U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Idaho

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Idaho
1568001
Valley >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$986,400.00
$1,233,000.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Safety
$4,459,340.00
$5,574,175.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Construction Engineering
$2,600,000.00
$3,250,000.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECTS-TEA-21 Construction Engineering
$440,000.00
$550,000.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Preliminary Engineering
$2,476,000.00
$3,095,000.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Safety
$3,183,043.00
$3,978,804.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECTS-TEA-21 Safety
$9,752,747.00
$12,190,932.75
Idaho
1568001
Valley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$931,820.46
$1,005,634.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$145,758.78
$157,304.97
Idaho
1568001
Valley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$100,000.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$36,578,215.17
$39,819,517.05
Idaho
1568001
Valley >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$436,946.56
$546,093.70
Idaho
1568001
Valley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$230,881.88
$249,171.03
Idaho
1568001
Valley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Safety
$12,410.88
$13,394.00
Idaho
1568001
Valley >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety
$1,722,403.92
$1,858,843.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A CONGESTION AIR QUALITY 4R - No Added Capacity
$4,030,851.45
$4,350,152.65
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A CONGESTION AIR QUALITY Construction Engineering
$4,403,603.14
$4,752,431.61
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A CONGESTION AIR QUALITY Preliminary Engineering
$417,600.00
$450,680.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A CONGESTION AIR QUALITY Utilities
$926,600.00
$1,000,000.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$890,321.00
$1,112,901.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECTS-TEA-21 4R - No Added Capacity
$14,740,392.00
$18,425,490.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Preliminary Engineering
$250,000.00
$312,500.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A HIGHWAY INFRASTRUCTURE Preliminary Engineering
$185,641.00
$232,051.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$22,871,626.13
$38,244,241.71
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,870,206.87
$3,097,568.39
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$100,000.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way
$4,816,198.32
$9,611,855.25
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity
$2.76
$2.98
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Construction Engineering
$1,297,240.00
$1,400,000.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$2,739,866.05
$2,956,903.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way
$172,152.78
$185,789.75
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Utilities
$138,990.00
$150,000.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A SURFACE TRANS PRIORITIES S129 4R - No Added Capacity
$490,000.00
$490,000.00
Idaho
4110156
Latah >= 5,000 AND < 50,000 N/A TRAN COMM SYS PRES PILOT-TEA21 Preliminary Engineering
$377,287.00
$407,173.00
Idaho
A013057
Ada >= 200,000 N/A EQUITY BONUS SP LIMITATION Construction Engineering
$144,089.76
$156,161.00
Idaho
A013057
Ada >= 200,000 N/A EQUITY BONUS SP LIMITATION Other
$24,487.38
$26,538.83
Idaho
A013057
Ada >= 200,000 N/A INTERSTATE MAINTENANCE Other
$118,866.89
$128,825.06
Idaho
A013057
Ada >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$205,245.00
$222,440.00
Idaho
A013057
Ada >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Construction Engineering
$14,412.82
$15,620.00
Idaho
A013057
Ada >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Other
$66,413.79
$71,977.74
Idaho
A013057
Ada >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$23,458,770.71
$25,507,051.00
Idaho
A013057
Ada >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$743,858.06
$806,175.00
Idaho
A013057
Ada >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Other
$3,111,534.91
$3,372,205.47
Idaho
A013057
Ada >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$144,016.67
$156,082.00
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A CONGESTION AIR QUALITY Bridge Replacement - No Added Capacity
$829,429.08
$898,915.22
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Construction Engineering
$127,570.66
$138,258.00
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A CONGESTION AIR QUALITY Construction Engineering
$46,135.00
$50,000.00
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity
$132,984.56
$144,125.45
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering
$72,623.33
$78,707.41
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Construction Engineering
$26,097.86
$28,284.24
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering
$104,733.72
$113,508.30
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Right of Way
$49,893.15
$54,073.00
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Utilities
$177,160.25
$192,002.00
Idaho
A018881
Cassia >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$1,141,333.91
$1,236,950.17
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$31,290,917.59
$33,912,341.62
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,350,667.15
$2,547,596.35
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,596,729.54
$3,943,048.70
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,573.20
$1,705.00
Idaho
A018881
Cassia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$27,681.00
$30,000.00
Idaho
A019261
Lewis < 5,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$4,334,830.36
$4,678,211.05
Idaho
A019261
Lewis < 5,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity
$125,091.00
$135,000.00
Idaho
A019261
Lewis < 5,000 State HSIP LIMITING FLEXIBLE Construction Engineering
$7,332.18
$7,913.00
Idaho
A019261
Lewis < 5,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering
$732,487.50
$841,121.00
Idaho
A019261
Lewis < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$9,472,075.94
$19,395,032.23
Idaho
A019261
Lewis < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,111,869.96
$1,199,946.00
Idaho
A019261
Lewis < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$11,231,741.71
$12,121,456.63
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity
$1,633,008.98
$1,769,815.74
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$358,475.03
$388,506.59
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,087,067.78
$3,345,689.58
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$509,791.75
$552,500.00
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$2,043,846.63
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$135,536.09
$146,890.73
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Special Bridge
$27,978,040.76
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$12,918,041.05
$14,000,261.24
Idaho
A019338
Jerome >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,516,307.63
$1,643,337.63
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$35,210.80
$38,000.00
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$378,058.36
$408,006.00
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$3,409,597.81
$3,679,686.82
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$22,788,293.56
$24,593,453.00
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,300,986.24
$1,404,043.00
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$170,574.09
$184,086.00
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$3,067,096.05
$3,310,054.00
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$7,431,859.05
$14,176,858.80
Idaho
A019682
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$833,940.00
$900,000.00
Idaho
A020083
Bannock >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity
$19,313,107.92
$20,931,080.44
Idaho
A020083
Bingham >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$2,581,714.60
$2,798,000.00
Idaho
A020083
Bingham >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$1,845.40
$2,000.00
Idaho
A020083
Bannock >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Bridge Replacement - Added Capacity
$1,598.10
$1,731.98
Idaho
A020083
Bingham >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$172,220.89
$186,648.85
Idaho
A020083
Bingham >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$9,655,365.32
$10,464,252.00
Idaho
A020083
Bannock >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$139,523.33
$151,212.02
Idaho
A020083
Bingham >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$637,393.69
$690,791.92
Idaho
A020083
Bannock >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - Added Capacity
$2,471.51
$2,678.56
Idaho
A020083
Bingham >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$25,203.52
$27,314.97
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - No Added Capacity
$6,486,200.00
$7,000,000.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$12,602,658.42
$13,600,969.59
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,866,556.01
$2,014,414.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$32,973.99
$35,586.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,663,451.88
$2,874,435.44
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$1,050,272.38
$1,133,469.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State RAIL HWY CROSSING HAZ ELI Right of Way
$560,832.30
$623,147.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State RAIL HWY CROSSING HAZ ELI Utilities
$421,578.00
$468,420.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$14,922,850.31
$16,849,953.94
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$166,788.00
$180,000.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,942,212.91
$2,096,064.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$1,745,046.32
$2,233,279.00
Idaho
A020098
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$342,842.00
$370,000.00
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State FAST ACT NATIONAL FREIGHT 4R - No Added Capacity
$1,878,195.53
$2,035,543.00
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$331,064.85
$358,800.10
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering
$21,222.10
$23,000.00
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$66,952.85
$72,561.88
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$29,165,157.19
$31,608,493.79
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$1,056,193.38
$1,144,676.90
Idaho
A020139
Elmore >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$780,903.26
$846,324.12
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering
$457,197.85
$4,295,500.00
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering
$6,260,528.73
$6,785,010.00
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Right of Way
$2,869,284.38
$3,109,661.19
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety
$13,757,460.00
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Utilities
$147,632.00
$160,000.00
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$3,617.87
$3,920.96
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,192,408.13
$2,376,079.04
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$369,080.00
$400,000.00
Idaho
A020442
Kootenai >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$184,540.00
$200,000.00
Idaho
A020470
Minidoka >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY 4R - Restoration & Rehabilitation
$1.27
$1.38
Idaho
A020470
Minidoka >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$191,435.80
$207,473.52
Idaho
A020470
Minidoka >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$508,041.86
$550,603.53
Idaho
A020470
Minidoka >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$23,021,484.60
$24,950,129.62
Idaho
A020470
Minidoka >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,072,177.40
$1,162,000.00
Idaho
A020470
Minidoka >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$18,453.13
$19,999.06
Idaho
A020513
Nez Perce >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity
$5,908,604.81
$6,376,650.99
Idaho
A020513
Nez Perce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$286,621.97
$309,326.54
Idaho
A020513
Nez Perce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,264,822.99
$2,444,229.52
Idaho
A020513
Nez Perce >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$31,256,861.59
$33,732,853.00
Idaho
A020513
Nez Perce >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,964,086.22
$2,119,670.00
Idaho
A020513
Nez Perce >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Special Bridge
$3,484.46
$3,760.47
Idaho
A020589
Statewide N/A N/A INTERSTATE MAINTENANCE Construction Engineering
$78,372.97
$514,938.73
Idaho
A020589
Statewide N/A N/A INTERSTATE MAINTENANCE Preliminary Engineering
$10,496.64
$11,376.00
Idaho
A020589
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity
$19,465,555.00
Idaho
A020589
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$719,399.39
$8,479,667.71
Idaho
A020589
Bannock >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$4,976.64
$5,393.56
Idaho
A020589
Bannock >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$116,260.20
$126,000.00
Idaho
A020589
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,467,317.08
$3,757,794.63
Idaho
A020589
Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Utilities
$786,965.71
$852,894.38
Idaho
A020798
Canyon >= 200,000 N/A NAT SIG FREIGHT AND HWY PROJ 4R - Restoration & Rehabilitation
$41,075,230.00
$68,957,370.49
Idaho
A020798
Canyon >= 200,000 N/A NAT SIG FREIGHT AND HWY PROJ Construction Engineering
$3,312,304.00
$5,520,506.31
Idaho
A020799
Canyon >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Restoration & Rehabilitation
$15,317,705.00
$25,670,144.00
Idaho
A020799
Canyon >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Construction Engineering
$1,377,447.75
$2,295,746.77
Idaho
A020799
Canyon >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Other
$14,000.00
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$279,719.20
$303,152.91
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$8,949,867.00
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$544,000.00
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,096,206.61
$2,271,818.15
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$184,540.00
$450,000.00
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$14,861,006.20
$16,106,000.00
Idaho
A021935
Shoshone >= 5,000 AND < 50,000 State TECHNOLOGY DEPLOYMENT GRANTS T Preliminary Engineering
$115,000.00
$143,750.00
Idaho
A023080
Canyon >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$922,700.00
$44,634,776.21
Idaho
A023080
Canyon >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$387,534.00
$420,000.00
Idaho
A023080
Canyon >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$18,762,953.77
Idaho
A023080
Canyon >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Other
$2,975,342.58
$3,224,604.51
Idaho
A023081
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$2,944,962.60
$31,231,363.29
Idaho
A023081
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$387,534.00
$420,000.00
Idaho
A023081
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$12,057,064.07
Idaho
A023090
Nez Perce >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Construction Engineering
$592,322.00
$592,322.00
Idaho
A023090
Nez Perce >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC New Construction Roadway
$17,743,352.00
$17,743,352.00
Idaho
A023090
Nez Perce >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering
$2,375,000.00
$2,500,000.00
Idaho
A023090
Nez Perce >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT New Construction Roadway
$16,740,710.00
$17,621,800.00
Idaho
A023090
Nez Perce >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way
$19,000.00
$20,000.00
Idaho
A023336
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,500,000.00
Idaho
A023336
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$1,610,186.17
Idaho
A023336
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$4,000,000.00
Idaho
A023336
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,200,000.00
Idaho
A023336
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Special Bridge
$3,626,328.77
$18,759,267.64
Idaho
A023336
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$550,000.00
Idaho
A023336
Canyon >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Special Bridge
$341,281.23
$369,872.36
Idaho
A023437
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$98,707,350.00
Idaho
A023437
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,700,000.00
Idaho
A023437
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$8,600,000.00
Idaho
A023437
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$8,150,000.00
Idaho
A023437
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,100,000.00
Idaho
A023437
Canyon >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$5,450,000.00