Report: FMISF71A-3
New Hampshire

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
New Hampshire
A000124
Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service
$22,402.15
$22,402.15
New Hampshire
A000124
Hillsborough >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service
$730,404.56
$730,404.56
New Hampshire
A000124
Hillsborough >= 200,000 N/A CONGESTION AIR QUALITY Debt Service
$1,838,760.53
$1,838,760.53
New Hampshire
A000124
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$64,897.38
$64,897.38
New Hampshire
A000124
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$17,307,762.47
$24,460,212.81
New Hampshire
A000124
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Construction Engineering
$88,537.27
New Hampshire
A000124
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$1,674,255.04
$9,249,098.44
New Hampshire
A000124
Hillsborough >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$13,316,429.49
$13,316,429.49
New Hampshire
A000125
Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service
$6,138,310.43
$6,138,310.43
New Hampshire
A000125
Rockingham >= 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity
$11,896.00
New Hampshire
A000125
Rockingham >= 200,000 N/A INTERSTATE MAINTENANCE Debt Service
$366,108.89
$366,108.89
New Hampshire
A000125
Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$22,179,629.74
$22,179,629.74
New Hampshire
A000125
Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$34,455.44
New Hampshire
A000125
Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$5,955,256.37
$5,955,256.37
New Hampshire
A000125
Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Utilities
$153,943.36
New Hampshire
A000125
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$99,312.79
New Hampshire
A000125
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$11,307,551.58
$11,307,551.58
New Hampshire
A000128
Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service
$2,534,083.87
$3,017,511.75
New Hampshire
A000128
Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$582,788.40
New Hampshire
A000128
Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$21,606,493.10
$23,042,860.28
New Hampshire
A000128
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$126,260.36
New Hampshire
A000128
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing
$35,243.85
New Hampshire
A000128
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$7,630,190.00
$7,630,190.00
New Hampshire
A000129
Hillsborough >= 200,000 N/A CONGESTION AIR QUALITY Debt Service
$4,763,883.19
$4,763,883.19
New Hampshire
A000129
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$575,746.01
New Hampshire
A000129
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$14,366,895.37
$14,366,895.37
New Hampshire
A000129
Hillsborough >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$16,421,279.71
$16,421,279.71
New Hampshire
A000501
Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service
$1,667,225.73
$9,868,763.99
New Hampshire
A000501
Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Utilities
$15,099.66
New Hampshire
A000501
Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service
$981,897.76
$981,897.76
New Hampshire
A000501
Rockingham >= 200,000 N/A GRANTS SUP PLAN SECTION 117 Other
$2.00
$2.00
New Hampshire
A000501
Rockingham >= 200,000 N/A HIGHWAY PRIORITY PROJECTS 4R - Added Capacity
$1,980,000.00
$1,980,000.00
New Hampshire
A000501
Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$65,182.95
$136,786.21
New Hampshire
A000501
Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$20,883,896.32
$34,417,642.84
New Hampshire
A000501
Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$923,941.76
$1,244,754.64
New Hampshire
A000501
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$7,302,262.92
$7,302,262.92
New Hampshire
A000909
Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$239,437.14
$25,239,437.14
New Hampshire
A000909
Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$29,156.47
$29,156.47
New Hampshire
A000909
Rockingham >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering
$47,843.53
$7,947,843.53
New Hampshire
A000909
Rockingham >= 200,000 State HIGHWAY BRIDGE PROGRAM Bridge Replacement - No Added Capacity
$216,274.90
$216,274.90
New Hampshire
A000909
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$61,513,660.17
$131,486,849.67
New Hampshire
A000909
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,447,601.50
$10,399,966.50
New Hampshire
A000909
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,386,000.00
$1,386,000.00
New Hampshire
A000909
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$5,250,000.00
$20,800,000.00
New Hampshire
A000909
Rockingham >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity
$190,000.00
$190,000.00
New Hampshire
A000909
Rockingham >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$1,100,000.00
$1,100,000.00
New Hampshire
A000909
Rockingham >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Bridge Replacement - No Added Capacity
$721,476.00
$721,476.00
New Hampshire
A000909
Rockingham >= 200,000 State REDISTRIBUTION OF TIFIA FUNDS Bridge Replacement - No Added Capacity
$178,854.83
$178,854.83
New Hampshire
A000909
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$14,844,585.52
$14,844,585.52
New Hampshire
A000909
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$7,183,000.00
$7,183,000.00
New Hampshire
A000909
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$49,999.99
$149,999.99
New Hampshire
A001026
Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering
$161,884.34
$161,884.34
New Hampshire
A001026
Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Right of Way
$10,533.78
$10,533.78
New Hampshire
A001026
Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$24,218,437.71
$82,778,309.86
New Hampshire
A001026
Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$3,492,932.85
New Hampshire
A001026
Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Other
$196,921.30
$196,921.30
New Hampshire
A001026
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,060,103.65
$2,060,103.65
New Hampshire
A001026
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$2,440,747.20
New Hampshire
A001026
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$5,895,241.21
$5,895,241.21
New Hampshire
A001026
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$594,602.91
$594,602.91
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Bridge Rehabilitation - Added Capacity
$14,836,623.76
$15,205,728.88
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$1,760,650.97
$1,760,650.97
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity
$3,864,659.86
$3,864,659.86
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering
$581,680.00
$1,071,280.00
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Right of Way
$4,950.00
$49,450.00
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$700,040.00
$700,040.00
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Rehabilitation - Added Capacity
$10,000,000.00
$12,719,895.88
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity
$13,173,728.63
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,131,000.00
New Hampshire
A001154
Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$1,251,360.00
$1,488,960.00
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$30,971,161.39
New Hampshire
A004115
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$10,323,720.46
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction
$589,383.00
New Hampshire
A004115
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction
$196,461.00
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$3,567,767.90
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,559,085.80
$2,599,827.08
New Hampshire
A004115
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$13,580.43
New Hampshire
A004115
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff
$7,975.00
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff
$1,847,163.91
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$55,000.00
$55,000.00
New Hampshire
A004115
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$8,357.00
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$2,626,060.75
$2,626,060.75
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction
$20,248,128.05
$20,248,128.05
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$2,124,650.00
$2,124,650.00
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Environmental Only
$167,486.97
$167,486.97
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Other
$1,133,152.06
$1,133,152.06
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$87,413.33
$87,413.33
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge New Construction
$12,000,000.00
$15,000,000.00
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$4,331,850.77
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction
$8,675,229.79
$20,264,910.32
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$947,100.00
$1,887,536.31
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$249,024.27
$1,189,524.27
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,713,095.02
$3,229,115.02
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$297,000.00
$8,377,000.00
New Hampshire
A004152
Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$900,893.40
New Hampshire
A004375
Rockingham >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - No Added Capacity
$2,769,912.20
$2,769,912.20
New Hampshire
A004375
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$161,732.34
$1,854,018.14
New Hampshire
A004375
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$323,367.66
$40,007,262.65
New Hampshire
A004375
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity
$1,969,577.09
New Hampshire
A004375
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$12,914,107.24
New Hampshire
A004375
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$674,656.00
New Hampshire
A004375
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,238,855.83
$3,817,957.86
New Hampshire
A004375
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$436,764.58
$694,594.38
New Hampshire
A004375
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff
$101,842.61
New Hampshire
A004375
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff
$203,624.14
New Hampshire
A004375
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$251,653.22
$1,121,893.51
New Hampshire
A004375
Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities
$10,731.54
$48,426.55
New Hampshire
A004375
Rockingham >= 200,000 Local REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity
$26,995.80
$26,995.80
New Hampshire
A004375
Rockingham >= 200,000 Local REPURPOSED SPECIAL Bridge Replacement - No Added Capacity
$1,009,436.29
$1,009,436.29
New Hampshire
A004376
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$16,465,739.38
New Hampshire
A004376
Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$25,775,767.49
New Hampshire
A004376
Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction
$288,311.35
New Hampshire
A004376
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction
$184,175.30
New Hampshire
A004376
Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity
$4,049,825.40
New Hampshire
A004376
Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,319,418.38
$2,416,022.34
New Hampshire
A004376
Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$857,571.96
$857,571.96
New Hampshire
A004376
Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff
$102,839.21
New Hampshire
A005073
Rockingham >= 200,000 Local BRIDGE PROGRAM - 85% ON/OFF Bridge New Construction
$7,166.70
$7,166.70
New Hampshire
A005073
Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge New Construction
$2,832.30
$2,832.30
New Hampshire
A005073
Rockingham >= 200,000 Local FAST ACT NATIONAL FREIGHT New Construction Roadway
$9,399,580.22
$9,399,580.22
New Hampshire
A005073
Rockingham >= 200,000 State FAST ACT NATIONAL FREIGHT New Construction Roadway
$3,714,710.40
$3,714,710.40
New Hampshire
A005073
Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction
$2,534,051.18
$2,815,425.95
New Hampshire
A005073
Rockingham >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Bridge New Construction
$6,412,079.38
$7,124,060.81
New Hampshire
A005073
Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,936,150.39
$1,939,289.74
New Hampshire
A005073
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$765,165.83
$766,406.48
New Hampshire
A005073
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff
$1,216,828.03
$1,216,828.03
New Hampshire
A005073
Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff
$3,079,021.30
$3,079,021.30
New Hampshire
A005073
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$7,454,049.11
$7,676,273.06
New Hampshire
A005073
Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$18,861,479.01
$19,423,787.14
New Hampshire
A005073
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$617,999.91
$617,999.91
New Hampshire
A005073
Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Other
$1,563,766.49
$1,563,766.49
New Hampshire
A005073
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,199,999.99
$2,199,999.99
New Hampshire
A005073
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$449,783.50
$449,783.50
New Hampshire
A005073
Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$2,830,150.26
$2,830,150.26
New Hampshire
A005252
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,497,429.84
$2,497,429.84
New Hampshire
A005252
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff
$205,772.60
$205,772.60
New Hampshire
A005252
Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other
$41,623,830.60
$41,623,830.60
New Hampshire
A005301
Rockingham >= 200,000 N/A CARBON REDUCTION PROGRAM Bridge Replacement - No Added Capacity
$779,712.00
$779,712.00
New Hampshire
A005301
Rockingham >= 200,000 State CONGESTION AIR QUALITY Bridge Replacement - No Added Capacity
$6,373,551.43
$6,373,551.43
New Hampshire
A005301
Rockingham >= 200,000 State CONGESTION AIR QUALITY Construction Engineering
$104,000.00
New Hampshire
A005301
Rockingham >= 200,000 State CONGESTION AIR QUALITY Other
$2,056,570.00
New Hampshire
A005301
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,723,726.67
$37,314,235.67
New Hampshire
A005301
Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$2,023,450.00
$2,023,450.00