Russell >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$201,338.73
$251,673.41
Alabama
ATRP013
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$11,568,366.14
Alabama
ATRP013
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$12,711,371.78
Alabama
ATRP013
Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$88,567.38
$113,198.31
Alabama
ATRP016
Statewide N/A State CARBON REDUCTION PROGRAM Debt Service
$206,995.68
$258,994.03
Alabama
ATRP016
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$9,854,141.87
$25,001,070.95
Alabama
ATRP016
Madison >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$10,285,552.48
$12,856,940.60
Alabama
ATRP016
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$1,385,141.05
$2,709,445.62
Alabama
ATRP016
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$2,786,159.90
Alabama
ATRP016
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,238,768.90
Alabama
ATRP016
Greene >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$71,525.42
$89,406.78
Alabama
ATRP016
Greene >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$4,190,700.31
$5,261,902.59
Alabama
ATRP017
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$4,644,311.63
$25,612,424.45
Alabama
ATRP017
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$7,990,356.12
Alabama
ATRP017
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,743,567.50
Alabama
ATRP017
Tuscaloosa >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$757,477.94
Alabama
ATRP017
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$209,959.53
$8,532,570.85
Alabama
ATRP017
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$573,738.19
Alabama
I022309
Marion >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$78,089.59
$86,766.21
Alabama
I022309
Marion >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$22,433,329.48
$24,925,921.64
Alabama
I059383
Jefferson >= 200,000 Other FAST ACT NATIONAL FREIGHT Debt Service
$40,583,177.75
$45,092,419.74
Alabama
I059383
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$286,168,734.50
Alabama
I059383
Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service
$10,005,352.23
$11,117,058.04
Alabama
I059383
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$7,592,848.63
$8,499,748.43
Alabama
I059383
Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$438,105.96
$486,784.40
Alabama
I059385
Jefferson >= 200,000 Other FAST ACT NATIONAL FREIGHT Debt Service
$52,109,998.80
$57,899,998.63
Alabama
I059385
Jefferson >= 200,000 State FAST ACT NATIONAL FREIGHT Debt Service
$58,375,730.19
$64,861,922.47
Alabama
I059385
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$196,591,628.67
Alabama
I059385
Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$175,490,559.38
Alabama
I059385
Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service
$36,136,601.65
$40,151,779.59
Alabama
I059385
Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service
$4,945,634.00
$5,495,148.89
Alabama
I059385
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$40,481,684.10
$44,979,649.03
Alabama
I059385
Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,487,306.76
$1,859,133.45
Alabama
I059387
Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Maintenance Resurfacing
$19,909,113.42
$19,909,113.42
Alabama
I059387
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$34,121,182.87
$42,651,478.59
Alabama
I059387
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$34,290,072.72
$38,744,525.25
Alabama
I059387
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,150,082.76
$1,277,869.73
Alabama
I059387
Tuscaloosa >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$2,423.67
$3,029.59
Alabama
I059387
Tuscaloosa >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Maintenance Resurfacing
$502,681.51
$628,351.88
Alabama
I059387
Tuscaloosa >= 200,000 State REPURPOSED SPECIAL 4R - Maintenance Resurfacing
$4,722,673.82
$5,903,342.28
Alabama
I059387
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$7,904,834.87
$9,367,456.24
Alabama
I059387
Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,667,956.28
$2,084,945.35
Alabama
I059387
Tuscaloosa >= 200,000 State TECHNOLOGY DEPLOYMENT GRANTS T 4R - Maintenance Resurfacing
$100,000.00
$125,000.00
Alabama
I059394
Statewide N/A Other FAST ACT NATIONAL FREIGHT Debt Service
$11,795,616.68
$13,106,240.76
Alabama
I059394
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$15,315,692.49
Alabama
I059394
Statewide N/A Other NATIONAL HIGHWAY PERF PROGRAM Debt Service
$13,329,701.02
$14,810,778.92
Alabama
I059407
DeKalb >= 50,000 AND < 200,000 State INTERSTATE - 56 4R - No Added Capacity
$67,471.21
$74,968.01
Alabama
I059407
DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity
$479,564.13
$532,849.04
Alabama
I059407
DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$630,540.00
$700,600.00
Alabama
I059407
DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$21,769,510.04
$24,188,344.49
Alabama
I059407
DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$11,783,349.38
$13,092,610.42
Alabama
I059409
DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$380,405.70
$422,673.00
Alabama
I059409
Etowah >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$281,182.27
$312,424.75
Alabama
I059409
Etowah >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$15,609,313.17
$17,343,681.30
Alabama
I059409
DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$21,117,517.61
$23,463,908.45
Alabama
I059409
DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$8,626,231.23
$9,584,701.36
Alabama
I059409
Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$6,376,201.36
$7,084,668.18
Alabama
I059422
DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$420,542.45
$467,269.40
Alabama
I059422
DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$3,420,000.00
$19,323,218.57
Alabama
I059422
DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$659,457.54
$732,730.60
Alabama
I059422
DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$31,500,000.00
$35,000,000.00
Alabama
I059423
DeKalb >= 50,000 AND < 200,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity
$10,000,000.00
$12,500,000.00
Alabama
I059423
DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$27,999,633.02
$31,110,703.36
Alabama
I059423
DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$813,486.79
$903,874.21
Alabama
I059423
DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$8,695,796.49
$9,661,996.10
Alabama
I059429
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$76,356,870.60
$86,278,949.84
Alabama
I065354
Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$77,735,925.07
$96,194,906.34
Alabama
I065354
Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$114,539.04
$143,173.80
Alabama
I065416
Conecuh >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$816,303.82
$1,020,379.78
Alabama
I065416
Conecuh >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - No Added Capacity
$1,150,000.00
$1,150,000.00
Alabama
I065416
Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$16,886,100.00
$21,107,625.00
Alabama
I065416
Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$914,022.51
$1,142,528.13
Alabama
I065416
Conecuh >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity
$406,314.41
$507,893.01
Alabama
I065416
Conecuh >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity
$3,599,585.59
$4,499,481.99
Alabama
I065497
Conecuh >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$46,604,500.19
$51,782,777.98
Alabama
I065497
Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,530,000.00
$1,700,000.00
Alabama
I065505
Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preventive Maintenance
$22,406,263.94
$25,855,711.55
Alabama
I065505
Morgan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preventive Maintenance
$7,759,070.82
$8,953,580.88
Alabama
I065505
Morgan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$104,173.34
$115,748.16
Alabama
I065505
Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$300,826.66
$334,251.84
Alabama
I085362
Lee >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Restoration & Rehabilitation
$16,000,000.00
$17,777,777.78
Alabama
I085362
Lee >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -ALLOC 4R - Restoration & Rehabilitation
$10,855,000.00
$13,568,750.00
Alabama
I085362
Lee >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$613,000.00
$681,111.11
Alabama
I085362
Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$10,184,229.51
$11,315,810.57
Alabama
I085362
Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,913,670.00
$2,126,300.00
Alabama
I085362
Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$157,060.44
$174,511.60
Alabama
I085362
Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$346,129.50
$384,588.33
Alabama
I085362
Lee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$390,735.26
$434,150.29
Alabama
I085365
Macon >= 5,000 AND < 50,000 Other HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$478,324.00
$531,471.12
Alabama
I085365
Montgomery >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$421,676.00
$468,528.88
Alabama
I085365
Montgomery >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$584,034.07
$648,926.75
Alabama
I085365
Macon >= 5,000 AND < 50,000 Other HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$662,493.37
$736,103.74
Alabama
I085365
Macon >= 5,000 AND < 50,000 Other INTERSTATE MAINTENANCE Preliminary Engineering
$68,554.09
$76,171.21
Alabama
I085365
Montgomery >= 200,000 Other INTERSTATE MAINTENANCE Preliminary Engineering
$60,435.13
$67,150.14
Alabama
I085365
Montgomery >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$18,179,599.00
$20,199,554.45
Alabama
I085365
Macon >= 5,000 AND < 50,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$20,621,850.33
$22,913,167.03
Alabama
I085365
Macon >= 5,000 AND < 50,000 Other NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$123,949.41
$137,721.55
Alabama
I085365
Montgomery >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$109,270.01
$121,411.14
Alabama
I459315
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$22,451,373.00
$24,945,970.00
Alabama
I459315
Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$189,000.00
$210,000.00
Alabama
PE10917
Madison >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$30,000,000.00
$30,000,000.00
Alabama
PE10917
Madison >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Utilities
$404,417.00
$505,521.25
Alabama
PE10917
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$10,282,131.00
Alabama
PE10917
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$842,234.54
$1,052,793.17
Alabama
PE10917
Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,223,092.14
$4,028,865.17