Report: FMISF71A-3
Rhode Island


DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Rhode Island
0032018
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$2,800,000.00
$3,500,000.00
Rhode Island
0032018
Providence >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$18,576,136.55
$21,757,009.01
Rhode Island
0037012
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$15,777,514.00
$19,721,892.50
Rhode Island
0037012
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$4,487,857.59
$5,609,821.99
Rhode Island
0037012
Providence >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$2,500,000.00
$10,599,858.07
Rhode Island
0037014
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$6,000,000.00
$7,500,000.00
Rhode Island
0037014
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$2,000,000.00
$45,408,327.50
Rhode Island
0037014
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,400,000.00
$7,913,860.00
Rhode Island
0037014
Providence >= 200,000 State PROTECT PROGRAM APPORTIONED Bridge Replacement - No Added Capacity
$4,080,000.00
$5,100,000.00
Rhode Island
0138060
Newport >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - Maintenance Resurfacing
$6,005,650.24
$7,507,062.79
Rhode Island
0138060
Newport >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Maintenance Resurfacing
$3,000,000.00
$3,750,000.00
Rhode Island
0138060
Newport >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$16,186,003.50
$20,232,504.38
Rhode Island
0138060
Newport >= 50,000 AND < 200,000 State PROTECT PROGRAM APPORTIONED 4R - Restoration & Rehabilitation
$1,600,000.00
$2,000,000.00
Rhode Island
0146030
Providence >= 200,000 State CARBON REDUCTION PROGRAM Bridge Replacement - No Added Capacity
$4,000,000.00
$5,000,000.00
Rhode Island
0146030
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation
$21,000,000.00
$26,250,000.00
Rhode Island
0146030
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering
$14,413,868.72
$18,017,335.90
Rhode Island
0146030
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$66,307,751.00
Rhode Island
0146030
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$387,464.00
$484,330.00
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity
$13,070,363.89
$13,070,363.89
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$9,325,000.00
$9,325,000.00
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service
$2,123,414.32
$2,123,414.32
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE REP & REHAB-20% ON/OFF Bridge Replacement - Added Capacity
$245,785.18
$245,785.18
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - Added Capacity
$1,309,226.78
$1,309,226.78
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE REPLAC & REHAB - DISC Bridge Replacement - No Added Capacity
$10,369.33
$10,369.33
Rhode Island
0200005
Providence >= 200,000 N/A BRIDGE REPLAC & REHAB - DISC Debt Service
$4,061,674.00
$4,061,674.00
Rhode Island
0200005
Providence >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - Added Capacity
$590,635.00
$590,635.00
Rhode Island
0200005
Providence >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Debt Service
$275,768.00
$275,768.00
Rhode Island
0200005
Providence >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway
$273,751.00
$273,751.00
Rhode Island
0200005
Providence >= 200,000 N/A INTERSTATE MAINT DISC Bridge Replacement - Added Capacity
$661,333.00
$661,333.00
Rhode Island
0200005
Providence >= 200,000 N/A INTERSTATE MAINT DISC Debt Service
$193,667.00
$193,667.00
Rhode Island
0200005
Providence >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$32,945,052.03
$32,945,052.03
Rhode Island
0200005
Providence >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$20,190,457.48
$22,863,057.42
Rhode Island
0200005
Providence >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$4,710,790.10
$4,710,790.10
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$25,440,000.00
$31,800,000.00
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service
$31,648,010.11
$87,151,209.14
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Debt Service
$1,427,225.76
$1,784,032.20
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PRGM -APPOR Debt Service
$700,000.00
$875,000.00
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$15,898,018.63
$19,872,523.29
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$7,500,000.00
$9,375,000.00
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$50,038,350.24
$62,549,937.82
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity
$2,250,000.00
$2,812,500.00
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$33,019,024.91
$41,273,781.14
Rhode Island
0250010
Newport >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$7,200,858.23
$9,001,072.79
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge New Construction
$6,670,000.00
$8,337,500.00
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NAT COR PL DV/COOR BDR INF-TEA Special Bridge
$752,334.88
$940,418.88
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction
$3,489,551.88
$4,361,939.86
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$19,527,139.43
$24,300,866.66
Rhode Island
0403016
Kent >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$2,021,198.91
$2,526,498.64
Rhode Island
0403016
Kent >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Landscaping and Other Scenic Beautification
$5,874,041.95
$7,342,552.44
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$10,219,963.97
$12,774,954.96
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Special Bridge
$845,125.31
$1,056,406.64
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge New Construction
$4,752,147.87
$5,940,184.84
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Construction Engineering
$900,000.00
$1,125,000.00
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$6,041,555.70
$7,645,126.57
Rhode Island
0403016
Kent >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$3,363,602.81
$4,231,951.72
Rhode Island
0403016
Kent >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Landscaping and Other Scenic Beautification
$10,252,815.70
$12,816,019.63
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Landscaping and Other Scenic Beautification
$2,049,802.08
$2,562,252.60
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway
$14,431,437.00
$18,039,296.25
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way
$5,896,000.00
$7,370,000.00
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Special Bridge
$3,704,077.86
$4,630,097.33
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Utilities
$789,627.23
$987,034.04
Rhode Island
0403016
Washington >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway
$12,637,689.28
$15,796,911.60
Rhode Island
0550003
Providence >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$43,171,814.46
$73,111,670.76
Rhode Island
0550003
Providence >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - No Added Capacity
$3,427.52
$4,284.40
Rhode Island
0550003
Providence >= 200,000 N/A INTERSTATE MAINT DISC Bridge Replacement - No Added Capacity
$5,116,200.00
$6,395,250.00
Rhode Island
0550003
Providence >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity
$10,305,231.57
$11,881,539.46
Rhode Island
0578005
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$12,416,235.74
$130,748,380.43
Rhode Island
0578005
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$12,117,322.44
$17,826,769.57
Rhode Island
0600005
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity
$38,600,000.00
$60,830,415.81
Rhode Island
0600005
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$3,000,000.00
$3,750,000.00
Rhode Island
0600005
Providence >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$3,000,000.00
$3,750,000.00
Rhode Island
0700006
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$4,000,000.00
$5,000,000.00
Rhode Island
0700006
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$728,564.55
$23,561,000.00
Rhode Island
0700006
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$3,415,200.00
$4,269,000.00
Rhode Island
0896001
Washington >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$7,657,887.76
$34,140,768.86
Rhode Island
1954055
Providence >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity
$53,485,611.12
$66,857,013.90
Rhode Island
1954055
Providence >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service
$16,426,565.73
$20,533,207.17
Rhode Island
1954055
Providence >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Safety
$1.00
Rhode Island
1954055
Providence >= 200,000 N/A BRIDGE REP & REHAB-20% ON/OFF Debt Service
$9,576,842.91
$11,971,053.90
Rhode Island
1954055
Providence >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity
$50,000,000.00
Rhode Island
1954055
Providence >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Debt Service
$21,570,600.00
$26,963,254.00
Rhode Island
1954055
Providence >= 200,000 N/A HIGHWAY PROJECTS,DEMOS S378 Debt Service
$3,038,839.49
$3,798,549.40
Rhode Island
1954055
Providence >= 200,000 N/A INTERSTATE MAINT DISC Debt Service
$1,040,602.42
$1,300,752.78
Rhode Island
1954055
Providence >= 200,000 State INTERSTATE MAINT DISC Safety
$1,171,207.58
$1,464,009.48
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$978,855.66
$1,223,569.58
Rhode Island
1954055
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$5,379,524.61
$6,724,405.76
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service
$105,257,517.67
$130,777,135.55
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$64,484,014.37
$79,843,661.63
Rhode Island
1954055
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway
$21,161,984.54
$26,452,480.69
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge New Construction
$16,146,157.08
$20,182,696.35
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service
$48,053,636.16
$60,067,047.21
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Landscaping and Other Scenic Beautification
$2,043,768.74
$2,554,710.92
Rhode Island
1954055
Providence >= 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway
$10,676,786.84
$13,345,983.55
Rhode Island
1954055
Providence >= 200,000 N/A TECHNOLOGY DEPLOYMENT GRANTS T Debt Service
$320,000.00
$400,000.00
Rhode Island
2950002
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$6,225,028.19
$42,709,405.13
Rhode Island
2950002
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,887,300.00
$2,359,125.00
Rhode Island
2950002
Providence >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$728,814.90
$911,018.63
Rhode Island
610X001
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction
$2,759,313.06
$3,449,141.33
Rhode Island
610X001
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction
$13,796,561.42
$383,101,750.71
Rhode Island
610X001
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service
$2,759,286.37
$3,449,107.96
Rhode Island
610X001
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$19,600,228.65
$25,000,000.00
Rhode Island
610X003
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction
$40,523,783.26
$121,480,813.97
Rhode Island
BG39005
Providence >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity
$3,000,000.00
$3,750,000.00
Rhode Island
BG39005
Providence >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity
$6,637,636.91
$27,992,767.16
Rhode Island
BLDG001
Newport >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Maintenance Resurfacing
$20,000,000.00
$25,000,000.00
Rhode Island
BLDG002
Providence >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Rehabilitation - No Added Capacity
$25,000,000.00
$31,250,000.00
Rhode Island
BLDG003
Providence >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity
$21,329,338.00
$26,661,672.50
Rhode Island
FRIP001
Statewide N/A N/A CONGESTION AIR QUALITY Debt Service
$5,060,628.20
$6,325,785.25
Rhode Island
FRIP001
Washington >= 50,000 AND < 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Debt Service
$662,320.00
$827,900.00
Rhode Island
FRIP001
Washington >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity
$1.01
Rhode Island
FRIP001
Washington >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$11,919,269.53
$14,866,649.53
Rhode Island
FRIP001
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$2,873,583.67
$3,592,479.59
Rhode Island
FRIP001
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$2,326,871.14
$2,908,588.92
Rhode Island
FRIP001
Statewide N/A Other SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$103,934.85
$129,918.56
Rhode Island
FRIP001
Providence >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$2,181,537.50
$2,726,921.88
Rhode Island
FRIP001
Providence >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Debt Service
$254,344.73
$317,930.86
Rhode Island
FRIP001
Providence >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other
$2,013,832.86
$2,517,291.08
Rhode Island
FRIP001
Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Other
$7,960,120.58
$9,950,150.73
Rhode Island
FRIP001
Washington >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other
$3,112,773.34
$3,815,967.18
Rhode Island
INFR001
Providence >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Bridge Replacement - No Added Capacity
$60,355,000.00
$75,443,750.00
Rhode Island
INFR002
Providence >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Restoration & Rehabilitation
$65,000,000.00
$81,250,000.00
Rhode Island
RESF440
Statewide N/A State FAST ACT NATIONAL FREIGHT 4R - Maintenance Resurfacing
$6,100,000.00
$6,777,777.78
Rhode Island
RESF440
Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing
$15,480,000.00
$20,620,569.15
Rhode Island
RESF440
Statewide N/A State PROTECT PROGRAM APPORTIONED 4R - Maintenance Resurfacing
$2,460,000.00
$2,830,555.56
Rhode Island
TIGR003
Providence >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - Added Capacity
$20,000,000.00
$25,000,000.00