Utah | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $5,877,973.67 |
$7,347,466.84 |
|
Utah | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $14,355.77 |
$17,944.71 |
|
Utah | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | $63.79 |
$92,980,079.74 |
|
Utah | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $47,627.82 |
$59,534.77 |
|
Utah | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $777,582.03 |
$971,977.55 |
|
Utah | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $30,399.92 |
$37,999.90 |
|
Utah | Salt Lake | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,421.54 |
$3,670.00 |
|
Utah | Salt Lake | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | 4R - Added Capacity | $361,741.65 |
$388,009.92 |
|
Utah | Salt Lake | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Preliminary Engineering | $18,559.29 |
$19,906.99 |
|
Utah | Salt Lake | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $1,431,975.06 |
$1,535,959.52 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS - CHARGED TO LIM | 4R - Added Capacity | $59,704.36 |
$64,039.86 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $4,268,705.41 |
$4,578,682.19 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $12,288.30 |
$13,180.63 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Environmental Only | $2,659.14 |
$2,852.24 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $29,587.48 |
$31,736.01 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $872.63 |
$936.00 |
|
Utah | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $55,592.69 |
$59,629.61 |
|
Utah | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $10,129,601.27 |
$12,662,001.60 |
|
Utah | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Environmental Only | $88,950.15 |
$111,187.69 |
|
Utah | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Other | $379,989.34 |
$474,986.68 |
|
Utah | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $146,057.16 |
$182,571.46 |
|
Utah | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $18,446.92 |
$23,058.65 |
|
Utah | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $273,635.41 |
$342,044.27 |
|
Utah | Utah | >= 200,000 | State | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | $495,000.00 |
$495,000.00 |
|
Utah | Utah | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $8,337.99 |
$8,943.46 |
|
Utah | Utah | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | 4R - Added Capacity | $37,292.00 |
$41,435.56 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Added Capacity | $245,000.00 |
$245,000.00 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $235,564.50 |
$252,670.28 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,572,839.14 |
$17,776,294.27 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $24,108.94 |
$25,859.64 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $42,783.29 |
$45,890.05 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $657,059.44 |
$704,772.54 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $466,150.00 |
$500,000.00 |
|
Utah | Utah | >= 200,000 | State | TRANSPORTATION IMP PROJ | 4R - Added Capacity | $5,438,903.95 |
$5,833,856.00 |
|
Utah | Utah | >= 200,000 | State | TRANSPORTATION IMP PROJ | Other | $29,041,850.00 |
||
Utah | Utah | >= 200,000 | State | HIGH RISK RURAL ROAD | 4R - Added Capacity | $282,055.27 |
$302,537.03 |
|
Utah | Utah | >= 200,000 | State | HIGH RISK RURAL ROAD | Construction Engineering | $103,485.30 |
$111,000.00 |
|
Utah | Utah | >= 200,000 | State | HIGH RISK RURAL ROAD | Preliminary Engineering | $267,069.43 |
$286,462.97 |
|
Utah | Utah | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $525,458.26 |
$563,615.00 |
|
Utah | Utah | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $256,720.87 |
$1,075,362.94 |
|
Utah | Utah | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $150,120.87 |
$161,022.06 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $12,961,379.93 |
||
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $643,287.00 |
$690,000.00 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,311,742.34 |
$9,987,924.86 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $59,376.45 |
$63,688.16 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Environmental Only | $9,323.00 |
$10,000.00 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,403,111.50 |
$1,505,000.00 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $689,902.00 |
$740,000.00 |
|
Utah | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $34,855.91 |
$37,387.01 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $228,434.07 |
$245,022.06 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $117,970.47 |
$126,537.03 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $419,535.00 |
$450,000.00 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,982,855.65 |
$4,272,075.14 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,506,005.51 |
$1,615,365.77 |
|
Utah | Tooele | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,946,549.69 |
$3,140,156.00 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,893,983.44 |
$6,281,254.13 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $869,533.46 |
$932,607.90 |
|
Utah | Tooele | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,128.85 |
$3,322.20 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,815,322.91 |
$3,019,734.25 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $43,057.84 |
$46,184.51 |
|
Utah | Tooele | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $68,838.84 |
$73,837.62 |
|
Utah | Tooele | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,554,144.10 |
$1,667,000.00 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $17,157,039.79 |
$18,402,917.40 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $584,776.88 |
$627,241.10 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $72,213.16 |
$6,677,243.34 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $769,671.35 |
$825,561.78 |
|
Utah | Davis | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $463,547.56 |
$579,434.44 |
|
Utah | Cache | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,829,346.00 |
$1,962,186.00 |
|
Utah | Weber | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $143,110.68 |
$178,888.35 |
|
Utah | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,038,891.10 |
$2,184,069.36 |
|
Utah | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,759,085.22 |
$8,312,958.04 |
|
Utah | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,169,023.94 |
$9,063,075.48 |
|
Utah | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $978,356.40 |
$3,340,598.71 |
|
Utah | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $108,080.84 |
$3,349,631.86 |
|
Utah | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $350,087.93 |
$8,376,850.15 |
|
Utah | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,499,822.00 |
||
Utah | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,010,178.00 |
||
Utah | Weber | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,698,885.87 |
$19,171,285.20 |
|
Utah | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,592,244.42 |
$26,378,037.56 |
|
Utah | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,588,362.28 |
$74,351,307.68 |
|
Utah | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,991,952.18 |
$2,136,600.00 |
|
Utah | Weber | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $804,947.82 |
$863,400.00 |
|
Utah | Salt Lake | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,634,606.54 |
$2,825,921.42 |
|
Utah | Salt Lake | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $677,840.56 |
$727,062.71 |
|
Utah | Salt Lake | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | $351,222.76 |
$376,727.19 |
|
Utah | Salt Lake | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | $5,896,944.44 |
$6,325,157.61 |
|
Utah | Salt Lake | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Right of Way | $8,390,700.00 |
$9,000,000.00 |
|
Utah | Salt Lake | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Utilities | $2,551,880.58 |
$2,737,188.22 |
|
Utah | Salt Lake | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Rail/Hwy Crossing | $11,352,772.00 |
$18,921,286.67 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,704,905.84 |
$2,901,325.57 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,585,000.17 |
$4,917,945.06 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $190,423.96 |
$204,251.81 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $653,613.10 |
$701,075.94 |
|
Utah | Salt Lake | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $450,000.00 |
$500,000.00 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $15,341,788.55 |
||
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $1,800,000.00 |
$1,930,709.00 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $14,199,996.26 |
$15,231,144.77 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,534,761.92 |
$11,299,755.38 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,514,546.39 |
$4,842,375.19 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $100,103.57 |
$107,372.75 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $267,698.98 |
$287,138.24 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5,240,799.86 |
||
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $93,230.00 |
$100,000.00 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,968,618.85 |
$6,402,036.78 |
|
Utah | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $263,297.00 |
$282,416.60 |
|
Utah | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $6,495,606.48 |
$6,967,292.17 |
|
Utah | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $236,643.84 |
$253,828.00 |
|
Utah | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $18,428,090.00 |
||
Utah | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,169,917.18 |
$1,254,872.00 |
|
Utah | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,865,190.00 |
$5,218,481.18 |
|
Utah | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $284,842.50 |
$305,526.65 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $19,558,740.01 |
$20,767,402.86 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $12,772,510.00 |
$13,700,000.00 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,177,464.51 |
$5,497,414.00 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $337,355.43 |
$3,377,425.65 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,656,834.57 |
$9,191,797.16 |
|
Utah | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $423,810.00 |
$450,000.00 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $55,423,890.12 |
$59,448,557.46 |
|
Utah | Statewide | N/A | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $26,304,673.77 |
$28,214,816.87 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,095,207.93 |
$4,392,586.00 |
|
Utah | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,382,075.75 |
$3,627,668.94 |
|
Utah | Millard | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $800,530.00 |
$850,000.00 |
|
Utah | Millard | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $15,000,000.00 |
$34,497,433.49 |
|
Utah | Millard | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,585,000.00 |
||
Utah | Millard | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $2,415,566.51 |
||
Utah | Millard | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $2,000.00 |