U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Utah

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Utah
F003728
Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity
$5,877,973.67
$7,347,466.84
Utah
F003728
Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Construction Engineering
$14,355.77
$17,944.71
Utah
F003728
Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Other
$63.79
$92,980,079.74
Utah
F003728
Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$47,627.82
$59,534.77
Utah
F003728
Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way
$777,582.03
$971,977.55
Utah
F003728
Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Utilities
$30,399.92
$37,999.90
Utah
F003728
Salt Lake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$3,421.54
$3,670.00
Utah
F003728
Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ 4R - Added Capacity
$361,741.65
$388,009.92
Utah
F003728
Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ Preliminary Engineering
$18,559.29
$19,906.99
Utah
F003728
Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ Right of Way
$1,431,975.06
$1,535,959.52
Utah
F006557
Utah >= 200,000 State EQUITY BONUS - CHARGED TO LIM 4R - Added Capacity
$59,704.36
$64,039.86
Utah
F006557
Utah >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$4,268,705.41
$4,578,682.19
Utah
F006557
Utah >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity
$12,288.30
$13,180.63
Utah
F006557
Utah >= 200,000 State EQUITY BONUS SP LIMITATION Environmental Only
$2,659.14
$2,852.24
Utah
F006557
Utah >= 200,000 State EQUITY BONUS SP LIMITATION Other
$29,587.48
$31,736.01
Utah
F006557
Utah >= 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering
$872.63
$936.00
Utah
F006557
Utah >= 200,000 State EQUITY BONUS SP LIMITATION Right of Way
$55,592.69
$59,629.61
Utah
F006557
Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity
$10,129,601.27
$12,662,001.60
Utah
F006557
Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Environmental Only
$88,950.15
$111,187.69
Utah
F006557
Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Other
$379,989.34
$474,986.68
Utah
F006557
Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering
$146,057.16
$182,571.46
Utah
F006557
Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way
$18,446.92
$23,058.65
Utah
F006557
Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities
$273,635.41
$342,044.27
Utah
F006557
Utah >= 200,000 State HIGHWAY PRIORITY PROJECTS 4R - Added Capacity
$495,000.00
$495,000.00
Utah
F006557
Utah >= 200,000 State MINIMUM GUARANTEE - TEA-21 4R - Added Capacity
$8,337.99
$8,943.46
Utah
F006557
Utah >= 200,000 State RAIL HWY CROSSING HAZ ELI 4R - Added Capacity
$37,292.00
$41,435.56
Utah
F006557
Utah >= 200,000 State SURFACE TRANS PRIORITIES S129 4R - Added Capacity
$245,000.00
$245,000.00
Utah
F006557
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$235,564.50
$252,670.28
Utah
F006557
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$16,572,839.14
$17,776,294.27
Utah
F006557
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only
$24,108.94
$25,859.64
Utah
F006557
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$42,783.29
$45,890.05
Utah
F006557
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$657,059.44
$704,772.54
Utah
F006557
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$466,150.00
$500,000.00
Utah
F006557
Utah >= 200,000 State TRANSPORTATION IMP PROJ 4R - Added Capacity
$5,438,903.95
$5,833,856.00
Utah
F006557
Utah >= 200,000 State TRANSPORTATION IMP PROJ Other
$29,041,850.00
Utah
F007701
Utah >= 200,000 State HIGH RISK RURAL ROAD 4R - Added Capacity
$282,055.27
$302,537.03
Utah
F007701
Utah >= 200,000 State HIGH RISK RURAL ROAD Construction Engineering
$103,485.30
$111,000.00
Utah
F007701
Utah >= 200,000 State HIGH RISK RURAL ROAD Preliminary Engineering
$267,069.43
$286,462.97
Utah
F007701
Utah >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity
$525,458.26
$563,615.00
Utah
F007701
Utah >= 200,000 State HSIP LIMITING FLEXIBLE Other
$256,720.87
$1,075,362.94
Utah
F007701
Utah >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering
$150,120.87
$161,022.06
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$12,961,379.93
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$643,287.00
$690,000.00
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$9,311,742.34
$9,987,924.86
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$59,376.45
$63,688.16
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Environmental Only
$9,323.00
$10,000.00
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering
$1,403,111.50
$1,505,000.00
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way
$689,902.00
$740,000.00
Utah
F007701
Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities
$34,855.91
$37,387.01
Utah
F007701
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$228,434.07
$245,022.06
Utah
F007701
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$117,970.47
$126,537.03
Utah
F007701
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$419,535.00
$450,000.00
Utah
F007701
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$3,982,855.65
$4,272,075.14
Utah
F007701
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$1,506,005.51
$1,615,365.77
Utah
F010782
Tooele >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$2,946,549.69
$3,140,156.00
Utah
F010782
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$5,893,983.44
$6,281,254.13
Utah
F010782
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$869,533.46
$932,607.90
Utah
F010782
Tooele >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,128.85
$3,322.20
Utah
F010782
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$2,815,322.91
$3,019,734.25
Utah
F010782
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$43,057.84
$46,184.51
Utah
F010782
Tooele >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$68,838.84
$73,837.62
Utah
F010782
Tooele >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$1,554,144.10
$1,667,000.00
Utah
F010782
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$17,157,039.79
$18,402,917.40
Utah
F010782
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$584,776.88
$627,241.10
Utah
F010782
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$72,213.16
$6,677,243.34
Utah
F010782
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$769,671.35
$825,561.78
Utah
F011271
Davis >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$463,547.56
$579,434.44
Utah
F011271
Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$1,829,346.00
$1,962,186.00
Utah
F011271
Weber >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities
$143,110.68
$178,888.35
Utah
F011271
Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$2,038,891.10
$2,184,069.36
Utah
F011271
Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$7,759,085.22
$8,312,958.04
Utah
F011271
Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$3,169,023.94
$9,063,075.48
Utah
F011271
Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$978,356.40
$3,340,598.71
Utah
F011271
Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$108,080.84
$3,349,631.86
Utah
F011271
Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$350,087.93
$8,376,850.15
Utah
F011271
Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$2,499,822.00
Utah
F011271
Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$1,010,178.00
Utah
F011271
Weber >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$1,698,885.87
$19,171,285.20
Utah
F011271
Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$24,592,244.42
$26,378,037.56
Utah
F011271
Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$6,588,362.28
$74,351,307.68
Utah
F011271
Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$1,991,952.18
$2,136,600.00
Utah
F011271
Weber >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$804,947.82
$863,400.00
Utah
F011826
Salt Lake >= 200,000 State FAST ACT NATIONAL FREIGHT Construction Engineering
$2,634,606.54
$2,825,921.42
Utah
F011826
Salt Lake >= 200,000 State FAST ACT NATIONAL FREIGHT Other
$677,840.56
$727,062.71
Utah
F011826
Salt Lake >= 200,000 State FAST ACT NATIONAL FREIGHT Preliminary Engineering
$351,222.76
$376,727.19
Utah
F011826
Salt Lake >= 200,000 State FAST ACT NATIONAL FREIGHT Rail/Hwy Crossing
$5,896,944.44
$6,325,157.61
Utah
F011826
Salt Lake >= 200,000 State FAST ACT NATIONAL FREIGHT Right of Way
$8,390,700.00
$9,000,000.00
Utah
F011826
Salt Lake >= 200,000 State FAST ACT NATIONAL FREIGHT Utilities
$2,551,880.58
$2,737,188.22
Utah
F011826
Salt Lake >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Rail/Hwy Crossing
$11,352,772.00
$18,921,286.67
Utah
F011826
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$2,704,905.84
$2,901,325.57
Utah
F011826
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$4,585,000.17
$4,917,945.06
Utah
F011826
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing
$190,423.96
$204,251.81
Utah
F011826
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$653,613.10
$701,075.94
Utah
F011826
Salt Lake >= 200,000 State RAIL HWY CROSSING HAZ ELI Rail/Hwy Crossing
$450,000.00
$500,000.00
Utah
F011826
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$15,341,788.55
Utah
F011826
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$1,800,000.00
$1,930,709.00
Utah
F011826
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing
$14,199,996.26
$15,231,144.77
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$10,534,761.92
$11,299,755.38
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$4,514,546.39
$4,842,375.19
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$100,103.57
$107,372.75
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$267,698.98
$287,138.24
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other
$5,240,799.86
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$93,230.00
$100,000.00
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way
$5,968,618.85
$6,402,036.78
Utah
F012676
Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$263,297.00
$282,416.60
Utah
F012730
Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$6,495,606.48
$6,967,292.17
Utah
F012730
Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only
$236,643.84
$253,828.00
Utah
F012730
Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$18,428,090.00
Utah
F012730
Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$1,169,917.18
$1,254,872.00
Utah
F012730
Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way
$4,865,190.00
$5,218,481.18
Utah
F012730
Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$284,842.50
$305,526.65
Utah
F013049
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$19,558,740.01
$20,767,402.86
Utah
F013049
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$12,772,510.00
$13,700,000.00
Utah
F013049
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$5,177,464.51
$5,497,414.00
Utah
F013049
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other
$337,355.43
$3,377,425.65
Utah
F013049
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering
$8,656,834.57
$9,191,797.16
Utah
F013049
Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities
$423,810.00
$450,000.00
Utah
F013049
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$55,423,890.12
$59,448,557.46
Utah
F013049
Statewide N/A Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$26,304,673.77
$28,214,816.87
Utah
F013049
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$4,095,207.93
$4,392,586.00
Utah
F013049
Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering
$3,382,075.75
$3,627,668.94
Utah
F013093
Millard >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$800,530.00
$850,000.00
Utah
F013093
Millard >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation
$15,000,000.00
$34,497,433.49
Utah
F013093
Millard >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering
$1,585,000.00
Utah
F013093
Millard >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering
$2,415,566.51
Utah
F013093
Millard >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Utilities
$2,000.00