U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
District Of Columbia

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
District Of Columbia
1104013
District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$169,393.06
$203,719.86
District Of Columbia
1104013
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$15,742,271.31
$19,788,288.72
District Of Columbia
1104013
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,016,939.95
$6,563,624.43
District Of Columbia
1104013
District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity
$38,344.71
$46,115.11
District Of Columbia
1104013
District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering
$828,346.98
$1,097,460.23
District Of Columbia
1104013
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$2,446,843.87
$2,942,686.55
District Of Columbia
1104013
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$301,986.02
$363,182.22
District Of Columbia
1116033
District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$113,975.04
$142,468.80
District Of Columbia
1116033
District of Columbia >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - No Added Capacity
$20,000,000.00
$25,000,000.00
District Of Columbia
1116033
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$713,037.19
$8,618,187.52
District Of Columbia
2016006
District of Columbia >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Restoration & Rehabilitation
$214,897.00
$258,444.98
District Of Columbia
2016006
District of Columbia >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Restoration & Rehabilitation
$276,495.03
$332,525.59
District Of Columbia
2016006
District of Columbia >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Restoration & Rehabilitation
$18,096,928.06
$22,263,396.80
District Of Columbia
2016006
District of Columbia >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering
$29,211.71
$32,457.46
District Of Columbia
2016006
District of Columbia >= 200,000 State RAIL HWY CROSSING HAZ ELI 4R - Restoration & Rehabilitation
$47,707.14
$89,501.41
District Of Columbia
2016006
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,577,047.66
$1,896,629.78
District Of Columbia
2016006
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$905,260.58
$1,088,707.85
District Of Columbia
2016010
District of Columbia >= 200,000 State HSIP LIMITING FLEXIBLE Traffic Management/Engineering - HOV
$1,464,750.00
$1,627,500.00
District Of Columbia
2016010
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$4,760,796.79
$5,745,240.98
District Of Columbia
2016010
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$330,625.43
$397,625.29
District Of Columbia
2016010
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$14,101,378.35
$16,993,505.15
District Of Columbia
2016010
District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$1,179,763.38
$1,418,837.50
District Of Columbia
2016016
District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity
$8,372,090.64
$9,534,385.47
District Of Columbia
2016016
District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Construction Engineering
$3,693,774.00
$4,617,217.50
District Of Columbia
2016016
District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Debt Service
$3,098,143.00
$3,725,968.73
District Of Columbia
2016016
District of Columbia >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity
$252,940.22
$169,815,681.53
District Of Columbia
2016016
District of Columbia >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service
$46,494,697.50
$56,711,308.16
District Of Columbia
2016016
District of Columbia >= 200,000 Other PUBLIC LANDS - BEGINNING FY 83 Bridge Rehabilitation - Added Capacity
$497,101.34
$497,101.34
District Of Columbia
2016016
District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$651,576.78
$783,616.09
District Of Columbia
2016016
District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$18,312,559.50
$298,018,083.73
District Of Columbia
2016016
District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,365,489.30
$1,642,200.00
District Of Columbia
2016049
District of Columbia >= 200,000 Local HIGH RISK RURAL ROAD Safety
$2,348,476.46
$4,614,858.78
District Of Columbia
2016049
District of Columbia >= 200,000 Local HSIP LIMITING FLEXIBLE Safety
$4,496,641.90
$22,211,366.51
District Of Columbia
2016049
District of Columbia >= 200,000 Local RAIL HWY CROSSING HAZ ELI Safety
$2,591,381.63
$2,879,312.93
District Of Columbia
2016049
Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Safety
$162,208.00
$1,895,078.77
District Of Columbia
2016049
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Safety
$5,575,142.00
$16,938,639.06
District Of Columbia
2016049
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety
$5,161,952.00
$11,726,000.00
District Of Columbia
2016051
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Tunnel Preventive Maintenance
$18,708,750.42
$22,500,000.51
District Of Columbia
2016051
District of Columbia >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Tunnel Preventive Maintenance
$27,351,521.41
$32,999,677.92
District Of Columbia
2016051
District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Tunnel Preventive Maintenance
$1,605,812.92
$1,931,224.20
District Of Columbia
2018005
Statewide N/A N/A FRA TRANSFER DEVELOPMENT 4R - No Added Capacity
$117,683,979.70
$117,683,979.70
District Of Columbia
2018005
Statewide N/A N/A FRA TRANSFER DEVELOPMENT Construction Engineering
$19,297,472.38
$20,749,153.38
District Of Columbia
2018006
Statewide N/A N/A NAT SIG FREIGHT AND HWY PROJ 4R - Restoration & Rehabilitation
$90,000,000.00
$90,000,000.00
District Of Columbia
2018017
District of Columbia >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Restoration & Rehabilitation
$3,057,670.18
$3,822,087.72
District Of Columbia
2018017
District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$26,190,532.97
$40,720,435.03
District Of Columbia
2018017
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$30,841,444.49
$37,091,334.30
District Of Columbia
2018017
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,366,000.00
$1,707,500.00
District Of Columbia
2018022
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$21,729,506.57
$32,858,491.52
District Of Columbia
2018023
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$12,285,399.88
$26,076,177.26
District Of Columbia
2018031
District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation
$9,419,723.40
$11,328,590.99
District Of Columbia
2018031
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$21,842,272.16
$26,281,537.31
District Of Columbia
2018045
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,130,128.32
$1,359,144.11
District Of Columbia
2018045
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$10,505,156.60
$12,633,982.68
District Of Columbia
2018045
District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Traffic Management/Engineering - HOV
$26,310.40
$31,642.09
District Of Columbia
2018045
District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Traffic Management/Engineering - HOV
$645,006.31
$775,714.15
District Of Columbia
2018045
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,268,878.32
$2,728,657.02
District Of Columbia
2018045
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$19,193,730.33
$23,083,259.57
District Of Columbia
2019026
District of Columbia >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$6,069,950.00
$7,344,048.50
District Of Columbia
2019026
District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$19,883,885.12
$23,913,271.33
District Of Columbia
2020037
District of Columbia >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Restoration & Rehabilitation
$3,753,768.84
$4,692,212.61
District Of Columbia
2020037
District of Columbia >= 200,000 State FRA TRANSFER DEVELOPMENT 4R - Restoration & Rehabilitation
$31,301.75
$31,301.75
District Of Columbia
2020037
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$35,659,814.55
$44,574,768.19
District Of Columbia
2020037
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$4,306,310.07
$5,382,887.59
District Of Columbia
2021023
District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation
$7,977,944.14
$27,908,046.73
District Of Columbia
2021023
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$571,433.43
$714,291.79
District Of Columbia
2021023
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$4,342,853.26
$5,428,566.57
District Of Columbia
2022022
District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$2,400,000.00
$26,414,101.47
District Of Columbia
2022035
District of Columbia >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP 4R - Restoration & Rehabilitation
$12,978,686.11
$12,978,686.11
District Of Columbia
2022035
District of Columbia >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation
$1,595,451.11
$1,994,313.89
District Of Columbia
2022035
District of Columbia >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$7,237,955.06
$11,261,562.15
District Of Columbia
2023011
District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM - COVID APP Bridge Rehabilitation - No Added Capacity
$6,617,951.89
$6,617,951.89
District Of Columbia
2023011
District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$20,124,815.20
$22,360,905.78
District Of Columbia
2023011
District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$31,838,039.10
$35,375,599.00
District Of Columbia
2023020
District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$11,700,000.00
$13,000,000.00
District Of Columbia
2023020
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$11,700,000.00
$13,000,000.00
District Of Columbia
2952185
District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$27,351,438.70
$34,189,298.37
District Of Columbia
2952185
District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$34,925,243.91
$43,656,554.89
District Of Columbia
2952185
District of Columbia >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity
$1,743,995.78
$2,179,994.73
District Of Columbia
2952185
District of Columbia >= 200,000 N/A BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity
$342,834.46
$428,543.08
District Of Columbia
2952185
District of Columbia >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Rehabilitation - No Added Capacity
$2,096,045.89
$2,620,057.37
District Of Columbia
2952185
District of Columbia >= 200,000 State EQUITY BONUS EXEMPT LIM Bridge Rehabilitation - No Added Capacity
$235,795.08
$261,994.54
District Of Columbia
2952185
District of Columbia >= 200,000 State EQUITY BONUS SP LIMITATION Bridge Rehabilitation - No Added Capacity
$404,872.09
$449,857.88
District Of Columbia
2952185
District of Columbia >= 200,000 State EXTENSION OF ALLOC PROGRAMS Bridge Rehabilitation - No Added Capacity
$284,753.30
$342,457.37
District Of Columbia
2952185
District of Columbia >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$15,838,242.00
$19,797,802.50
District Of Columbia
2952185
District of Columbia >= 200,000 State HIGHWAY BRIDGE PROGRAM Bridge Rehabilitation - No Added Capacity
$57,496.17
$71,870.21
District Of Columbia
2952185
District of Columbia >= 200,000 State HIGHWAY INFRASTRUCTURE Bridge Rehabilitation - No Added Capacity
$2,790,907.00
$3,488,633.75
District Of Columbia
2952185
District of Columbia >= 200,000 N/A INTERSTATE MAINTENANCE Bridge Rehabilitation - No Added Capacity
$890,003.46
$988,892.73
District Of Columbia
2952185
District of Columbia >= 200,000 State INTERSTATE MAINTENANCE Bridge Rehabilitation - No Added Capacity
$9,642,994.35
$10,714,438.16
District Of Columbia
2952185
District of Columbia >= 200,000 State MINIMUM GUARANTEE - TEA-21 Bridge Rehabilitation - No Added Capacity
$35,151.41
$43,939.26
District Of Columbia
2952185
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$19,543,486.83
$23,503,892.76
District Of Columbia
2952185
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$90,552,635.11
$147,036,478.52
District Of Columbia
2952185
District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity
$15,261,148.77
$16,956,831.96
District Of Columbia
2952185
District of Columbia >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$200,797.92
$223,108.80
District Of Columbia
2952185
District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$9,413,670.94
$11,149,138.39
District Of Columbia
2952185
District of Columbia >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Bridge Rehabilitation - No Added Capacity
$659,586.00
$793,248.34
District Of Columbia
2952185
District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Bridge Rehabilitation - No Added Capacity
$586,466.87
$719,709.47
District Of Columbia
2952185
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$3,479,728.95
$7,857,079.48
District Of Columbia
2952185
District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$344,957.57
$414,861.78
District Of Columbia
2952185
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$49,860,631.21
$57,502,487.28
District Of Columbia
2952185
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$5,635,590.10
$7,393,416.23
District Of Columbia
2952185
District of Columbia >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$348,182.39
$418,740.10
District Of Columbia
2952185
District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,500,000.00
$44,794,588.94
District Of Columbia
8888468
Statewide N/A State CONGESTION AIR QUALITY 4R - Restoration & Rehabilitation
$8,078,808.69
$10,098,510.87
District Of Columbia
8888468
District of Columbia >= 200,000 State EXTENSION OF ALLOC PROGRAMS 4R - Restoration & Rehabilitation
$44,074.96
$53,006.57
District Of Columbia
8888468
District of Columbia >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Restoration & Rehabilitation
$1,401,226.69
$1,685,179.42
District Of Columbia
8888468
District of Columbia >= 200,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation
$3,827.27
$4,602.85
District Of Columbia
8888468
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$39,679,349.60
$50,996,922.51
District Of Columbia
8888468
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$7,638,375.21
$9,432,690.01
District Of Columbia
8888468
District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Restoration & Rehabilitation
$20,497.13
$24,650.79
District Of Columbia
8888468
District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering
$124,725.00
$150,000.00
District Of Columbia
8888468
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$1,838,297.70
$2,210,821.05
District Of Columbia
8888468
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$7,786,676.96
$9,364,614.50
District Of Columbia
8888468
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,615,078.71
$1,942,367.66
District Of Columbia
8888468
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,151,260.49
$2,587,204.44
District Of Columbia
8888468
Statewide N/A State TECHNOLOGY DEPLOYMENT GRANTS T Research
$50,000.00
$55,000.00
District Of Columbia
8888468
Statewide N/A State TRANSPORTATION ALTERNATIVES 4R - Restoration & Rehabilitation
$3,924,845.53
$4,906,056.91
District Of Columbia
8888483
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,715,291.97
$7,403,007.84
District Of Columbia
8888483
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,224,367.73
$1,592,766.01
District Of Columbia
8888483
District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV
$7,931,624.74
$22,929,700.33
District Of Columbia
8888483
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$4,155,388.88
$5,522,461.07
District Of Columbia
8888483
District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV
$11,121,181.88
$13,383,553.35