DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Delaware
2015019
New Castle >= 200,000 State EQUITY BONUS EXEMPT LIM Construction Engineering
$4,975.49
$4,975.49
Delaware
2015019
New Castle >= 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering
$12,499.99
$12,499.99
Delaware
2015019
New Castle >= 200,000 State FAST ACT NATIONAL FREIGHT Other
$187,520.00
Delaware
2015019
New Castle >= 200,000 State FAST ACT NATIONAL FREIGHT Preliminary Engineering
$1,974.72
$1,975.72
Delaware
2015019
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$192,770.18
$192,770.18
Delaware
2015019
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$955,333.00
$955,333.00
Delaware
2015019
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR Traffic Management/Engineering - HOV
$491,456.54
$491,456.54
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$2,490,457.64
$2,490,457.64
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$5,559,577.71
$5,559,577.71
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,065,358.32
$1,065,358.32
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$579,915.04
$579,915.04
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$562,360.00
$562,360.00
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$789,019.02
$986,273.78
Delaware
2015019
New Castle >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$555,960.15
$555,960.15
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$9,693,330.82
$9,693,330.82
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,415,845.33
$3,415,845.33
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$982,524.52
$982,524.52
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,701,000.00
$1,701,000.00
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,251,865.91
$2,251,865.91
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,107,504.96
$1,107,504.96
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$4,400,000.00
$5,500,000.00
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$1,485,108.47
$1,485,108.47
Delaware
2015019
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$58,757.05
$58,757.05
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$2,513,206.00
$2,777,376.65
Delaware
K008006
Kent >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$5,833,201.84
$5,833,201.84
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$24,383,011.35
$24,398,711.35
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$622,568.88
$622,568.88
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,811,291.38
$5,811,291.38
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$382,246.37
$6,767,073.13
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$63,476.00
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$320,523.03
$405,923.03
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$1,501,721.92
$1,501,721.92
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$345,190.54
$345,190.54
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$4,057,600.00
$5,772,865.90
Delaware
K008006
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$9,541,058.06
$12,616,303.42
Delaware
K008006
Kent >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity
$2,207,752.68
$2,207,752.68
Delaware
K008006
Kent >= 50,000 AND < 200,000 N/A REPURPOSED SPECIAL 4R - No Added Capacity
$1,878,688.00
$1,878,688.00
Delaware
K008006
Kent >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity
$8,472,666.44
$8,472,666.44
Delaware
K104003
Kent >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$353,639.63
Delaware
K104003
Kent >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$6,833,398.74
$17,853,240.69
Delaware
K104003
Kent >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,280,000.00
$1,600,000.00
Delaware
K104003
Kent >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$319,945.53
$399,931.91
Delaware
K104003
Kent >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,362,163.96
$2,952,704.95
Delaware
K104003
Kent >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$720,000.00
$900,000.00
Delaware
K104003
Kent >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,405,600.00
$4,257,000.00
Delaware
K104003
Kent >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$222,390.73
$277,988.41
Delaware
N011031
New Castle >= 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity
$8,000,000.00
$8,000,000.00
Delaware
N011031
New Castle >= 200,000 State CONGESTION AIR QUALITY Construction Engineering
$104,000.00
$130,000.00
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$15,782,746.78
$16,022,048.37
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$2,480,620.00
$2,480,620.00
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$102,980.39
$112,761.61
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$4,425,000.00
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$995,527.04
$995,598.46
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$1,412,253.74
$1,412,253.74
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$12,090.00
$15,112.50
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$176,000.00
$220,000.00
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,788,385.20
$1,796,385.20
Delaware
N011031
New Castle >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$193,222.75
$193,222.75
Delaware
N011031
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$6,512,722.30
$6,512,722.30
Delaware
N011031
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,909,184.09
$2,909,184.09
Delaware
N011031
New Castle >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$500,000.00
$500,000.00
Delaware
N011031
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,259,472.96
$1,259,472.96
Delaware
N011031
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$18,137.60
$22,672.00
Delaware
N029003
New Castle >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$1,567,949.49
$1,959,936.87
Delaware
N029003
New Castle >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Other
$8,979,137.07
Delaware
N029003
New Castle >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$1,300,000.00
$1,300,000.00
Delaware
N029003
New Castle >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$2,890,355.93
$2,890,355.93
Delaware
N029003
New Castle >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$26,629.00
$26,629.00
Delaware
N029003
New Castle >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$4,000,000.00
$4,000,000.00
Delaware
N029003
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR New Construction Roadway
$753,547.00
$941,933.75
Delaware
N029003
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way
$53,600.00
$53,600.00
Delaware
N029003
New Castle >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway
$21,137.60
$26,422.00
Delaware
N029003
New Castle >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway
$986,851.03
$1,233,563.79
Delaware
N029003
New Castle >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Other
$46,500.00
Delaware
N029003
New Castle >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way
$2,368,876.02
$2,368,876.02
Delaware
N029003
New Castle >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway
$742,952.98
$928,691.25
Delaware
N029003
New Castle >= 200,000 State REPURPOSED SPECIAL New Construction Roadway
$3,060,357.45
$3,825,446.82
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$5,158,400.12
$6,448,000.14
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$10,899,996.90
$13,624,996.13
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$4,240,648.12
$5,300,810.15
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$1,425,516.73
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$543,749.77
$543,749.77
Delaware
N029003
New Castle >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$900,000.00
$900,000.00
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,037,279.71
$2,037,279.71
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$550,773.73
$688,467.16
Delaware
N029003
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,216,988.80
$1,521,236.00
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$12,025,125.98
$15,031,407.49
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$395,431.07
$494,288.84
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,233,733.60
$2,792,167.00
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$404,147.26
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$30,545.60
$38,182.00
Delaware
N032013
New Castle >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$298,012.32
$372,515.41
Delaware
N032013
New Castle >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way
$3,500,000.00
$3,500,000.00
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$890,268.08
$1,112,835.10
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$189,920.19
$237,400.24
Delaware
N032013
New Castle >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$9,034.40
$11,293.00
Delaware
N032013
New Castle >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$976,000.00
$1,220,000.00
Delaware
N056041
New Castle >= 200,000 State EQUITY BONUS EXEMPT LIM Safety
$4,260.80
$5,326.00
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,081,840.88
$1,352,301.10
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,788,125.84
$4,932,944.20
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$3,469,185.37
Delaware
N056041
New Castle >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$800,000.00
$1,000,000.00
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$564,494.48
$705,618.10
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$905,061.07
$1,131,326.33
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$26,537,950.44
$33,172,438.05
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$27,676,119.89
$34,595,149.86
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$1,461,325.98
$1,826,657.48
Delaware
N056041
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$893,579.20
$1,116,974.00
Delaware
N056041
New Castle >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Safety
$312,746.62
$390,933.28
Delaware
N056041
New Castle >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Safety
$446,930.00
$558,662.50
Delaware
N056041
New Castle >= 200,000 State REPURPOSED SPECIAL Safety
$486,899.63
$608,624.54
Delaware
N056041
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$10,160.00
Delaware
N056041
New Castle >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,853,266.42
$3,566,583.02
Delaware
N056041
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$97,461.92
$121,827.41
Delaware
N056041
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety
$669,545.00
$836,931.25
Delaware
N056041
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety
$4,066,169.37
$5,082,711.71
Delaware
N059047
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity
$39,782,387.30
Delaware
N059047
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$6,347,850.00
Delaware
N059047
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$55,754.56
Delaware
N060044
New Castle >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity
$56,807,160.00
$113,614,320.00
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$16,670,437.92
$131,209,067.24
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$4,219,000.00
$4,679,216.00
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$20,756,000.00
$20,756,000.00
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$2,988,212.09
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$13,224,988.00
$16,531,235.00
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,760,423.46
$2,200,529.32
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$1,000,000.00
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$3,426,565.45
Delaware
N060044
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$444,098.00
Delaware
N060044
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$2,299,119.32
$2,299,119.32
Delaware
N060044
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$1,135,000.00
$1,135,000.00
Delaware
N060044
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$1,003,920.55
$1,003,920.55
Delaware
N159002
New Castle >= 200,000 N/A BRIDGE PROGRAM - 15% OFF SYST Preliminary Engineering
$1,248,954.88
$1,561,193.60
Delaware
N159002
New Castle >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$10,400.00
$13,000.00
Delaware
N159002
New Castle >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$73,442.72
$91,803.40
Delaware
N159002
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$4,611,000.00
$5,763,750.00
Delaware
N159002
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$3,389,000.00
$4,236,250.00
Delaware
N159002
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity
$2,314,780.88
$2,893,476.10
Delaware
N159002
New Castle >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$716,727.93
$716,727.93
Delaware
N159002
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$6,513.00
Delaware
N159002
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$9,040.00
$11,300.00
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$3,606,826.06
$4,508,532.58
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$1,618,423.00
$2,023,028.75
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,732,371.09
$1,732,371.09
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,758,850.00
$2,758,850.00
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$305,600.00
$382,000.00
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$521,600.00
$652,000.00
Delaware
N159002
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$182,400.00
$228,000.00
Delaware
N356007
New Castle >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$9,071,760.77
$11,339,700.97
Delaware
N356007
New Castle >= 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$1,524,442.56
$1,905,553.20
Delaware
N356007
New Castle >= 200,000 State FAST ACT NATIONAL FREIGHT Traffic Management/Engineering - HOV
$715,356.26
$894,195.32
Delaware
N356007
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,600,000.00
$8,317,321.92
Delaware
N356007
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,000,000.00
$1,250,000.00
Delaware
N356007
New Castle >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other
$89,650.00
Delaware
N356007
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$350,000.00
Delaware
N356007
New Castle >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$200,000.00
$250,000.00
Delaware
N356007
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,488,000.29
$1,860,000.36
Delaware
N356007
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$754,000.00
$754,000.00
Delaware
N356007
New Castle >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,910,270.00
$2,910,270.00
Delaware
N356007
New Castle >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$545,000.00
$545,000.00
Delaware
N748001
New Castle >= 200,000 State FAST ACT NATIONAL FREIGHT Preliminary Engineering
$2,400,000.00
$3,000,000.00
Delaware
N748001
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$694,144.00
$867,680.00
Delaware
N748001
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$196,261,199.99
Delaware
N748001
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$80,000.00
$100,000.00
Delaware
N748001
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$7,468,800.00
$9,336,000.00
Delaware
N748001
New Castle >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$5,491,200.00
$6,864,000.00
Delaware
N748001
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$520,000.00
$650,000.00
Delaware
N748001
New Castle >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$1,745,856.00
$2,182,320.00
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$6,415,236.68
$14,193,904.29
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$1,896,215.27
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$451,184.00
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,000,000.00
$5,125,000.00
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$9,175,000.00
Delaware
S014014
Sussex >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,400,000.00
$2,400,000.00
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$247,642.45
$247,642.45
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$682,026.34
$682,026.34
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$112.43
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$430,190.00
$729,204.00
Delaware
S014014
Sussex >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$141,279.24
$141,279.24
Delaware
S014014
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$2,000,000.00
$2,000,000.00
Delaware
S014014
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$8,154,573.32
$8,154,573.32
Delaware
S014014
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$3,536.28
$3,536.28
Delaware
S014014
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$323,916.87
$323,916.87
Delaware
S014014
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$14,000.00
$14,000.00
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$6,291,101.00
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,100,000.00
$5,100,000.00
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only
$319,978.10
$319,978.10
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$591,000.00
$591,000.00
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$13,403,615.00
$85,137,649.65
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$50,000.00
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$755,000.00
Delaware
S113026
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$701,942.43
Delaware
S113027
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,229,428.51
$4,329,586.74
Delaware
S113027
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$13,205,889.11
$37,516,672.26
Delaware
S113027
Sussex >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$1,264,682.38
$1,264,682.38
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$180,273.60
$225,342.00
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,943,256.00
$2,429,070.00
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$12,688,885.48
$15,861,106.85
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$4,900,000.00
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$1,680,000.00
$2,100,000.00
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$289,964.43
$362,455.54
Delaware
S318005
Sussex >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$103,360.00
$129,200.00