Kentucky | Fulton | >= 5,000 AND < 50,000 | State | INTERSTATE 4R | Preliminary Engineering | $112.44 |
$112.44 |
|
Kentucky | Hickman | < 5,000 | State | INTERSTATE 4R | Preliminary Engineering | $112.13 |
$112.13 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | INTERSTATE 4R | Preliminary Engineering | $112.79 |
$112.79 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $0.18 |
$0.18 |
|
Kentucky | Hickman | < 5,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $0.17 |
$0.17 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $0.18 |
$0.18 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,046,855.22 |
$11,308,569.03 |
|
Kentucky | Hickman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,021,515.89 |
$11,276,894.85 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,074,908.89 |
$11,343,636.12 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $907,490.89 |
$1,134,363.61 |
|
Kentucky | Hickman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $902,151.59 |
$1,127,689.49 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $904,685.52 |
$1,130,856.90 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,513.32 |
$2,513.32 |
|
Kentucky | Hickman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,506.29 |
$2,506.29 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,521.11 |
$2,521.11 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $144,443.12 |
$277,496.85 |
|
Kentucky | Hickman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $143,593.25 |
$275,864.15 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $143,996.59 |
$276,639.00 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $85,324.80 |
$106,656.00 |
|
Kentucky | Hickman | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $85,085.81 |
$106,357.26 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $85,589.39 |
$106,986.74 |
|
Kentucky | Graves | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $732,899.71 |
$732,899.71 |
|
Kentucky | Hickman | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $728,587.62 |
$728,587.62 |
|
Kentucky | Fulton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $730,634.06 |
$730,634.06 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $10,848,247.00 |
$10,848,247.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,360,163.00 |
$11,360,163.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000,000.00 |
$2,220,841.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $2,524,180.00 |
$2,524,180.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $45,650,000.00 |
$45,650,000.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $9,500,000.00 |
$9,500,000.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,733,450.00 |
$51,466,900.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,961,690.00 |
$9,923,380.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $6,513,535.00 |
$13,027,070.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $9,921,004.00 |
$9,921,004.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,900,000.00 |
$5,800,000.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,500,000.00 |
$3,000,000.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $200,000.00 |
$200,000.00 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,857,421.22 |
$17,857,421.22 |
|
Kentucky | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $44,568,218.67 |
$44,568,218.67 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,136,328.05 |
$15,136,328.05 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,113,832.80 |
$1,113,832.80 |
|
Kentucky | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,882,877.20 |
$4,882,877.20 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,277,788.17 |
$3,277,788.17 |
|
Kentucky | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,500,693.34 |
$1,500,693.34 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,724,780.00 |
$1,724,780.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,905,716.66 |
$1,905,716.66 |
|
Kentucky | Morgan | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $373,796.44 |
$373,796.44 |
|
Kentucky | Morgan | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Construction Engineering | $95,125.39 |
$95,125.39 |
|
Kentucky | Wolfe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,670,001.96 |
$5,670,001.96 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $91,221.97 |
$91,221.97 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | $575,014.68 |
$575,014.68 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $61,325.42 |
$61,325.42 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,400,200.00 |
$8,400,200.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,000,000.00 |
$6,000,000.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $6,175,000.00 |
$6,175,000.00 |
|
Kentucky | Magoffin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $51,915,176.33 |
$52,605,176.33 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $51,705,811.05 |
$51,705,811.05 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,532,800.00 |
$4,532,800.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,200,000.00 |
$1,200,000.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,000,000.00 |
$1,000,000.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,000,000.00 |
$11,200,000.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000,000.00 |
$1,000,000.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,630,000.00 |
$1,630,000.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $32,341,100.00 |
$32,341,100.00 |
|
Kentucky | Perry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,234,100.00 |
$3,234,100.00 |
|
Kentucky | Lyon | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Maintenance Resurfacing | $1,348,043.49 |
$1,348,043.49 |
|
Kentucky | Caldwell | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Maintenance Resurfacing | $404.53 |
$404.53 |
|
Kentucky | Caldwell | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $83.50 |
$83.50 |
|
Kentucky | Lyon | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $320,725.50 |
$320,725.50 |
|
Kentucky | Lyon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $1,180,879.63 |
$1,180,879.63 |
|
Kentucky | Caldwell | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $354.37 |
$354.37 |
|
Kentucky | Caldwell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,406,649.45 |
$5,406,649.45 |
|
Kentucky | Lyon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,830,359.53 |
$3,830,359.53 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,759,000.00 |
$16,759,000.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,900,933.00 |
$1,900,933.00 |
|
Kentucky | Lyon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $586,762.52 |
$586,762.52 |
|
Kentucky | Caldwell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $389,454.48 |
$389,454.48 |
|
Kentucky | Christian | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $23,349,000.00 |
$23,349,000.00 |
|
Kentucky | Christian | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $2,335,000.00 |
$2,335,000.00 |
|
Kentucky | Owsley | < 5,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $7,032,224.00 |
$7,032,224.00 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $8,221,840.00 |
$8,221,840.00 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge New Construction | $3,824,500.00 |
$3,824,500.00 |
|
Kentucky | Owsley | < 5,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge New Construction | $476,000.00 |
$476,000.00 |
|
Kentucky | Owsley | < 5,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $358,468.00 |
$358,468.00 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $358,468.00 |
$358,468.00 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $24,383,600.10 |
$24,383,600.10 |
|
Kentucky | Owsley | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,496,776.00 |
$8,496,776.00 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $990,500.00 |
$990,500.00 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,796,287.88 |
$2,796,287.88 |
|
Kentucky | Owsley | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,377,276.12 |
$1,377,276.12 |
|
Kentucky | Owsley | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $1,845,289.84 |
$1,845,289.84 |
|
Kentucky | Jackson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $6,301,685.16 |
$6,301,685.16 |
|
Kentucky | Owsley | < 5,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $5,620,000.00 |
$7,025,000.00 |
|
Kentucky | Lee | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $5,620,000.00 |
$7,025,000.00 |
|
Kentucky | Lee | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $962,000.00 |
$1,202,500.00 |
|
Kentucky | Owsley | < 5,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $962,000.00 |
$1,202,500.00 |
|
Kentucky | Owsley | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,006,201.36 |
$5,007,751.70 |
|
Kentucky | Lee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,397,798.64 |
$1,747,248.30 |
|
Kentucky | Lee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $1,298,000.00 |
$1,622,500.00 |
|
Kentucky | Owsley | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $1,298,000.00 |
$1,622,500.00 |
|
Kentucky | Jefferson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $9,872,730.00 |
$19,065,545.20 |
|
Kentucky | Jefferson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $987,270.00 |
$1,936,425.30 |
|
Kentucky | Jefferson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $3,900,000.00 |
$3,900,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $2,150,000.00 |
$3,295,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $6,500,000.00 |
$8,125,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,280,000.00 |
$1,600,000.00 |
|
Kentucky | Christian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $42,232,034.47 |
$42,232,034.47 |
|
Kentucky | Hopkins | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $6,608,065.53 |
$6,608,065.53 |
|
Kentucky | Hopkins | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $869,168.55 |
$869,168.55 |
|
Kentucky | Christian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,554,841.45 |
$5,554,841.45 |
|
Kentucky | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $29,902,240.00 |
$37,377,800.00 |
|
Kentucky | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $5,090,224.00 |
$6,362,780.00 |
|
Kentucky | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $250,000.00 |
$250,000.00 |
|
Kentucky | Livingston | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $21,000,000.00 |
$26,250,000.00 |
|
Kentucky | Livingston | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $100,000.00 |
$100,000.00 |
|
Kentucky | Franklin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,119,536.00 |
$15,149,420.00 |
|
Kentucky | Franklin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $12,076,000.00 |
$15,095,000.00 |
|
Kentucky | Franklin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,419,624.00 |
$3,024,530.00 |
|
Kentucky | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preventive Maintenance | $1,786,884.00 |
$1,985,426.67 |
|
Kentucky | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $3,000,000.00 |
$3,000,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $56,002,925.00 |
$62,225,472.22 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,258,941.00 |
$2,278,941.00 |
|
Kentucky | Jefferson | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Preventive Maintenance | $14,216,041.00 |
$15,795,601.11 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $12,348,480.00 |
$15,435,600.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $3,034,848.00 |
$3,793,560.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Environmental Only | $586,735.00 |
$733,418.75 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Utilities | $564,000.00 |
$705,000.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,000,000.00 |
$22,500,000.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,246,581.25 |
||
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,192,000.00 |
$1,340,000.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $920,000.00 |
$920,000.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $68,588,050.00 |
$68,588,050.00 |
|
Kentucky | Hardin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,858,805.00 |
$6,858,805.00 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,560,237.80 |
$18,560,237.80 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,083,000.00 |
$2,083,000.00 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $4,978,000.00 |
$4,978,000.00 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $942,277.07 |
$942,277.07 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $1,144,207.33 |
$1,144,207.33 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | 4R - Restoration & Rehabilitation | $45,565.19 |
$50,627.98 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Restoration & Rehabilitation | $61.73 |
$68.59 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $32,718,441.54 |
$62,788,872.02 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,260,630.00 |
$6,283,950.00 |
|
Kentucky | Bullitt | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $500,000.00 |
$2,500,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | $60,407.86 |
$60,407.86 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $85,000,000.00 |
$85,000,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,337,620.09 |
$2,337,620.09 |
|
Kentucky | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Debt Service | $54,688.08 |
$54,688.08 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $47,139,344.93 |
$50,306,661.79 |
|
Kentucky | Jefferson | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $11,002,029.19 |
$11,002,029.19 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $171,857,338.71 |
$228,413,609.67 |
|
Kentucky | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $55,603.88 |
$55,603.88 |
|
Kentucky | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Debt Service | $216,912.36 |
$216,912.36 |
|
Kentucky | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $5,726,041.26 |
$5,726,041.26 |
|
Kentucky | Jefferson | >= 200,000 | State | REPURPOSED SPECIAL | Debt Service | $3,131,876.03 |
$3,131,876.03 |
|
Kentucky | Jefferson | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $1,860,349.07 |
$1,860,349.07 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,825,574.43 |
$3,825,574.43 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,035,817.14 |
$2,224,723.25 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $30,411,428.00 |
$30,411,428.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,363,131.80 |
$2,363,131.80 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $10,408,121.00 |
$10,408,121.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,713,000.00 |
$1,903,333.34 |
|
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $50,000.00 |
$55,555.56 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $50,000.00 |
$55,555.56 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,619,252.00 |
$26,619,252.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,380,748.00 |
$4,380,748.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,000,000.00 |
$3,000,000.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,446,375.91 |
$3,057,969.89 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $25,526,200.00 |
$25,526,200.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,545,500.00 |
$1,545,500.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | INTERSTATE MAINT DISC | Environmental Only | $14,191.09 |
$14,191.09 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,527,300.00 |
$17,827,300.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,561,900.00 |
$2,561,900.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $495,808.91 |
$495,808.91 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $42,893,000.00 |
$42,893,000.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,037,600.00 |
$4,037,600.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $33,000,000.00 |
$33,000,000.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $20,555,117.81 |
$20,555,117.81 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,354,800.00 |
$5,354,800.00 |
|
Kentucky | Laurel | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,493,882.19 |
$1,493,882.19 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $1,512,090.14 |
$1,512,090.14 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,808,400.00 |
$30,909,500.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,101,150.00 |
$3,101,150.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $630,600.00 |
$630,600.00 |
|
Kentucky | Rockcastle | >= 5,000 AND < 50,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - Added Capacity | $625,000.00 |
$625,000.00 |
|
Kentucky | Fayette | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $9,844,180.00 |
$12,305,225.00 |
|
Kentucky | Fayette | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $155,820.00 |
$194,775.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,424,620.00 |
$29,280,775.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,171,060.00 |
$3,963,825.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $61,707,091.00 |
$83,572,800.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $5,737,909.00 |
$7,329,000.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,028,119.99 |
$42,735,149.99 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $9,716,160.00 |
$13,796,200.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,204,188.00 |
$6,505,235.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $17,197,421.88 |
$21,496,777.35 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,493,594.40 |
$13,109,493.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | RAIL HWY CROSSING HAZ ELI | 4R - No Added Capacity | $7,014,274.26 |
$8,767,842.83 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | RAIL HWY CROSSING HAZ ELI | Right of Way | $3,802,578.12 |
$4,753,222.65 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $696,725.74 |
$870,907.18 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $2,640,825.74 |
$2,640,825.74 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Debt Service | $560,003.52 |
$560,003.52 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Debt Service | $267,033.00 |
$267,033.00 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $345,928.77 |
$345,928.77 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Debt Service | $560,003.52 |
$560,003.52 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Debt Service | $267,033.00 |
$267,033.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $585,559.52 |
$585,559.52 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $30,736,620.85 |
$70,665,608.48 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,249,400.00 |
||
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $10,713,258.06 |
$15,466,241.28 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,973,877.10 |
$6,443,570.87 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $1,750,000.00 |
$1,750,000.00 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $25,887,366.33 |
$65,816,353.98 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $274,659.51 |
$274,659.51 |
|
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,249,400.00 |
||
Kentucky | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $9,593,251.01 |
$14,346,234.18 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $4,439,811.06 |
$5,909,504.83 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $56,777,350.73 |
$119,285,914.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,828,591.00 |
||
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $31,017,574.58 |
$46,390,077.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $21,759,000.00 |
$22,731,000.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,661,930.00 |
$24,661,930.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,466,193.00 |
$2,466,193.00 |
|
Kentucky | Trigg | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $4,200,000.00 |
$4,200,000.00 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Bridge New Construction | $17,406,745.69 |
$17,406,745.69 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $11,717,804.31 |
$11,717,804.31 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $500,000.00 |
$500,000.00 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | APPALACHIAN DEV HWY INFRA PRGM | Bridge New Construction | $14,525,564.00 |
$14,525,564.00 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Bridge New Construction | $25,692,327.30 |
$25,692,327.30 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $21,469,766.96 |
$26,837,208.70 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,306,000.00 |
$11,632,500.00 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | APPALACHIAN DEV HWY INFRA PRGM | Construction Engineering | $2,735,600.00 |
$3,419,500.00 |
|
Kentucky | Pike | >= 50,000 AND < 200,000 | State | APPALACHIAN DEV HWY INFRA PRGM | New Construction Roadway | $27,356,000.00 |
$34,195,000.00 |
|
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $15,050,000.00 |
$15,050,000.00 |
|
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,993,750.00 |
||
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,641,250.00 |
||
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $625,000.00 |
||
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $330,000.00 |
$600,000.00 |
|
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,400,000.00 |
$13,000,000.00 |
|
Kentucky | Whitley | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $120,000.00 |
$5,000,000.00 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,430,000.00 |
$2,430,000.00 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $8,636,200.00 |
$8,636,200.00 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $25,446,581.70 |
$25,446,581.70 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $939,652.32 |
$939,652.32 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $2,284,043.78 |
$2,284,043.78 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,356,692.00 |
$10,545,425.00 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $60,566,920.00 |
$105,454,250.00 |
|
Kentucky | Russell | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,645,000.00 |
$1,645,000.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,268,000.00 |
$17,835,000.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,426,800.00 |
$1,783,500.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,800,000.00 |
$3,500,000.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,612,000.00 |
$5,765,000.00 |
|
Kentucky | Jefferson | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $6,491,799.00 |
$6,491,799.00 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $63,334,125.06 |
$67,338,855.48 |
|
Kentucky | Oldham | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,111,375.05 |
$22,446,285.21 |
|
Kentucky | Oldham | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $690,088.50 |
$2,250,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,070,265.50 |
$6,750,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $3,051,462.88 |
$3,051,462.88 |
|
Kentucky | Oldham | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $671,597.43 |
$671,597.43 |
|
Kentucky | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $53,202,515.52 |
$53,202,515.52 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $26,797,484.48 |
$26,797,484.48 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,731,600.00 |
$35,731,600.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,116,100.00 |
$6,116,100.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,171,890.00 |
$4,171,890.00 |
|
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,550,000.00 |
||
Kentucky | Fayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,395,500.00 |
||
Kentucky | Fayette | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $30,000,000.00 |
$37,500,000.00 |
|
Kentucky | Fayette | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,040,000.00 |
$1,300,000.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $57,710,850.00 |
$58,250,850.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,550,085.00 |
$5,550,085.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,000,000.00 |
$1,000,000.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $10,500,000.00 |
$10,500,000.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $31,337,300.00 |
$31,337,300.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,133,730.00 |
$3,133,730.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $3,146,187.00 |
$3,932,733.75 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $3,146,187.00 |
$3,932,733.75 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $3,128,606.00 |
$3,910,757.50 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $999,400.00 |
$999,400.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $1,000,600.00 |
$1,000,600.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $500,000.00 |
$10,724,887.50 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $500,000.00 |
$10,724,887.50 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,245,860.00 |
||
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $76,740.00 |
||
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $908,544.80 |
$1,135,681.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $907,455.20 |
$1,134,319.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,998,800.00 |
$3,722,765.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,001,200.00 |
$3,727,235.00 |
|
Kentucky | Kenton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $750,450.00 |
$1,510,906.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $749,550.00 |
$1,509,094.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $116,664.00 |
$145,830.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $80,440,000.00 |
$192,800,000.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $17,483,336.00 |
$20,354,170.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,000,000.00 |
$16,750,000.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $800,000.00 |
$1,000,000.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,508,194.78 |
$1,508,194.78 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,711,805.22 |
$1,711,805.22 |
|
Kentucky | Bourbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $8,755,150.00 |
$8,755,150.00 |
|
Kentucky | Bourbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,444,850.00 |
$1,444,850.00 |
|
Kentucky | Bourbon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,817,175.00 |
||
Kentucky | Bourbon | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,000,000.00 |
$7,000,000.00 |
|
Kentucky | Pulaski | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,548,400.00 |
$27,728,669.00 |
|
Kentucky | Pulaski | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,880,000.00 |
$4,850,000.00 |
|
Kentucky | Pulaski | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,000,000.00 |
$2,000,000.00 |
|
Kentucky | Pulaski | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,149,464.24 |
$7,686,830.30 |
|
Kentucky | Pulaski | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $25,000,000.00 |
$35,537,000.00 |
|
Kentucky | Pulaski | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Utilities | $350,535.76 |
$438,169.70 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $14,715,934.00 |
$14,715,934.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $3,721,593.40 |
$3,721,593.40 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $18,000,000.00 |
$18,000,000.00 |
|
Kentucky | Henderson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $250,000.00 |
$250,000.00 |
|
Kentucky | Daviess | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,000,000.00 |
$23,384,900.00 |
|
Kentucky | Daviess | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,338,490.00 |
||
Kentucky | Boyd | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $15,153,249.34 |
$18,941,561.67 |
|
Kentucky | Boyd | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,000,000.00 |
$26,803,938.33 |
|
Kentucky | Boyd | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,574,550.00 |
||
Kentucky | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,531,517.60 |
$28,707,000.00 |
|
Kentucky | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,870,700.00 |
||
Kentucky | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,000,000.00 |
$4,080,000.00 |
|
Kentucky | Statewide | N/A | State | BRIDGE PROGRAM - 15% OFF SYST | Bridge Replacement - No Added Capacity | $5,262.23 |
$6,577.79 |
|
Kentucky | Statewide | N/A | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $1,426,630.00 |
$1,508,598.03 |
|
Kentucky | Statewide | N/A | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $363,171.65 |
$363,171.65 |
|
Kentucky | Statewide | N/A | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - No Added Capacity | $2,820,106.05 |
$3,525,132.56 |
|
Kentucky | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $30,747,092.47 |
$35,390,251.89 |
|
Kentucky | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,096,876.36 |
$3,871,095.45 |
|
Kentucky | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $49,651,820.07 |
$57,464,083.74 |
|
Kentucky | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,000,000.00 |
$3,750,000.00 |
|
Kentucky | Jefferson | >= 200,000 | State | CARBON REDUCTION PROGRAM | New Construction Roadway | $6,292,374.00 |
$7,865,467.50 |
|
Kentucky | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $1,389,825.00 |
$1,737,281.25 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $138,308.00 |
$2,718,400.00 |
|
Kentucky | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,383,080.00 |
$17,181,251.25 |
|
Kentucky | Calloway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,772,499.00 |
$20,509,776.75 |
|
Kentucky | Calloway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,367,500.80 |
$4,209,376.00 |
|
Kentucky | Calloway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,700,000.00 |
$5,650,000.00 |
|
Kentucky | Calloway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,600,000.00 |
$2,000,000.00 |
|
Kentucky | Calloway | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $23,000,000.00 |
$23,000,000.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,000,000.00 |
$15,000,000.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,577,700.00 |
$1,577,700.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,171,120.00 |
$9,216,120.00 |
|
Kentucky | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $591,600.00 |