RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
New Hampshire | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $22,402.15 |
$22,402.15 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $730,404.56 |
$730,404.56 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $1,838,760.53 |
$1,838,760.53 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $64,897.38 |
$64,897.38 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $17,307,762.47 |
$24,460,212.81 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $88,537.27 |
||
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $1,674,255.04 |
$9,249,098.44 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,316,429.49 |
$13,316,429.49 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $6,138,310.43 |
$6,138,310.43 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $11,896.00 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $366,108.89 |
$366,108.89 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $22,179,629.74 |
$22,179,629.74 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $34,455.44 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $5,955,256.37 |
$5,955,256.37 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $153,943.36 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $99,312.79 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $11,307,551.58 |
$11,307,551.58 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $2,534,083.87 |
$3,017,511.75 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $582,788.40 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $21,606,493.10 |
$23,042,860.28 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $126,260.36 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $35,243.85 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,630,190.00 |
$7,630,190.00 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $4,763,883.19 |
$4,763,883.19 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $575,746.01 |
||
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $14,366,895.37 |
$14,366,895.37 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $16,421,279.71 |
$16,421,279.71 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $1,667,225.73 |
$9,868,763.99 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $15,099.66 |
||
New Hampshire | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $981,897.76 |
$981,897.76 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Other | $2.00 |
$2.00 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | $1,980,000.00 |
$1,980,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $65,182.95 |
$136,786.21 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $20,883,896.32 |
$34,417,642.84 |
|
New Hampshire | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $923,941.76 |
$1,244,754.64 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,302,262.92 |
$7,302,262.92 |
|
New Hampshire | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $239,437.14 |
$25,239,437.14 |
|
New Hampshire | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $29,156.47 |
$29,156.47 |
|
New Hampshire | Rockingham | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $47,843.53 |
$7,947,843.53 |
|
New Hampshire | Rockingham | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Replacement - No Added Capacity | $216,274.90 |
$216,274.90 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $61,513,660.17 |
$131,486,849.67 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,447,601.50 |
$10,399,966.50 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,386,000.00 |
$1,386,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,250,000.00 |
$20,800,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $190,000.00 |
$190,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,100,000.00 |
$1,100,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $721,476.00 |
$721,476.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge Replacement - No Added Capacity | $178,854.83 |
$178,854.83 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $14,844,585.52 |
$14,844,585.52 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $7,183,000.00 |
$7,183,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $49,999.99 |
$149,999.99 |
|
New Hampshire | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $161,884.34 |
$161,884.34 |
|
New Hampshire | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $10,533.78 |
$10,533.78 |
|
New Hampshire | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $24,218,437.71 |
$82,778,309.86 |
|
New Hampshire | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,492,932.85 |
||
New Hampshire | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $196,921.30 |
$196,921.30 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,060,103.65 |
$2,060,103.65 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,440,747.20 |
||
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,895,241.21 |
$5,895,241.21 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $594,602.91 |
$594,602.91 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $14,836,623.76 |
$15,205,728.88 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,760,650.97 |
$1,760,650.97 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $3,864,659.86 |
$3,864,659.86 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $581,680.00 |
$1,071,280.00 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $4,950.00 |
$49,450.00 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $700,040.00 |
$700,040.00 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | $10,000,000.00 |
$12,719,895.88 |
|
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $13,173,728.63 |
||
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,131,000.00 |
||
New Hampshire | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,251,360.00 |
$1,488,960.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,971,161.39 |
||
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,323,720.46 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $589,383.00 |
||
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $196,461.00 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,567,767.90 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,559,085.80 |
$2,599,827.08 |
|
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,580.43 |
||
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $7,975.00 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $1,847,163.91 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $55,000.00 |
$55,000.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,357.00 |
||
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,626,060.75 |
$2,626,060.75 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $20,248,128.05 |
$20,248,128.05 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,124,650.00 |
$2,124,650.00 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Environmental Only | $167,486.97 |
$167,486.97 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $1,133,152.06 |
$1,133,152.06 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $87,413.33 |
$87,413.33 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $12,000,000.00 |
$15,000,000.00 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,331,850.77 |
||
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $8,675,229.79 |
$20,264,910.32 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $947,100.00 |
$1,887,536.31 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $249,024.27 |
$1,189,524.27 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,713,095.02 |
$3,229,115.02 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $297,000.00 |
$8,377,000.00 |
|
New Hampshire | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $900,893.40 |
||
New Hampshire | Rockingham | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | $2,769,912.20 |
$2,769,912.20 |
|
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $161,732.34 |
$1,854,018.14 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $323,367.66 |
$40,007,262.65 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,969,577.09 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $12,914,107.24 |
||
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $674,656.00 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,238,855.83 |
$3,817,957.86 |
|
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $436,764.58 |
$694,594.38 |
|
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $101,842.61 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $203,624.14 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $251,653.22 |
$1,121,893.51 |
|
New Hampshire | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $10,731.54 |
$48,426.55 |
|
New Hampshire | Rockingham | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $26,995.80 |
$26,995.80 |
|
New Hampshire | Rockingham | >= 200,000 | Local | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $1,009,436.29 |
$1,009,436.29 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,465,739.38 |
||
New Hampshire | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,775,767.49 |
||
New Hampshire | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $288,311.35 |
||
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $184,175.30 |
||
New Hampshire | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $4,049,825.40 |
||
New Hampshire | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,319,418.38 |
$2,416,022.34 |
|
New Hampshire | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $857,571.96 |
$857,571.96 |
|
New Hampshire | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $102,839.21 |
||
New Hampshire | Rockingham | >= 200,000 | Local | BRIDGE PROGRAM - 85% ON/OFF | Bridge New Construction | $7,166.70 |
$7,166.70 |
|
New Hampshire | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge New Construction | $2,832.30 |
$2,832.30 |
|
New Hampshire | Rockingham | >= 200,000 | Local | FAST ACT NATIONAL FREIGHT | New Construction Roadway | $9,399,580.22 |
$9,399,580.22 |
|
New Hampshire | Rockingham | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | New Construction Roadway | $3,714,710.40 |
$3,714,710.40 |
|
New Hampshire | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $2,534,051.18 |
$2,815,425.95 |
|
New Hampshire | Rockingham | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $6,412,079.38 |
$7,124,060.81 |
|
New Hampshire | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,936,150.39 |
$1,939,289.74 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $765,165.83 |
$766,406.48 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $1,216,828.03 |
$1,216,828.03 |
|
New Hampshire | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $3,079,021.30 |
$3,079,021.30 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,454,049.11 |
$7,676,273.06 |
|
New Hampshire | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $18,861,479.01 |
$19,423,787.14 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $617,999.91 |
$617,999.91 |
|
New Hampshire | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,563,766.49 |
$1,563,766.49 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,199,999.99 |
$2,199,999.99 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $449,783.50 |
$449,783.50 |
|
New Hampshire | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,830,150.26 |
$2,830,150.26 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,497,429.84 |
$2,497,429.84 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $205,772.60 |
$205,772.60 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $41,623,830.60 |
$41,623,830.60 |
|
New Hampshire | Rockingham | >= 200,000 | N/A | CARBON REDUCTION PROGRAM | Bridge Replacement - No Added Capacity | $779,712.00 |
$779,712.00 |
|
New Hampshire | Rockingham | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | $6,373,551.43 |
$6,373,551.43 |
|
New Hampshire | Rockingham | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $104,000.00 |
||
New Hampshire | Rockingham | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $2,056,570.00 |
||
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,723,726.67 |
$37,314,235.67 |
|
New Hampshire | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,023,450.00 |
$2,023,450.00 |