RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $327,179.56 |
$1,135,579.06 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,248,758.30 |
$14,746,645.66 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $813,975.48 |
$1,472,799.01 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $62,680.93 |
$113,424.53 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $302,885.92 |
$1,112,051.42 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,933,280.75 |
$14,441,115.25 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $546,075.96 |
$1,663,335.34 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $46,960.84 |
$133,309.18 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $74,137.94 |
$78,586.04 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $200,106.06 |
$212,111.96 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,251,879.00 |
$3,448,440.00 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $198,293.00 |
$765,725.54 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $362,269.00 |
$442,487.89 |
|
Arizona | Maricopa | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $28,147,860.00 |
$30,681,167.00 |
|
Arizona | Maricopa | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,716,393.00 |
$1,870,869.00 |
|
Arizona | Maricopa | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $3,135,747.00 |
$3,417,964.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,682,434.00 |
$40,183,665.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,040,429.00 |
$9,100,492.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,392,682.00 |
$4,239,475.96 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,081,669.74 |
$7,579,743.71 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,669.00 |
$19,800.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $487,409.00 |
$4,000,860.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $55,578.00 |
$354,440.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $57,013.00 |
$540,567.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,014,249.00 |
$21,215,019.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $943,058.00 |
$999,638.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,345,821.00 |
$2,486,560.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,186,636.00 |
$3,377,820.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $357,101.00 |
$378,526.00 |
|
Arizona | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $30,694,084.00 |
$30,898,011.00 |
|
Arizona | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,319,943.00 |
$3,342,000.00 |
|
Arizona | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,687,401.00 |
$3,714,063.00 |
|
Arizona | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $409,465.00 |
$434,031.00 |
|
Arizona | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,152.00 |
$7,200.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINT DISC | Debt Service | $1,243,742.00 |
$1,243,742.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $1,254,500.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | $2,029,948.25 |
||
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $1,007,733.29 |
||
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $65,135,210.34 |
$65,135,210.34 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $25,597,763.36 |
$25,597,763.36 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,042,923.44 |
$2,042,923.44 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $1,072,271.37 |
$1,072,271.37 |
|
Arizona | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Other | $15,305.00 |
$16,223.73 |
|
Arizona | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $447,553.00 |
$474,404.00 |
|
Arizona | Pinal | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $80,706.00 |
$85,548.00 |
|
Arizona | Pinal | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $80,516.00 |
$85,347.00 |
|
Arizona | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $18,158,707.00 |
$22,698,384.00 |
|
Arizona | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $1,841,293.00 |
$2,301,616.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,182,368.81 |
$5,227,961.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,411,922.00 |
$10,514,902.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,727,509.19 |
$4,536,076.79 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,880,946.93 |
$2,304,593.65 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $20,400.00 |
$25,500.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,037,740.00 |
$1,100,000.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $375,150.00 |
$397,657.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,123,531.00 |
$2,250,934.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,193,862.00 |
$2,325,484.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,421,021.00 |
$1,506,276.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,330,194.00 |
$1,410,000.00 |
|
Arizona | Pinal | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $81,259.00 |
$101,574.00 |
|
Arizona | Pinal | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $357,078.19 |
$446,348.00 |
|
Arizona | Maricopa | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $27,000,000.00 |
$28,619,886.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $25,437,655.00 |
$25,437,655.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,695,411.00 |
$3,917,120.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $426,921.00 |
$452,534.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $310,250,583.25 |
$404,069,813.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $65,204,512.00 |
$123,049,693.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,284,194.00 |
$20,745,737.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,555,784.00 |
$18,543,513.93 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $41,891,088.00 |
$59,283,603.83 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $36,037,502.00 |
||
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,652,873.00 |
$10,232,004.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $35,745,054.00 |
$37,889,606.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $60,510,286.00 |
$64,140,646.00 |
|
Arizona | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $21,611,571.00 |
$22,908,174.00 |
|
Arizona | Pinal | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $29,995,703.00 |
$31,795,318.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $84,114.00 |
||
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $36,403,893.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,206,012.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $219,991.74 |
$10,835,679.31 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,195,112.26 |
$2,366,809.69 |
|
Arizona | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,183,249.00 |
$2,314,236.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $15,130,383.37 |
||
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge New Construction | $2,519,036.00 |
||
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | $594,066.00 |
||
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $1,157,515.40 |
||
Arizona | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $7,525,282.00 |
$7,976,767.78 |
|
Arizona | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $7,020,876.00 |
$7,442,099.22 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Training | $5,200.00 |
||
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $3,776,769.00 |
||
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $7,844,505.00 |
$8,315,142.19 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,643,294.61 |
$9,161,855.63 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $33,693,007.00 |
$38,597,633.36 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,601,562.00 |
$2,757,645.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,570,909.00 |
$3,785,148.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,525,287.00 |
$4,796,784.55 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $15,660,968.06 |
$20,702,032.40 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $24,057.00 |
$25,500.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,218,231.55 |
$5,531,303.66 |
|
Arizona | Pima | >= 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $4,605,263.00 |
$4,881,559.26 |
|
Arizona | Pima | >= 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Construction Engineering | $394,737.00 |
$418,419.55 |
|
Arizona | Pima | >= 200,000 | N/A | SURF TRANS PROJ | Preliminary Engineering | $993,500.00 |
$993,500.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,872,185.00 |
$3,044,503.92 |
|
Arizona | Pima | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Bridge New Construction | $2,195,543.92 |
$2,195,543.92 |
|
Arizona | Pima | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $2,286,905.00 |
$2,858,632.00 |
|
Arizona | Pima | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,697,974.00 |
$2,122,468.00 |
|
Arizona | Pima | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Safety | $314,611.00 |
$6,783,382.46 |
|
Arizona | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | $14,000,000.00 |
$14,839,941.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Bridge New Construction | $1,470,000.00 |
$1,470,000.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $19,748,000.00 |
$20,932,797.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $8,627,110.14 |
||
Arizona | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $584,418.00 |
||
Arizona | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Debt Service | $1,778,139.00 |
$4,755,246.00 |
|
Arizona | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $547,238.00 |
||
Arizona | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $4,812,402.00 |
||
Arizona | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Other | $74,006.00 |
$78,446.00 |
|
Arizona | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $1,337,004.00 |
$1,417,219.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $425,716.00 |
$451,258.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,915,669.00 |
$2,030,601.00 |
|
Arizona | Pinal | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $880,235.00 |
$933,046.00 |
|
Arizona | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $30,869,802.00 |
$38,587,253.00 |
|
Arizona | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $3,130,198.00 |
$3,912,747.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,450,000.00 |
$9,678,872.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $475,526.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,824,654.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,516,652.50 |
$8,537,135.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $9,791,868.50 |
$22,300,511.50 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $241,979.00 |
$3,264,263.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $780,062.00 |
$838,362.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,306,996.00 |
$4,565,397.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,363,841.00 |
$2,505,662.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $60,000.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $61,321.00 |
$65,000.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $7,547,200.00 |
$8,000,000.00 |
|
Arizona | Pinal | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,283,743.00 |
$4,540,750.00 |
|
Arizona | Pinal | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | $88,920.00 |
$94,255.00 |
|
Arizona | Pima | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $12,793,251.94 |
$12,878,248.00 |
|
Arizona | Pima | >= 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | $737.00 |
$742.00 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $784,888.00 |
$790,103.00 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $406,002.00 |
$408,700.00 |
|
Arizona | Pima | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | 4R - Added Capacity | $60,597.96 |
$61,001.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $201,819.00 |
$203,160.00 |
|
Arizona | Pima | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $66,192.00 |
$66,632.00 |
|
Arizona | Pima | >= 200,000 | State | MINIMUM GUARANTEE-CHRG TO LIM | 4R - Added Capacity | $2,397.00 |
$2,413.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $41,775,579.00 |
$56,702,667.50 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,895,019.50 |
||
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,685,553.50 |
$6,729,971.50 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,718,553.50 |
$1,729,971.50 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,771.50 |
||
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $602,257.50 |
||
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,148,213.17 |
$1,217,597.31 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,347,482.00 |
$1,489,466.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,370,431.00 |
$3,574,158.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $40,735.08 |
$43,178.66 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $113,501.00 |
$120,362.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $851,385.00 |
$857,041.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $693,912.00 |
$735,856.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $3,237,513.00 |
$3,433,206.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $1,345,093.00 |
$1,426,398.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $329,602.00 |
$331,792.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $652,854.00 |
$657,191.50 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $652,854.00 |
$657,191.50 |
|
Arizona | Pima | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Other | $4,991,160.00 |
$5,024,320.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $1,410,900.00 |
$1,420,274.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,987,000.00 |
$16,093,215.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,509,999.35 |
$6,553,250.50 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,509,999.35 |
$6,553,250.50 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $13,758,518.00 |
$13,849,927.50 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $12,853,913.00 |
$12,939,312.50 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,016,612.00 |
$5,049,941.50 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,160,449.00 |
$6,201,378.50 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $8,927,014.00 |
$9,867,433.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $4,227,415.00 |
$4,255,500.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,405,732.00 |
$5,732,484.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,897.50 |
$7,950.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,897.50 |
$7,950.00 |
|
Arizona | Pima | >= 200,000 | State | COORD BORDER INFRA PROGRAM | 4R - No Added Capacity | $3,011,018.56 |
$3,191,666.91 |
|
Arizona | Pima | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $4,707,642.00 |
$4,990,080.56 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,960,811.02 |
$31,931,482.78 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,157,164.14 |
$1,226,589.08 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $500,455.00 |
$560,158.14 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,117,987.24 |
$15,687,050.45 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,253,323.15 |
$4,055,906.78 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $17,556,209.00 |
$25,425,620.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $245,390.60 |
$3,601,612.35 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $118,149.51 |
||
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $71,358.00 |
$625,763.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,179,136.49 |
||
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $875,558.00 |
$1,428,390.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $634,809.69 |
$672,895.58 |
|
Arizona | Pima | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Other | $312,330.00 |
$331,209.00 |
|
Arizona | Pima | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $6,052,920.00 |
$6,418,791.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Training | $70,000.00 |
$74,200.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,132,935.51 |
$5,440,890.18 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $21,410,342.44 |
$22,764,918.98 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $8,416,337.00 |
$8,921,281.54 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,856,139.50 |
$1,967,500.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,096,998.00 |
$4,613,000.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $189,602.50 |
$385,312.19 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $115,095.00 |
$122,000.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $907,550.00 |
$962,000.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $2,170.00 |
$2,300.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $615,618.00 |
$652,552.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $367,816.49 |
$697,548.00 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $351,229.70 |
$372,302.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | $272,001.00 |
$288,320.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,099,168.02 |
$2,225,109.03 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $293,048.00 |
$310,629.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Other | $23,585.00 |
$25,000.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Training | $7,076.00 |
$7,500.00 |
|
Arizona | Pima | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $30,791.51 |
$32,638.87 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,909,226.75 |
$38,798,794.53 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,207,542.00 |
$10,843,898.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,243,826.00 |
$6,389,957.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,034,618.00 |
$1,108,456.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $8,991,473.83 |
$29,268,309.96 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $651,984.00 |
$691,394.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,836,868.65 |
$7,249,990.34 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $23,921,861.57 |
$25,362,011.48 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $54,906.00 |
$58,200.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,351,318.24 |
$6,841,127.49 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $110,989.33 |
$117,648.22 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $303,081.00 |
$321,401.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $3,718,784.00 |
$3,943,567.00 |
|
Arizona | Pima | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $5,279,404.05 |
$5,596,145.91 |
|
Arizona | Pima | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $189,088.81 |
$200,433.34 |
|
Arizona | Pima | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $16,073,519.13 |
$17,037,862.13 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,199,449.00 |
$8,747,057.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $472,912.00 |
$501,284.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,140,325.00 |
$1,600,360.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,536,884.00 |
$1,894,838.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $775,352.00 |
$822,218.00 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $667,316.55 |
$707,353.00 |
|
Arizona | Pima | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,549,262.00 |
$2,702,206.91 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,235,568.30 |
$2,369,693.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Other | $353,935.00 |
$375,170.00 |
|
Arizona | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $302,065.00 |
$320,187.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,768,096.82 |
$12,474,133.12 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $4,449,202.51 |
$4,716,136.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,321,711.00 |
$3,521,000.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,857,365.00 |
$3,028,795.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,124,526.00 |
$1,191,993.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $105,457.00 |
$111,784.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $566,555.00 |
$600,546.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,491.00 |
$9,000.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $912,907.82 |
$967,679.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $341,842.00 |
$362,351.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Added Capacity | $735,000.00 |
$779,096.88 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,670,301.00 |
$2,830,508.00 |
|
Arizona | Mohave | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - No Added Capacity | $2,588,400.35 |
$2,605,597.29 |
|
Arizona | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,815,142.00 |
$2,833,846.00 |
|
Arizona | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $19,755,974.20 |
$19,887,230.62 |
|
Arizona | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $850,480.80 |
$856,131.37 |
|
Arizona | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $7,106,384.00 |
$7,153,598.00 |
|
Arizona | Mohave | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $164,629.27 |
$165,723.04 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,753,152.00 |
$27,117,309.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,155,965.18 |
$6,196,864.05 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,028,814.20 |
$6,103,845.63 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $495,738.00 |
$547,502.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,989,994.00 |
$5,289,373.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $436,933.00 |
$463,147.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $30,398.00 |
$30,600.00 |
|
Arizona | Yavapai | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $16,247,057.90 |
$16,247,057.90 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $19,945,987.10 |
$19,945,987.10 |
|
Arizona | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $38,902,760.73 |
$48,628,451.20 |
|
Arizona | Yavapai | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $31,688,349.27 |
$39,610,436.80 |
|
Arizona | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Rehabilitation - Added Capacity | $5,246,656.00 |
$6,558,320.00 |
|
Arizona | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $2,719,421.14 |
$3,399,276.29 |
|
Arizona | Yavapai | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $2,215,111.86 |
$2,768,889.71 |
|
Arizona | Yavapai | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $4,142,320.68 |
$5,177,900.74 |
|
Arizona | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $5,085,380.32 |
$6,356,725.26 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $120,850,676.83 |
||
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $98,447,918.17 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $22,632,258.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,989,914.44 |
||
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,766,424.56 |
||
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $537,095.87 |
$49,847,391.45 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $737,653.13 |
$61,279,992.55 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,394,753.37 |
$7,933,119.36 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,379,047.63 |
$5,770,662.64 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $45,989.81 |
$48,749.20 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $56,460.19 |
$59,847.80 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,038,030.00 |
$34,746,079.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,348,427.00 |
$11,453,289.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,474,041.00 |
$4,500,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,716,229.00 |
$6,102,811.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,210,559.00 |
$3,404,622.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,717.00 |
$31,500.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,363,686.00 |
$6,745,480.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $2,912,000.00 |
$2,934,931.02 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $19,646,284.00 |
$19,648,691.76 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $3,600.00 |
$3,600.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,658,326.21 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $43,727.00 |
$651,791.90 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $441,180.00 |
$467,649.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,942,031.61 |
$23,094,455.09 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $323,384.39 |
$325,532.91 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,834,030.00 |
$2,852,859.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $364,599.00 |
$367,021.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $30,666.23 |
$30,869.97 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,175,536.74 |
$2,189,991.18 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,878,093.28 |
$2,897,214.50 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $40,568.95 |
$40,838.47 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $227.69 |
$229.20 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $16,163.31 |
$16,270.80 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $33,742.00 |
$35,766.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $85,707.00 |
$90,849.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $239,043.00 |
$253,385.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $7,838,045.99 |
$7,890,120.83 |
|
Arizona | Yavapai | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $4,690.01 |
$4,721.17 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,683.25 |
$10,754.22 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $17,806,107.75 |
$17,924,407.78 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,833,675.00 |
$1,845,858.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,964,306.00 |
$2,984,000.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,574.89 |
$2,593.57 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,306,365.11 |
$4,337,608.43 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $496,569.88 |
$526,360.99 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $298.12 |
$316.01 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,364.00 |
$5,400.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $5,975.39 |
$6,015.09 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,994,023.61 |
$10,060,422.91 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $301,707.61 |
$319,808.79 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $180.39 |
$191.21 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - Added Capacity | $22,703.92 |
$24,066.06 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - Added Capacity | $3,068,037.91 |
$3,252,107.47 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $560,323.51 |
$593,940.92 |
|
Arizona | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $1,946,319.00 |
$2,063,812.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,295,603.00 |
$1,373,329.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $590,690.19 |
$19,125,773.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $987,012.00 |
$1,046,766.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,380,790.66 |
$1,466,191.66 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,430.00 |
$10,000.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,979,886.00 |
$3,158,657.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,142,569.00 |
$3,331,110.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $37,720.00 |
$40,000.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $30,189.00 |
$32,000.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $68,868.00 |
$73,000.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $28,290.00 |
$30,000.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $462,908.00 |
$490,680.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $5,825,164.00 |
$7,174,650.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $500,000.00 |
||
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $3,150,645.00 |
$3,339,670.00 |
|
Arizona | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $5,112,130.00 |
||
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,057,620.00 |
$14,158,261.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $882,501.00 |
$1,438,281.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,040,332.00 |
$1,736,173.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,111,391.00 |
$1,178,070.00 |
|
Arizona | Pima | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $4,500,000.00 |
$4,769,981.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,955,869.00 |
$20,132,521.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,237,987.00 |
$5,552,244.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,639,352.00 |
$1,737,706.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,108,087.54 |
$6,491,990.61 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,138,706.53 |
$3,920,934.89 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,104.00 |
$20,250.00 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $143,365.00 |
$267,862.00 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $1,681,238.00 |
$4,075,497.00 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $188,452.00 |
$1,649,191.00 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $40,242.00 |
||
Arizona | Pinal | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $78,940.00 |
$83,712.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Inspection and Bridge Related Training | $5,658.00 |
$6,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,161,094.00 |
$7,593,948.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $479,984.00 |
$508,997.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,160,455.00 |
$5,472,381.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,245,076.50 |
$56,463,497.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,614,550.00 |
$11,256,151.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,384,977.00 |
$1,468,692.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $31,662,320.00 |
$33,576,161.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $8,416,894.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,066.00 |
$23,400.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $158,930.00 |
$2,290,561.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $47,906.00 |
$649,915.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $278,924.00 |
$3,649,700.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,404,803.50 |
$7,852,389.00 |
|
Arizona | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $14,833.00 |
$15,730.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $582,944.00 |
$1,466,885.00 |
|
Arizona | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $153,021.00 |
$162,270.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $168,440.00 |
$178,621.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $29,293,662.00 |
$31,051,158.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,284,317.00 |
$1,361,370.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,740,581.00 |
$3,965,000.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,730,404.00 |
$3,954,212.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $413,655.00 |
$438,473.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,094.00 |
$5,400.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $29,314.02 |
$13,407,052.35 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $83,726.22 |
||
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,746,000.00 |
$21,100,750.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,327,066.09 |
||
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $35,517.00 |
$37,648.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $340,794.59 |
$361,240.69 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $23,338,965.93 |
$24,739,205.43 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,867,823.07 |
$1,979,884.57 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $190,843.22 |
$202,293.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,384,638.78 |
$2,527,707.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,790,275.10 |
$2,957,679.64 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $223,306.90 |
$236,704.36 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $22,649.45 |
$24,008.28 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $282,947.55 |
$299,922.72 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,572.18 |
$1,666.62 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $125.82 |
$133.38 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,857,768.90 |
$36,427,872.47 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $544,661.00 |
$548,280.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,321,463.00 |
$5,356,818.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $10,484,250.00 |
$29,338,000.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,483,941.00 |
$4,513,731.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $29,566.00 |
$31,339.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $284,102.20 |
$301,147.96 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $23,842.00 |
$24,000.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $16,594.00 |
$17,590.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $197,861.24 |
$209,731.86 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - No Added Capacity | $50,000.00 |
$50,000.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,612,897.00 |
$35,853,957.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $734,100.00 |
$738,978.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,831,190.00 |
$2,850,000.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $13,141,538.34 |
$33,597,038.34 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,997,326.00 |
$4,023,884.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,948.00 |
$23,100.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Other | $7,081.00 |
$7,506.13 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Other | $35,517.00 |
$37,648.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $341,843.00 |
$362,352.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $108,602.63 |
$115,117.87 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,189,596.88 |
$10,276,231.59 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $619,543.99 |
$656,714.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,401,373.21 |
$1,485,449.66 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,294,833.33 |
$12,101,583.33 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $279,511.89 |
$1,256,017.47 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $857.48 |
$908.93 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,660.40 |
$6,000.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $10,732.17 |
$11,376.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,945,355.13 |
$3,123,388.77 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,999,605.47 |
$3,180,917.70 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $311,860.00 |
$330,710.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $16,067,781.49 |
$16,067,781.49 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,540,000.00 |
$11,177,094.50 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $21,193.63 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | $286,000.00 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $5,513,764.40 |
$10,121,882.23 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $2,730,908.30 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $998,000.00 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $2,723,428.50 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $3,845,907.00 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $311,000.00 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $85,000.00 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $187,734.56 |
$201,469.36 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $3,980,000.00 |
$4,220,573.64 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $3,298,854.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $24,804.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $5,393,500.00 |
$5,393,500.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,018.00 |
$3,200.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,799,384.36 |
$10,888,125.72 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $49,036.00 |
$52,000.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,263,183.00 |
$5,581,317.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,689,309.00 |
$1,791,420.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $39,547.00 |
$39,547.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $291,712.00 |
$309,345.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $16,572.35 |
$17,574.07 |
|
Arizona | Pinal | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $23,033.65 |
$24,425.93 |
|
Arizona | Pinal | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,290,175.77 |
$1,368,160.48 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $1,066,711.00 |
$1,131,189.79 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,409,535.35 |
$4,676,071.75 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Mitigation of Water Pollution due to Highway Runoff | $22,937.00 |
$24,323.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $2,720,125.85 |
$2,884,544.89 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Training | $15,560.00 |
$16,500.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,833,121.00 |
$9,051,336.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $978,466.98 |
$13,689,587.21 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,678,444.44 |
$17,159,944.44 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $30,520.00 |
$32,365.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $414,576.00 |
$439,635.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $70,757.00 |
$75,034.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $716,648.00 |
$759,966.00 |
|
Arizona | Pinal | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $6,552.00 |
$6,948.00 |
|
Arizona | Pinal | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,735,695.00 |
$2,901,055.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,648,503.07 |
$11,568,291.35 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,985,564.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,368,523.00 |
$5,693,025.20 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,073,233.00 |
$1,138,105.40 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $627,344.00 |
$665,264.25 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,287,689.00 |
$1,365,523.50 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,034,333.00 |
$3,217,745.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,077,690.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,471,912.00 |
$2,651,586.79 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $788,990.00 |
$2,473,426.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,606,892.93 |
$2,764,467.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,697,811.00 |
$1,800,436.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,412.00 |
$6,800.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,821,137.00 |
$4,052,107.00 |
|
Arizona | Pinal | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,335,005.12 |
$1,415,700.00 |
|
Arizona | Pinal | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,874,464.88 |
$3,048,213.00 |
|
Arizona | Pinal | >= 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Preliminary Engineering | $52,982.00 |
$56,184.00 |
|
Arizona | Pinal | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,022,171.00 |
$1,083,956.69 |
|
Arizona | Pinal | >= 200,000 | N/A | BRIDGE REP & REHAB-15% OFF SYS | Preliminary Engineering | $56,446.69 |
$59,859.00 |
|
Arizona | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $22,970,631.00 |
$24,359,100.00 |
|
Arizona | Pinal | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $9,809,777.00 |
$10,402,732.00 |
|
Arizona | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,320,162.00 |
$3,520,850.00 |
|
Arizona | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $5,395,922.00 |
$5,722,081.00 |
|
Arizona | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Training | $16,974.00 |
$18,000.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $16,142,707.00 |
||
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $126,695.00 |
$134,354.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $38,673.92 |
$41,011.58 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,206,024.00 |
$1,278,922.00 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $38,403.00 |
$40,724.00 |
|
Arizona | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,637,899.00 |
$1,637,899.00 |
|
Arizona | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $132,592.00 |
$132,592.00 |
|
Arizona | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $335,810.00 |
$1,135,513.00 |
|
Arizona | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $979,107.00 |
$1,038,290.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,630,325.00 |
$26,229,626.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,310,480.00 |
$6,220,737.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,931,743.00 |
$3,287,406.00 |
|
Arizona | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,184.00 |
$10,800.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $294,512.00 |
$312,314.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,418,362.00 |
$1,504,095.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,556,507.00 |
$1,650,591.00 |
|
Arizona | Pinal | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $754,829.00 |
$800,455.00 |
|
Arizona | Pinal | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,080,249.00 |
$1,145,545.00 |
|
Arizona | Pinal | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | $45,477.00 |
$45,798.00 |
|
Arizona | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $571,559.00 |
$575,588.00 |
|
Arizona | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $3,577,518.00 |
$3,602,737.50 |
|
Arizona | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $2,438,084.00 |
$2,491,469.10 |
|
Arizona | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $49,650.00 |
$53,800.90 |
|
Arizona | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Training | $7,150.00 |
$7,200.00 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,742,633.00 |
$4,852,018.00 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $14,114,456.00 |
$14,217,750.50 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,932.00 |
||
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,962,039.93 |
$3,006,743.59 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $911,736.07 |
$966,846.41 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $51,483.00 |
$54,595.00 |
|
Arizona | Pima | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $11,176,055.00 |
$11,851,596.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $1,525,996.00 |
$1,618,235.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $588,432.00 |
$624,000.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge New Construction | $1,694,935.00 |
$1,797,386.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge Rehabilitation - Added Capacity | $217,141.00 |
$230,266.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Construction Engineering | $2,746,790.00 |
$2,912,821.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Other | $2,957,863.00 |
$3,136,652.00 |
|
Arizona | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Training | $28,290.00 |
$30,000.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,490,451.00 |
$14,078,153.47 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,546,045.60 |
$16,485,732.07 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $251,421.44 |
$266,618.70 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $812,849.00 |
$861,982.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,642,579.15 |
$1,741,867.03 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $160,285.00 |
$1,160,803.64 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $602,985.79 |
$1,078,984.51 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $715,727.00 |
$5,130,901.63 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,315,341.34 |
$5,713,848.84 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,168,545.94 |
$4,420,515.22 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,455,260.99 |
$1,543,224.80 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,427,485.00 |
$4,712,485.00 |
|
Arizona | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $5,527.87 |
$5,862.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $35,242.00 |
$37,372.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $889,355.00 |
$943,112.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,061,153.24 |
$8,548,412.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,725,183.76 |
$25,152,999.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $358,380.52 |
$380,043.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,190,550.00 |
||
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,025,000.00 |
$2,322,375.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,338,986.70 |
$3,540,812.62 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,288,206.57 |
$1,418,792.99 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $47,150.00 |
$50,000.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $302,283.00 |
$320,555.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $40,334.00 |
$42,772.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $489,632.00 |
$519,228.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,474,677.54 |
$2,624,260.38 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $13,953.00 |
$14,797.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $528,997.00 |
$560,972.00 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,430.00 |
$10,000.00 |
|
Arizona | Mohave | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $61,492.22 |
$610,161.00 |
|
Arizona | Mohave | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $51,309.00 |
$1,088,209.00 |
|
Arizona | Mohave | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $298,339.00 |
$1,042,744.00 |
|
Arizona | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $965,227.04 |
$4,786,400.00 |
|
Arizona | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $643,450.00 |
$682,343.00 |
|
Arizona | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $208,020.00 |
$220,594.00 |
|
Arizona | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $2,122.00 |
$2,250.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,432,048.00 |
||
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,794,388.89 |
$13,944,888.89 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $71,005.00 |
$75,297.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $683,395.00 |
$724,703.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,365.00 |
$6,750.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,853,437.54 |
$1,965,468.58 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $29,508,027.45 |
$31,291,651.60 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,429,471.62 |
$4,697,212.74 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,139,060.75 |
$6,510,139.35 |
|
Arizona | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $64,220.00 |
$68,102.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $247,437.00 |
$262,393.00 |
|
Arizona | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $454,012.00 |
$481,455.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,994.00 |
$6,356.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,783.30 |
$23,100.00 |
|
Arizona | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $863,033.00 |
$915,199.00 |
|
Arizona | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $159,514.00 |
$169,156.00 |
|
Arizona | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,861,671.00 |
$1,974,200.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,408,925.00 |
$30,771,118.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $583,086.42 |
$618,328.05 |
|
Arizona | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $277,234.00 |
$293,992.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $21,915.78 |
$23,240.47 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $547,566.00 |
$580,664.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,985,039.85 |
$4,225,916.75 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $218,720.15 |
$231,940.79 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,281,129.00 |
$2,419,013.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $45,566.00 |
$48,319.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $472,173.00 |
$500,713.00 |
|
Arizona | Yavapai | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $406,299.00 |
$430,859.00 |
|
Arizona | Yavapai | >= 200,000 | State | REPURPOSED SPECIAL | Preliminary Engineering | $3,200,552.80 |
$3,394,012.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $21,178,301.00 |
$22,458,431.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $756,467.00 |
$802,192.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,185,983.00 |
$3,378,561.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,393,397.83 |
$6,779,849.44 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $101,987.17 |
$108,151.84 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,005,162.27 |
$1,065,919.68 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,848,601.73 |
$7,262,567.98 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $11,882.00 |
$12,600.00 |
|
Arizona | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,426,448.00 |
$20,667,375.00 |
|
Arizona | Yuma | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,950,759.00 |
$4,683,633.00 |
|
Arizona | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,291,490.00 |
$2,430,000.00 |
|
Arizona | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $202,471.00 |
$442,749.00 |
|
Arizona | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,226,174.00 |
$3,550,291.00 |
|
Arizona | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $6,790.00 |
$7,200.00 |
|
Arizona | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $454,960.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,563,123.24 |
$60,726,632.48 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $848,700.00 |
$900,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,288,766.00 |
$1,366,666.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $234,492.00 |
$4,254,763.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,070,616.00 |
$1,135,329.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $25,461.00 |
$27,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,640,898.76 |
$1,740,083.52 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,577,534.00 |
$2,733,334.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,730,409.00 |
$2,895,450.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,830,232.00 |
$29,701,601.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,338,353.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,070,457.00 |
$10,888,152.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,334,003.00 |
$14,509,661.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $9,952,865.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,658,276.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,066.00 |
$23,400.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $73,167,859.00 |
$77,592,614.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $608,182.00 |
$642,848.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $566,784.00 |
$601,044.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $271,747.00 |
$388,210.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $3,832,521.00 |
$5,475,030.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $815,243.00 |
$1,164,633.00 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $677,168.00 |
$967,384.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $77,537,498.00 |
$149,273,820.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $13,672,489.00 |
$14,498,927.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,700,263.00 |
$3,923,927.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $24,156,466.00 |
$43,919,041.07 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $14,538,238.00 |
$24,043,944.78 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $90,528.00 |
$96,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $6,000,000.00 |
$6,362,673.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,917,750.00 |
$8,396,342.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,998,312.00 |
$5,305,543.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,602,430.00 |
$2,289,186.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $51,073.00 |
||
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $51,073.00 |
||
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $10,747.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | COORD BORDER INFRA PROGRAM | Preliminary Engineering | $1,733,411.00 |
$1,838,190.00 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $8,182,982.60 |
$12,129,960.58 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $2,455.62 |
$3,640.07 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $3,411,948.78 |
$5,057,601.02 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,296,376.97 |
$1,921,664.15 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | FAST ACT NATIONAL FREIGHT | Construction Engineering | $389.03 |
$576.68 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Other | $1,324,511.52 |
$1,963,368.32 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | FAST ACT NATIONAL FREIGHT | Other | $397.48 |
$589.19 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Training | $2,697.19 |
$3,998.78 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | FAST ACT NATIONAL FREIGHT | Training | $0.81 |
$1.20 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Right of Way | $29,137.40 |
$30,898.87 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | INTERSTATE MAINTENANCE | Right of Way | $35.01 |
$37.13 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | MINIMUM GUARANTEE-CHRG TO LIM | Right of Way | $4.67 |
$4.95 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE-CHRG TO LIM | Right of Way | $3,887.35 |
$4,122.05 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,443,218.12 |
$22,739,361.29 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,183,727.01 |
$1,255,277.84 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $9,338,114.47 |
$9,902,560.41 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,195,919.65 |
$4,449,543.64 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,173,655.81 |
$6,546,826.17 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,054.06 |
$7,480.44 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,018,745.04 |
$1,080,323.06 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,223.96 |
$1,297.94 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $24,267.12 |
$25,733.96 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $20,198,328.15 |
$21,419,224.04 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,072.17 |
$7,499.65 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,791,174.57 |
$1,899,442.81 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $525.43 |
$557.19 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $961,113.71 |
$1,019,208.49 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,154.72 |
$1,224.51 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $14,384,599.74 |
$25,162,167.65 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $4,316.68 |
$7,550.90 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | $5,997,776.58 |
$10,491,498.87 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $683.86 |
$1,196.24 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,278,862.14 |
$3,986,276.29 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $2,328,317.30 |
$4,072,786.48 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Other | $698.70 |
$1,222.20 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Training | $4,743.58 |
$8,297.89 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Training | $1.42 |
$2.48 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Other | $653.50 |
$693.00 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $108,114.00 |
$114,649.00 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $543,927.50 |
$576,805.00 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $632,141.00 |
$670,351.00 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,372,263.54 |
$5,696,992.40 |
|
Arizona | Santa Cruz | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $6,454.46 |
$6,844.60 |
|
Arizona | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $314,093.73 |
$333,079.00 |
|
Arizona | Maricopa | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $10,821,351.29 |
$11,475,452.00 |
|
Arizona | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $13,434,397.41 |
$14,246,445.00 |
|
Arizona | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $5,287,706.99 |
$5,607,323.99 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $45,112,757.57 |
$47,839,614.79 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $4,304,770.00 |
$4,564,973.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,212,202.76 |
$8,708,592.98 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,177,240.00 |
$6,550,626.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,744,680.82 |
$7,152,365.75 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $880,744.00 |
$933,982.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $722,406.84 |
$766,073.06 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,601,000.00 |
$7,000,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,684,112.52 |
$2,846,437.65 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $947,715.00 |
$1,005,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,772.00 |
$4,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $282,900.00 |
$300,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $28,311.45 |
$30,023.00 |
|
Arizona | Maricopa | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $1,414,445.01 |
$1,499,943.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,798,575.55 |
$19,934,862.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | $774,074.58 |
$774,074.58 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $645,870.86 |
$684,910.78 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $8,011,331.53 |
$8,011,331.53 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $44,185,693.56 |
$56,945,819.81 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $36,030.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,086,075.00 |
$6,086,075.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $19,347,205.39 |
$20,530,045.39 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,500,000.00 |
$9,804,621.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $12,263.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $443,708.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $8,289,956.86 |
$8,289,956.86 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $52,134,819.00 |
$69,654,439.90 |
|
Arizona | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | $1,861,725.00 |
$1,861,725.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $3,723,200.00 |
$3,723,200.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,120,000.00 |
$4,369,035.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $17,827,505.15 |
$18,905,095.60 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $101,418.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $89,058.00 |
||
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,451,792.61 |
$6,451,792.61 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $15,453,771.00 |
$24,319,674.80 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $27,458,393.38 |
$29,926,089.54 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,431,310.00 |
$21,264,512.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,647,714.00 |
$1,747,311.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $190,945.00 |
$202,487.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,261,373.00 |
$1,937,513.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,093,738.00 |
$2,309,114.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $188,660.00 |
$385,687.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $13,579.00 |
$14,400.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,158,804.00 |
$66,875,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $283,211,196.00 |
$989,792,755.24 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,914,161.54 |
$3,090,309.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,100,000.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $346,584,838.46 |
$515,731,744.38 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $15,805,879.00 |
||
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $80,000,000.00 |
$84,835,631.00 |
|
Arizona | Yavapai | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $1,900,000.00 |
$1,913,394.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,167,027.00 |
$17,288,042.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $369,127.00 |
$371,729.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,930,469.00 |
$4,965,226.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,726,543.00 |
$2,765,656.00 |
|
Arizona | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,895,819.00 |
$4,131,303.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $170,118.00 |
$171,317.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $1,060,911.00 |
$1,068,390.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $893,700.00 |
$900,000.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $2,760,959.94 |
$2,927,847.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $393,735.00 |
$396,511.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge New Construction | $1,772,416.00 |
$1,784,910.00 |
|
Arizona | Yavapai | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Training | $32,769.00 |
$33,000.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,646,309.00 |
$24,890,940.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $62,232.00 |
||
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,218,327.00 |
$1,238,947.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,527,965.00 |
$1,620,324.08 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $361,169.00 |
$383,000.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $367,770.00 |
$390,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,501,677.00 |
$5,834,228.00 |
|
Arizona | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,162,919.00 |
$2,859,403.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $13,803,898.89 |
$14,638,281.16 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $10,239,963.11 |
$10,858,921.84 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,068,538.81 |
$1,162,810.28 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,440,357.19 |
$1,567,432.22 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Other | $22,865.43 |
$24,247.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $80,905.00 |
$85,796.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $1,618,581.47 |
$1,720,618.82 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $1,209,976.53 |
$1,286,231.21 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $146,381.35 |
$155,229.21 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $207,136.65 |
$219,656.79 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,319,022.61 |
$1,398,751.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $2,923.32 |
$3,100.14 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $2,168.68 |
$2,299.86 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $278,867.00 |
$295,723.00 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $455,713.12 |
$483,258.44 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $338,073.88 |
$358,508.56 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $47,975.08 |
$50,875.03 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $64,668.92 |
$68,577.97 |
|
Arizona | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $54,769.14 |
$58,079.40 |
|
Arizona | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $40,630.86 |
$43,086.60 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,069,864.00 |
$12,799,432.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,350,289.00 |
$5,673,689.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,085,304.00 |
$3,271,797.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,340,962.00 |
$1,422,017.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $96,812.00 |
$102,664.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,772.00 |
$4,000.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $9,715,000.00 |
$10,459,063.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $1,284,273.00 |
$1,361,901.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $1,386,253.41 |
||
Arizona | Maricopa | >= 200,000 | State | EMERGENCY RELIEF | 4R - Added Capacity | $180,347.00 |
$180,347.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $406,017.00 |
$430,559.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $572,659.00 |
$661,736.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,283,842.12 |
$27,154,377.65 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,255,366.00 |
$6,636,618.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $779,302.39 |
$834,472.54 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,573,098.94 |
$3,789,259.08 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $429,455.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,404,822.78 |
$3,604,130.79 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,640.00 |
$2,800.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,638,826.00 |
||
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $18,738.00 |
$18,738.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,651,568.00 |
$1,751,398.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,812,174.88 |
$9,344,830.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,269,417.00 |
$2,406,593.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $15,709,111.00 |
$16,658,653.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,776,549.00 |
$2,944,378.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $36,925,127.12 |
$39,522,177.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $3,501,129.00 |
$4,016,960.74 |
|
Arizona | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $63,030,422.61 |
$66,840,321.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $2,400,385.00 |
$2,545,477.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $816,563.00 |
$865,920.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $9,683,048.39 |
$10,268,344.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $685,515.00 |
$726,951.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $790,988.00 |
$838,800.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $14,920,805.00 |
$15,822,699.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $10,635,288.00 |
$11,278,142.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $16,722,576.00 |
$18,478,188.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $2,752,581.00 |
$2,918,961.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $8,487.00 |
$9,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $32,900.00 |
$34,889.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $12,975,000.00 |
$13,759,278.90 |
|
Arizona | Maricopa | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $516,538.00 |
$516,538.00 |
|
Arizona | Maricopa | >= 200,000 | State | EMERGENCY RELIEF | Other | $53,462.00 |
$53,462.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | 4R - Added Capacity | $7,707,783.86 |
$8,173,683.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | Construction Engineering | $1,152,018.00 |
$1,221,652.00 |
|
Arizona | Maricopa | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $1,356,777.00 |
$1,438,787.67 |
|
Arizona | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $8,301,293.01 |
$8,803,067.89 |
|
Arizona | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $1,822,765.00 |
$1,932,942.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $8,656,790.00 |
$9,180,053.41 |
|
Arizona | Maricopa | >= 200,000 | State | HIGHWAY INFRASTRUCTURE | 4R - Added Capacity | $11,300,902.07 |
$14,126,130.35 |
|
Arizona | Maricopa | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Construction Engineering | $1,614,166.00 |
$2,017,708.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $54,062,895.00 |
$57,306,439.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | $24,860,445.11 |
$26,351,967.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $11,293,569.61 |
$11,971,136.00 |
|
Arizona | Maricopa | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $8,795,379.00 |
$9,327,019.52 |
|
Arizona | Maricopa | >= 200,000 | State | INTERSTATE MAINTENANCE | Safety | $70,406.00 |
$74,630.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Right of Way | $44,370.09 |
$47,051.99 |
|
Arizona | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE-CHRG TO LIM | 4R - Added Capacity | $360,807.00 |
$382,616.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,150,040.00 |
$2,280,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $239,015.00 |
$253,462.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,217,255.99 |
$1,290,833.37 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $9,165,532.00 |
$9,894,889.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $20,395,042.11 |
$21,627,829.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,662,490.89 |
$4,908,906.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $3,280,425.00 |
$3,478,712.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $31,258,473.00 |
$33,147,903.92 |
|
Arizona | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $8,298.00 |
$8,800.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,547,192.00 |
$10,124,276.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $216,807.00 |
$229,912.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,165,160.00 |
$2,296,034.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $28,144,067.57 |
$29,845,071.04 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,187,494.18 |
$5,501,054.27 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,412,636.28 |
$4,951,946.52 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,533,643.97 |
$1,617,513.08 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,640.00 |
$2,800.00 |
|
Arizona | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $144,279.00 |
$153,000.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $319,918.00 |
$339,112.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,925,382.00 |
$4,160,888.00 |
|
Arizona | Maricopa | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $590,522.05 |
$625,951.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $24,548,328.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,106,798.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,400,885.00 |
$3,606,453.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $2,571,166.00 |
$2,726,581.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $37,745,180.00 |
$40,057,677.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $791,501.00 |
$839,344.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,643,592.00 |
$7,730,782.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,709,107.00 |
$1,812,415.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,734,175.00 |
$1,838,218.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,162,209.00 |
$5,474,241.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $42,435.00 |
$45,000.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $750,000.00 |
||
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $210,707.66 |
$223,349.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,356,598.00 |
$1,437,988.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $80,860.29 |
$85,712.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,190,101.00 |
$13,249,779.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $7,687,465.00 |
$8,152,137.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,904,860.00 |
$2,088,013.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,167,497.00 |
$2,337,209.00 |
|
Arizona | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,790.00 |
$7,200.00 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $714.41 |
$757.31 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,369.01 |
$3,572.54 |
|
Arizona | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,333,990.98 |
$4,583,515.47 |
|
Arizona | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $721,622.00 |
$765,241.00 |
|
Arizona | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $7,920,642.00 |
$7,920,642.00 |
|
Arizona | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $4,115,778.00 |
$4,115,778.00 |
|
Arizona | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,561,610.00 |
$1,561,610.00 |
|
Arizona | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $1,380,970.00 |
$1,380,970.00 |
|
Arizona | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Training | $21,000.00 |
$21,000.00 |
|
Arizona | Pinal | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $121,890.00 |
$129,258.00 |
|
Arizona | Pinal | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $61,553.00 |
$65,274.00 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $103,287.00 |
$11,458,382.00 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $884,059.00 |
||
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $71,370.63 |
$1,904,992.63 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,017,039.00 |
$3,564,869.00 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,968,565.72 |
$5,768,892.44 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $14,904,530.00 |
$15,805,440.00 |
|
Arizona | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $230,092.00 |
$244,000.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | $63,811.86 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $506,310.24 |
$711,914.40 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,157,264.00 |
$2,287,661.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $7,408,921.00 |
$8,696,334.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $11,455,567.00 |
$13,446,146.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,474,942.00 |
$2,905,000.00 |
|
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Other | $53,489.00 |
||
Arizona | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Training | $6,134.00 |
$7,200.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,768,100.00 |
$7,204,910.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $33,471,464.00 |
$36,024,548.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $13,509,020.00 |
$15,217,021.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $500,000.00 |
$4,536,215.00 |
|
Arizona | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $469,252.00 |
$497,616.00 |
|
Arizona | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $18,797,676.00 |
$30,337,342.00 |
|
Arizona | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $832,837.00 |
$2,809,120.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,353,438.00 |
$15,483,460.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $7,202,449.00 |
$7,637,804.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $902,530.00 |
$1,525,236.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $29,984.00 |
$31,795.00 |
|
Arizona | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $300,000.00 |
$318,134.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $552,598.00 |
$586,000.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $11,599.00 |
$12,300.00 |
|
Arizona | Pima | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $137,678.00 |
$146,000.00 |
|
Arizona | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $5,422,084.00 |
$5,422,084.00 |
|
Arizona | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $456,958.00 |
$456,958.00 |
|
Arizona | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $664,562.00 |
$704,433.00 |
|
Arizona | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $51,009.00 |
$54,069.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,098,880.00 |
$28,441,226.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $559,409.00 |
$2,315,973.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $110,267.00 |
$151,000.00 |
|
Arizona | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $3,874.00 |
$3,900.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | HIGH RISK RURAL ROAD | 4R - No Added Capacity | $5,033,031.00 |
$5,033,031.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | HIGH RISK RURAL ROAD | Construction Engineering | $511,143.00 |
$511,143.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $11,957,761.00 |
$12,677,783.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,198,832.00 |
$1,271,296.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Other | $1,963,581.00 |
$2,046,791.00 |
|
Arizona | Maricopa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $28,033.00 |
$29,727.00 |
|
Arizona | Maricopa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $283,157.00 |
$300,273.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $20,426,418.00 |
$21,661,100.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $44,321.00 |
$47,000.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,064,756.00 |
$2,189,561.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,778,996.37 |
$2,946,973.95 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $27,183.00 |
$28,826.00 |
|
Arizona | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $274,577.00 |
$291,174.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,393,946.63 |
$3,599,095.05 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $8,487.00 |
$9,000.00 |
|
Arizona | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $141,663.00 |
$150,226.00 |