RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $7,374,223.70 |
$8,193,582.78 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,106.30 |
$1,229.22 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $297.95 |
$331.06 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,979,702.05 |
$2,199,668.94 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $35,296,458.06 |
$39,278,868.28 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $5,295.27 |
$5,892.72 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $17.55 |
$19.50 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $116,982.45 |
$129,980.50 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | OP MOT VEH/INTOX-TEA21 | Safety | $1,471,874.18 |
$1,635,416.65 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | State | OP MOT VEH/INTOX-TEA21 | Safety | $220.82 |
$245.35 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $7.24 |
$8.04 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $48,267.76 |
$53,630.96 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $3,220,685.00 |
$4,025,857.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $3,238,400.00 |
$4,048,000.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | $2,487,900.00 |
$3,109,875.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | N/A | GRANTS SUP PLAN SECTION 117 | Debt Service | $1,721,874.00 |
$1,721,874.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | $180,613.00 |
$225,767.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,374,312.00 |
$17,067,142.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $1,153,520.00 |
$1,441,900.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $29,644,000.00 |
$43,955,000.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,565,669.00 |
$4,457,086.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,149,241.00 |
$7,686,552.00 |
|
Mississippi | Simpson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $20,132,092.00 |
$25,165,116.00 |
|
Mississippi | Simpson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,026,418.00 |
$5,033,023.00 |
|
Mississippi | Simpson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $53,357.00 |
$66,697.00 |
|
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $46,266,221.00 |
||
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,253,244.00 |
||
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,899,372.00 |
$4,874,216.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $6,205,599.00 |
$7,757,000.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $984,939.00 |
$1,231,174.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $16,621,458.00 |
$20,776,823.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,666,020.00 |
$5,832,525.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $4,537,483.00 |
$5,671,854.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $613,980.00 |
$767,475.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $93,872.00 |
$117,340.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $53,383,370.00 |
$72,053,028.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,090,979.00 |
$28,616,077.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $552,534.00 |
$690,668.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,661,216.00 |
$2,076,521.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,952,482.00 |
$3,690,603.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1.00 |
$2.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $100,000.00 |
$125,000.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,765,118.00 |
$2,206,398.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $3,782,683.00 |
$4,728,354.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $139,968,062.45 |
$174,960,078.45 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,671,659.00 |
$8,339,575.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,296,055.00 |
$2,870,068.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $300,966.00 |
$376,207.00 |
|
Mississippi | Harrison | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $490,161.00 |
$612,702.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $655,038.00 |
$818,798.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Safety | $1,504,830.00 |
$1,881,038.00 |
|
Mississippi | Harrison | >= 200,000 | State | CARBON REDUCTION PROGRAM | Safety | $2,450,807.00 |
$3,063,508.00 |
|
Mississippi | Harrison | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $40,000,000.00 |
$50,000,000.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $20,000,000.00 |
$25,000,000.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $7,000,000.00 |
$12,775,025.00 |
|
Mississippi | Harrison | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $7,458,717.00 |
$26,517,110.00 |
|
Mississippi | Harrison | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $15,303,422.00 |
||
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $7,555,005.00 |
||
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,422,035.00 |
||
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $3,967,385.00 |
$6,291,379.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $600,062.00 |
$787,581.26 |
|
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $619,938.00 |
$812,418.74 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $360,133.00 |
$450,166.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | New Construction Roadway | $1,800,665.00 |
$2,250,832.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $726,911.00 |
$908,639.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $71,460,000.00 |
$89,325,000.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $41,496,172.00 |
||
Mississippi | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $33,000,000.00 |
$117,247,221.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,270,000.00 |
$1,587,500.00 |
|
Mississippi | Marion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $670,000.00 |
$837,500.00 |
|
Mississippi | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $34,977,095.00 |
||
Mississippi | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,995,419.00 |
||
Mississippi | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $249,232.00 |
$311,540.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $10,483,426.00 |
$13,104,283.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $10,002,129.00 |
||
Mississippi | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,621,282.00 |
||
Mississippi | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $266,033.00 |
$332,542.00 |
|
Mississippi | Humphreys | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $530,400.00 |
$663,000.00 |
|
Mississippi | Hinds | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | $11,825,524.00 |
$14,781,905.00 |
|
Mississippi | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $900,000.00 |
$9,141,517.00 |
|
Mississippi | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $80,000.00 |
$8,403,332.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $43,162.00 |
$53,953.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $215,811.00 |
$269,764.00 |
|
Mississippi | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,280,000.00 |
$2,850,000.00 |
|
Mississippi | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $400,000.00 |
$500,000.00 |
|
Mississippi | Hinds | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | $465,483.00 |
$563,212.00 |
|
Mississippi | Hinds | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | $47,667.00 |
$59,584.00 |
|
Mississippi | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $13,576,354.32 |
$16,970,444.00 |
|
Mississippi | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,298,012.00 |
$33,624,384.00 |
|
Mississippi | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,379,900.00 |
$6,724,876.00 |
|
Mississippi | Scott | >= 5,000 AND < 50,000 | N/A | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $16,766,292.00 |
$18,629,214.00 |
|
Mississippi | Scott | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,168,663.00 |
$16,854,070.00 |
|
Mississippi | Scott | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,954,016.00 |
$7,096,657.00 |
|
Mississippi | Pontotoc | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $17,236,000.00 |
$21,544,999.00 |
|
Mississippi | Pontotoc | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,447,120.00 |
$4,308,901.00 |
|
Mississippi | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $27,000,000.00 |
$58,748,434.00 |
|
Mississippi | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $11,749,687.00 |
||
Mississippi | Hinds | >= 200,000 | Local | HIGH PRIORITY PROJECTS-TEA-21 | Other | $2,187,203.00 |
$2,734,004.00 |
|
Mississippi | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $13,172,796.00 |
$19,624,865.00 |
|
Mississippi | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $4,390,681.00 |
||
Mississippi | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Other | $5,240,380.00 |
$9,035,098.00 |
|
Mississippi | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,086,824.00 |
$1,358,530.00 |
|
Mississippi | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,928,048.00 |
$3,660,060.00 |
|
Mississippi | Hinds | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Other | $818,566.00 |
$1,093,295.00 |
|
Mississippi | Hinds | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Rail/Hwy Crossing | $598,096.00 |
$598,096.00 |
|
Mississippi | Neshoba | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Maintenance Resurfacing | $25,000,000.00 |
$25,000,000.00 |
|
Mississippi | Neshoba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,468,938.00 |
$22,301,314.00 |
|
Mississippi | Neshoba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,693,788.00 |
$8,874,506.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Debt Service | $6,212,620.00 |
$7,765,776.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Debt Service | $333,084.00 |
$416,355.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $8,000,000.00 |
$10,000,000.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $10,489,176.00 |
$13,111,471.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $886,385.00 |
$1,107,982.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $9,462,876.00 |
$11,828,596.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Debt Service | $1,158,251.00 |
$1,499,155.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $153,019.00 |
$10,423,596.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Debt Service | $1,342,862.00 |
$1,678,578.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Debt Service | $5,066,973.00 |
$6,333,717.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $30,448,088.00 |
$111,611,970.45 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $30,377,823.00 |
$53,723,679.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $11,192,000.00 |
$104,920,000.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $25,152,100.00 |
$31,440,125.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $39,301,481.00 |
$279,836,852.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $5,602,505.00 |
$7,003,132.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $48,329,706.00 |
$60,412,134.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $10,923,043.00 |
$13,653,805.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,733,610.00 |
$17,167,013.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $22,630,510.00 |
$28,288,138.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $14,696,738.00 |
$18,370,923.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,178,531.00 |
$1,473,164.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $26,548,482.00 |
$33,185,603.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,608,000.00 |
$5,760,000.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Debt Service | $552,757.00 |
$690,947.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Debt Service | $2,317,983.00 |
$2,897,479.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $3,599,629.00 |
$4,499,537.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $3,566,497.00 |
$4,458,122.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $408,662.00 |
$510,828.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Right of Way | $42,371.00 |
$52,964.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | $964,847.00 |
$1,206,059.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $2,800,000.00 |
$3,500,000.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $12,457,487.00 |
$15,571,859.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,081,087.00 |
$2,601,359.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,600,000.00 |
$5,750,000.00 |
|
Mississippi | Franklin | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $6,583,379.00 |
$8,229,224.00 |
|
Mississippi | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $14,000,011.00 |
$17,500,014.00 |
|
Mississippi | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,116,678.00 |
$5,145,848.00 |
|
Mississippi | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $150,880.00 |
$188,600.00 |
|
Mississippi | Calhoun | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $2,708,781.00 |
$3,385,977.00 |
|
Mississippi | Calhoun | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $3,868,555.00 |
$4,835,694.00 |
|
Mississippi | Calhoun | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $9,633,996.00 |
$12,042,495.00 |
|
Mississippi | Calhoun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $7,000,000.00 |
$8,750,000.00 |
|
Mississippi | Calhoun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $313,280.00 |
$391,600.00 |
|
Mississippi | Calhoun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $109,200.00 |
$136,500.00 |
|
Mississippi | Pike | >= 5,000 AND < 50,000 | Other | CARBON REDUCTION PROGRAM | Construction Engineering | $180,283.00 |
$522,866.00 |
|
Mississippi | Pike | >= 5,000 AND < 50,000 | Other | CARBON REDUCTION PROGRAM | Safety | $2,091,464.00 |
$2,614,330.00 |
|
Mississippi | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $68,018,407.00 |
||
Mississippi | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $13,603,681.00 |
||
Mississippi | Pike | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $516,094.00 |
||
Mississippi | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,620,000.00 |
$1,800,000.00 |
|
Mississippi | Pike | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,580,469.00 |
||
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $5,845,618.00 |
$7,307,023.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $2,981,425.00 |
$3,726,782.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | $4,158,731.00 |
$4,620,813.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $4,529,506.00 |
$5,661,883.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $18,411,518.00 |
$20,457,243.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | $9,583,848.00 |
$51,583,720.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $10,185,410.00 |
$12,731,763.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $14,012,613.00 |
$16,253,459.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $37,485,497.00 |
$41,974,787.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $12,840,702.00 |
$14,267,447.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $2,453,015.00 |
$7,287,396.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $1,857,565.00 |
$2,321,956.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,674,546.00 |
$8,134,762.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,570,884.00 |
$16,963,606.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $20,212,165.00 |
$25,265,207.00 |
|
Mississippi | Carroll | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $3,559.88 |
$3,955.42 |
|
Mississippi | Holmes | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $11,862,684.12 |
$13,180,760.58 |
|
Mississippi | Holmes | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $7,017,857.02 |
$7,797,619.02 |
|
Mississippi | Carroll | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,105.98 |
$2,339.98 |
|
Mississippi | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $6,300.00 |
$7,000.00 |
|
Mississippi | Holmes | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $20,993,700.00 |
$23,326,334.00 |
|
Mississippi | Holmes | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,232,897.92 |
$2,480,998.46 |
|
Mississippi | Carroll | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $670.08 |
$744.54 |
|
Mississippi | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $9,900,000.00 |
$11,000,000.00 |
|
Mississippi | Montgomery | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $16,252.00 |
$20,315.00 |
|
Mississippi | Montgomery | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,892,460.00 |
$9,880,511.00 |
|
Mississippi | Montgomery | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,762,149.00 |
$4,180,166.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $15,000,000.00 |
$18,750,000.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,065,298.00 |
$1,331,623.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $26,966,727.00 |
$33,708,410.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $8,393,345.00 |
$10,491,682.00 |
|
Mississippi | Panola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $13,000,000.00 |
$18,381,848.00 |
|
Mississippi | Panola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,676,370.00 |
||
Mississippi | Panola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $90,000.00 |
$100,000.00 |
|
Mississippi | Panola | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,000,000.00 |
$10,000,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,080,000.00 |
$1,200,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $809,148.00 |
$899,054.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,234,500.00 |
$4,705,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,250,000.00 |
$2,500,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,126,538.00 |
$5,158,173.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $5,553,000.00 |
$6,170,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $273,944.00 |
$342,430.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Safety | $4,063.00 |
$5,079.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Safety | $35,996.00 |
$44,995.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,871,500.00 |
$4,839,376.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,230,000.00 |
$4,700,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $14,916,962.00 |
$18,646,203.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $9,000,000.00 |
$10,000,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $5,359,197.00 |
$5,954,665.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,055,637.00 |
$4,506,264.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,342,328.00 |
$7,047,031.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $121,890.00 |
$152,363.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $260,032.00 |
$325,040.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $176,280.00 |
$220,350.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $12,961,360.00 |
$14,401,512.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $4,344,881.00 |
$4,827,646.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,620,250.00 |
$13,419,858.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,592,732.00 |
||
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARKS EXEMPT | Construction Engineering | $950,000.00 |
$950,000.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $17,519,538.89 |
$19,466,155.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | $1,226,744.00 |
$1,363,049.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $7,225,000.00 |
||
Mississippi | Jones | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $5,360,437.00 |
$6,509,916.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,220,195.00 |
$9,133,550.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,200,795.00 |
$4,667,550.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,890,227.00 |
$4,322,475.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,849,576.00 |
$10,943,975.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,870,257.00 |
$3,189,175.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $5,538,148.00 |
$6,153,498.00 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $8,881,167.13 |
$9,867,964.14 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $1,331.87 |
$1,479.86 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,794.60 |
$3,105.11 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,627,904.40 |
$20,697,671.89 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,369,095.60 |
$1,521,217.78 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $205.40 |
$228.22 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $109.70 |
$137.13 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $731,228.30 |
$914,035.87 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $29,196.62 |
$32,352.15 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $4.38 |
$4.85 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $645.56 |
$717.29 |
|
Mississippi | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,303,067.44 |
$4,781,186.71 |
|
Mississippi | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,915,434.00 |
$2,128,260.00 |
|
Mississippi | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,387,500.00 |
$4,875,000.00 |
|
Mississippi | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $20,022,064.40 |
$22,246,739.00 |
|
Mississippi | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $337,935.60 |
$375,484.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Other | $487,560.00 |
$609,450.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $22,644,302.00 |
$22,644,302.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $2,103,673.00 |
$2,103,673.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $42,525,234.00 |
||
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $44,937,541.00 |
$187,268,744.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $10,251,779.00 |
$12,814,725.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Bridge Replacement - Added Capacity | $3,629,299.00 |
$3,629,299.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Right of Way | $710,500.00 |
$710,500.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Utilities | $248,500.00 |
$248,500.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $19,336.00 |
$24,170.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $216,599.00 |
$270,749.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $3,538,253.00 |
$4,422,817.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | $142,205.00 |
$177,757.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | $207,182.00 |
$258,978.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $6,773,488.00 |
$8,466,863.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,763,270.00 |
$5,954,088.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $4,398,159.00 |
$5,497,700.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $16,487,500.00 |
$20,609,376.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,084,174.00 |
$5,105,218.00 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $187,520.00 |
$234,400.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $187,520.00 |
$234,400.00 |
|
Mississippi | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,139.00 |
$51,423.50 |
|
Mississippi | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,139.00 |
$51,423.50 |
|
Mississippi | Yazoo | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $16,115,000.00 |
$23,680,687.00 |
|
Mississippi | Yazoo | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $4,736,137.00 |
||
Mississippi | Yazoo | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $760,000.00 |
$950,000.00 |
|
Mississippi | Yazoo | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $57,200.00 |
$71,500.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA PRGM | New Construction Roadway | $1,951,308.00 |
$2,319,047.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA-IIJA | New Construction Roadway | $3,666,715.00 |
$3,784,755.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $52,400,000.00 |
$65,500,000.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $18,000,000.00 |
$22,500,000.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $288,414.00 |
$3,043,789.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $800,000.00 |
$1,000,000.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | Local | GRANTS SUP PLAN SECTION 117 | 4R - No Added Capacity | $43,065.00 |
$43,065.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $13,000,000.00 |
$29,899,722.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,217,656.00 |
||
Mississippi | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $575,356.00 |
$762,260.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,102,965.00 |
||
Mississippi | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSPORTATION PROJECT | 4R - No Added Capacity | $1,499,744.00 |
$1,499,744.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,628,263.00 |
$15,785,329.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,171,736.00 |
$2,714,671.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,504,752.00 |
$6,880,940.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,760,000.00 |
$2,200,000.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $229,497.00 |
$1,329,497.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $920,315.00 |
$920,315.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety | $12,074,088.00 |
$12,249,960.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $14,414,914.00 |
||
Mississippi | Harrison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $4,883,003.00 |
$6,103,753.00 |
|
Mississippi | Harrison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $13,498,949.00 |
$16,873,687.00 |
|
Mississippi | Harrison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $2,078,048.00 |
$2,597,560.00 |
|
Mississippi | Harrison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $23,818,004.00 |
||
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | $400,000.00 |
$400,000.00 |
|
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $17,997,210.00 |
$22,496,513.00 |
|
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,599,442.00 |
$4,499,303.00 |
|
Mississippi | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $900,000.00 |
$900,000.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $17,997,145.00 |
$22,496,432.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,699,572.00 |
$3,374,465.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $800,000.00 |
$1,000,000.00 |
|
Mississippi | Lafayette | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $880,140.00 |
$1,100,175.00 |
|
Mississippi | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Relocation | $370,513.00 |
$463,141.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,199,374.00 |
$2,749,217.00 |
|
Mississippi | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,480,320.00 |
$1,850,400.00 |
|
Mississippi | Lafayette | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,268,932.00 |
$1,586,165.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $966,482.00 |
$1,208,103.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $149,920.00 |
$187,400.00 |
|
Mississippi | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $378,166.00 |
$472,707.00 |
|
Mississippi | Kemper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,590,784.00 |
$1,988,480.00 |
|
Mississippi | Pearl River | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $912,960.00 |
$1,141,200.00 |
|
Mississippi | Itawamba | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $399,996.00 |
$499,995.00 |
|
Mississippi | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $3,598,979.00 |
$4,498,724.00 |
|
Mississippi | Carroll | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,420,037.00 |
$1,775,047.00 |
|
Mississippi | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,142,000.00 |
$1,427,500.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,629,578.00 |
$3,286,972.00 |
|
Mississippi | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,638,822.00 |
$2,048,527.00 |
|
Mississippi | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $203,632.00 |
$254,540.00 |
|
Mississippi | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $80,112.00 |
$100,140.00 |
|
Mississippi | Holmes | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $433,520.00 |
$541,900.00 |
|
Mississippi | Quitman | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $682,869.00 |
$853,586.00 |
|
Mississippi | Tallahatchie | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $865,620.00 |
$1,082,025.00 |
|
Mississippi | Perry | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,786,880.00 |
$2,233,600.00 |
|
Mississippi | Chickasaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,036,102.00 |
$1,295,128.00 |
|
Mississippi | Attala | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $119,542.00 |
$149,428.00 |
|
Mississippi | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $746,308.00 |
$932,885.00 |
|
Mississippi | Choctaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $667,008.00 |
$833,760.00 |
|
Mississippi | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $318,011.00 |
$397,514.00 |
|
Mississippi | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $140,197.00 |
$175,247.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $255,825.00 |
$319,781.00 |
|
Mississippi | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,452,000.00 |
$1,815,000.00 |
|
Mississippi | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $315,546.00 |
$394,433.00 |
|
Mississippi | Yazoo | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,017,033.00 |
$2,521,292.00 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Acquisition of Scenic Easements and Scenic or Historic Sites | $200,000.00 |
$250,000.00 |
|
Mississippi | Lowndes | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $939,111.00 |
$1,173,889.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $2,073,232.00 |
$2,591,540.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $3,000,000.00 |
$3,750,000.00 |
|
Mississippi | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,575,349.00 |
$1,969,186.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $3,042,200.00 |
$3,802,750.00 |
|
Mississippi | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $64,000.00 |
$80,000.00 |
|
Mississippi | Harrison | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $25,206.00 |
$31,508.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $58,443.00 |
$73,054.00 |
|
Mississippi | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $106,923.00 |
$133,654.00 |
|
Mississippi | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $24,000.00 |
$30,000.00 |
|
Mississippi | Warren | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $9,838.00 |
$12,298.00 |
|
Mississippi | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $8,000.00 |
$10,000.00 |
|
Mississippi | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $200,000.00 |
$250,000.00 |
|
Mississippi | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $10,000.00 |
$12,500.00 |
|
Mississippi | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $27,202.00 |
$34,002.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $62,709.00 |
$141,095.00 |
|
Mississippi | Holmes | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $24,000.00 |
$30,000.00 |
|
Mississippi | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $566,106.00 |
$707,632.00 |
|
Mississippi | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $66,835.00 |
$83,544.00 |
|
Mississippi | Jasper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $14,030.00 |
$17,538.00 |
|
Mississippi | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $190,150.00 |
$237,688.00 |
|
Mississippi | Washington | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $330,000.00 |
$412,500.00 |
|
Mississippi | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $58,863.00 |
$73,579.00 |
|
Mississippi | George | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $80,000.00 |
$100,000.00 |
|
Mississippi | Lafayette | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $208,481.00 |
$260,601.00 |
|
Mississippi | Lafayette | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $720,000.00 |
$900,000.00 |
|
Mississippi | Pontotoc | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $60,000.00 |
$75,000.00 |
|
Mississippi | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $64,000.00 |
$80,000.00 |
|
Mississippi | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $89,600.00 |
$112,000.00 |
|
Mississippi | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rehabilitation and Operation of Historic Transportation Buildings, Structures, or Facilities | $283,636.00 |
$354,545.00 |
|
Mississippi | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $238,753.00 |
$298,442.00 |
|
Mississippi | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $800,000.00 |
$1,000,000.00 |
|
Mississippi | Franklin | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $120,000.00 |
$150,000.00 |
|
Mississippi | Kemper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $748,002.00 |
$935,004.00 |
|
Mississippi | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $281,280.00 |
$351,600.00 |
|
Mississippi | Madison | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $969,143.00 |
$1,001,003.00 |
|
Mississippi | Harrison | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $448,155.00 |
$560,194.00 |
|
Mississippi | Greene | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $510,279.00 |
$637,849.00 |
|
Mississippi | Carroll | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $246,664.00 |
$308,330.00 |
|
Mississippi | Warren | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $501,712.00 |
$501,712.00 |
|
Mississippi | Marshall | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $432,710.00 |
$540,888.00 |
|
Mississippi | Lamar | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $351,296.00 |
$439,120.00 |
|
Mississippi | Clay | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $221,878.00 |
$277,347.00 |
|
Mississippi | Benton | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $90,756.00 |
$113,445.00 |
|
Mississippi | Statewide | N/A | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $353,539.00 |
$441,924.00 |
|
Mississippi | Jackson | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $525,948.00 |
$657,435.00 |
|
Mississippi | Tishomingo | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $125,342.00 |
$156,678.00 |
|
Mississippi | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | $294,500.00 |