RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $458,669.63 |
$504,198.78 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $3,638,800.00 |
$4,000,000.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $17,956,763.97 |
$19,739,215.09 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,498,094.33 |
$20,585,016.31 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,850,931.95 |
$2,034,661.92 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,060,085.25 |
$3,363,840.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,151,056.77 |
$3,463,841.68 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,334,408.46 |
$2,566,130.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,429,690.54 |
$2,821,870.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,132,687.40 |
$2,344,385.40 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,219,735.86 |
$2,440,074.60 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $2,176.80 |
$2,392.87 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $2,176.80 |
$2,392.88 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,759,095.08 |
$3,032,972.50 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,759,095.09 |
$3,032,972.50 |
|
Alaska | Anchorage | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $33,694,139.32 |
$36,075,095.63 |
|
Alaska | Anchorage | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $5,054,120.98 |
$5,411,264.44 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $31,439,225.37 |
$33,660,840.86 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,311,683.96 |
$3,545,700.17 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $20,008,631.76 |
$21,422,517.93 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,376,243.30 |
$5,756,149.14 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $202,945.38 |
$217,286.28 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $36,362.04 |
$38,931.52 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $345,200.29 |
$369,593.48 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,655.38 |
$2,843.02 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $279.71 |
$299.48 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $190,211.58 |
$203,652.66 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,805,759.50 |
$1,933,361.34 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,772,037.29 |
$2,834,061.35 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | HSIP LIMITING FLEXIBLE | Construction Engineering | $924,012.43 |
$944,687.12 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,225,000.00 |
$3,228,782.25 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,075,000.00 |
$1,076,260.75 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | HSIP LIMITING FLEXIBLE | Safety | $5,294,834.99 |
$5,432,666.03 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $15,884,505.00 |
$16,297,998.10 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | HSIP LIMITING FLEXIBLE | Training | $261.60 |
$261.60 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $784.80 |
$784.80 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $545,944.50 |
$545,944.50 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | HSIP LIMITING FLEXIBLE | Utilities | $181,981.50 |
$181,981.50 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | CONGESTION AIR QUALITY | New Construction Roadway | $2,577,895.86 |
$2,833,786.81 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $901,033.02 |
$990,472.71 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $29,211.06 |
$36,513.83 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $9,217,824.41 |
$10,132,817.85 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,831,194.69 |
$2,012,965.47 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $21,690,921.31 |
$27,741,971.08 |
|
Alaska | Northwest Arctic | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $1,429.37 |
$1,571.25 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | BRIDGE REPLAC & REHAB - DISC | Construction Engineering | $4,343,656.34 |
$4,774,822.85 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | BRIDGE REPLAC & REHAB - DISC | Other | $15,733,383.30 |
$17,295,133.89 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | Local | FERRY BOATS & TERMINAL | Preliminary Engineering | $1,141,140.24 |
$1,426,425.33 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Other | $10,350,736.64 |
$11,378,186.92 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,893,471.53 |
$2,081,424.12 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,548,500.00 |
$5,000,000.00 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Training | $19,584.02 |
$21,528.00 |
|
Alaska | Ketchikan Gateway | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $64,019.23 |
$70,374.00 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Rehabilitation - Added Capacity | $5,299,015.49 |
$5,825,014.28 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - Added Capacity | $6,266,835.72 |
$6,888,903.73 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,398,193.50 |
$3,735,510.06 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGHWAY INFRASTRUCTURE | Preliminary Engineering | $1,214,097.43 |
$1,551,781.76 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,194,000.00 |
$20,000,000.00 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,247,266.67 |
$3,569,601.71 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $513,945.32 |
$564,961.32 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $114,114.98 |
$125,442.43 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $35,505,692.11 |
$39,030,111.17 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $308,749.01 |
$339,396.51 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,285,848.87 |
$1,413,486.72 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,626,068.12 |
$7,283,794.79 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $334,377.62 |
$367,569.11 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $4,759.55 |
$5,232.00 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,134,929.52 |
$2,346,850.08 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $17,033,928.74 |
$18,237,611.07 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $2,241,886.57 |
$2,400,306.82 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,891,373.80 |
$3,095,689.29 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $876,958.75 |
$938,928.00 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10.01 |
$10.72 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,239,856.22 |
$2,398,133.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,509,415.10 |
$2,788,239.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,493,592.10 |
$3,882,769.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $1,331,200.00 |
$1,331,200.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $14,526,850.64 |
$16,142,044.16 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $968.76 |
$1,076.40 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $1,255,828.78 |
$1,395,365.31 |
|
Alaska | Anchorage | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $909,700.00 |
$1,000,000.00 |
|
Alaska | Anchorage | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $90,970.00 |
$100,000.00 |
|
Alaska | Anchorage | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $14,637.00 |
$16,089.92 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,456,513.98 |
$25,784,889.50 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,778,591.71 |
$4,153,667.92 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $536,381.86 |
$589,625.00 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,104,964.00 |
$2,314,922.37 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $889,131.13 |
$977,389.20 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,058,674.18 |
$1,163,761.87 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $1,520.34 |
$1,671.25 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $11,981,184.84 |
$13,170,479.10 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,612,146.29 |
$27,055,233.91 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,947,798.40 |
$2,141,143.68 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,722,487.92 |
$8,489,049.06 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,331.69 |
$3,662.40 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,538,342.29 |
$4,988,834.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,920,642.05 |
$27,421,699.95 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,988,834.00 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $5,690,802.00 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $2,174,075.66 |
$2,389,882.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,554,690.34 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $690,362.35 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $258,885.88 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,626,192.98 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $120,575.61 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $45,215.85 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $717,079.26 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $28,321.96 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $75,525.23 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $23,592.50 |
$25,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $47,185.00 |
$50,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,192,476.56 |
$7,621,571.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $10,644,577.83 |
$11,701,195.81 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $179,501.27 |
$197,319.19 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $585.14 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Training | $61.63 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Training | $23.11 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $31,190.37 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,657,263.29 |
$13,595,583.57 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $93,608.13 |
$509,203.72 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | RURAL SECONDARY | Preliminary Engineering | $471,850.00 |
$520,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $849,327.80 |
$900,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $994,126.00 |
$9,572,053.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $141,555.00 |
$150,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,535,846.51 |
$1,688,300.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $94,370.00 |
$431,700.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSPORTATION PROJECT | Preliminary Engineering | $999,829.00 |
$999,829.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | URBAN SYSTEM NON ATTRIBUTABLE | Preliminary Engineering | $1,628,494.00 |
$1,725,647.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $5,458,200.00 |
$6,000,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $10,669,645.51 |
$11,728,751.80 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,896,203.79 |
$2,084,427.60 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Facilities for Pedestrians and Bicycles | $911,920.22 |
$1,002,440.61 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $10,894.59 |
$11,976.03 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $771,828.68 |
$848,443.09 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,460,620.12 |
$9,300,450.83 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,023,223.35 |
$6,621,109.54 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $235,239.10 |
$258,589.75 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,850,048.18 |
$4,232,217.42 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $2,392,236.50 |
$2,629,698.26 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $235,000.90 |
$258,327.91 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,994.28 |
$3,291.50 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $286,644.88 |
$315,098.25 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,385,008.18 |
$4,820,279.41 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $13,124,945.56 |
$14,427,773.51 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $13,134,643.57 |
$14,438,434.17 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $3,275,665.30 |
$3,600,819.28 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,135,208.23 |
$4,545,683.44 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,219,674.90 |
$1,340,744.09 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,950.03 |
$2,143.60 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $90,970.00 |
$100,000.00 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $349,557.60 |
$384,255.91 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | EQUITY BONUS - CHARGED TO LIM | Preliminary Engineering | $197,485.24 |
$217,088.31 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $771,662.69 |
$848,260.62 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $262,523.75 |
$288,582.77 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | $18,576,229.48 |
$20,420,170.92 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $59,741,669.60 |
||
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $8,875,956.29 |
||
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,000.00 |
$7,034,747.99 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,361,001.35 |
$2,595,362.61 |
|
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $9,646.20 |
||
Alaska | Yukon-Koyukuk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $773,886.97 |
$850,705.69 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $46,737,159.59 |
$51,376,453.32 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,540,414.37 |
$11,586,692.72 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,192,954.75 |
$3,509,898.59 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,364,550.00 |
$1,500,000.00 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,905.82 |
$2,095.00 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $14,039,594.37 |
$14,039,594.37 |
|
Alaska | North Slope | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,091,640.00 |
$1,201,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $857.17 |
$942.26 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $12,641.63 |
$13,896.48 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,144,758.24 |
$3,456,917.93 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $213,232.41 |
$234,398.60 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $1,046,767.96 |
$1,109,216.87 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,802,402.18 |
$4,179,841.90 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,222,122.80 |
$1,343,434.98 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $990,179.06 |
$1,088,467.70 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $714.69 |
$785.63 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,713,047.80 |
$1,883,090.90 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $312,627.54 |
$343,660.05 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,155,262.80 |
$6,766,255.69 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $96,214.53 |
$105,765.13 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,418,975.20 |
$1,559,827.63 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $68,330.98 |
$75,113.76 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $1,118,676.14 |
$1,229,719.84 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $7,368,635.73 |
$7,808,240.13 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,296,582.24 |
$10,623,076.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $737.45 |
$810.65 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $50.01 |
$54.97 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,772,579.28 |
$3,047,795.18 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $113,422.05 |
$124,680.72 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | URBAN SYSTEM NON ATTRIBUTABLE | Preliminary Engineering | $235,925.00 |
$255,000.00 |
|
Alaska | Copper River | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,465,134.69 |
$33,489,210.39 |
|
Alaska | Copper River | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,377,177.09 |
$2,613,143.99 |
|
Alaska | Copper River | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $532,420.00 |
$585,269.87 |
|
Alaska | Copper River | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,913,172.29 |
$3,202,343.95 |
|
Alaska | Copper River | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,958.40 |
$2,152.80 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | 4R - No Added Capacity | $17,133,218.36 |
$18,833,921.47 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Bridge Replacement - No Added Capacity | $5,514,424.97 |
$6,061,806.06 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Construction Engineering | $3,170,943.90 |
$3,485,702.87 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Training | $1,950.03 |
$2,143.60 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Utilities | $416,860.93 |
$458,240.00 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,713,135.67 |
$2,982,451.00 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $17,421,917.24 |
$19,151,277.62 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,038,800.18 |
$3,340,442.09 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $985,852.11 |
$1,083,711.23 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,148,090.63 |
$1,970,068.86 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,534,331.86 |
$1,686,635.00 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $14,625.25 |
$16,077.00 |
|
Alaska | Juneau | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,184,470.26 |
$1,302,044.92 |
|
Alaska | Haines | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $31,698,541.48 |
$34,845,049.44 |
|
Alaska | Hoonah-Angoon | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,288,674.27 |
$11,309,964.02 |
|
Alaska | Hoonah-Angoon | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,377,851.46 |
$1,515,847.03 |
|
Alaska | Haines | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,245,044.63 |
$4,670,197.37 |
|
Alaska | Haines | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,791.10 |
$11,862.26 |
|
Alaska | Hoonah-Angoon | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,502.56 |
$3,850.24 |
|
Alaska | Hoonah-Angoon | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $873,745.04 |
$960,476.02 |
|
Alaska | Haines | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,691,935.10 |
$2,959,145.98 |
|
Alaska | Skagway | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $8,536,644.08 |
$9,384,021.20 |
|
Alaska | Skagway | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,771,026.22 |
$3,081,087.96 |
|
Alaska | Skagway | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,509,976.38 |
$2,761,259.32 |
|
Alaska | Skagway | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $60,946.26 |
$66,996.00 |
|
Alaska | Skagway | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $9,392,437.43 |
$10,324,763.58 |
|
Alaska | Skagway | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,459,582.94 |
$2,703,729.74 |
|
Alaska | Skagway | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $85,933.90 |
$94,464.00 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $12,735,800.00 |
$21,621,999.38 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $189,468.43 |
||
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000,000.00 |
$1,070,663.81 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,569.60 |
||
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $199,849.00 |
$213,971.09 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,785,473.51 |
$2,982,305.69 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,319,991.16 |
||
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,312,982.44 |
||
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,893.86 |
||
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $12,372,798.20 |
||
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,702,567.10 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,710,687.50 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,711,387.26 |
$2,902,984.22 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,662,985.77 |
$1,780,498.68 |
|
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,551,675.96 |
$1,661,323.30 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,529,904.04 |
$2,708,676.70 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $24,912.69 |
||
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $15,279.81 |
||
Alaska | Southeast Fairbanks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $588,831.91 |
$630,441.02 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $960,051.11 |
$1,027,891.98 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $294,685.49 |
$315,509.09 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $2,089,358.00 |
$2,237,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $1,475,720.00 |
$1,580,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $140,059.97 |
$149,957.14 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,398,524.12 |
$17,557,306.36 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,640,007.13 |
$1,755,896.08 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $292,645.77 |
$313,325.22 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $833,277.44 |
$892,160.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,956.73 |
$2,095.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,257,204.03 |
$1,346,042.86 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $224,252.92 |
$240,099.49 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $115,200.00 |
$130,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,705,428.56 |
$11,461,914.95 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $10,372,105.21 |
$11,105,037.70 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,056,532.51 |
$3,272,518.75 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,305,112.00 |
$2,468,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,002.12 |
$2,143.60 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,195,866.69 |
$2,351,035.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge New Construction | $6,281,669.10 |
$6,281,669.10 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,458,689.30 |
$2,458,689.30 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Construction Engineering | $92,082.88 |
$92,082.88 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $44,153.91 |
$49,059.90 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,178,946.09 |
$1,309,940.10 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $167,400.00 |
$186,000.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $534,846.91 |
$534,846.91 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Right of Way | $20,031.09 |
$20,031.09 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $8,074,603.47 |
$14,426,489.33 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $302,410.20 |
$540,301.14 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $7,688.31 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Training | $287.94 |
||
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $674,730.00 |
$674,730.00 |
|
Alaska | Fairbanks North Star | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Utilities | $25,270.00 |
$25,270.00 |
|
Alaska | Anchorage | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $149,360.00 |
$186,700.00 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $10,640.00 |
$13,300.00 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $95,771.86 |
$119,714.83 |
|
Alaska | Anchorage | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $1,344,406.59 |
$1,680,508.23 |
|
Alaska | Anchorage | >= 200,000 | State | HIGH RISK RURAL ROAD | Construction Engineering | $1,269,105.33 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGH RISK RURAL ROAD | Construction Engineering | $133,347.86 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGH RISK RURAL ROAD | Safety | $82,465.09 |
$884,569.68 |
|
Alaska | Anchorage | >= 200,000 | State | HIGH RISK RURAL ROAD | Safety | $784,841.12 |
$8,418,673.62 |
|
Alaska | Anchorage | >= 200,000 | State | HIGH RISK RURAL ROAD | Training | $4,849.46 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGH RISK RURAL ROAD | Training | $509.54 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $93,277.78 |
$103,641.98 |
|
Alaska | Anchorage | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $887,748.32 |
$986,387.02 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,793,662.71 |
$2,991,074.18 |
|
Alaska | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $11,176,137.26 |
$13,295,823.62 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $293,536.66 |
$314,279.14 |
|
Alaska | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,012,471.41 |
$1,633,500.00 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,894,585.83 |
$2,028,464.51 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $199,068.55 |
$213,135.49 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $19,448,155.13 |
$30,022,435.90 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $894,006.12 |
$957,180.00 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,521,720.38 |
$6,982,570.00 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,600,620.00 |
$4,925,717.35 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $11,919.71 |
$12,762.00 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,470,553.11 |
$1,574,468.00 |
|
Alaska | Anchorage | >= 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $13,331.87 |
$13,331.87 |
|
Alaska | Anchorage | >= 200,000 | Other | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $1,500.94 |
$1,500.94 |
|
Alaska | Anchorage | >= 200,000 | Other | EMERGENCY RELIEF | Construction Engineering | $225.14 |
$225.14 |
|
Alaska | Anchorage | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $1,999.76 |
$1,999.76 |
|
Alaska | Anchorage | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $168,172.12 |
$180,055.80 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $50,261,884.64 |
$53,813,580.98 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,545,816.88 |
$2,725,714.00 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,420,863.48 |
$4,733,258.55 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,327,630.00 |
$6,775,611.15 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $4,933.39 |
$5,282.00 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,702,758.76 |
$2,893,746.00 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,611,542.43 |
$7,078,739.22 |
|
Alaska | Anchorage | >= 200,000 | Other | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $638,978.42 |
$684,131.06 |
|
Alaska | Anchorage | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $1,798,010.18 |
$1,925,064.44 |
|
Alaska | Anchorage | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | $5,066,534.50 |
$5,424,555.14 |
|
Alaska | Anchorage | >= 200,000 | State | CONGESTION AIR QUALITY | Utilities | $351,478.40 |
$376,315.20 |
|
Alaska | Anchorage | >= 200,000 | Other | CONGESTION AIR QUALITY | Utilities | $81,987.10 |
$87,780.62 |
|
Alaska | Anchorage | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,935,392.00 |
$2,072,154.18 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $17,045,276.04 |
$18,249,760.21 |
|
Alaska | Anchorage | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $6,057,564.89 |
$6,485,615.51 |
|
Alaska | Anchorage | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,216,382.40 |
$1,302,336.62 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,697,396.68 |
$5,029,332.64 |
|
Alaska | Anchorage | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $24.43 |
$26.16 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,275,983.46 |
$4,578,140.76 |
|
Alaska | Anchorage | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,732,307.37 |
$2,925,382.63 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $10,046,356.54 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,693,643.43 |
$16,694,092.85 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $34,990,877.98 |
$100,979,645.61 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $267,950.00 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $129,849.07 |
$139,024.70 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $35,619,831.53 |
$38,136,864.59 |
|
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $104,196,382.15 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $21,799,315.76 |
||
Alaska | Kenai Peninsula | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $345,637.50 |
||
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,332,192.02 |
$1,456,272.32 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $781,682.65 |
$868,536.28 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $9,708,482.16 |
$9,708,482.16 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $38,190,184.37 |
$40,888,848.36 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,674,191.91 |
$2,863,160.50 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,132,672.51 |
$6,566,030.52 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $22,368,299.46 |
$24,689,730.70 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $20,107.15 |
$21,528.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,151,807.36 |
$9,805,302.10 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $6,280,568.80 |
$6,905,000.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Right of Way | $679,590.42 |
$834,176.82 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Utilities | $516,626.56 |
$569,227.90 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Right of Way | $3,130,710.80 |
$3,475,823.18 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $14,405,118.93 |
$15,423,039.54 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $1,805,200.94 |
$1,932,763.32 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $90,345.82 |
$96,730.00 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,708,601.88 |
$7,182,657.26 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,127,160.61 |
$1,206,809.94 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,422,173.87 |
$1,719,830.10 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,033,594.15 |
$4,318,623.28 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $1,466.01 |
$1,569.60 |
|
Alaska | Matanuska-Susitna | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $494,525.91 |
$529,471.00 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,642,003.41 |
$20,860,985.70 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,752,486.09 |
$4,366,283.06 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,126,604.41 |
$2,476,878.38 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,755,300.00 |
$2,950,000.00 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $25,127.46 |
$26,903.06 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,260.77 |
$1,349.86 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $186,800.00 |
$200,000.00 |
|
Alaska | Denali | < 5,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $51,370.00 |
$55,000.00 |
|
Alaska | Denali | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $462,330.00 |
$496,000.00 |
|
Alaska | Denali | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $92,986.18 |
$99,556.94 |
|
Alaska | Statewide | N/A | State | FERRY BOATS & TERMINAL | Preliminary Engineering | $293,300.00 |
$366,625.00 |
|
Alaska | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,061,187.04 |
||
Alaska | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Ferry Boats | $36,312,584.00 |