RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Indiana | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Construction Engineering | $1,200,964.81 |
$1,200,964.81 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge New Construction | $86,393,550.47 |
$105,895,727.21 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $46,283,896.80 |
$46,283,896.80 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $63,092,770.75 |
$67,107,795.56 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $2,305,956.61 |
$2,882,445.76 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Bridge New Construction | $45,408,600.00 |
$47,592,888.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $2,770,827.94 |
$211,407,848.86 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $2,284,265.74 |
$2,917,784.18 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
New Construction Roadway | $267,862.64 |
$334,828.30 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Bridge New Construction | $18,408,600.00 |
$18,408,600.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $2,581,782.41 |
$3,227,228.01 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $647,327.48 |
$809,159.34 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $8,127.64 |
$10,159.56 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA |
Utilities | $220.23 |
$275.28 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA |
Utilities | $17,539.77 |
$21,924.72 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $3,815,263.05 |
$4,769,078.85 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $3,831,007.72 |
$4,766,963.63 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $47,903.26 |
$59,879.04 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $494,768.46 |
$1,599,169.84 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $39,406,146.25 |
$127,366,431.43 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $4,188,185.43 |
$5,784,072.77 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $244.71 |
||
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $9,499,981.18 |
$25,647,726.03 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $119,278.82 |
$322,024.91 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $186,691.33 |
$244,328.60 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $14,869,060.78 |
$19,459,592.35 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $635,227.67 |
$794,034.60 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $434,544.00 |
$543,180.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $5,456.00 |
$6,820.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $57,245.07 |
$71,556.35 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $16,134.98 |
$20,168.72 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $209,802.41 |
$264,063.06 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $767,405.56 |
$965,877.68 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $11,821,432.41 |
$15,049,831.66 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $3,332,062.29 |
$4,242,036.71 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $719,382.39 |
$895,363.47 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $2,553,556.68 |
$3,177,810.37 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $295,784.94 |
$7,382,002.43 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $82,015.06 |
$2,078,151.60 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $613,430.86 |
$1,205,771.96 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $2,176,382.27 |
$4,277,882.47 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $7,538.92 |
$7,538.92 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $2,061.08 |
$2,061.08 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $1,252,898.35 |
$1,566,122.94 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $59,210.10 |
$74,012.63 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $4,451,743.47 |
$5,564,679.34 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $2,839.88 |
$2,839.88 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $14,326.60 |
$14,326.60 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $3,507,602.53 |
$33,294,458.24 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $17,695,062.76 |
$117,737,401.43 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $100,819.36 |
$10,941,810.72 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $86,680.64 |
$8,712,369.10 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $83,840.00 |
$104,800.00 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM |
Utilities | $285,195.44 |
$356,494.30 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
New Construction Roadway | $1,886.73 |
$2,358.41 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 |
New Construction Roadway | $1,032,466.09 |
$1,290,582.61 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $833.22 |
$833.22 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $6,201,305.45 |
$7,751,631.82 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $155,600.44 |
$194,500.55 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $1,714,341.75 |
$1,714,341.75 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $469,180.54 |
$61,926,992.57 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Utilities | $234,554.43 |
$293,193.04 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $850,734.48 |
$1,063,418.10 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
New Construction Roadway | $32,128.13 |
$40,160.16 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $213,906.31 |
$267,382.89 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $187,996.80 |
$234,996.00 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION |
Construction Engineering | $517,558.49 |
$517,558.49 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION |
Construction Engineering | $32,000.00 |
$40,000.00 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRASTRUCTURE |
Utilities | $1,120,000.00 |
$1,400,000.00 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
New Construction Roadway | $1,235,289.48 |
||
Indiana | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
Right of Way | $112.87 |
||
Indiana | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
Utilities | $8,520.79 |
$10,650.99 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $519,176.87 |
$648,971.10 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $48,149,211.63 |
$51,949,624.13 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $40,302.76 |
$50,378.44 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $20,468.00 |
$25,585.00 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $20,266,209.16 |
$20,266,209.16 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $11,531.20 |
$14,414.00 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $80,662.72 |
$100,828.40 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF TIFIA
FUNDS |
Construction Engineering | $33,694.00 |
$42,117.50 |
|
Indiana | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $930,832.76 |
$1,163,540.95 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM |
Utilities | $419,691.36 |
$524,614.20 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION |
Utilities | $182,888.76 |
$228,610.95 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $1,791.49 |
$1,791.49 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
New Construction Roadway | $163,169.10 |
$362,598.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 |
Right of Way | $2,400.00 |
$3,000.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $447,439.95 |
$559,299.93 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $44,819,134.01 |
$56,023,917.52 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $1,642,111.67 |
$2,052,639.58 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $1,006,577.23 |
$1,258,221.53 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $309,798.22 |
$387,247.78 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $3,668,939.60 |
$4,586,174.50 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $5,767.81 |
$7,209.76 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
New Construction Roadway | $3,450,506.47 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
Preliminary Engineering | $277,600.00 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
Right of Way | $234,400.00 |
$308,498.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
Utilities | $846,817.94 |
$1,058,522.42 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $29,440.96 |
$36,801.20 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $677,236.15 |
$846,545.19 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION |
Utilities | $294,939.09 |
$368,673.86 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | HIGHWAY INFRASTRUCTURE |
Rail/Hwy Crossing | $267,642.71 |
$334,553.39 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $120,076.20 |
$120,076.20 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $406,890.75 |
$508,613.44 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $772.00 |
$965.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $19,828.34 |
$24,785.43 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $316,081.60 |
$395,102.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $13,298.86 |
$16,623.57 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $336,724.26 |
$336,724.26 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $74,714.15 |
$93,392.70 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $38,171.54 |
$47,714.42 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $100,000.00 |
$20,668,044.61 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $61,243.51 |
$76,554.39 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Rail/Hwy Crossing | $11,999.99 |
$14,999.99 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $462,584.46 |
$811,942.57 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Right of Way | $3,353,634.62 |
$4,192,043.28 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $824,696.29 |
$1,030,870.36 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Utilities | $1,338,687.20 |
$1,673,359.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Right of Way | $12,080.00 |
$15,100.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY
PROJECTS-TEA-21 |
Right of Way | $800,000.00 |
$1,000,000.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
Right of Way | $230,034.40 |
$287,543.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $35,625.62 |
$44,532.02 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $471,550.94 |
$589,438.68 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $441.77 |
$568.52 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $172,645.04 |
$215,806.30 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $100,173.29 |
$125,216.61 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $42,294.64 |
$52,868.30 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $347,804.63 |
$434,755.79 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $15,972,977.96 |
$20,521,395.40 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $358,296.50 |
$1,216,097.36 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Rail/Hwy Crossing | $41,800.86 |
$52,251.07 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Right of Way | $7,462.53 |
$9,328.16 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $372,290.11 |
$465,362.64 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $1,018,843.80 |
$1,273,554.75 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $266,013.10 |
$332,516.38 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Right of Way | $6,497.56 |
$8,121.95 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT |
4R - Added Capacity | $49,373,363.79 |
$49,377,193.53 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT |
4R - Added Capacity | $57,901,525.09 |
$57,906,016.34 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT |
Construction Engineering | $2,480,015.89 |
$3,100,019.86 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT |
Construction Engineering | $2,114,480.91 |
$2,643,101.13 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT |
Preliminary Engineering | $4,269,433.92 |
$5,181,716.07 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT |
Preliminary Engineering | $5,006,884.58 |
$6,076,743.38 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT |
Rail/Hwy Crossing | $3,643.30 |
$5,397.48 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT |
Rail/Hwy Crossing | $3,106.70 |
$4,602.52 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR |
4R - Added Capacity | $3,913,917.44 |
$4,348,797.15 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
4R - Added Capacity | $4,594,165.23 |
$5,104,628.04 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $14,573.23 |
$15,469,482.92 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $12,426.77 |
$13,190,793.55 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $207,112.90 |
$460,250.89 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $242,887.10 |
$539,749.11 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $1,252,811.66 |
$2,193,200.45 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $1,068,198.72 |
$1,869,951.19 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $89.62 |
$99.58 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $8,283.26 |
$9,203.62 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $1.26 |
$1.40 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $9,715.48 |
$10,794.98 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $13,115.90 |
$14,573.22 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $11,184.10 |
$12,426.78 |
|
Indiana | Jackson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - Added Capacity | $213,704.47 |
$237,449.41 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - Added Capacity | $252,124.73 |
$280,138.59 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE |
4R - Added Capacity | $300,000.00 |
$300,000.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
4R - Added Capacity | $69,586.40 |
$263,991.35 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
4R - Added Capacity | $18,523,255.50 |
$20,581,395.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $840,736.03 |
$934,151.14 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Right of Way | $2,835.00 |
$3,150.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $1,894,338.76 |
$2,104,820.84 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $24,466.55 |
$27,185.06 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $10,219.67 |
$10,219.67 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $17,722.00 |
$19,691.11 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $16.86 |
$21.08 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
4R - Added Capacity | $15,625,123.98 |
$19,531,404.97 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $1,665.00 |
$2,081.25 |
|
Indiana | Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 |
Preliminary Engineering | $449,949.95 |
$562,437.44 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANS PRIORITIES
S129 |
New Construction Roadway | $48,210.44 |
$48,210.44 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANS PRIORITIES
S129 |
Preliminary Engineering | $855,294.41 |
$855,294.41 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANS PRIORITIES
S129 |
Rail/Hwy Crossing | $1,789.56 |
$1,789.56 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
Bridge New Construction | $6,079,358.70 |
$7,599,198.37 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $10,778,937.29 |
$13,473,671.62 |
|
Indiana | Adams | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $57,876.00 |
$72,345.00 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
Rail/Hwy Crossing | $1,221,111.91 |
$1,532,789.54 |
|
Indiana | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
Right of Way | $51,991.60 |
$64,989.50 |
|
Indiana | Lake | >= 200,000 | Local | URGENT SUPPLEMENTAL BRIDGES |
New Construction Roadway | $1,336,025.96 |
||
Indiana | Lake | >= 200,000 | Local | URGENT SUPPLEMENTAL BRIDGES |
Preliminary Engineering | $1,934,779.82 |
$2,374,943.63 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION |
Utilities | $32,392.80 |
$32,392.80 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
Construction Engineering | $24,480.00 |
$30,600.00 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
New Construction Roadway | $100,000.00 |
$100,000.00 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
Preliminary Engineering | $3,101,033.24 |
$3,876,291.54 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
Right of Way | $1,156,235.50 |
$1,445,294.38 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
Utilities | $716,416.00 |
$895,520.00 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | INDIANA INDUST CORR SFTY
DEMO |
New Construction Roadway | $198,222.34 |
||
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | INDIANA INDUST CORR SFTY
DEMO |
Preliminary Engineering | $25,539.57 |
$69,140.46 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA |
Preliminary Engineering | $242,750.00 |
$303,437.50 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA |
Preliminary Engineering | $242,750.00 |
$303,437.50 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $1,015,123.06 |
$1,268,903.82 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $20,449.63 |
$25,562.04 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $38,474.60 |
$48,093.25 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $644,691.25 |
$651,237.38 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $529.76 |
$662.20 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $3,840.00 |
$4,800.00 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $20,074,264.27 |
$20,180,165.53 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $2,440,832.73 |
$3,051,040.91 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $160,996.80 |
$201,246.00 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $3,557,247.56 |
$4,446,559.45 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $612,716.13 |
$765,895.16 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
New Construction Roadway | $5,691,940.00 |
$5,691,940.00 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | SURFACE TRANSPORTATION PROJECT |
Preliminary Engineering | $314.04 |
$392.55 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | HIGH PRIORITY
PROJECTS-TEA-21 |
Construction Engineering | $13,360.00 |
$16,700.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY
PROJECTS-TEA-21 |
Preliminary Engineering | $3,095,176.00 |
$3,868,970.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $42,320.00 |
$52,900.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $4,000.00 |
$5,000.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $300.24 |
$375.30 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $117,697.30 |
$147,121.63 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $21,680.00 |
$27,100.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $788,266.39 |
$985,332.99 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $11,260,948.46 |
$14,076,185.58 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $521,099.76 |
$605,524.70 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $1,402,216.00 |
$1,752,770.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $19,600.00 |
||
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Right of Way | $2,688,000.00 |
$3,360,000.00 |
|
Indiana | Carroll | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $384,000.00 |
$480,000.00 |
|
Indiana | White | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
Preliminary Engineering | $806,393.60 |
$2,213,073.97 |
|
Indiana | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Other | $31,032,013.89 |
$34,371,763.99 |
|
Indiana | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $1,620,000.00 |
$1,800,000.00 |
|
Indiana | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $101,196.40 |
$101,196.40 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM |
New Construction Roadway | $6,470,635.40 |
$6,470,635.40 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $1,428,784.53 |
$1,595,179.33 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $1,565,889.58 |
$1,565,889.58 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $77,429,371.60 |
$77,429,371.60 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $1,971,829.36 |
$1,971,829.36 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $576,000.00 |
$720,000.00 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Utilities | $59,662.00 |
$59,662.00 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $36,048.62 |
$36,048.62 |
|
Indiana | Daviess | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Rail/Hwy Crossing | $105,587.01 |
$105,587.01 |
|
Indiana | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $360,662.20 |
$24,513,484.10 |
|
Indiana | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,971,271.63 |
$2,952,537.37 |
|
Indiana | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $4,601,424.63 |
$5,752,531.13 |
|
Indiana | Lake | >= 200,000 | State | REPURPOSED SPECIAL |
4R - Added Capacity | $756,043.94 |
$945,054.92 |
|
Indiana | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $63,902.50 |
$71,002.78 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | EQUITY BONUS SP LIMITATION |
Preliminary Engineering | $970,540.00 |
$1,213,175.00 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,543,146.12 |
$1,928,932.66 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $52,882.45 |
$66,103.06 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $11,404,374.94 |
$14,255,468.67 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $1,611,318.20 |
$2,014,147.75 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $2,026,251.20 |
$2,532,814.00 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $49,200.00 |
$61,500.00 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $72,014.40 |
$90,018.00 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $139,826.71 |
$174,783.39 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $511,075.11 |
$638,843.89 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $62,887.28 |
$78,609.10 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $727,926.46 |
$910,908.08 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $103,517.64 |
||
Indiana | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $53,500.00 |
||
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $1,566,649.91 |
$2,233,512.39 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM |
Rail/Hwy Crossing | $20,000.00 |
$25,000.00 |
|
Indiana | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $531,245.76 |
||
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM |
Right of Way | $545,902.48 |
||
Indiana | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM |
Utilities | $110,000.00 |
||
Indiana | Jennings | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $257,080.00 |
$321,350.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $9,623.32 |
$10,692.58 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $55,488,631.63 |
$61,654,035.15 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,191,060.36 |
$1,404,363.24 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $659,856.00 |
$793,570.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $208.65 |
$245.22 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $25.60 |
$28.93 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $33,780.06 |
$42,225.08 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $144,198.65 |
$163,584.02 |
|
Indiana | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - Added Capacity | $6,154,541.88 |
$7,688,902.25 |
|
Indiana | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - Added Capacity | $27,330,172.13 |
$33,078,768.27 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - Added Capacity | $1,138.80 |
$1,415.51 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $9.88 |
$28.22 |
|
Indiana | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $53,646.12 |
$157,600.99 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $508,616.55 |
$635,770.69 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,400,000.00 |
$1,750,000.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,849,879.48 |
$2,312,349.34 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Historic Preservation | $10,014,720.00 |
$12,518,400.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $17,310,490.78 |
$21,638,113.46 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $17,347,595.39 |
$21,684,494.24 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $628.46 |
$785.58 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $4,759,619.19 |
$5,949,523.99 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $1,868,886.56 |
$2,336,108.18 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $5,547,452.27 |
$6,934,315.34 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $6,797,291.42 |
$8,496,614.28 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $2,511.21 |
$3,139.02 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $690.45 |
$863.06 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $2,596,099.34 |
$3,245,124.13 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $27.63 |
$34.54 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $9,442,167.92 |
$11,802,709.94 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $30,042,899.97 |
$37,553,624.98 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $5,141,657.56 |
$6,427,071.95 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $11,187,590.00 |
$13,984,487.51 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $1,413,677.00 |
$1,767,096.25 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $6,609,153.89 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $24,037,871.11 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $545,840.67 |
$682,300.83 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $155.73 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $92,584.33 |
||
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $25,455.67 |
||
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $78,518.49 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM |
Right of Way | $0.01 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $285,578.00 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $2,602,314.57 |
||
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $715,495.44 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $8,254,074.34 |
$10,317,592.92 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Right of Way | $400,000.00 |
$500,000.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $3,613,661.60 |
$4,517,077.00 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $1,639.51 |
$2,049.38 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $450.77 |
$563.47 |
|
Indiana | Hamilton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM |
New Construction Roadway | $354,223.00 |
$393,582.22 |
|
Indiana | Hamilton | >= 200,000 | State | EQUITY BONUS SP LIMITATION |
New Construction Roadway | $1,059,967.76 |
$1,177,741.95 |
|
Indiana | Hamilton | >= 200,000 | State | EQUITY BONUS SP LIMITATION |
New Construction Roadway | $1,757,941.03 |
$1,953,267.81 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $2,813,415.53 |
$5,612,128.16 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $568,526.40 |
$726,688.43 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $596,776.43 |
$701,973.82 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $34,333,219.51 |
$38,148,021.68 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $241,523.67 |
$267,837.73 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $2,386.14 |
$2,982.68 |
|
Indiana | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $5,188,059.43 |
$5,764,510.47 |
|
Indiana | Grant | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Construction Engineering | $500.00 |
$500.00 |
|
Indiana | Grant | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $24,974,933.29 |
$27,806,449.40 |
|
Indiana | Grant | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,552,784.52 |
$1,713,340.17 |
|
Indiana | Grant | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $303,139.39 |
$336,821.54 |
|
Indiana | Grant | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $43,752.19 |
$50,583.68 |
|
Indiana | Grant | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $586,468.35 |
$1,303,263.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF |
Bridge Replacement - No Added Capacity | $141,335.03 |
$157,038.93 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF |
Preliminary Engineering | $79,200.00 |
$887,145.74 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF |
Right of Way | $225,900.00 |
$330,200.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF |
Utilities | $88,707.60 |
$98,564.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON
SYS |
Bridge Replacement - No Added Capacity | $77,534.35 |
$86,149.28 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | HIGHWAY BRIDGE PROGRAM
(PLUS) |
Right of Way | $455.00 |
$700.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Preliminary Engineering | $961,426.50 |
$1,068,251.67 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Right of Way | $16,155.00 |
$35,900.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Utilities | $10,080.00 |
$22,400.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Replacement - No Added Capacity | $652,604.36 |
$725,115.96 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $71,100.00 |
$79,000.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $521,283.00 |
$579,203.33 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $11,526,608.62 |
$12,807,342.91 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Bridge Replacement - No Added Capacity | $81,259.00 |
$90,287.78 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Bridge Replacement - No Added Capacity | $14,141,076.89 |
$15,712,307.65 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $2,160.00 |
$4,800.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
4R - Added Capacity | $283,189.00 |
$314,654.44 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Construction Engineering | $99,450.00 |
$110,500.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $400,000.00 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $7,440,609.29 |
$71,077,750.12 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $3,720,000.00 |
$3,734,000.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Facilities for Pedestrians and Bicycles | $75,800.00 |
$221,430.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $1,002,580.00 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $497,150.00 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $39,000.00 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $148,038.96 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $32,111.01 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
4R - Added Capacity | $527,039.41 |
$585,599.34 |
|
Indiana | Hamilton | >= 200,000 | State | CONGESTION AIR QUALITY |
Construction Engineering | $481,862.29 |
$481,862.29 |
|
Indiana | Hamilton | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 |
Construction Engineering | $134,047.80 |
$134,047.80 |
|
Indiana | Hamilton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $775,000.00 |
$775,000.00 |
|
Indiana | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $25,124,799.74 |
$25,124,799.74 |
|
Indiana | Hamilton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $106,431.58 |
||
Indiana | Decatur | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $28,032.50 |
$55,406.75 |
|
Indiana | Franklin | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $61,613.55 |
$121,780.30 |
|
Indiana | Ripley | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $100,286.89 |
$198,218.82 |
|
Indiana | Ripley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $28,415,153.99 |
$31,686,159.11 |
|
Indiana | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $17,457,457.22 |
$19,467,069.13 |
|
Indiana | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $7,942,509.80 |
$8,856,810.34 |
|
Indiana | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $170,259.11 |
$199,640.00 |
|
Indiana | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $374,223.05 |
$438,799.34 |
|
Indiana | Ripley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $609,114.85 |
$714,223.88 |
|
Indiana | Ripley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $66,504.52 |
$73,893.91 |
|
Indiana | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $18,590.96 |
$20,656.62 |
|
Indiana | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $40,858.93 |
$45,398.81 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge New Construction | $3,773,349.60 |
$19,713,365.14 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $38,800.00 |
$48,500.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $94,628.92 |
$283,978.92 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $9,120.00 |
$11,400.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $1,072,498.40 |
$1,340,623.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $1,236,480.00 |
$1,997,759.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM |
Rail/Hwy Crossing | $8,000.00 |
$10,000.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Bridge New Construction | $180,180.78 |
||
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Construction Engineering | $17,187.43 |
||
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Preliminary Engineering | $280,720.00 |
||
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Preliminary Engineering | $1,712,510.00 |
$1,734,210.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Rail/Hwy Crossing | $10,000.00 |
$10,000.00 |
|
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Rail/Hwy Crossing | $31,230.00 |
||
Indiana | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI |
Utilities | $441,600.00 |
||
Indiana | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
4R - Added Capacity | $31,700.71 |
$35,223.01 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $37,271.65 |
$37,271.65 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Preliminary Engineering | $4,500.00 |
$10,000.00 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $15,857,911.69 |
$58,341,301.65 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,841,409.65 |
$1,978,433.65 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $2,950,278.38 |
$4,107,055.90 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $68,863.15 |
$76,514.62 |
|
Indiana | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - Added Capacity | $42,362.27 |
$47,069.19 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $4,546,725.04 |
$5,051,916.71 |
|
Indiana | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $31,868,985.85 |
$35,409,984.28 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $15,881.94 |
$17,646.60 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $2,411.65 |
$2,679.61 |
|
Indiana | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $4,693,572.33 |
$5,215,080.36 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $675,227.04 |
$750,252.27 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $3,626.71 |
$168,170.25 |
|
Indiana | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $110,900.00 |
||
Indiana | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $25,209.56 |
$1,169,002.41 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $12.95 |
$605.54 |
|
Indiana | Hendricks | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $3,070,422.18 |
$3,411,580.20 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR |
Construction Engineering | $87,608.48 |
$97,342.76 |
|
Indiana | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Construction Engineering | $29,391.52 |
$32,657.24 |
|
Indiana | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Maintenance Resurfacing | $8,114,977.44 |
$9,031,876.45 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Maintenance Resurfacing | $24,188,641.03 |
$26,921,670.88 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $304,130.48 |
$337,314.81 |
|
Indiana | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $102,033.51 |
$113,166.60 |
|
Indiana | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $80,464.93 |
$184,954.30 |
|
Indiana | Wayne | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $16.72 |
$18.58 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $239,828.35 |
$551,282.12 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $232,849.40 |
$258,721.55 |
|
Indiana | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $78,118.48 |
$86,798.32 |
|
Indiana | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Rehabilitation - Added Capacity | $17,018,060.75 |
||
Indiana | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $304,248.00 |
$2,433,155.66 |
|
Indiana | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $1,681,000.00 |
||
Indiana | Porter | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Bridge Rehabilitation - Added Capacity | $1,244,648.73 |
$1,244,648.73 |
|
Indiana | Porter | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Construction Engineering | $1,918,285.69 |
||
Indiana | Porter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $80,000.00 |
$100,000.00 |
|
Indiana | Porter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $17,020,502.00 |
||
Indiana | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP |
4R - No Added Capacity | $149,317,455.20 |
$149,317,455.20 |
|
Indiana | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $87,300.00 |
$97,000.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $124,402,598.26 |
$213,657,870.05 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $20,669,682.10 |
$22,941,556.27 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $5,851,003.76 |
$54,488,312.37 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $555,158.96 |
$618,509.96 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $683,377.17 |
$5,518,602.14 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
4R - No Added Capacity | $1,118,306.78 |
$1,242,563.09 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Construction Engineering | $545,007.32 |
$681,259.15 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Preliminary Engineering | $135,000.00 |
$150,000.00 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Rail/Hwy Crossing | $60,948.04 |
$67,720.04 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Utilities | $273,813.90 |
$304,237.67 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED SPECIAL |
4R - No Added Capacity | $2,605,932.54 |
$2,605,932.54 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Preliminary Engineering | $15,470,307.90 |
$17,189,231.00 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Rail/Hwy Crossing | $29,452.68 |
$32,725.20 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $1,026,719.03 |
$1,140,798.93 |
|
Indiana | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
4R - No Added Capacity | $6,469,658.90 |
$36,388,211.72 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $9,924,557.71 |
$129,229,249.59 |
|
Indiana | Scott | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $7,655,970.31 |
$99,689,611.01 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Maintenance Resurfacing | $11,965,501.85 |
$13,317,963.92 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Maintenance Resurfacing | $19,407,007.98 |
$21,600,578.62 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $547,494.35 |
$598,901.42 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $337,562.04 |
$369,256.61 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $161,060.97 |
$228,385.99 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $261,399.03 |
$370,620.11 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $83,505.96 |
$92,784.40 |
|
Indiana | Henry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $51,494.04 |
$57,215.60 |
|
Indiana | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Rehabilitation - Added Capacity | $49,140,218.75 |
||
Indiana | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Rehabilitation - No Added Capacity | $4,950,000.00 |
$87,905,007.25 |
|
Indiana | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $5,213,616.03 |
$13,178,516.74 |
|
Indiana | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $319,700.00 |
$14,182,140.00 |
|
Indiana | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $359,023.32 |
$736,628.80 |
|
Indiana | Floyd | >= 50,000 AND < 200,000 | State | TRAN COMM SYS PRES PILOT-TEA21 |
Rail/Hwy Crossing | $1,900.96 |
$2,376.20 |
|
Indiana | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP |
New Construction Roadway | $0.11 |
$0.11 |
|
Indiana | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
New Construction Roadway | $29,282,322.74 |
$36,602,903.43 |
|
Indiana | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $897,929.67 |
$1,122,412.09 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $13,838,152.84 |
$43,322,991.05 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $100,000.00 |
$100,000.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Facilities for Pedestrians and Bicycles | $103,485.46 |
||
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $34,400,784.06 |
$364,538,698.93 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $59,045,250.53 |
$73,806,563.16 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $313,280.00 |
$391,600.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $18,566,132.81 |
$111,933,080.01 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $2,411,112.50 |
$3,013,890.62 |
|
Indiana | Marion | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH |
Construction Engineering | $1,931.63 |
$2,414.54 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $76,157.31 |
$195,196.64 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $97,548,952.61 |
$121,936,190.76 |
|
Indiana | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Utilities | $2,800,000.00 |
$3,500,000.00 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR |
Utilities | $450,400.00 |
$563,000.00 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $3,429,652.70 |
$14,287,065.88 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $5,559,781.73 |
$6,949,727.14 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,780,218.27 |
$2,225,272.86 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $2,984,324.00 |
$7,869,379.94 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $9,320,312.15 |
$24,576,780.88 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $2,291,345.55 |
$21,651,739.29 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $325,685.00 |
||
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $203,218.19 |
$6,021,944.32 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $65,069.81 |
$1,928,207.74 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $151,337.89 |
$4,685,027.28 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $3,809,131.01 |
$4,761,413.75 |
|
Indiana | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $472,640.22 |
$14,631,733.51 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $55,405,786.05 |
||
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Restoration & Rehabilitation | $8,418,207.96 |
$10,522,759.95 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Rail/Hwy Crossing | $18,000.00 |
$20,000.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $608,579.84 |
$930,030.93 |
|
Indiana | Vermillion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Maintenance Resurfacing | $8,510,324.75 |
$9,455,916.39 |
|
Indiana | Fountain | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Maintenance Resurfacing | $12,018,063.08 |
$13,353,403.42 |
|
Indiana | Fountain | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $419,933.44 |
$466,592.71 |
|
Indiana | Vermillion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $297,366.56 |
$330,407.29 |
|
Indiana | Vermillion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Highway Infrastructure Preventive Maintenance | $1,204,741.62 |
$1,338,601.80 |
|
Indiana | Fountain | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Highway Infrastructure Preventive Maintenance | $1,701,382.82 |
$1,890,425.35 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $371,339.16 |
$6,085,945.82 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $40,777,643.41 |
$50,972,054.25 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $637,090.68 |
$796,363.35 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $960,492.68 |
$1,200,615.85 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $16,388,024.48 |
$65,206,431.54 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $466,014.10 |
||
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Other | $33,844,128.94 |
$33,844,128.94 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $1,773,254.94 |
$2,703,265.94 |
|
Indiana | Posey | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Other | $39,661,666.67 |
$39,661,666.67 |
|
Indiana | Posey | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $820,488.00 |
$2,953,226.00 |
|
Indiana | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Other | $53,127,666.67 |
$53,127,666.67 |
|
Indiana | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $380,100.00 |
$2,565,620.10 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE |
Construction Engineering | $4,395.52 |
$5,494.40 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $1,876,192.09 |
$46,105,056.60 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $5,681,983.41 |
$6,321,123.26 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
4R - Added Capacity | $1,876,192.09 |
$2,345,240.11 |
|
Indiana | Tippecanoe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $104,184.27 |
$130,230.34 |
|
Indiana | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $57,330,010.00 |
||
Indiana | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Right of Way | $4,400,000.00 |
$11,150,700.00 |
|
Indiana | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $115,800,000.00 |
||
Indiana | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $58,860,000.00 |
||
Indiana | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
New Construction Roadway | $52,150,000.00 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Preliminary Engineering | $6,121,987.52 |
$6,126,491.81 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 |
Preliminary Engineering | $1,164,678.13 |
$1,179,000.46 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Right of Way | $2,256,538.75 |
$2,322,683.13 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Utilities | $1,180,480.96 |
$1,441,262.99 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY
PROJECTS-TEA-21 |
Right of Way | $176,280.00 |
$220,350.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINT DISC |
Preliminary Engineering | $1,171,712.00 |
$1,301,902.22 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $197,617.70 |
$247,022.12 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $4,372,371.42 |
$5,465,464.28 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $87,035.69 |
$105,127.11 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $558,412.04 |
$698,015.05 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $1,398,199.01 |
$1,744,823.75 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $4,293,010.80 |
$5,347,513.50 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $50,780.00 |
$63,475.00 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $7,625.79 |
$9,532.24 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | N/A | SURF TRANS PROJ |
Preliminary Engineering | $30,017.40 |
$30,017.40 |
|
Indiana | Clark | >= 50,000 AND < 200,000 | State | SURF TRANS PROJ |
Preliminary Engineering | $54,500.00 |
||
Indiana | Clark | >= 50,000 AND < 200,000 | State | SURF TRANS PROJ |
Utilities | $37,607.15 |
$47,008.94 |
|
Indiana | St. Joseph | >= 200,000 | State | EQUITY BONUS EXEMPT LIM |
Rail/Hwy Crossing | $2,754.07 |
$2,754.07 |
|
Indiana | St. Joseph | >= 200,000 | State | EQUITY BONUS SP LIMITATION |
New Construction Roadway | $107,500.00 |
$107,500.00 |
|
Indiana | St. Joseph | >= 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS |
Bridge New Construction | $2,357,606.36 |
$2,357,606.36 |
|
Indiana | St. Joseph | >= 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS |
New Construction Roadway | $18,954,819.64 |
$18,955,819.64 |
|
Indiana | St. Joseph | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE |
Utilities | $7,640.62 |
$8,489.58 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $467,918.18 |
$467,918.18 |
|
Indiana | St. Joseph | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $2,992,648.51 |
$2,992,648.51 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Tunnel | $408,000.00 |
$408,000.00 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $746,836.69 |
$746,836.69 |
|
Indiana | St. Joseph | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Bridge New Construction | $2,795,884.49 |
$2,795,884.49 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Construction Engineering | $688,029.18 |
$834,652.02 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $1,331,738.39 |
$1,349,913.68 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
New Construction Roadway | $113,903.61 |
||
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $9,200.00 |
||
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Preliminary Engineering | $24,600.00 |
||
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Rail/Hwy Crossing | $2,516,191.53 |
$2,516,191.53 |
|
Indiana | St. Joseph | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Right of Way | $1,030,000.00 |
$1,030,000.00 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Right of Way | $10,998,769.77 |
$11,028,869.77 |
|
Indiana | St. Joseph | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM |
Utilities | $1,191,298.77 |
$1,191,298.77 |
|
Indiana | St. Joseph | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM |
Utilities | $3,788,718.93 |
$3,788,718.93 |
|
Indiana | St. Joseph | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM |
Construction Engineering | $11,681.33 |
$11,681.33 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $48,005,547.56 |
$82,768,185.44 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $2,470,455.41 |
$4,259,405.88 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Rehabilitation - Added Capacity | $13,349,990.10 |
$23,017,224.31 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $2,666,500.00 |
$2,775,000.00 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $6,700,423.39 |
$11,552,454.12 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $67,296.19 |
$116,027.92 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
4R - Added Capacity | $22,500,000.00 |
$38,844,103.45 |
|
Indiana | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
Construction Engineering | $250,000.00 |
||
Indiana | Hancock | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
4R - Added Capacity | $40,630.00 |
$70,051.72 |
|
Indiana | Allen | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
4R - No Added Capacity | $5,525,653.96 |
$12,761,243.73 |
|
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
4R - No Added Capacity | $32,980,645.40 |
$76,167,283.98 |
|
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
Construction Engineering | $430.06 |
$977.41 |
|
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
Construction Engineering | $1,450.10 |
$3,295.68 |
|
Indiana | Allen | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
Construction Engineering | $242.95 |
$552.16 |
|
Indiana | Allen | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ |
4R - No Added Capacity | $6,409,730.11 |
$14,803,071.84 |
|
Indiana | Marion | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ |
4R - No Added Capacity | $38,257,378.64 |
$88,354,223.19 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $16,094,303.77 |
$37,257,566.39 |
|
Indiana | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $2,696,477.05 |
$6,242,219.23 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge New Construction | $16,188,871.29 |
$37,387,453.84 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Replacement - Added Capacity | $3,693,760.19 |
$8,530,569.32 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $36,969.94 |
$84,022.59 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $6,589,595.94 |
$12,697,526.85 |
|
Indiana | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $1,104,036.21 |
$2,127,373.15 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Safety | $88,838.72 |
$205,168.95 |
|
Indiana | Marion | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM |
Safety | $69,560.46 |
$160,646.70 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Safety | $179,586.32 |
$414,746.35 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Traffic Management/Engineering - HOV | $6,341,622.38 |
$14,648,766.28 |
|
Indiana | Marion | >= 200,000 | State | TRANSPORTATION ALTERNATIVES |
Other | $227,567.55 |
$227,567.55 |
|
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
4R - No Added Capacity | $4,152,626.69 |
$9,846,165.17 |
|
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
4R - No Added Capacity | $40,149,267.16 |
$96,911,244.80 |
|
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
Bridge Rehabilitation - Added Capacity | $79,451.87 |
||
Indiana | Marion | >= 200,000 | State | FAST ACT NATIONAL FREIGHT |
Traffic Management/Engineering - HOV | $157,196.41 |
||
Indiana | Marion | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ |
4R - No Added Capacity | $25,332,891.25 |
$60,316,407.74 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $2,108,753.32 |
$5,000,000.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $1,080,321.96 |
$2,806,415.41 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge New Construction | $2,840,997.02 |
$3,156,663.36 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Rehabilitation - Added Capacity | $21,087.53 |
$50,000.00 |
|
Indiana | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $3,481,176.67 |
$3,867,974.08 |
|
Indiana | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM |
Construction Engineering | $121,891.00 |
$135,434.44 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
New Construction Roadway | $669,011.37 |
$1,846,524.19 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
New Construction Roadway | $183,941.86 |
$507,771.35 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Preliminary Engineering | $225,654.27 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Preliminary Engineering | $820,768.73 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Right of Way | $2,378,218.89 |
||
Indiana | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Right of Way | $653,705.76 |
||
Indiana | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Utilities | $29,088.61 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 |
Utilities | $105,768.15 |
||
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $22,382,426.81 |
$27,978,033.53 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $534,973.52 |
$668,716.90 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $6,153,953.62 |
$7,692,442.01 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $28,010,561.52 |
$35,013,201.89 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $60,600,818.43 |
$75,751,023.04 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $101,876,677.04 |
$127,345,846.31 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $936,450.98 |
$1,170,563.72 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $6,408,639.06 |
$8,010,798.83 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Preliminary Engineering | $1,762,028.21 |
$2,202,535.27 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $288,759.44 |
$360,949.30 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Right of Way | $1,050,241.36 |
$1,312,801.70 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $408,733.98 |
$510,917.48 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $4,200,350.46 |
$5,250,438.08 |
|
Indiana | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Utilities | $1,154,868.60 |
$1,443,585.75 |
|
Indiana | Monroe | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL |
New Construction Roadway | $2,068,842.84 |
$2,586,053.55 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $29,412,962.00 |
$34,261,757.56 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $2,252,620.00 |
$2,495,140.00 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
4R - Added Capacity | $20,000,000.00 |
$41,747,207.40 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - Added Capacity | $1,375,212.92 |
$1,524,258.80 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $4,400,038.24 |
$4,888,931.38 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
4R - Added Capacity | $20,000,000.00 |
$47,005,579.50 |
|
Indiana | Bartholomew | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
Construction Engineering | $1,079,922.54 |
||
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
4R - No Added Capacity | $11,250,194.20 |
$13,224,271.49 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge New Construction | $411,414.52 |
$591,424.86 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Bridge Preventive Maintenance | $10,530.00 |
$12,476.95 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
Construction Engineering | $2,181,558.10 |
$2,373,451.10 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM |
New Construction Roadway | $10,099,354.06 |
$11,226,052.11 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
4R - No Added Capacity | $1,027,405.24 |
||
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
Bridge New Construction | $1,097,068.84 |
$3,335,050.85 |
|
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
Construction Engineering | $742,985.62 |
||
Indiana | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT |
New Construction Roadway | $14,902,931.16 |
$43,219,023.83 |