Missouri | Clay | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $154,450.00 |
$154,450.00 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,831,714.87 |
$13,385,092.60 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,057,874.68 |
$2,930,584.88 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $667,062.10 |
$1,847,933.54 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $592,946.17 |
$1,902,908.12 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $420,596.29 |
$1,349,795.22 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,415,761.19 |
$1,415,761.19 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $787,395.29 |
$2,532,862.09 |
|
Missouri | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,808,200.00 |
$2,956,000.00 |
|
Missouri | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,616,400.00 |
$5,912,000.00 |
|
Missouri | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $26,677,900.00 |
$28,082,000.00 |
|
Missouri | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $94,816.18 |
$99,806.51 |
|
Missouri | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $589,981.69 |
$621,033.36 |
|
Missouri | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,062,575.00 |
$1,118,500.00 |
|
Missouri | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $377,777.13 |
$397,660.13 |
|
Missouri | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $494,794.86 |
$544,470.73 |
|
Missouri | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $908,870.00 |
$994,300.00 |
|
Missouri | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $620,225.95 |
$682,494.62 |
|
Missouri | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $99,636.23 |
$109,639.81 |
|
Missouri | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $237,272.96 |
$261,094.84 |
|
Missouri | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,026.61 |
$4,238.54 |
|
Missouri | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $25,055.10 |
$26,373.79 |
|
Missouri | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $45,125.00 |
$47,500.00 |
|
Missouri | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,043.29 |
$16,887.67 |
|
Missouri | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $210,444.00 |
$221,520.00 |
|
Missouri | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $617,500.00 |
$650,000.00 |
|
Missouri | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $42,360.50 |
$44,590.00 |
|
Missouri | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $263,796.00 |
$277,680.00 |
|
Missouri | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $100,899.50 |
$106,210.00 |
|
Missouri | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $26,555,187.52 |
$29,505,763.91 |
|
Missouri | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,765,383.63 |
$3,072,648.48 |
|
Missouri | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $296,694.36 |
$329,660.40 |
|
Missouri | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,220,720.93 |
$1,220,720.93 |
|
Missouri | St. Louis | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $2,000,000.00 |
$2,222,222.22 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,803,440.57 |
$22,003,822.85 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $19,507,851.58 |
$21,675,390.65 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,248,597.65 |
$4,720,664.06 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $1,224,233.13 |
$1,360,259.03 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $81,900.00 |
$91,000.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,561,493.41 |
$2,846,103.79 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,844,978.06 |
$1,844,978.06 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $385,098.36 |
$427,887.08 |
|
Missouri | Franklin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $81,823.33 |
$102,279.16 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $45,372,570.88 |
$56,715,713.60 |
|
Missouri | Franklin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $108,242.50 |
$135,303.12 |
|
Missouri | Franklin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,022.00 |
$2,527.50 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,919.34 |
$3,649.18 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - No Added Capacity | $10,000,000.00 |
$12,500,000.00 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,648,857.89 |
$2,061,072.36 |
|
Missouri | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,142,010.53 |
$1,427,513.17 |
|
Missouri | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $242,281.70 |
$302,852.12 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $349,811.23 |
$437,264.04 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $73,148.69 |
$91,435.86 |
|
Missouri | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $50,663.31 |
$63,329.14 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Replacement - Added Capacity | $12,406,572.19 |
$15,508,215.24 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $209,785.17 |
$262,231.46 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Other | $128,466.12 |
$160,582.65 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $247,468.56 |
$494,937.12 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Right of Way | $1,284.66 |
$1,605.83 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Utilities | $6,423.30 |
$8,029.13 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $116,663,167.04 |
$137,250,784.76 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,936,953.26 |
$2,278,768.54 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,138,504.75 |
$1,339,417.35 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,642,031.44 |
$5,284,062.88 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,385.05 |
$13,394.17 |
|
Missouri | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $99,425.24 |
$116,970.87 |
|
Missouri | Callaway | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Restoration & Rehabilitation | $481,112.61 |
||
Missouri | Callaway | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $49,109.07 |
||
Missouri | Callaway | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $388,019.04 |
||
Missouri | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $21,552,185.70 |
||
Missouri | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,199,916.96 |
||
Missouri | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $557,000.00 |
||
Missouri | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $68,942.96 |
||
Missouri | St. Louis | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | $1,087,484.80 |
$1,208,316.44 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,948,628.05 |
$8,366,976.90 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $13,154,541.58 |
$13,846,885.85 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,161,558.73 |
$2,275,324.98 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,222.29 |
$8,024.77 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $539,387.00 |
$539,387.00 |
|
Missouri | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | |||
Missouri | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $381,442.00 |
$381,442.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,978,117.65 |
$14,713,808.04 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $23,763,617.66 |
$25,014,334.35 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,822,481.22 |
$4,023,664.44 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,177,016.77 |
$1,307,796.41 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $127,060.00 |
$127,060.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | |||
Missouri | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $199,677,650.00 |
$210,187,000.00 |
|
Missouri | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | |||
Missouri | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | |||
Missouri | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,039,100.00 |
$14,778,000.00 |
|
Missouri | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,121,833.00 |
$3,286,140.00 |
|
Missouri | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,167.00 |
$13,860.00 |
|
Missouri | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $15,552,450.00 |
$16,583,625.00 |
|
Missouri | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | |||
Missouri | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | |||
Missouri | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $954,750.00 |
$1,005,000.00 |
|
Missouri | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $52,405.74 |
$52,405.74 |
|
Missouri | St. Louis | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $8,384.35 |
$8,384.35 |
|
Missouri | St. Louis | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Safety | $119,906.91 |
$119,906.91 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $327,440.13 |
$614,002.30 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,682,817.29 |
$8,781,026.83 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,046,641.96 |
$3,837,779.02 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,272,842.01 |
$2,386,781.11 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,272,842.00 |
$2,386,781.07 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,545,684.02 |
$4,773,562.22 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $375,366.12 |
$703,871.14 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $858,856.11 |
$1,610,491.73 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $60,054.44 |
$112,611.63 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,599.52 |
$10,500.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,799.76 |
$5,250.00 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,799.77 |
$5,250.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $614,153.32 |
$682,392.58 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $98,264.54 |
$109,182.82 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,405,352.22 |
$1,561,502.47 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $844,484.64 |
$1,135,060.00 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $135,117.54 |
$181,609.60 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,932,413.82 |
$2,597,330.40 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $60,742.91 |
$60,742.91 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $379,669.47 |
$379,669.47 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Safety | $868,702.37 |
$868,702.37 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,741.52 |
$85,772.62 |
|
Missouri | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $91,483.04 |
$171,545.24 |
|
Missouri | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,741.50 |
$85,772.59 |
|
Missouri | Cooper | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $8,677,430.73 |
$8,677,430.73 |
|
Missouri | Boone | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | |||
Missouri | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | |||
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $77,233,770.07 |
$161,250,000.00 |
|
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $661,770.35 |
$1,885,049.45 |
|
Missouri | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $504,459.58 |
$1,436,950.55 |
|
Missouri | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | |||
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | $4,500,000.00 |
||
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $52,064,584.41 |
||
Missouri | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | |||
Missouri | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | |||
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,000,000.00 |
||
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,000,000.00 |
||
Missouri | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | |||
Missouri | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | |||
Missouri | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,178,000.00 |
||
Missouri | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,958,879.53 |
$39,937,109.73 |
|
Missouri | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,640,731.25 |
||
Missouri | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,579,620.84 |
$5,088,467.60 |
|
Missouri | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,087,200.00 |
$1,208,000.00 |
|
Missouri | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,973,938.50 |
||
Missouri | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $763,375.00 |
||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,441,543.90 |
$1,801,929.87 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $8,557,672.81 |
$10,697,091.01 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $147,779.62 |
$184,724.53 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $713,368.33 |
$891,710.41 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,161,696.06 |
$1,452,120.08 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $27,901.75 |
$34,877.19 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,613,008.01 |
$4,516,260.01 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,043,836.62 |
$2,554,795.77 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $815,960.23 |
$815,960.23 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $163,807.64 |
$204,759.55 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,058,730.27 |
$6,323,412.84 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $74,763.58 |
$93,454.47 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $360,902.07 |
$451,127.59 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $587,716.74 |
$734,645.93 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $14,115.85 |
$17,644.81 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $299,899.13 |
$299,899.13 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $82,872.36 |
$103,590.45 |
|
Missouri | Jackson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $5,082,112.00 |
$7,353,129.23 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,340,237.22 |
$26,188,384.52 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $72,123,762.78 |
$104,218,399.99 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,041,941.80 |
||
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,958,058.20 |
||
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,651,043.10 |
$3,629,189.10 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $985,756.90 |
$2,166,810.90 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,541,725.06 |
$14,427,156.32 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,482,274.94 |
$5,602,843.68 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $447,556.16 |
$559,445.20 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,152,443.84 |
$1,440,554.80 |
|
Missouri | Clay | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $15,653,852.25 |
$22,649,008.65 |
|
Missouri | Jackson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $9,346,147.75 |
$13,522,612.70 |
|
Missouri | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $34,917,888.00 |
$50,521,464.91 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,805,487.50 |
$4,005,776.32 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $18,710,965.15 |
$19,695,752.79 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,636,693.28 |
$4,880,729.77 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $544,569.85 |
$605,077.61 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,896.98 |
$51,470.50 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $196,829,612.49 |
$216,650,948.84 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,339,475.83 |
$10,279,988.44 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $641,780.95 |
$675,558.90 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,525,569.05 |
$14,237,441.10 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,423,140.05 |
$7,012,491.16 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $304,702.48 |
$332,658.87 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $131,166.15 |
$138,165.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,764,333.85 |
$2,911,835.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $923,044.17 |
$971,625.44 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $43,797.95 |
$46,103.11 |
|
Missouri | St. Louis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $426,107.23 |
$448,533.92 |
|
Missouri | St. Louis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $8,970,646.77 |
$9,442,786.08 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Traffic Management/Engineering - HOV | $954,700.00 |
$2,052,605.00 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Traffic Management/Engineering - HOV | $45,300.00 |
$97,395.00 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $659,396.32 |
$694,101.39 |
|
Missouri | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $13,881,978.58 |
$14,612,609.03 |
|
Missouri | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $352,818.00 |
$352,818.00 |
|
Missouri | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,523,032.32 |
$30,024,244.55 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $73,743.77 |
$77,625.02 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,219,001.21 |
$3,388,422.32 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,367,493.61 |
$3,544,730.11 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,906.04 |
$2,006.36 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,946.55 |
$2,049.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,643,377.42 |
$1,907,564.58 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $505,800.00 |
$562,000.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | |||
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,600,135.80 |
$1,600,135.80 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $20,589.24 |
$21,672.88 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | |||
Missouri | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $337,075.00 |
$337,075.00 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,409,594.63 |
$26,263,820.10 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,195,411.98 |
$4,637,511.10 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $4,734,997.61 |
$5,782,920.50 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,222,291.57 |
$4,551,846.81 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $66,801.92 |
$94,815.71 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,114,753.84 |
$1,478,673.30 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $155,050.00 |
||
Missouri | St. Louis | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $25,380,007.91 |
$28,200,008.79 |
|
Missouri | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $161,799,991.21 |
||
Missouri | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,176,999.74 |
$14,432,245.00 |
|
Missouri | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,077,187.04 |
$6,930,158.96 |
|
Missouri | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $10,756.16 |
$69,200.50 |
|
Missouri | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $218,429.63 |
$1,405,282.47 |
|
Missouri | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $491,627.43 |
$3,162,919.84 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $62,225,000.00 |
$65,500,000.00 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,393,750.00 |
$4,625,000.00 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,434,389.86 |
$1,593,766.51 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $190,000.00 |
$200,000.00 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $95,000.00 |
$100,000.00 |
|
Missouri | Jackson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | |||
Missouri | Clay | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $167,352.30 |
$167,352.30 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,173,965.11 |
$4,637,739.01 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | |||
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $24,326,250.55 |
$27,029,167.28 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | |||
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | |||
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,867,631.75 |
$3,186,257.50 |
|
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,292,008.50 |
$1,435,565.00 |
|
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | |||
Missouri | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | |||
Missouri | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $28,316.45 |
$28,316.45 |
|
Missouri | St. Louis | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $7,576,000.00 |
$13,160,576.12 |
|
Missouri | St. Louis | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $7,950,000.00 |
$11,682,969.77 |
|
Missouri | St. Louis | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,125,000.00 |
$10,470,586.11 |
|
Missouri | Greene | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $19,763,822.00 |
$29,725,000.00 |
|
Missouri | Greene | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,197,000.00 |
$1,800,000.00 |
|
Missouri | Greene | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,439,840.00 |
$1,799,800.00 |
|
Missouri | Greene | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $684,648.73 |
$855,810.91 |
|
Missouri | Greene | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,348,655.97 |
$1,685,819.95 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $17,899,433.65 |
$22,374,292.06 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,819,712.57 |
$6,024,640.70 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $137,888.00 |
$172,360.00 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $780,041.30 |
$975,051.63 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,148,271.20 |
$6,435,339.00 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $243,087.14 |
$303,858.93 |
|
Missouri | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $226,325.60 |
$282,907.00 |
|
Missouri | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $28,414,810.83 |
$28,414,810.83 |
|
Missouri | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $45,117,477.28 |
$56,396,846.59 |
|
Missouri | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $402,236.42 |
$502,795.52 |
|
Missouri | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $6,814,772.63 |
$8,518,465.79 |
|
Missouri | Shelby | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $855,129.37 |
$1,068,911.71 |
|
Missouri | Scotland | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,642,031.27 |
$2,052,539.09 |
|
Missouri | Adair | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,231,259.68 |
$1,539,074.60 |
|
Missouri | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,402,531.74 |
$1,753,164.67 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $718,322.74 |
$897,903.42 |
|
Missouri | Lewis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,778,662.06 |
$2,223,327.58 |
|
Missouri | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $684,209.00 |
$855,261.25 |
|
Missouri | Macon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $718,322.74 |
$897,903.42 |
|
Missouri | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,505,048.80 |
$1,881,311.00 |
|
Missouri | Schuyler | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,736,484.32 |
$3,420,605.41 |
|
Missouri | Gentry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $854,953.53 |
$1,068,691.91 |
|
Missouri | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,326,064.43 |
$2,907,580.54 |
|
Missouri | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,131,380.32 |
$1,414,225.40 |
|
Missouri | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $72,060.80 |
$90,076.00 |
|
Missouri | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $148,153.60 |
$185,192.00 |
|
Missouri | Gentry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $54,454.40 |
$68,068.00 |
|
Missouri | Schuyler | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $174,294.40 |
$217,868.00 |
|
Missouri | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $95,860.80 |
$119,826.00 |
|
Missouri | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $43,579.20 |
$54,474.00 |
|
Missouri | Macon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $45,752.00 |
$57,190.00 |
|
Missouri | Lewis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $113,288.00 |
$141,610.00 |
|
Missouri | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $45,752.00 |
$57,190.00 |
|
Missouri | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $89,331.20 |
$111,664.00 |
|
Missouri | Adair | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $78,422.40 |
$98,028.00 |
|
Missouri | Scotland | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $104,585.60 |
$130,732.00 |
|
Missouri | Shelby | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $54,465.60 |
$68,082.00 |
|
Missouri | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Other | $320,000.00 |
$400,000.00 |
|
Missouri | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $1,760,000.00 |
$2,200,000.00 |
|
Missouri | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Right of Way | $8,000.00 |
$10,000.00 |
|
Missouri | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Utilities | $1,600.00 |
$2,000.00 |
|
Missouri | Pike | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $19,431,850.00 |
$22,861,000.00 |
|
Missouri | Pike | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,224,000.00 |
$1,440,000.00 |
|
Missouri | Pike | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,837,051.42 |
$2,283,814.28 |
|
Missouri | Pike | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $209,032.39 |
$261,290.49 |
|
Missouri | Pike | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $10,000,000.00 |
$10,000,000.00 |
|
Missouri | St. Charles | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | $2,034,760.92 |
$2,483,413.00 |
|
Missouri | St. Charles | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $53,835.08 |
$65,705.38 |
|
Missouri | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $42,148,996.37 |
$51,442,587.00 |
|
Missouri | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,115,165.32 |
$1,361,052.31 |
|
Missouri | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,447,593.65 |
$5,559,492.06 |
|
Missouri | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,589,500.00 |
$1,870,000.00 |
|
Missouri | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $581,538.91 |
$3,300,000.00 |
|
Missouri | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,600,000.00 |
$4,000,000.00 |
|
Missouri | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Right of Way | $98,481.07 |
$100,000.00 |
|
Missouri | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $36,030,887.31 |
$44,369,000.00 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,024,124.45 |
$10,616,617.00 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $47,449,233.80 |
$55,822,628.00 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,651,480.00 |
$6,648,800.00 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $27.68 |
$32.56 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,157,304.68 |
$3,946,630.85 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $160,000.00 |
$200,000.00 |
|
Missouri | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,755.00 |
$48,755.00 |
|
Missouri | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,389,220.00 |
$8,693,200.00 |
|
Missouri | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 |
$1,738,640.00 |
|
Missouri | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 |
$1,738,640.00 |
|
Missouri | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,955,688.00 |
$3,477,280.00 |
|
Missouri | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,216,766.00 |
$2,607,960.00 |
|
Missouri | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 |
$1,738,640.00 |
|
Missouri | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 |
$1,738,640.00 |
|
Missouri | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,851.85 |
$128,061.00 |
|
Missouri | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 |
$127,449.00 |
|
Missouri | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 |
$127,449.00 |
|
Missouri | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $216,663.30 |
$254,898.00 |
|
Missouri | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 |
$127,449.00 |
|
Missouri | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $541,658.25 |
$637,245.00 |
|
Missouri | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 |
$127,449.00 |
|
Missouri | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $451,915.59 |
$531,665.40 |
|
Missouri | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 |
$32,487.00 |
|
Missouri | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 |
$32,487.00 |
|
Missouri | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $965,382.06 |
$1,135,743.60 |
|
Missouri | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 |
$32,487.00 |
|
Missouri | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 |
$32,487.00 |
|
Missouri | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,746.55 |
$32,643.00 |
|
Missouri | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $271,782.14 |
$319,743.70 |
|
Missouri | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $93,717.86 |
$110,256.30 |