U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Georgia

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Georgia
0000297
Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity
$358,628.66
$448,285.82
Georgia
0000297
Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Construction Engineering
$124,800.00
$156,000.00
Georgia
0000297
Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$1,102,468.32
$1,378,085.40
Georgia
0000297
Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way
$122,480.40
$153,100.50
Georgia
0000297
Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities
$65,872.80
$82,341.00
Georgia
0000297
Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$4,163,382.43
$5,204,228.04
Georgia
0000297
Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$146,400.00
$183,000.00
Georgia
0000297
Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$9,698,468.11
$12,123,085.13
Georgia
0000297
Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$335,908.81
$419,886.01
Georgia
0000297
Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$94,400.00
$118,000.00
Georgia
0000297
Upson >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,657,960.44
$2,072,450.55
Georgia
0000297
Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$611,051.49
$763,814.37
Georgia
0000297
Upson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$8,136,166.35
$10,170,207.94
Georgia
0000297
Upson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$301,261.11
$376,576.39
Georgia
0000297
Upson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$985,995.57
$1,232,494.46
Georgia
0000425
Hall >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$4,319,523.00
$5,399,403.75
Georgia
0000425
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$678,516.84
$848,146.05
Georgia
0000425
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$27,947,137.58
$34,933,921.98
Georgia
0000425
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$5,253,277.00
$6,566,596.25
Georgia
0000425
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$557,061.60
$696,327.00
Georgia
0000566
Bibb >= 50,000 AND < 200,000 Local EQUITY BONUS SP LIMITATION 4R - Added Capacity
$692,389.23
$865,486.54
Georgia
0000566
Bibb >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way
$6,696,586.36
$8,370,732.95
Georgia
0000566
Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$44,666,293.83
$56,363,848.83
Georgia
0000566
Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$1,615,521.69
$2,019,402.11
Georgia
0000566
Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,065,564.79
$1,331,955.99
Georgia
0000566
Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,060,000.00
$1,325,000.00
Georgia
0000566
Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$903,632.64
$1,129,540.80
Georgia
0000566
Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,450,613.64
$3,063,267.05
Georgia
0000566
Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,636,554.14
$2,045,692.67
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$38,545,178.43
$48,181,473.03
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$969,423.35
$1,211,779.19
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way
$16,000,000.00
$20,000,000.00
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,307,609.67
$1,634,512.09
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$1,117,729.80
$1,844,991.31
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$943,970.77
$1,179,963.46
Georgia
0000762
Lowndes >= 50,000 AND < 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering
$1,977,569.20
$2,471,961.50
Georgia
0001757
Fulton >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$719,921.00
$899,901.25
Georgia
0001757
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity
$321,280.39
$356,978.21
Georgia
0001757
Forsyth >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity
$38,719.61
$43,021.79
Georgia
0001757
Forsyth >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$479,032.47
$532,258.31
Georgia
0001757
Fulton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$6,305,871.51
$7,006,523.89
Georgia
0001757
Fulton >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$900,000.00
$1,000,000.00
Georgia
0001757
Fulton >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity
$164,231,796.98
$205,289,746.23
Georgia
0001757
Forsyth >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity
$19,792,650.02
$24,740,812.52
Georgia
0001757
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$1,106,907.65
$366,008,234.18
Georgia
0001757
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$9,184,693.95
$3,036,995,548.07
Georgia
0001757
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$32,606,955.10
$111,866,016.79
Georgia
0001757
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$3,929,677.83
$13,481,706.71
Georgia
0001757
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$29,001,622.83
$43,312,281.55
Georgia
0001757
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$14,150,211.52
$17,687,764.40
Georgia
0001757
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,705,788.48
$2,132,235.60
Georgia
0001757
Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,327,351.41
$1,659,189.26
Georgia
0001817
Clayton >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Rail/Hwy Crossing
$9,341,654.12
$11,677,067.65
Georgia
0001817
Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$69,711.10
$87,138.87
Georgia
0001817
Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,237,539.32
$1,546,924.16
Georgia
0001817
Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$1,076,163.26
$1,345,204.08
Georgia
0001817
Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$27,904,486.55
$34,880,608.17
Georgia
0001817
Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,964,000.00
$6,100,000.00
Georgia
0001817
Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$4,840,349.60
$6,408,421.00
Georgia
0002392
Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$1,345.26
$1,774.77
Georgia
0002392
Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$9,010,355.67
$11,262,944.59
Georgia
0002392
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$7,466,981.31
$9,597,046.37
Georgia
0002392
Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$755,646.60
$944,558.25
Georgia
0002392
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$33,600.00
$42,000.00
Georgia
0002392
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,040,000.00
$1,300,000.00
Georgia
0002392
Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities
$455,150.77
$568,938.46
Georgia
0002392
Forsyth >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$677,984.32
$847,480.40
Georgia
0002392
Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$761,553.50
$951,941.87
Georgia
0002392
Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$13,409,135.26
$16,762,314.00
Georgia
0002626
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$864,272.75
$1,080,340.93
Georgia
0002626
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$25,236,897.54
$31,546,121.92
Georgia
0002626
Bartow >= 50,000 AND < 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$993,539.21
$1,241,924.01
Georgia
0002626
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,642,741.54
$4,553,426.94
Georgia
0002626
Bartow >= 50,000 AND < 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$6,000.40
$7,500.50
Georgia
0002626
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,261,844.88
$1,577,306.10
Georgia
0002626
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$21,999.60
$27,499.50
Georgia
0002626
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,511,738.75
$1,889,673.44
Georgia
0002626
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$12,992,000.00
$16,240,000.00
Georgia
0002626
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,792,794.57
$2,240,993.21
Georgia
0004166
Fulton >= 200,000 N/A HSIP LIMITING FLEXIBLE Construction Engineering
$9,540.00
$10,600.00
Georgia
0004166
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering
$1,071,000.00
$1,190,000.00
Georgia
0004166
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering
$46,699.00
$51,887.78
Georgia
0004166
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering
$66,677.62
$74,086.24
Georgia
0004166
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Right of Way
$2,083,743.10
$2,315,270.11
Georgia
0004166
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Safety
$8,886,859.29
$29,060,280.36
Georgia
0004166
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Utilities
$704,425.50
$782,695.00
Georgia
0004166
Fulton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$197,100.00
$219,000.00
Georgia
0004166
Fulton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,902,256.90
$3,224,729.89
Georgia
0004428
Douglas >= 50,000 AND < 200,000 N/A EXTENSION OF ALLOC PROGRAMS Right of Way
$4,800,000.00
$6,000,000.00
Georgia
0004428
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,555,066.40
$4,443,833.00
Georgia
0004428
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$10,400,000.00
$16,930,300.00
Georgia
0004428
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$20,000.00
Georgia
0004428
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$503,107.43
$1,080,546.48
Georgia
0004428
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$530,644.80
$2,600,000.00
Georgia
0004915
Bartow >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$3,764,014.46
$4,705,018.07
Georgia
0004915
Floyd >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$2,694,486.67
$3,368,108.34
Georgia
0004915
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$19,753,591.51
$24,691,989.39
Georgia
0004915
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$26,572,182.75
$33,215,228.44
Georgia
0004915
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,697,332.52
$2,121,665.65
Georgia
0004915
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,697,332.52
$2,121,665.65
Georgia
0004915
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$66,441.90
$83,329.59
Georgia
0004915
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$91,700.23
$114,998.07
Georgia
0004915
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,704,238.10
$3,380,297.62
Georgia
0004915
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$10,296,000.00
$12,870,000.00
Georgia
0004915
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,931,764.52
$2,414,705.65
Georgia
0004915
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,436,613.03
$1,795,766.29
Georgia
0005088
Glynn >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Bridge Rehabilitation - Added Capacity
$101,552.90
$126,941.13
Georgia
0005088
Glynn >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$60,895,644.76
$76,119,555.93
Georgia
0005088
Glynn >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - Added Capacity
$4,019.20
$5,024.00
Georgia
0005088
Camden >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - Added Capacity
$2,196,817.99
$2,746,022.49
Georgia
0005088
Glynn >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$725,636.93
$907,046.16
Georgia
0005088
Glynn >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$37,311,906.88
$46,639,883.63
Georgia
0005088
Glynn >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Debt Service
$11,986,046.47
$14,982,558.09
Georgia
0006049
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$213,557.69
$266,947.11
Georgia
0006049
Paulding >= 50,000 AND < 200,000 Other EQUITY BONUS EXEMPT LIM Preliminary Engineering
$750.08
$937.60
Georgia
0006049
Cobb >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$219,601.47
$274,501.84
Georgia
0006049
Cobb >= 200,000 State EQUITY BONUS EXEMPT LIM Right of Way
$5,644,699.43
$7,061,522.67
Georgia
0006049
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Right of Way
$5,266,857.49
$6,588,842.49
Georgia
0006049
Paulding >= 50,000 AND < 200,000 Other EQUITY BONUS SP LIMITATION Preliminary Engineering
$608.48
$760.60
Georgia
0006049
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$173,244.32
$216,555.40
Georgia
0006049
Cobb >= 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$178,147.20
$222,684.00
Georgia
0006049
Cobb >= 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering
$2,653,121.97
$3,316,402.46
Georgia
0006049
Cobb >= 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$246,636.86
$308,296.07
Georgia
0006049
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$230,075.92
$287,594.90
Georgia
0006049
Cobb >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$11,728,673.36
$14,660,841.70
Georgia
0006049
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$37,446,711.29
$46,840,496.96
Georgia
0006049
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,164,203.63
$1,455,254.54
Georgia
0006049
Cobb >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$655,816.02
$819,770.03
Georgia
0006049
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$814,492.15
$1,018,115.19
Georgia
0006049
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$760,013.72
$950,017.15
Georgia
0006049
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$94,479.02
$118,098.78
Georgia
0006049
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$101,251.28
$126,564.10
Georgia
0006049
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$637,333.26
$6,730,025.58
Georgia
0006073
Tift >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity
$735,459.69
$919,324.61
Georgia
0006073
Tift >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Construction Engineering
$797,185.77
$996,482.21
Georgia
0006073
Tift >= 5,000 AND < 50,000 N/A EQUITY BONUS SP LIMITATION Debt Service
$6,441,526.06
$8,051,907.57
Georgia
0006073
Tift >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$24,541,816.01
$30,677,270.01
Georgia
0006073
Tift >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$136,870.09
$171,087.61
Georgia
0006073
Tift >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$6,245,499.32
$7,806,874.14
Georgia
0006073
Tift >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Debt Service
$8,300,135.54
$10,375,169.40
Georgia
0006073
Tift >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$78,905.30
$98,631.63
Georgia
0006073
Tift >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$80,494.25
$100,617.81
Georgia
0006073
Tift >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$26,223,332.49
$32,779,165.61
Georgia
0006073
Tift >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$4,164,877.92
$5,206,097.40
Georgia
0006857
Paulding >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$6,648,086.75
$8,310,108.44
Georgia
0006857
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$14,473,272.13
$18,091,590.16
Georgia
0006857
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$520,604.44
$650,755.55
Georgia
0006857
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,118,540.09
$2,648,175.11
Georgia
0006857
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$847.76
$1,059.70
Georgia
0006866
Cobb >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$5,469,703.06
$6,837,128.82
Georgia
0006866
Cobb >= 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$837,880.45
$1,047,350.56
Georgia
0006866
Cobb >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$4,769,668.48
$5,962,085.60
Georgia
0006866
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$12,066,155.24
$15,082,694.05
Georgia
0006866
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$507,416.51
$634,270.64
Georgia
0006866
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,009,204.08
$1,411,505.10
Georgia
0006866
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$314,527.20
$3,487,291.00
Georgia
0006900
Douglas >= 50,000 AND < 200,000 N/A GRANTS SUP PLAN SECTION 117 Preliminary Engineering
$1,967,855.00
$1,967,855.00
Georgia
0006900
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$980,735.82
$1,225,919.78
Georgia
0006900
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$18,897,782.42
$23,622,228.02
Georgia
0006900
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$9,986,680.24
$19,026,208.72
Georgia
0006900
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$393,969.10
$492,461.38
Georgia
0006900
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$9,136,000.00
$11,435,237.79
Georgia
0006900
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,711,419.39
$4,912,299.24
Georgia
0006900
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$524,220.80
$655,276.00
Georgia
0006901
Douglas >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway
$5,315,814.19
$6,644,767.74
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$880,000.00
$1,100,000.00
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way
$4,879,360.00
$6,099,200.00
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$603,963.93
$754,954.91
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$472,457.37
$590,571.71
Georgia
0006901
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$15,339,080.74
$19,173,850.93
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,114,935.56
$1,393,669.45
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$12,279,840.00
$17,830,800.00
Georgia
0006901
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$173,928.11
$217,410.14
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$180,051.97
$225,064.96
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$360,157.95
$450,197.44
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering
$76,061.28
$95,076.60
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering
$38,024.93
$47,531.16
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$189,968.20
$237,460.25
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$321,799.58
$402,249.47
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity
$15,967.75
$1,650,438.02
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity
$9,426.25
$974,304.37
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity
$53,814.72
$7,725,324.11
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity
$91,160.28
$13,086,432.65
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Construction Engineering
$50,304.00
$229,512.00
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Construction Engineering
$29,696.00
$135,488.00
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$133,632.00
$167,040.00
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$226,368.00
$282,960.00
Georgia
0007037
Montgomery >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$302,213.85
$377,767.31
Georgia
0007037
Jeff Davis >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$604,518.38
$755,647.98
Georgia
0007128
Chatham >= 200,000 N/A ARRA AMERICAN RECOV & REINV AC Preliminary Engineering
$863,632.04
$863,632.04
Georgia
0007128
Chatham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$50,005,768.22
$63,605,001.76
Georgia
0007128
Chatham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,248,104.94
$1,560,131.17
Georgia
0007128
Chatham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities
$253,500.00
Georgia
0007128
Chatham >= 200,000 Local NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity
$10,438,025.22
$13,047,531.53
Georgia
0007128
Chatham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$56,987.80
$71,234.75
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$10,600,000.00
$13,250,000.00
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$12,617.60
$15,772.00
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$5,530,705.23
$6,951,366.14
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,549.03
$1,946.93
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$22,516,576.96
$28,145,721.20
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$546,954.60
$683,693.25
Georgia
0007386
Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$288,692.00
$360,865.00
Georgia
0007414
Camden >= 50,000 AND < 200,000 Local EQUITY BONUS SP LIMITATION 4R - Added Capacity
$12,599,041.34
$15,748,801.66
Georgia
0007414
Camden >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering
$128,000.00
$160,000.00
Georgia
0007414
Camden >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$719,921.00
$899,901.25
Georgia
0007414
Camden >= 50,000 AND < 200,000 Local REPURPOSED SPECIAL 4R - Added Capacity
$746,395.78
$932,994.73
Georgia
0007414
Camden >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$21,079,747.74
$26,891,524.62
Georgia
0007414
Camden >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$836,692.41
$1,045,865.51
Georgia
0007414
Camden >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$121,938.74
$152,423.42
Georgia
0007414
Camden >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$5,224,000.00
$6,530,000.00
Georgia
0007414
Camden >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$2,799,026.40
$3,679,396.31
Georgia
0007526
Fulton >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$53,602.78
$67,003.47
Georgia
0007526
Fulton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$210,456.73
$263,070.92
Georgia
0007526
Forsyth >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$379,412.19
$474,265.24
Georgia
0007526
Forsyth >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$33,216.30
$41,520.37
Georgia
0007526
Forsyth >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$953,810.97
$1,192,263.71
Georgia
0007526
Forsyth >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$12,680.37
$15,850.45
Georgia
0007526
Forsyth >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$123,188.00
$153,985.00
Georgia
0007526
Fulton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$500,317.10
$625,396.37
Georgia
0007526
Fulton >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$541,003.56
$676,254.47
Georgia
0007526
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$274,114.34
$342,642.92
Georgia
0007526
Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$69,816.20
$87,270.25
Georgia
0007526
Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$43,263.34
$54,079.18
Georgia
0007526
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$494,174.36
$617,717.95
Georgia
0007526
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$11,926,825.71
$14,908,532.13
Georgia
0007526
Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$4,617,043.62
$5,771,304.51
Georgia
0007526
Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$13,358,196.93
$16,697,746.20
Georgia
0007526
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$10,448,876.68
$13,061,095.84
Georgia
0007526
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,195,528.97
$2,744,411.22
Georgia
0007526
Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,212,704.98
$1,515,881.22
Georgia
0007526
Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way
$696,867.40
$871,084.25
Georgia
0007526
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$3,932,098.65
$4,915,123.31
Georgia
0007526
Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities
$694,498.34
$998,396.08
Georgia
0007526
Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,951,454.66
$3,927,359.76
Georgia
0007526
Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,986,658.76
$2,693,551.67
Georgia
0007526
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,644,281.93
$2,880,756.40
Georgia
0007526
Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$4,000,000.00
$9,330,000.00
Georgia
0007535
Gwinnett >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$1,490,308.02
$1,862,885.25
Georgia
0007535
Gwinnett >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$40,000.00
$50,000.00
Georgia
0007535
Gwinnett >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way
$1,231,203.98
$1,539,004.98
Georgia
0007535
Gwinnett >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Right of Way
$2,058,746.00
$4,340,995.02
Georgia
0007535
Gwinnett >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$12,907,795.00
$16,134,743.75
Georgia
0007535
Gwinnett >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,820,000.00
$3,525,000.00
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$39,050.38
$48,812.98
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$175,411.77
$219,264.71
Georgia
0007691
Paulding >= 50,000 AND < 200,000 N/A EQUITY BONUS EXEMPT LIM Preliminary Engineering
$2,276,181.60
$2,845,227.00
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$399,141.30
$498,926.63
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$85,543.96
$106,929.95
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Right of Way
$656,676.50
$820,845.63
Georgia
0007691
Paulding >= 50,000 AND < 200,000 N/A EQUITY BONUS EXEMPT LIM Right of Way
$380,158.09
$475,197.62
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Right of Way
$3,064,000.35
$3,830,000.44
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$804,095.64
$1,009,730.62
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$178,864.36
$224,606.15
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$8,865,721.11
$11,082,151.39
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$39,876,702.55
$49,845,878.19
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$747,339.24
$934,174.05
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$160,127.77
$200,159.71
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$501,689.60
$627,112.00
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,250,310.40
$2,812,888.00
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,388,690.64
$2,985,863.29
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$511,809.98
$639,762.48
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$29,578.64
$36,973.30
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$132,941.36
$166,176.70
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$12,957.11
$16,196.40
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$2,882.89
$3,603.60
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$167,858.66
$209,823.33
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$783,420.47
$979,275.58
Georgia
0007691
Paulding >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$300,000.00
$375,000.00
Georgia
0007691
Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$9,986,646.50
$12,483,308.11
Georgia
0007691
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$2,140,336.96
$2,675,421.20
Georgia
0008256
Cobb >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way
$1,331,851.95
$1,664,814.95
Georgia
0008256
Cobb >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$38,714,143.51
$53,638,207.08
Georgia
0008256
Cobb >= 200,000 Local INTERSTATE MAINTENANCE Preliminary Engineering
$15,709.20
$21,670.66
Georgia
0008256
Cherokee >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$9,287,057.82
$12,867,191.68
Georgia
0008256
Cobb >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,400,000.00
$3,000,000.00
Georgia
0008256
Cobb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$27,795.31
$153,217.37
Georgia
0008256
Cobb >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$37,600,000.00
$47,000,000.00
Georgia
0008256
Cherokee >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$17,923,605.33
$79,696,265.49
Georgia
0008256
Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$74,736,868.36
$332,193,945.60
Georgia
0008256
Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$12,446,043.62
$19,782,809.93
Georgia
0008256
Cherokee >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,986,213.29
$4,746,543.69
Georgia
0008256
Cobb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way
$5,094.33
$8,097.36
Georgia
0008256
Cobb >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway
$43,212.80
$54,016.01
Georgia
0008256
Cherokee >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway
$12,652.70
$15,815.87
Georgia
0008256
Cobb >= 200,000 Local REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway
$55,865.50
$69,831.87
Georgia
0008256
Cherokee >= 200,000 State REPURPOSED SPECIAL New Construction Roadway
$953,388.68
$1,191,735.84
Georgia
0008256
Cobb >= 200,000 State REPURPOSED SPECIAL New Construction Roadway
$3,981,335.31
$4,976,669.16
Georgia
0008256
Cobb >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$19,987,391.20
$24,984,239.00
Georgia
0008256
Cobb >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$31,261,517.29
$35,000,000.00
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$960,000.00
$1,200,000.00
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$3,308,585.86
$4,135,732.32
Georgia
0008430
Barrow >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$400,000.00
$500,000.00
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$39,846.98
$49,808.72
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering
$755,164.68
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT New Construction Roadway
$24,821,050.00
$30,360,785.53
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Utilities
$1,288,878.24
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Right of Way
$101,575.04
$126,968.80
Georgia
0008430
Barrow >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Right of Way
$3,797,839.10
$4,747,298.88
Georgia
0009157
Clayton >= 200,000 State DONOR STATE BONUS 4R - Added Capacity
$1,005,014.59
$1,256,268.24
Georgia
0009157
Henry >= 200,000 State DONOR STATE BONUS 4R - Added Capacity
$1,104,915.39
$1,381,144.24
Georgia
0009157
Henry >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$779,431.34
$974,289.17
Georgia
0009157
Clayton >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$708,959.16
$886,198.96
Georgia
0009157
Clayton >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$67,149.27
$83,936.59
Georgia
0009157
Henry >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering
$73,831.88
$92,289.85
Georgia
0009157
Henry >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity
$783,418.72
$979,273.40
Georgia
0009157
Clayton >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity
$712,521.92
$890,652.40
Georgia
0009157
Clayton >= 200,000 State HIGHWAY INFRASTRUCTURE Preliminary Engineering
$571,591.25
$714,489.05
Georgia
0009157
Henry >= 200,000 State HIGHWAY INFRASTRUCTURE Preliminary Engineering
$628,408.75
$785,510.95
Georgia
0009157
Henry >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$10,337,024.51
$12,921,280.62
Georgia
0009157
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$9,402,403.63
$11,753,004.54
Georgia
0009157
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$967,278.83
$1,209,098.54
Georgia
0009157
Henry >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,063,428.62
$1,329,285.77
Georgia
0009157
Henry >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$4,273,389.15
$5,341,736.43
Georgia
0009157
Clayton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$3,887,011.18
$4,858,763.98
Georgia
0009157
Clayton >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$966,456.41
$1,208,070.52
Georgia
0009157
Henry >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$1,062,524.45
$1,328,155.56
Georgia
0009157
Henry >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$21,842,670.40
$27,303,338.00
Georgia
0009157
Henry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$13,372.64
$16,715.80
Georgia
0009157
Henry >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$634,949.64
$793,687.05
Georgia
0009157
Clayton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$12,163.56
$15,204.45
Georgia
0009316
Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$26,160,865.82
$32,701,082.28
Georgia
0009316
Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$540,343.37
$675,429.21
Georgia
0009316
Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$144,000.00
$180,000.00
Georgia
0009316
Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,766,050.25
$4,707,562.81
Georgia
0009316
Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$5,742,050.25
$7,177,562.81
Georgia
0009316
Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,420,590.00
Georgia
0009323
Coweta >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$47,250.00
$52,500.00
Georgia
0009323
Coweta >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$159,700.97
$177,445.52
Georgia
0009323
Coweta >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$576,118.82
$720,148.52
Georgia
0009323
Coweta >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$23,436,108.58
$29,295,135.73
Georgia
0009323
Coweta >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$52,284.80
$727,715.19
Georgia
0009323
Coweta >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway
$24,179.74
$30,224.67
Georgia
0009400
DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering
$733,465.61
$814,961.79
Georgia
0009400
DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering
$2,127,816.50
$2,364,240.55
Georgia
0009400
DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Right of Way
$5,271,537.60
$5,857,264.00
Georgia
0009400
Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Right of Way
$8,399,462.40
$9,332,736.00
Georgia
0009400
DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Safety
$29,436,138.05
$32,706,820.06
Georgia
0009400
DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Utilities
$20,783.70
$23,093.00
Georgia
0010212
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$17,091,880.46
$21,364,850.57
Georgia
0010212
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$419,212.46
$524,015.57
Georgia
0010212
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,295,897.65
$1,619,872.06
Georgia
0010212
Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity
$1,526,772.42
$1,908,465.52
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$14,233,769.25
$37,326,811.26
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$715,922.92
$894,903.65
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$453,040.87
$566,301.09
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$397,345.09
$496,681.36
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$9,840,000.00
$12,300,000.00
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$50,309.01
$62,886.26
Georgia
0010297
Lowndes >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,241,952.00
$1,552,440.00
Georgia
0012683
Statewide N/A N/A INTERSTATE MAINTENANCE Construction Engineering
$20,455.87
$22,728.75
Georgia
0012683
Statewide N/A N/A INTERSTATE MAINTENANCE Vehicle Weight Enforcement Program
$409,117.50
$454,575.00
Georgia
0012683
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,344,438.00
$1,493,820.00
Georgia
0012683
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$200,146.55
$222,385.05
Georgia
0012683
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Vehicle Weight Enforcement Program
$23,188,017.22
$25,764,463.59
Georgia
0012698
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$30,000.00
Georgia
0012698
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$14,998,752.04
$21,012,213.59
Georgia
0012698
Gwinnett >= 200,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway
$535,228.02
$669,035.03
Georgia
0012698
Gwinnett >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Right of Way
$243,780.00
$304,725.00
Georgia
0012698
Gwinnett >= 200,000 State REPURPOSED SPECIAL Right of Way
$2,159,760.00
$2,699,700.00
Georgia
0012698
Gwinnett >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$40,000.00
$50,000.00
Georgia
0012698
Gwinnett >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,580,460.00
$4,475,575.00
Georgia
0012700
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$44,580,952.70
$55,726,190.87
Georgia
0012700
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,229,872.11
$1,537,340.14
Georgia
0012700
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$3,419,993.21
$5,788,583.42
Georgia
0012700
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$1,533,768.07
$1,917,210.09
Georgia
0012700
Bibb >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity
$487,561.19
$609,451.49
Georgia
0012700
Bibb >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity
$4,820,257.81
$6,025,322.27
Georgia
0012701
Bibb >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$47,621,053.00
$59,526,316.25
Georgia
0012701
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$20,953,934.06
$26,192,417.57
Georgia
0012701
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,702,699.10
$2,128,373.88
Georgia
0012701
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$504,511.28
$1,787,425.09
Georgia
0012701
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$1,671,147.93
$2,088,934.91
Georgia
0012757
Chatham >= 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$27,927,086.00
$34,908,857.50
Georgia
0012757
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$49,954,961.00
$68,918,701.25
Georgia
0012757
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$87,512,914.00
$194,516,142.50
Georgia
0012757
Chatham >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$325,039.00
$406,298.75
Georgia
0012757
Chatham >= 200,000 State REPURPOSED SPECIAL Construction Engineering
$3,129,681.00
$3,912,101.25
Georgia
0012757
Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$4,250,912.00
$5,313,640.00
Georgia
0013104
Gwinnett >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - No Added Capacity
$8,000,000.00
$8,000,000.00
Georgia
0013104
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$9,536,761.12
$17,151,556.63
Georgia
0013104
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$496,816.80
$621,021.00
Georgia
0013104
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$16,812.21
$21,015.26
Georgia
0013104
Gwinnett >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,888,000.00
$3,689,000.00
Georgia
0013239
Cobb >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity
$7,437,700.00
$7,437,700.00
Georgia
0013239
Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$9,879,252.00
$15,054,600.00
Georgia
0013239
Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$12,000,000.00
$15,000,000.00
Georgia
0013239
Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$25,337.02
Georgia
0013239
Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$4,824,000.00
$7,530,000.00
Georgia
0013545
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$82,481,972.53
$103,102,465.67
Georgia
0013545
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$400,000.00
$500,000.00
Georgia
0013545
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$4,771,223.42
$5,964,029.27
Georgia
0013546
DeKalb >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$16,162,844.77
$20,203,555.97
Georgia
0013546
Fulton >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$151,762,728.23
$189,703,410.28
Georgia
0013546
DeKalb >= 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$3,163,169.20
$3,953,961.50
Georgia
0013546
Fulton >= 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$29,700,830.80
$37,126,038.50
Georgia
0013546
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$88,856,774.34
$135,693,481.36
Georgia
0013546
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$9,463,338.38
$14,451,496.13
Georgia
0013546
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$13,832,504.91
$15,145,531.93
Georgia
0013546
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$129,884,184.74
$142,212,957.23
Georgia
0013546
Fulton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Construction Engineering
$178,548.54
$223,185.67
Georgia
0013546
DeKalb >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Construction Engineering
$24,601.46
$30,751.83
Georgia
0013546
DeKalb >= 200,000 State REPURPOSED EARMARKS EXEMPT 4R - Added Capacity
$48,115.75
$48,115.75
Georgia
0013546
Fulton >= 200,000 State REPURPOSED EARMARKS EXEMPT 4R - Added Capacity
$451,799.25
$451,799.25
Georgia
0013546
Fulton >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$2,200,491.38
$2,200,491.38
Georgia
0013546
DeKalb >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$303,196.62
$303,196.62
Georgia
0013546
DeKalb >= 200,000 State REPURPOSED SPECIAL Construction Engineering
$173,231.25
$216,539.06
Georgia
0013546
Fulton >= 200,000 State REPURPOSED SPECIAL Construction Engineering
$1,626,568.75
$2,033,210.94
Georgia
0013546
DeKalb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$52,349,395.80
$65,436,744.75
Georgia
0013605
Ware >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$5,685,183.66
$8,881,979.58
Georgia
0013605
Pierce >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$2,800,165.09
$4,374,706.36
Georgia
0013605
Pierce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$11,038,951.55
$13,798,689.45
Georgia
0013605
Ware >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$4,508,867.55
$5,636,084.43
Georgia
0013605
Ware >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$188,597.27
$235,746.58
Georgia
0013605
Pierce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$461,738.12
$577,172.66
Georgia
0013605
Pierce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$430,724.62
$538,405.78
Georgia
0013605
Ware >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$175,929.78
$219,912.22
Georgia
0013605
Ware >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,007,105.60
$2,858,882.00
Georgia
0013715
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$18,928,516.39
$23,660,645.49
Georgia
0013715
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$468,768.69
$585,960.86
Georgia
0013715
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$936,000.00
$1,170,000.00
Georgia
0013715
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$128,000.00
$160,000.00
Georgia
0013715
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$48,841.60
$61,052.00
Georgia
0013715
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$304,000.00
$380,000.00
Georgia
0013727
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$28,221,822.08
$35,277,277.60
Georgia
0013727
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$280,000.00
$350,000.00
Georgia
0013727
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,193,600.00
$1,492,000.00
Georgia
0013727
Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$2,330,476.00
$2,913,095.00
Georgia
0013727
Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$80,000.00
$100,000.00
Georgia
0013727
Chatham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$400,000.00
$980,494.00
Georgia
0013727
Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$257,600.00
$6,977,933.83
Georgia
0013741
Chatham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$440,000.00
$550,000.00
Georgia
0013741
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$52,667,100.80
$65,833,876.00
Georgia
0013741
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$560,000.00
$700,000.00
Georgia
0013741
Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,040,395.18
$2,550,493.97
Georgia
0013915
DeKalb >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$32,137,452.80
$40,171,816.00
Georgia
0013915
DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$12,520,000.00
$15,650,000.00
Georgia
0013915
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$21,899,622.40
$776,110,840.00
Georgia
0013915
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$29,924,468.40
$112,216,759.38
Georgia
0013915
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,000,000.00
$2,500,000.00
Georgia
0013915
DeKalb >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering
$227,530.00
$284,412.50
Georgia
0013915
DeKalb >= 200,000 State REPURPOSED SPECIAL Preliminary Engineering
$2,567,476.99
$3,209,346.24
Georgia
0013915
DeKalb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,832,523.01
$5,806,241.26
Georgia
0015051
Cobb >= 200,000 State HIGHWAY INFRA PRGM -APPOR New Construction Roadway
$6,000,000.00
$9,000,000.00
Georgia
0015051
Cobb >= 200,000 State NAT SIG FREIGHT AND HWY PROJ New Construction Roadway
$4,512,000.00
$5,640,000.00
Georgia
0015051
Cobb >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Right of Way
$488,000.00
$610,000.00
Georgia
0015051
Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$6,008,251.51
$7,810,314.39
Georgia
0015051
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$321,781.46
$402,226.82
Georgia
0015051
Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$1,878,218.54
$3,169,773.18
Georgia
0015245
Banks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$3,055,089.98
$3,818,862.48
Georgia
0015245
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$117,986,510.02
$147,483,137.52
Georgia
0015245
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$200,000.00
$250,000.00
Georgia
0015245
Banks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$200,000.00
$250,000.00
Georgia
0015245
Banks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$100,960.00
$139,072.40
Georgia
0015245
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,899,040.00
$5,370,927.60
Georgia
0016054
DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$7,000,000.00
$31,711,200.00
Georgia
0016054
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$45,569,912.30
$65,212,390.38
Georgia
0016054
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$400,000.00
$500,000.00
Georgia
0016054
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,840,000.00
$2,300,000.00
Georgia
0016054
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$17,209,692.89
$21,512,116.11
Georgia
0016054
DeKalb >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$9,721,507.11
$12,151,883.89
Georgia
0016054
DeKalb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$400,000.00
$500,000.00
Georgia
0017129
DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$1,212,356.00
$21,973,204.00
Georgia
0017129
DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$27,829,792.80
$35,312,241.00
Georgia
0017129
DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$240,000.00
$300,000.00
Georgia
0017129
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$994,746.40
$1,613,433.00
Georgia
0017130
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$29,596,088.80
$40,198,111.00
Georgia
0017130
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$240,000.00
$300,000.00
Georgia
0017130
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$744,000.00
$930,000.00
Georgia
0017130
Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$1,000,000.00
$1,250,000.00
Georgia
0019545
Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity
$27,048,673.19
$27,048,673.19
Georgia
0019545
Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Construction Engineering
$664,931.66
$664,931.66
Georgia
0019545
Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Utilities
$55,870.11
$55,870.11
Georgia
0019550
Statewide N/A State CARBON REDUCTION PROGRAM Other
$12,450,187.93
$15,562,734.91
Georgia
0019550
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Other
$58,749,812.07
$73,437,265.09
Georgia
0019551
Statewide N/A State CARBON REDUCTION PROGRAM Other
$11,202,529.53
$14,003,161.91
Georgia
0019551
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Other
$55,297,470.47
$69,121,838.09
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State DONOR STATE BONUS 4R - Added Capacity
$198,900.27
$248,625.34
Georgia
0026051
Hall >= 200,000 State DONOR STATE BONUS 4R - Added Capacity
$228,760.68
$285,950.85
Georgia
0026051
Jackson >= 50,000 AND < 200,000 N/A DONOR STATE BONUS Preliminary Engineering
$104,000.00
$130,000.00
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$6,431,112.03
$8,038,890.04
Georgia
0026051
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$10,936,164.52
$13,670,205.65
Georgia
0026051
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$412,546.63
$515,683.29
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$412,546.63
$515,683.29
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$440,329.36
$621,121.38
Georgia
0026051
Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$996,870.71
$1,406,169.48
Georgia
0026051
Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$13,281,328.22
$16,601,660.28
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$6,809,616.90
$8,512,021.12
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$359,538.06
$449,422.57
Georgia
0026051
Hall >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,005,000.00
$1,256,250.00
Georgia
0026051
Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$801,783.67
$1,002,229.60
Georgia
0026051
Hall >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way
$800,800.00
$1,001,000.00
Georgia
0026051
Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$279,388.45
$15,173,289.33
Georgia
0026051
Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$120,611.55
$6,550,285.02
Georgia
0033053
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$6,576,938.76
$8,221,173.45
Georgia
0033053
Clarke >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$372,193.40
$465,241.74
Georgia
0033053
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$888,369.49
$1,110,461.87
Georgia
0033053
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,236,825.80
$1,546,032.25
Georgia
0033053
Clarke >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$200,000.00
$250,000.00
Georgia
0033053
Clarke >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$426,245.06
$532,806.32
Georgia
0033053
Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$892,176.94
$1,115,221.17
Georgia
0033053
Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$44,812,085.08
$56,015,106.35
Georgia
0033053
Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,258,575.69
$1,573,219.61
Georgia
0033053
Clarke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$10,111,379.20
$12,639,224.00
Georgia
0033053
Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$3,246,216.72
$4,057,770.90
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway
$851,609.18
$1,064,511.47
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering
$870,800.00
$1,088,500.00
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way
$3,160,000.00
$3,950,000.00
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$970,000.00
$1,212,500.00
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 New Construction Roadway
$303,663.82
$379,579.78
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$680,000.00
$850,000.00
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$886,486.90
$1,108,108.63
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$36,181,737.00
$45,227,171.24
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,283,094.05
$2,853,867.57
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,548,000.00
$4,435,000.00
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$310,000.00
$387,500.00
Georgia
00MS007
Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,687,927.38
$2,109,909.23
Georgia
0111053
Muscogee >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$12,172,358.48
$16,320,734.71
Georgia
0111053
Muscogee >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$563,914.61
$704,893.26
Georgia
0111053
Muscogee >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,493,948.87
$1,867,436.09
Georgia
0111053
Muscogee >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$38,902.86
$48,628.58
Georgia
0111053
Muscogee >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$487,805.08
$609,756.35
Georgia
0111053
Muscogee >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$14,840,200.00
$18,550,250.00
Georgia
0121080
Hall >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$265,655.48
$332,069.34
Georgia
0121080
Forsyth >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$207,041.10
$258,801.38
Georgia
0121080
Forsyth >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Right of Way
$120,000.00
$150,000.00
Georgia
0121080
Forsyth >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering
$60,000.00
$75,000.00
Georgia
0121080
Forsyth >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering
$416,964.66
$521,205.82
Georgia
0121080
Hall >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering
$516,137.36
$645,171.71
Georgia
0121080
Forsyth >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - Added Capacity
$329,450.56
$411,813.20
Georgia
0121080
Forsyth >= 200,000 State REPURPOSED SPECIAL Bridge Replacement - Added Capacity
$2,676,188.68
$28,343,596.12
Georgia
0121080
Forsyth >= 200,000 State REPURPOSED SPECIAL Construction Engineering
$681,233.63
Georgia
0121080
Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$518,903.66
$648,629.57
Georgia
0161092
Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way
$1,563,416.57
$1,563,416.57
Georgia
0161092
Bibb >= 50,000 AND < 200,000 N/A INTERSTATE 4R Preliminary Engineering
$27,000.00
$30,000.00
Georgia
0161092
Bibb >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$4,967,106.46
$5,532,896.07
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$52,388,124.28
$65,636,773.40
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,253,607.07
$1,567,008.84
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,640,000.00
$4,550,000.00
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$8,518,550.52
$10,648,188.15
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$102,476.14
$128,095.18
Georgia
0161092
Bibb >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$4,490,159.68
$5,066,965.09
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$9,240,000.00
$11,550,000.00
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$235,654.09
$294,567.61
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$3,370,050.91
$4,212,563.64
Georgia
0161092
Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$3,092,000.00
$3,865,000.00
Georgia
0161092
Bibb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$922,800.00
$1,153,516.04
Georgia
0161104
Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way
$2,551,606.65
$2,551,606.65
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 4R - Added Capacity
$181,914.68
$227,393.35
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$4,002,675.86
$5,003,344.83
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$71,817,199.03
$89,771,498.79
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,745,051.67
$2,181,314.59
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$546,400.00
$686,372.94
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$2,792,472.31
$3,490,590.39
Georgia
0161104
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$1,020,188.93
$1,275,236.16
Georgia
0161104
Bibb >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$60,000.00
$75,000.00
Georgia
0161104
Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$758,314.68
$947,893.35
Georgia
0161131
Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way
$722,580.52
$722,580.52
Georgia
0161131
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity
$116,490,272.85
$145,612,841.07
Georgia
0161131
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,876,217.59
$3,595,271.99
Georgia
0161131
Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$903,403.41
$1,534,043.36
Georgia
0161131
Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$326,000.00
$407,500.00
Georgia
0161131
Bibb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$660,800.00
$826,000.00
Georgia
0181067
Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$191,128.74
$238,910.92
Georgia
0181067
Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$344,771.26
$430,964.08
Georgia
0181067
Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$14,343,473.50
$17,929,341.88
Georgia
0181067
Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$7,951,503.57
$9,939,379.46
Georgia
0181067
Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$21,969.64
$292,096.35
Georgia
0181067
Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$39,630.36
$526,903.65
Georgia
0181067
Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$298,085.93
$372,607.41
Georgia
0181067
Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$537,708.08
$672,135.10
Georgia
0202117
Richmond >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - Added Capacity
$2,296,128.00
$2,296,128.00
Georgia
0202117
Richmond >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity
$142,181.41
$177,726.76
Georgia
0202117
Richmond >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$1,870,922.02
$2,078,802.25
Georgia
0202117
Richmond >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$314,729.91
$349,699.90
Georgia
0202117
Richmond >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$45,550,738.17
$49,978,354.94
Georgia
0202117
Haralson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$22,093,609.78
$26,521,226.54
Georgia
0202117
Haralson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,676,171.25
$2,095,214.06
Georgia
0202117
Richmond >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$4,460,178.43
$4,879,221.24
Georgia
0202117
Richmond >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - Added Capacity
$325,039.00
$406,298.75
Georgia
0202117
Richmond >= 200,000 State REPURPOSED SPECIAL Preliminary Engineering
$2,879,681.00
$3,599,601.25
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$15,104,823.00
$18,881,028.75
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way
$2,480,000.00
$3,100,000.00
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$363,600.00
$363,600.00
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,166,780.44
$3,958,475.55
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$410,349.61
$512,937.01
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$718,352.96
$1,643,075.49
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$6,000,000.00
$7,500,000.00
Georgia
0511023
Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,467,849.44
$1,834,811.81
Georgia
0562029
Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity
$25,015,810.20
$25,015,810.20
Georgia
0562029
Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity
$71,198,844.39
$71,198,844.39
Georgia
0562029
Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering
$1,713,332.03
$1,713,332.03
Georgia
0562029
Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering
$601,981.53
$601,981.53
Georgia
0562029
Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering
$892,488.45
$892,488.45
Georgia
0562029
Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering
$2,177,511.55
$2,177,511.55
Georgia
0562029
Union >= 5,000 AND < 50,000 N/A APPALACHIAN DEVEL HWY Preliminary Engineering
$3,185,270.78
$13,890,341.47
Georgia
0562029
Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Right of Way
$33,973,974.41
$33,975,553.80
Georgia
0562029
Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Right of Way
$11,936,801.82
$11,937,356.74
Georgia
0562029
Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities
$1,552,489.08
$1,552,489.08
Georgia
0562029
Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities
$4,418,622.77
$4,418,622.77
Georgia
0630010
Bryan >= 5,000 AND < 50,000 N/A REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering
$615,209.79
$769,012.24
Georgia
0630010
Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$22,459,849.72
$28,074,812.16
Georgia
0630010
Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$526,327.04
$657,908.80
Georgia
0630010
Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$836,457.91
$1,045,572.39
Georgia
0630010
Bryan >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$557,941.60
$697,427.00
Georgia
0630010
Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$5,130,570.40
$6,433,484.00
Georgia
0630010
Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$822,521.81
$1,028,152.26
Georgia
0791042
Coffee >= 5,000 AND < 50,000 Other NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$320,092.81
$400,116.01
Georgia
0791042
Coffee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$25,913,025.34
$32,391,281.69
Georgia
0791042
Coffee >= 5,000 AND < 50,000 Other NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$7,643.98
$9,554.98
Georgia
0791042
Coffee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$616,614.76
$770,768.44
Georgia
0791042
Irwin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$36,893.70
$46,117.13
Georgia
0791042
Ben Hill >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$79,747.78
$99,684.72
Georgia
0791042
Coffee >= 5,000 AND < 50,000 Other NATIONAL HIGHWAY PERF PROGRAM Utilities
$4,024.36
$5,030.45
Georgia
0791042
Coffee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$324,631.59
$405,789.49
Georgia
0791042
Coffee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$257,019.15
$321,273.94
Georgia
0791042
Coffee >= 5,000 AND < 50,000 Other NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$250.95
$313.69
Georgia
0791042
Coffee >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$754,896.12
$943,620.15
Georgia
0791042
Coffee >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,913,669.37
$3,642,086.71
Georgia
0791042
Coffee >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,175,358.44
$3,969,198.05
Georgia
0852164
Gwinnett >= 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity
$66,485,270.74
$83,106,588.43
Georgia
0852164
Gwinnett >= 200,000 State CONGESTION AIR QUALITY Construction Engineering
$2,676,883.84
$3,346,104.80
Georgia
0852164
Gwinnett >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$2,764,321.08
$3,455,401.35
Georgia
0852164
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$59,104,956.37
$73,881,195.45
Georgia
0852164
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,696,286.65
$3,370,358.31
Georgia
0852164
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$19,667,152.00
$24,583,940.00
Georgia
0852164
Gwinnett >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$60,763.20
$75,954.00
Georgia
0852164
Gwinnett >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,795,678.92
$2,244,598.65
Georgia
0852165
Barrow >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$2,930,270.70
$3,662,838.38
Georgia
0852165
Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$6,531,864.00
$8,164,830.00
Georgia
0852165
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$23,948,136.00
$29,935,170.00
Georgia
0852165
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,015,168.00
$3,768,960.00
Georgia
0852165
Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$824,832.00
$1,031,040.00
Georgia
0852165
Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$2,098,209.30
$2,622,761.62
Georgia
0852165
Gwinnett >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$791,427.20
$989,284.00
Georgia
0852165
Gwinnett >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$159,622.80
$199,528.49
Georgia
0852165
Barrow >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$43,527.29
$54,409.12
Georgia
0852165
Barrow >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$385,697.12
$5,088,781.17
Georgia
0852165
Gwinnett >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$1,414,102.79
$18,657,281.22
Georgia
1105004
Richmond >= 200,000 N/A DONOR STATE BONUS Preliminary Engineering
$4,000.00
$5,000.00
Georgia
1105004
Richmond >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$14,330,427.66
$19,429,548.01
Georgia
1105004
Richmond >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$610,570.13
$763,212.66
Georgia
1105004
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$195,426.91
$244,283.64
Georgia
1105004
Richmond >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$105,945.60
$132,432.00
Georgia
1105004
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$4,792,000.00
$5,990,000.00
Georgia
1551023
Twiggs >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$960,000.00
$1,200,000.00
Georgia
1551023
Twiggs >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way
$3,136,000.00
$3,920,000.00
Georgia
1551023
Twiggs >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity
$22,000,000.00
$70,526,110.35
Georgia
1551023
Twiggs >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering
$1,618,858.86
Georgia
1551023
Twiggs >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Utilities
$1,316,316.65
Georgia
1551023
Twiggs >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,473,262.58
$1,841,578.23
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$27,644,890.70
$34,556,113.38
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$1,984,000.00
$2,480,000.00
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$691,938.32
$864,922.90
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$191,578.07
$239,472.59
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,729,414.40
$2,161,768.00
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$100,000.00
$125,000.00
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$11,108,000.00
$13,885,000.00
Georgia
1801006
Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,781,196.58
$2,226,495.72
Georgia
1861011
Douglas >= 50,000 AND < 200,000 Local GRANTS SUP PLAN SECTION 117 Preliminary Engineering
$406,952.62
$406,952.62
Georgia
1861011
Douglas >= 50,000 AND < 200,000 State GRANTS SUP PLAN SECTION 117 Preliminary Engineering
$576,975.38
$576,975.38
Georgia
1861011
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$347,113.17
$433,891.46
Georgia
1861011
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$492,135.31
$615,169.14
Georgia
1861011
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$8,357,428.61
$10,446,785.75
Georgia
1861011
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$12,996,846.52
$16,246,058.17
Georgia
1861011
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$323,762.43
$404,703.04
Georgia
1861011
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$400,000.00
$500,000.00
Georgia
1861011
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$504,952.71
$631,190.89
Georgia
1861011
Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$6,184,000.00
$7,734,256.58
Georgia
1861011
Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$69,579.56
$86,974.45
Georgia
1861011
Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$98,649.56
$123,311.95
Georgia
2851346
Clayton >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$2,667,512.32
$2,963,902.58
Georgia
2851346
Clayton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$294,835.00
$327,594.44
Georgia
2851346
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$50,144,608.35
$62,680,760.44
Georgia
2851346
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,528,264.63
$1,910,330.79
Georgia
2851346
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$199,988.22
$222,209.13
Georgia
2851346
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$3,361,920.00
$4,202,400.00
Georgia
2851346
Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$104,002.28
$130,002.85
Georgia
2851346
Clayton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$1,911,103.43
$2,388,879.29
Georgia
2851346
Clayton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity
$121,891.00
$152,363.75
Georgia
2851346
Clayton >= 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity
$5,836,736.74
$7,295,920.92
Georgia
2851346
Clayton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$5,600,000.00
$7,000,000.00
Georgia
2851352
DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$3,965,355.68
$4,956,694.60
Georgia
2851352
DeKalb >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$3,965,355.69
$4,956,694.61
Georgia
2851352
DeKalb >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$3,718,800.00
$4,132,000.00
Georgia
2851352
DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$44,394,102.68
$55,492,628.36
Georgia
2851352
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$28,609,305.72
$35,761,632.14
Georgia
2851352
DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,103,341.25
$1,379,176.56
Georgia
2851352
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$711,036.49
$888,795.61
Georgia
2851352
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,120,000.00
$3,650,000.00
Georgia
2851352
DeKalb >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$90,000.00
$100,000.00
Georgia
2851352
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$18,184,000.00
$22,730,000.00
Georgia
2851352
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$177,677.66
$222,097.07
Georgia
2851352
DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities
$275,708.90
$344,636.13
Georgia
2851352
DeKalb >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$3,000,000.00
$3,750,000.00
Georgia
2851352
DeKalb >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way
$560,000.00
$700,000.00
Georgia
2946001
Bartow >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering
$298,274.90
$372,843.63
Georgia
2946001
Bartow >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way
$1,253,180.69
$1,566,475.87
Georgia
2946001
Bartow >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$1,251,431.58
$1,564,289.47
Georgia
2946001
Bartow >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Right of Way
$2,028,215.66
$2,535,269.57
Georgia
2946001
Bartow >= 50,000 AND < 200,000 Local REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$10,000,000.00
$12,500,000.00
Georgia
2946001
Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$48,573,805.81
$64,741,211.02
Georgia
2946001
Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,437,186.44
$1,796,483.05
Georgia
2946001
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,826,484.20
$2,283,105.26
Georgia
2946001
Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$179,668.52
$224,585.65
Georgia
2946001
Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$9,150,603.65
$11,438,254.57
Georgia
2946001
Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities
$2,964,302.72
$3,705,378.40
Georgia
3711009
Floyd >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$9,080,498.00
$11,350,622.50
Georgia
3711009
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$8,334,459.45
$10,418,074.31
Georgia
3711009
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$428,370.00
$535,462.50
Georgia
3711009
Floyd >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$260,000.00
$325,000.00
Georgia
3711009
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$948,800.00
$1,396,401.35
Georgia
3711009
Floyd >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$6,870,916.00
$8,588,645.00
Georgia
3711009
Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,463,237.60
$1,829,047.00
Georgia
7007006
Richmond >= 200,000 N/A DONOR STATE BONUS Preliminary Engineering
$4,000.00
$5,000.00
Georgia
7007006
Richmond >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$13,248,715.73
$22,373,769.67
Georgia
7007006
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$5,081,021.54
$6,351,276.92
Georgia
7007006
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,034,248.42
$1,292,810.53
Georgia
7007006
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$79,861.22
$99,826.52
Georgia
7007006
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$7,976,504.00
$9,970,630.00
Georgia
7007006
Richmond >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,817,710.40
$2,272,138.00
Georgia
7063001
Columbia >= 50,000 AND < 200,000 Local EQUITY BONUS SP LIMITATION 4R - Added Capacity
$5,438,139.58
$6,797,674.47
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering
$633,240.99
$791,551.25
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity
$3,779,580.96
$4,724,476.20
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A MIN ALLOC 90%-SUB TO LIM-STEA Right of Way
$88,000.00
$110,000.00
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$1,105,684.02
$1,382,105.03
Georgia
7063001
Columbia >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$251,343.39
$23,307,662.24
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,367,334.10
$1,709,167.62
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,011,791.20
$2,514,739.00
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$17,072,077.38
$21,340,096.74
Georgia
7063001
Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$2,478,877.19
$3,098,596.49
Georgia
8060002
Muscogee >= 200,000 N/A EQUITY BONUS SP LIMITATION 4R - Added Capacity
$689,779.35
$862,224.18
Georgia
8060002
Muscogee >= 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering
$6,800.00
$8,500.00
Georgia
8060002
Muscogee >= 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way
$10,694,760.00
$13,368,450.00
Georgia
8060002
Muscogee >= 200,000 N/A HIGHWAY INFRASTRUCTURE Right of Way
$563,640.00
$704,550.00
Georgia
8060002
Muscogee >= 200,000 N/A MINIMUM ALLOCATION-EXEMPT 90% Preliminary Engineering
$423,200.00
$529,000.00
Georgia
8060002
Muscogee >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 4R - Added Capacity
$38,986.27
$48,732.84
Georgia
8060002
Muscogee >= 200,000 State MINIMUM GUARANTEE - TEA-21 4R - Added Capacity
$71,141.99
$88,927.49
Georgia
8060002
Muscogee >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering
$440,000.00
$550,000.00
Georgia
8060002
Muscogee >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$7,323,039.06
$9,155,930.63
Georgia
8060002
Muscogee >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$358,473.77
$448,092.21
Georgia
8060002
Muscogee >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$299,070.78
$373,838.47
Georgia
8060002
Muscogee >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities
$365,139.99
$456,424.99
Georgia
9108004
Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$5,800,888.80
$7,251,111.00
Georgia
9108004
Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$15,545,739.20
$21,991,590.80
Georgia
9108004
Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$108,000.00
$135,000.00
Georgia
M004417
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$33,687,258.63
$37,430,287.37
Georgia
M004417
DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$336,872.58
$374,302.87
Georgia
M005713
Cobb >= 200,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing
$1,806,082.80
$2,006,758.67
Georgia
M005713
Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$41,119,424.63
$45,688,249.59
Georgia
M005713
Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$313,728.04
$348,586.71
Georgia
M005874
Lamar >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$182,708.91
$203,009.90
Georgia
M005874
Butts >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$12,487.26
$13,874.73
Georgia
M005874
Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$645,007.70
$716,675.23
Georgia
M005874
Monroe >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$16,543,335.11
$18,381,483.46
Georgia
M005874
Butts >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$320,276.63
$355,862.92
Georgia
M005874
Lamar >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$4,686,168.26
$5,206,853.62
Georgia
M005874
Lamar >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$46,861.68
$52,068.54
Georgia
M005874
Butts >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$3,202.77
$3,558.63
Georgia
M005874
Monroe >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$165,433.35
$183,814.83
Georgia
M006050
Fulton >= 200,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing
$6,382,525.64
$7,091,695.16
Georgia
M006050
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$16,712,936.86
$20,430,785.11
Georgia
M006050
Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$230,364.00
$255,960.00
Georgia
M006062
Gordon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$7,230,865.90
$8,034,295.44
Georgia
M006062
Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$15,493,414.10
$17,214,904.56
Georgia
M006062
Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$154,934.14
$172,149.04
Georgia
M006062
Gordon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$72,308.66
$80,342.96
Georgia
M006105
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$34,195,699.76
$37,995,221.95
Georgia
M006105
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$3,606,624.86
$4,007,360.96
Georgia
M006105
Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$341,957.00
$379,952.22