RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Alabama | Madison | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,323,246.66 |
$44,154,058.33 |
|
Alabama | Madison | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,768,908.74 |
$7,211,135.93 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,371,939.74 |
$16,714,924.68 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,261,832.45 |
$1,577,290.57 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,917,477.00 |
$3,646,846.25 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,651,761.49 |
$5,814,701.86 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $11,675,077.00 |
$14,593,846.25 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $3,204,923.00 |
$4,006,153.75 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,586,000.59 |
$25,732,500.74 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,382,572.89 |
$3,020,591.93 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $2,733,827.82 |
$3,417,284.77 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,008,396.42 |
$36,260,495.52 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,734.61 |
$7,168.26 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $347,983.40 |
$434,979.25 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,015,791.59 |
$8,319,024.82 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $3,718,244.33 |
$4,647,963.41 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,165,279.24 |
$1,456,441.05 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $2,608,800.00 |
$3,261,000.00 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $4,796.28 |
$5,995.35 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | New Construction Roadway | $21,744,588.00 |
$27,180,735.00 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $3,223,186.98 |
$3,223,186.98 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $25,807,253.39 |
$32,259,066.74 |
|
Alabama | Pickens | >= 5,000 AND < 50,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | New Construction Roadway | $524,348.58 |
$655,435.73 |
|
Alabama | Tuscaloosa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Preliminary Engineering | $1,365,146.76 |
$1,365,146.76 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Preliminary Engineering | $871,755.24 |
$871,755.24 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Right of Way | $1,099,510.02 |
$1,099,510.02 |
|
Alabama | Tuscaloosa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Right of Way | $1,721,804.98 |
$1,721,804.98 |
|
Alabama | Tuscaloosa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $663,339.62 |
$829,174.52 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $423,595.33 |
$529,494.17 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,279,895.19 |
$26,610,682.19 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $33,323,779.53 |
$41,671,657.60 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,419,639.69 |
$1,774,549.61 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $906,553.34 |
$1,133,191.68 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,748,117.40 |
$3,435,146.75 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,303,482.60 |
$5,379,353.25 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,714,890.98 |
$3,393,613.72 |
|
Alabama | Bibb | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,733,674.75 |
$2,167,093.45 |
|
Alabama | Tuscaloosa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $34,109.25 |
$42,636.56 |
|
Alabama | Tuscaloosa | >= 200,000 | State | FTA HWY PROJ. TRF FHWA | 4R - No Added Capacity | $360,000.00 |
$450,000.00 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,118,821.09 |
$13,373,512.65 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $466,248.18 |
$582,810.23 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $5,002,287.88 |
$6,252,859.87 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $466,312.19 |
$582,890.24 |
|
Alabama | Tuscaloosa | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $8,265.00 |
$10,331.25 |
|
Alabama | Tuscaloosa | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $965,135.00 |
$1,206,418.75 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,639,295.49 |
$4,549,119.36 |
|
Alabama | Elmore | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $602,400.00 |
$753,000.00 |
|
Alabama | Elmore | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $18,961,538.61 |
$23,701,923.26 |
|
Alabama | Elmore | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,361,763.87 |
$1,702,204.84 |
|
Alabama | Elmore | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,847,281.09 |
$3,559,101.36 |
|
Alabama | Elmore | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,057,337.67 |
$1,321,672.09 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | FTA HWY PROJ. TRF FHWA | 4R - No Added Capacity | $3,137,568.00 |
$3,941,644.40 |
|
Alabama | Cherokee | >= 5,000 AND < 50,000 | State | FTA HWY PROJ. TRF FHWA | 4R - No Added Capacity | $1,502,432.00 |
$1,887,465.92 |
|
Alabama | Cherokee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $10,091,385.96 |
$12,882,389.56 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $21,074,104.96 |
$26,902,630.71 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,737,240.12 |
$2,171,550.15 |
|
Alabama | Cherokee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $831,881.62 |
$1,039,852.03 |
|
Alabama | Cherokee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $664,479.48 |
$842,526.93 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,387,649.85 |
$1,759,471.00 |
|
Alabama | Jackson | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | 4R - No Added Capacity | $5,352,192.88 |
$6,690,241.10 |
|
Alabama | Jackson | >= 50,000 AND < 200,000 | State | HIGHWAY BRIDGE PROGRAM (PLUS) | Bridge Replacement - No Added Capacity | $15,555,494.00 |
$19,444,367.50 |
|
Alabama | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $659,069.62 |
$823,837.02 |
|
Alabama | Montgomery | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $2,197,328.09 |
$2,746,660.11 |
|
Alabama | Montgomery | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | New Construction Roadway | $26,972,965.90 |
$33,716,207.38 |
|
Alabama | Mobile | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $57,407.50 |
$71,759.37 |
|
Alabama | Mobile | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $48,863,096.60 |
$61,078,870.75 |
|
Alabama | Mobile | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $1,118,654.77 |
$1,398,318.47 |
|
Alabama | Mobile | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $3,641,610.82 |
$4,552,013.53 |
|
Alabama | Mobile | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $1,355,024.56 |
$1,693,780.71 |
|
Alabama | Mobile | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $11,637,990.40 |
$14,547,488.00 |
|
Alabama | Mobile | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $296,985.77 |
$371,232.21 |
|
Alabama | Mobile | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,753,873.44 |
$33,442,341.80 |
|
Alabama | Mobile | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $23,883.26 |
$29,854.08 |
|
Alabama | Mobile | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $156,118.53 |
$195,148.16 |
|
Alabama | Mobile | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $324,592.94 |
$405,741.18 |
|
Alabama | Mobile | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $216,784.12 |
$270,980.15 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Utilities | $49,526.09 |
$49,526.09 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | ARRA AMERICAN RECOV & REINV AC | Bridge New Construction | $36,100,378.68 |
$36,100,378.68 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | ARRA AMERICAN RECOV & REINV AC | New Construction Roadway | $606,307.15 |
$606,307.15 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $228,222.01 |
$285,277.51 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $1,826,640.00 |
$2,283,300.00 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $5,966,693.43 |
$7,458,366.79 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | $78,168.49 |
$97,710.61 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $4,426,994.55 |
$5,533,743.19 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $80,000.00 |
$100,000.00 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $347,375.20 |
$423,571.06 |
|
Alabama | Calhoun | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $589,224.38 |
$736,530.47 |
|
Alabama | Houston | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $44,400,505.74 |
$55,500,632.18 |
|
Alabama | Baldwin | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Other | $14,404,831.00 |
$25,060,134.88 |
|
Alabama | Franklin | >= 5,000 AND < 50,000 | State | APPALACHIA DEVELOPMENT HWY | Utilities | $270,080.01 |
$337,600.01 |
|
Alabama | Franklin | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | 4R - No Added Capacity | $24,522,247.28 |
$29,587,447.28 |
|
Alabama | Franklin | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Preliminary Engineering | $624,800.00 |
$781,000.00 |
|
Alabama | Franklin | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Utilities | $220,898.42 |
$276,123.03 |
|
Alabama | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $72,800.00 |
$91,000.00 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Bridge New Construction | $12,404,795.42 |
$15,505,994.28 |
|
Alabama | Jefferson | >= 200,000 | N/A | APPALACHIAN DEVEL HWY | New Construction Roadway | $22,027,586.08 |
$27,534,482.60 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Preliminary Engineering | $115,541.47 |
$130,484.84 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Utilities | $347,418.30 |
$434,272.88 |
|
Alabama | Jefferson | >= 200,000 | N/A | APPALCHIAN DEV HWY DEMO'S | Preliminary Engineering | $1,642,000.00 |
$1,642,000.00 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Bridge New Construction | $116,541,075.78 |
$145,676,344.73 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | New Construction Roadway | $18,485,189.51 |
$23,106,486.89 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Preliminary Engineering | $3,123,827.36 |
$3,904,784.20 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Utilities | $5,544,572.72 |
$6,930,715.90 |
|
Alabama | Jefferson | >= 200,000 | State | APPALCHIAN DEV HWY DEMO'S | Preliminary Engineering | $1,853,555.96 |
$1,853,555.96 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | New Construction Roadway | $58,908,477.92 |
$58,984,942.50 |
|
Alabama | Jefferson | >= 200,000 | State | APPALACHIAN DEVEL HWY | Utilities | $4,095,822.30 |
$5,119,777.87 |
|
Alabama | Jefferson | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $1,309,229.92 |
$1,636,537.40 |
|
Alabama | Jefferson | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | $5,492,680.58 |
$7,488,906.66 |
|
Alabama | Jefferson | >= 200,000 | Other | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $8,000,000.00 |
$10,000,000.02 |
|
Alabama | Statewide | N/A | Other | FAST ACT NATIONAL FREIGHT | Debt Service | $719,942.22 |
$899,927.78 |
|
Alabama | Jefferson | >= 200,000 | Other | HIGHWAY INFRA PRGM - COVID APP | Facilities for Pedestrians and Bicycles | $2,500,000.00 |
$2,500,000.00 |
|
Alabama | Statewide | N/A | Other | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $817,600.00 |
$1,022,000.00 |
|
Alabama | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $33,170,923.52 |
||
Alabama | Madison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $4,936,028.31 |
$17,911,760.64 |
|
Alabama | Madison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $938,138.00 |
$1,200,000.00 |
|
Alabama | Madison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Utilities | $3,394,637.69 |
$4,243,297.11 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,378,889.66 |
$2,973,612.08 |
|
Alabama | Madison | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $2,807,251.00 |
$2,807,251.00 |
|
Alabama | Madison | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,342,017.55 |
$15,427,521.94 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,724,983.17 |
$10,906,228.96 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,297,444.82 |
$1,621,806.03 |
|
Alabama | Jefferson | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,284,740.11 |
$4,105,925.14 |
|
Alabama | Jefferson | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,183,133.89 |
$1,478,917.37 |
|
Alabama | Jefferson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,571,934.71 |
$21,964,918.39 |
|
Alabama | Jefferson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,426,842.49 |
$6,783,553.11 |
|
Alabama | Jefferson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $455,560.00 |
$569,450.00 |
|
Alabama | Jefferson | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $1,571,648.38 |
$1,964,560.48 |
|
Alabama | Jefferson | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $78,599.33 |
$98,249.17 |
|
Alabama | Jefferson | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Right of Way | $652,432.00 |
$815,540.00 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $19,742,764.18 |
$24,678,455.22 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $518,432.67 |
$673,849.26 |
|
Alabama | Mobile | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $853,635.00 |
$1,067,043.75 |
|
Alabama | Mobile | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,100,000.00 |
$1,375,000.00 |
|
Alabama | Mobile | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $500,000.00 |
$625,000.00 |
|
Alabama | Mobile | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,580,754.71 |
$10,729,545.00 |
|
Alabama | Mobile | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,195,188.70 |
$1,497,162.57 |
|
Alabama | Mobile | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $11,363,000.00 |
$14,204,800.66 |
|
Alabama | Mobile | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,313,819.48 |
$1,642,274.35 |
|
Alabama | Mobile | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,193,362.08 |
$6,491,702.60 |
|
Alabama | Mobile | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,263,530.41 |
$1,579,413.02 |
|
Alabama | Morgan | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $20,950,118.45 |
$26,187,648.07 |
|
Alabama | Morgan | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $1,073,447.97 |
$1,341,809.96 |
|
Alabama | Morgan | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Right of Way | $13,607.25 |
$17,009.06 |
|
Alabama | Morgan | >= 50,000 AND < 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - Restoration & Rehabilitation | $741,493.00 |
$926,866.25 |
|
Alabama | Coffee | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Utilities | $291,525.42 |
$364,406.78 |
|
Alabama | Coffee | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,699,133.00 |
$2,123,916.25 |
|
Alabama | Coffee | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $7,529,662.00 |
$9,412,077.50 |
|
Alabama | Coffee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,939,494.66 |
$7,424,368.32 |
|
Alabama | Coffee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $238,451.00 |
$298,063.75 |
|
Alabama | Coffee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,988,112.15 |
$6,235,140.19 |
|
Alabama | Statewide | N/A | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $270,111.39 |
$337,639.24 |
|
Alabama | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $18,611,317.52 |
$21,335,563.70 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $7,002,879.84 |
$8,753,679.82 |
|
Alabama | Geneva | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $30,430.46 |
$38,038.08 |
|
Alabama | Russell | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $345,253.18 |
$431,566.48 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,172,213.00 |
$5,215,228.30 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $448,444,304.96 |
$563,952,324.48 |
|
Alabama | Shelby | >= 200,000 | Local | BRIDGE PROGRAM - 85% ON/OFF | 4R - No Added Capacity | $1,008,976.87 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $688,107.82 |
$45,656,093.71 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,315,926.24 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $6,236,035.81 |
||
Alabama | Coosa | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $516,703.04 |
$929,643.56 |
|
Alabama | Fayette | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $516,703.04 |
$929,643.56 |
|
Alabama | Coosa | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,782,205.51 |
$3,477,856.59 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $3,941,236.24 |
$5,379,283.65 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $378,541.44 |
||
Alabama | Statewide | N/A | State | BRIDGE PROGRAM - 85% ON/OFF | 4R - No Added Capacity | $577,413.66 |
||
Alabama | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,821,408.00 |
$2,277,287.22 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,120,842.83 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,073,901.18 |
$32,660,818.93 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $10,099,993.60 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $685,997.02 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $12,106,875.54 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $4,789,441.95 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,027,094.15 |
$3,142,843.69 |
|
Alabama | Statewide | N/A | State | TECHNOLOGY DEPLOYMENT GRANTS T | Bridge Replacement - Added Capacity | $479,670.00 |
$599,587.50 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,021,192.82 |
$34,414,981.73 |
|
Alabama | Lowndes | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,053,326.02 |
$1,316,657.53 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $52,931.90 |
$1,776,164.69 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,630,835.85 |
||
Alabama | Lawrence | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $267,054.08 |
$4,894,814.51 |
|
Alabama | Fayette | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,466,873.54 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $147,038.56 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $922,052.03 |
$34,697,227.08 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,654,928.21 |
||
Alabama | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $474,853.48 |
$602,846.47 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $481,648.46 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $196,168.00 |
$12,901,171.61 |
|
Alabama | Statewide | N/A | State | CARBON REDUCTION PROGRAM | Safety | $257,615.07 |
$514,256.38 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $522,124.30 |
$22,899,184.66 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,476,376.79 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,246,330.23 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $6,057,406.57 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $847,457.84 |
$2,979,182.43 |
|
Alabama | Macon | >= 5,000 AND < 50,000 | Local | BRIDGE PROGRAM - 15% OFF SYST | Bridge Replacement - No Added Capacity | $1,640,908.85 |
||
Alabama | Statewide | N/A | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $4,311,305.81 |
||
Alabama | Russell | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Debt Service | $13,499,999.98 |
$13,499,999.98 |
|
Alabama | Russell | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $402,800.00 |
$476,416.67 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,191,218.40 |
$28,984,962.07 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,707,394.35 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,236,103.57 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $649,822.86 |
$10,995,583.53 |
|
Alabama | Lauderdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $9,348,622.67 |
||
Alabama | Russell | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,274,800.95 |
||
Alabama | Russell | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,065,734.78 |
$7,582,168.48 |
|
Alabama | Statewide | N/A | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $855,402.96 |
||
Alabama | Statewide | N/A | N/A | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $222,884.77 |
$278,605.96 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,551,524.16 |
||
Alabama | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $940,284.07 |
$1,175,355.09 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $712,374.02 |
$25,425,846.15 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,902,156.33 |
$20,726,049.12 |
|
Alabama | Marion | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $21,675.18 |
$27,093.98 |
|
Alabama | Statewide | N/A | N/A | BRIDGE PROGRAM - 15% OFF SYST | Bridge Replacement - No Added Capacity | $597,911.60 |
||
Alabama | Shelby | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $114.20 |
$142.75 |
|
Alabama | Jefferson | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $380,546.47 |
$475,683.09 |
|
Alabama | Statewide | N/A | N/A | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $742,707.00 |
$742,707.00 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,852,097.15 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $20,461,887.75 |
||
Alabama | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $629,726.06 |
$787,158.86 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $9,111,429.06 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,537,349.95 |
$22,081,736.76 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $436,177.30 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $20,082,561.22 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,537,723.51 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,828,137.12 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,837,073.16 |
$27,137,006.73 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,306,625.50 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $199,405.88 |
$291,498.60 |
|
Alabama | Russell | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $262,806.00 |
$328,507.50 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $18,481,370.75 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,970,332.10 |
||
Alabama | Russell | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,835,571.01 |
$3,544,463.76 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $17,206,474.72 |
||
Alabama | Lamar | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $624,955.71 |
||
Alabama | Coosa | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $113,678.63 |
$147,964.43 |
|
Alabama | Statewide | N/A | N/A | BRIDGE PROGRAM - 15% OFF SYST | Bridge Replacement - No Added Capacity | $279,272.14 |
||
Alabama | Statewide | N/A | N/A | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $420,363.85 |
$525,454.82 |
|
Alabama | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,664,310.00 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,086,972.60 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $29,677,115.97 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,627,049.28 |
$3,225,994.37 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $6,927,714.66 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $923,351.76 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,400,561.33 |
$10,803,628.27 |
|
Alabama | Shelby | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $5,288,820.81 |
$6,611,026.01 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,086,112.70 |
||
Alabama | Cleburne | >= 5,000 AND < 50,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $2,815,132.20 |
$3,758,211.13 |
|
Alabama | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $9,515,402.99 |
$11,216,231.01 |
|
Alabama | Limestone | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,212,240.10 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,425,224.95 |
||
Alabama | Lauderdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $31,438.09 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $932,852.08 |
$14,270,111.78 |
|
Alabama | Russell | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $201,338.73 |
$251,673.41 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $11,568,366.14 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $12,711,371.78 |
||
Alabama | Lauderdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $88,567.38 |
$113,198.31 |
|
Alabama | Statewide | N/A | State | CARBON REDUCTION PROGRAM | Debt Service | $206,995.68 |
$258,994.03 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,854,141.87 |
$25,001,070.95 |
|
Alabama | Madison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $10,285,552.48 |
$12,856,940.60 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,385,141.05 |
$2,709,445.62 |
|
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,786,159.90 |
||
Alabama | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,238,768.90 |
||
Alabama | Greene | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $71,525.42 |
$89,406.78 |
|
Alabama | Greene | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $4,190,700.31 |
$5,261,902.59 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,644,311.63 |
$25,612,424.45 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $7,990,356.12 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,743,567.50 |
||
Alabama | Tuscaloosa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $757,477.94 |
||
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $209,959.53 |
$8,532,570.85 |
|
Alabama | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $573,738.19 |
||
Alabama | Marion | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $78,089.59 |
$86,766.21 |
|
Alabama | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,433,329.48 |
$24,925,921.64 |
|
Alabama | Jefferson | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Debt Service | $40,583,177.75 |
$45,092,419.74 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $286,168,734.50 |
||
Alabama | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $10,005,352.23 |
$11,117,058.04 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,592,848.63 |
$8,499,748.43 |
|
Alabama | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $438,105.96 |
$486,784.40 |
|
Alabama | Jefferson | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Debt Service | $52,109,998.80 |
$57,899,998.63 |
|
Alabama | Jefferson | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | $58,375,730.19 |
$64,861,922.47 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $196,591,628.67 |
||
Alabama | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $175,490,559.38 |
||
Alabama | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $36,136,601.65 |
$40,151,779.59 |
|
Alabama | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,945,634.00 |
$5,495,148.89 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $40,481,684.10 |
$44,979,649.03 |
|
Alabama | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,487,306.76 |
$1,859,133.45 |
|
Alabama | Tuscaloosa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $19,909,113.42 |
$19,909,113.42 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $34,121,182.87 |
$42,651,478.59 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $34,290,072.72 |
$38,744,525.25 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,150,082.76 |
$1,277,869.73 |
|
Alabama | Tuscaloosa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $2,423.67 |
$3,029.59 |
|
Alabama | Tuscaloosa | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $502,681.51 |
$628,351.88 |
|
Alabama | Tuscaloosa | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Maintenance Resurfacing | $4,722,673.82 |
$5,903,342.28 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $7,904,834.87 |
$9,367,456.24 |
|
Alabama | Tuscaloosa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,667,956.28 |
$2,084,945.35 |
|
Alabama | Tuscaloosa | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - Maintenance Resurfacing | $100,000.00 |
$125,000.00 |
|
Alabama | Statewide | N/A | Other | FAST ACT NATIONAL FREIGHT | Debt Service | $11,795,616.68 |
$13,106,240.76 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $15,315,692.49 |
||
Alabama | Statewide | N/A | Other | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $13,329,701.02 |
$14,810,778.92 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | INTERSTATE - 56 | 4R - No Added Capacity | $67,471.21 |
$74,968.01 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $479,564.13 |
$532,849.04 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $630,540.00 |
$700,600.00 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,769,510.04 |
$24,188,344.49 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $11,783,349.38 |
$13,092,610.42 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $380,405.70 |
$422,673.00 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $281,182.27 |
$312,424.75 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,609,313.17 |
$17,343,681.30 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,117,517.61 |
$23,463,908.45 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,626,231.23 |
$9,584,701.36 |
|
Alabama | Etowah | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $6,376,201.36 |
$7,084,668.18 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $420,542.45 |
$467,269.40 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,420,000.00 |
$19,323,218.57 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $659,457.54 |
$732,730.60 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $31,500,000.00 |
$35,000,000.00 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | FTA HWY PROJ. TRF FHWA | 4R - No Added Capacity | $10,000,000.00 |
$12,500,000.00 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,999,633.02 |
$31,110,703.36 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $813,486.79 |
$903,874.21 |
|
Alabama | DeKalb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,695,796.49 |
$9,661,996.10 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $76,356,870.60 |
$86,278,949.84 |
|
Alabama | Shelby | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $77,735,925.07 |
$96,194,906.34 |
|
Alabama | Shelby | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $114,539.04 |
$143,173.80 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $816,303.82 |
$1,020,379.78 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $1,150,000.00 |
$1,150,000.00 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $16,886,100.00 |
$21,107,625.00 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $914,022.51 |
$1,142,528.13 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $406,314.41 |
$507,893.01 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $3,599,585.59 |
$4,499,481.99 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $46,604,500.19 |
$51,782,777.98 |
|
Alabama | Conecuh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,530,000.00 |
$1,700,000.00 |
|
Alabama | Limestone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $22,406,263.94 |
$25,855,711.55 |
|
Alabama | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $7,759,070.82 |
$8,953,580.88 |
|
Alabama | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $104,173.34 |
$115,748.16 |
|
Alabama | Limestone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $300,826.66 |
$334,251.84 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $16,000,000.00 |
$17,777,777.78 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | 4R - Restoration & Rehabilitation | $10,855,000.00 |
$13,568,750.00 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $613,000.00 |
$681,111.11 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $10,184,229.51 |
$11,315,810.57 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,913,670.00 |
$2,126,300.00 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $157,060.44 |
$174,511.60 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $346,129.50 |
$384,588.33 |
|
Alabama | Lee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $390,735.26 |
$434,150.29 |
|
Alabama | Macon | >= 5,000 AND < 50,000 | Other | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $478,324.00 |
$531,471.12 |
|
Alabama | Montgomery | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $421,676.00 |
$468,528.88 |
|
Alabama | Montgomery | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $584,034.07 |
$648,926.75 |
|
Alabama | Macon | >= 5,000 AND < 50,000 | Other | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $662,493.37 |
$736,103.74 |
|
Alabama | Macon | >= 5,000 AND < 50,000 | Other | INTERSTATE MAINTENANCE | Preliminary Engineering | $68,554.09 |
$76,171.21 |
|
Alabama | Montgomery | >= 200,000 | Other | INTERSTATE MAINTENANCE | Preliminary Engineering | $60,435.13 |
$67,150.14 |
|
Alabama | Montgomery | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $18,179,599.00 |
$20,199,554.45 |
|
Alabama | Macon | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $20,621,850.33 |
$22,913,167.03 |
|
Alabama | Macon | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $123,949.41 |
$137,721.55 |
|
Alabama | Montgomery | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $109,270.01 |
$121,411.14 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,451,373.00 |
$24,945,970.00 |
|
Alabama | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $189,000.00 |
$210,000.00 |
|
Alabama | Madison | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $30,000,000.00 |
$30,000,000.00 |
|
Alabama | Madison | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Utilities | $404,417.00 |
$505,521.25 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,282,131.00 |
||
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $842,234.54 |
$1,052,793.17 |
|
Alabama | Madison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,223,092.14 |
$4,028,865.17 |