RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $2,800,000.00 |
$3,500,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $18,576,136.55 |
$21,757,009.01 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $15,777,514.00 |
$19,721,892.50 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $4,487,857.59 |
$5,609,821.99 |
|
Rhode Island | Providence | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,500,000.00 |
$10,599,858.07 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $6,000,000.00 |
$7,500,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,000,000.00 |
$45,408,327.50 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,400,000.00 |
$7,913,860.00 |
|
Rhode Island | Providence | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | $4,080,000.00 |
$5,100,000.00 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $6,005,650.24 |
$7,507,062.79 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $3,000,000.00 |
$3,750,000.00 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,186,003.50 |
$20,232,504.38 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Restoration & Rehabilitation | $1,600,000.00 |
$2,000,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | CARBON REDUCTION PROGRAM | Bridge Replacement - No Added Capacity | $4,000,000.00 |
$5,000,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $21,000,000.00 |
$26,250,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $14,413,868.72 |
$18,017,335.90 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $66,307,751.00 |
||
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $387,464.00 |
$484,330.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $13,070,363.89 |
$13,070,363.89 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $9,325,000.00 |
$9,325,000.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $2,123,414.32 |
$2,123,414.32 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Bridge Replacement - Added Capacity | $245,785.18 |
$245,785.18 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - Added Capacity | $1,309,226.78 |
$1,309,226.78 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REPLAC & REHAB - DISC | Bridge Replacement - No Added Capacity | $10,369.33 |
$10,369.33 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REPLAC & REHAB - DISC | Debt Service | $4,061,674.00 |
$4,061,674.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - Added Capacity | $590,635.00 |
$590,635.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Debt Service | $275,768.00 |
$275,768.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $273,751.00 |
$273,751.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | INTERSTATE MAINT DISC | Bridge Replacement - Added Capacity | $661,333.00 |
$661,333.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | INTERSTATE MAINT DISC | Debt Service | $193,667.00 |
$193,667.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $32,945,052.03 |
$32,945,052.03 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $20,190,457.48 |
$22,863,057.42 |
|
Rhode Island | Providence | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $4,710,790.10 |
$4,710,790.10 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $25,440,000.00 |
$31,800,000.00 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $31,648,010.11 |
$87,151,209.14 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Debt Service | $1,427,225.76 |
$1,784,032.20 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Debt Service | $700,000.00 |
$875,000.00 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $15,898,018.63 |
$19,872,523.29 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,500,000.00 |
$9,375,000.00 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $50,038,350.24 |
$62,549,937.82 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $2,250,000.00 |
$2,812,500.00 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $33,019,024.91 |
$41,273,781.14 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,200,858.23 |
$9,001,072.79 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge New Construction | $6,670,000.00 |
$8,337,500.00 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Special Bridge | $752,334.88 |
$940,418.88 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,489,551.88 |
$4,361,939.86 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $19,527,139.43 |
$24,300,866.66 |
|
Rhode Island | Kent | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,021,198.91 |
$2,526,498.64 |
|
Rhode Island | Kent | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Landscaping and Other Scenic Beautification | $5,874,041.95 |
$7,342,552.44 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,219,963.97 |
$12,774,954.96 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $845,125.31 |
$1,056,406.64 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $4,752,147.87 |
$5,940,184.84 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $900,000.00 |
$1,125,000.00 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $6,041,555.70 |
$7,645,126.57 |
|
Rhode Island | Kent | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $3,363,602.81 |
$4,231,951.72 |
|
Rhode Island | Kent | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Landscaping and Other Scenic Beautification | $10,252,815.70 |
$12,816,019.63 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Landscaping and Other Scenic Beautification | $2,049,802.08 |
$2,562,252.60 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $14,431,437.00 |
$18,039,296.25 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $5,896,000.00 |
$7,370,000.00 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Special Bridge | $3,704,077.86 |
$4,630,097.33 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $789,627.23 |
$987,034.04 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $12,637,689.28 |
$15,796,911.60 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $43,171,814.46 |
$73,111,670.76 |
|
Rhode Island | Providence | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | $3,427.52 |
$4,284.40 |
|
Rhode Island | Providence | >= 200,000 | N/A | INTERSTATE MAINT DISC | Bridge Replacement - No Added Capacity | $5,116,200.00 |
$6,395,250.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $10,305,231.57 |
$11,881,539.46 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $12,416,235.74 |
$130,748,380.43 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $12,117,322.44 |
$17,826,769.57 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $38,600,000.00 |
$60,830,415.81 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,000,000.00 |
$3,750,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,000,000.00 |
$3,750,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $4,000,000.00 |
$5,000,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $728,564.55 |
$23,561,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,415,200.00 |
$4,269,000.00 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $7,657,887.76 |
$34,140,768.86 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $53,485,611.12 |
$66,857,013.90 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $16,426,565.73 |
$20,533,207.17 |
|
Rhode Island | Providence | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Safety | $1.00 |
||
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Debt Service | $9,576,842.91 |
$11,971,053.90 |
|
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $50,000,000.00 |
||
Rhode Island | Providence | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Debt Service | $21,570,600.00 |
$26,963,254.00 |
|
Rhode Island | Providence | >= 200,000 | N/A | HIGHWAY PROJECTS,DEMOS S378 | Debt Service | $3,038,839.49 |
$3,798,549.40 |
|
Rhode Island | Providence | >= 200,000 | N/A | INTERSTATE MAINT DISC | Debt Service | $1,040,602.42 |
$1,300,752.78 |
|
Rhode Island | Providence | >= 200,000 | State | INTERSTATE MAINT DISC | Safety | $1,171,207.58 |
$1,464,009.48 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $978,855.66 |
$1,223,569.58 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,379,524.61 |
$6,724,405.76 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $105,257,517.67 |
$130,777,135.55 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $64,484,014.37 |
$79,843,661.63 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $21,161,984.54 |
$26,452,480.69 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $16,146,157.08 |
$20,182,696.35 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $48,053,636.16 |
$60,067,047.21 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Landscaping and Other Scenic Beautification | $2,043,768.74 |
$2,554,710.92 |
|
Rhode Island | Providence | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $10,676,786.84 |
$13,345,983.55 |
|
Rhode Island | Providence | >= 200,000 | N/A | TECHNOLOGY DEPLOYMENT GRANTS T | Debt Service | $320,000.00 |
$400,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,225,028.19 |
$42,709,405.13 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,887,300.00 |
$2,359,125.00 |
|
Rhode Island | Providence | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $728,814.90 |
$911,018.63 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $2,759,313.06 |
$3,449,141.33 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $13,796,561.42 |
$383,101,750.71 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,759,286.37 |
$3,449,107.96 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $19,600,228.65 |
$25,000,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $40,523,783.26 |
$121,480,813.97 |
|
Rhode Island | Providence | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $3,000,000.00 |
$3,750,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,637,636.91 |
$27,992,767.16 |
|
Rhode Island | Newport | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Maintenance Resurfacing | $20,000,000.00 |
$25,000,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - No Added Capacity | $25,000,000.00 |
$31,250,000.00 |
|
Rhode Island | Providence | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $21,329,338.00 |
$26,661,672.50 |
|
Rhode Island | Statewide | N/A | N/A | CONGESTION AIR QUALITY | Debt Service | $5,060,628.20 |
$6,325,785.25 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Debt Service | $662,320.00 |
$827,900.00 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1.01 |
||
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $11,919,269.53 |
$14,866,649.53 |
|
Rhode Island | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,873,583.67 |
$3,592,479.59 |
|
Rhode Island | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,326,871.14 |
$2,908,588.92 |
|
Rhode Island | Statewide | N/A | Other | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $103,934.85 |
$129,918.56 |
|
Rhode Island | Providence | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,181,537.50 |
$2,726,921.88 |
|
Rhode Island | Providence | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $254,344.73 |
$317,930.86 |
|
Rhode Island | Providence | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,013,832.86 |
$2,517,291.08 |
|
Rhode Island | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $7,960,120.58 |
$9,950,150.73 |
|
Rhode Island | Washington | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,112,773.34 |
$3,815,967.18 |
|
Rhode Island | Providence | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $60,355,000.00 |
$75,443,750.00 |
|
Rhode Island | Providence | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Restoration & Rehabilitation | $65,000,000.00 |
$81,250,000.00 |
|
Rhode Island | Statewide | N/A | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $6,100,000.00 |
$6,777,777.78 |
|
Rhode Island | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,480,000.00 |
$20,620,569.15 |
|
Rhode Island | Statewide | N/A | State | PROTECT PROGRAM APPORTIONED | 4R - Maintenance Resurfacing | $2,460,000.00 |
$2,830,555.56 |
|
Rhode Island | Providence | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $20,000,000.00 |
$25,000,000.00 |