RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Illinois | 000S658 | I-70 - Bridge replacement and new interchange on I-55/70 under IL 162 at Troy in Madison County. | $26,155,295.30 | $27,110,914.46 |
Illinois | 000V127 | 0.72 miles reconstruction/widening of I-290 EB mainline pavmt. from Racine to Congress Parkway (i-9094) retain wall, lighting | $29,751,133.60 | $33,484,867.43 |
Illinois | 0020074 | CREATE - Construction on CREATE project EW1: Plan number EW1-BRC-TSX-001-Z-BD | $58,652,208.00 | |
Illinois | 0057309 | Bourbonnais road improvements, Bourbonnais. 1.42 miles of a new structure an interchange on I-57 at 6000N and improvements at** | $46,105,899.29 | $51,787,033.35 |
Illinois | 0064403 | 0.711 mi of proposed bridge & additional lane on I-64 from MLK Bridge EB to I-55/64 WB | $29,321,246.02 | $32,620,141.26 |
Illinois | 0070027 | 6.6 miles of resurfacing, bridge repairs etc. on I 70 in Bond and Madison Counties | $24,125,747.26 | $27,555,390.52 |
Illinois | 0070047 | 9.05 miles of rebbilization/overlay of I-70 - starts at abandoned RR bridge in Altamont to Little Wabash River W of Effingham | $53,447,701.06 | $59,386,335.32 |
Illinois | 0070405 | Appr 9 mi of milling, patching, resurfacing, grdrl & bridge repair on I-70 from 2.5 mi east of I-55/70 int just west of Prairie Rd | $27,944,651.18 | $31,163,902.40 |
Illinois | 0074324 | 0.5 miles added lanes & ramps, bridge replacement/rehab, lighting & drainage improvements on I-74 from Mississippi River to 7th Ave Moline | $83,228,205.05 | $94,651,112.00 |
Illinois | 0074326 | 2 miles of reconstruction of I-74 starting (7th ave) south to (Avenue in Cities) - within the City of Moline | $78,871,807.71 | $89,781,322.45 |
Illinois | 0075156 | Construct 4 lane ext. of IL.Rte.29 from Rochester to Taylorville - new 4 lanes expressway around Edinburg incl. ** | $34,028,253.30 | $48,291,680.56 |
Illinois | 0090403 | 2.67 miles of a new lane on I-90 from Cumberland Ave to Harlem Ave in Chicago | $22,695,886.00 | $28,671,955.41 |
Illinois | 0290201 | 0.49 miles of the construction of 2 new WB expressway lanes along I-290 from Peoria to Racine St inc 4 new retaining walls and** | $27,346,416.25 | $33,212,207.99 |
Illinois | 0310139 | 5.5 miles of new 4-lane roadway; Seminary Road to US 67 in Godfrey including grading, paving, box culvert and signing. | $23,502,425.43 | $29,378,031.79 |
Illinois | 0322096 | 4.5 mi of grading, paving, new bridge and an additional lane to an existing bridge on US.51 from 1.4 mi S.of Assumption ** | $22,203,584.77 | $27,764,886.77 |
Illinois | 0326088 | 4.47 mi of addition of 2 or more lanes on IL 47 from N of I-80 in Morris to just N of Sherrill Rd in Kendall Cty inc 32' median * | $31,582,122.16 | $40,090,294.93 |
Illinois | 0326093 | Const. of the US. I-80 to I-88 North-South Connector in Illinois - 7.023 mi of reconst. of IL.47 from 2-4 lanes inc. pvmnt, ** | $37,885,492.26 | $50,216,808.04 |
Illinois | 0330073 | 1.8 miles of reconstruction on US 45 from 143rd St. to 159th St., including signals, culverts, pavement marking, additional** | $19,263,243.32 | $29,763,137.79 |
Illinois | 0330074 | 2.8 miles of additional lanes and roadway reconstruction inc signals, lighting, pavement marking, etc. on US 45 from 159th to** | $24,374,900.08 | $32,592,125.68 |
Illinois | 0341025 | Lakefront Bike Trail: Navy Pier Flyover consisting of new pedestrian bridge, furnishing structural steel, lighting, concrete** | $20,933,600.00 | $28,952,200.00 |
Illinois | 0345056 | 1.33 mi of interchange reconst. on US.20 inc lghtng, traff sgnls, structure work, retaining wall etc from Fleetwood Dr. to ** | $30,568,574.44 | $40,041,517.55 |
Illinois | 0351027 | 5.15 mi of roadway reconst inc adding lanes, multi-use path, traffic signals lighting etc on IL 7 from Gougar Rd to Will-Cook* | $49,078,337.36 | $67,903,453.66 |
Illinois | 0351028 | 2.5 mi of rdwy reconst, add lanes, add multi-use path, drainage improvements, signals, lighting, landscaping etc on US6/IL7* | $42,102,475.81 | $59,421,594.51 |
Illinois | 0365012 | Wide for add. lanes, reconst. & bridge repl, lndscpng, etc on IL.56 from W.of IL.59 (Joliet Rd.) toE.of Winfield Rd in Wrrnvlle | $23,572,903.42 | $29,936,368.31 |
Illinois | 0373028 | 2.03 mi of bridge rehab, widening, ramp modification & lighting on IL 171 through Vil of McCook, Lyons & Summit | $24,625,889.44 | $27,402,112.79 |
Illinois | 0556246 | 2.3 mi of relocate I-55 @ Arsenal Rd. interchange inc new Arsenal bridge, fly-over bridge, lighting, rem exist ** | $34,252,726.00 | $38,075,577.17 |
Illinois | 0557203 | STEVENSON EXPWY W DAMEN TO S FORK S.BRANCH, PAVEMENT RECONS & BR REHAB | $31,051,347.32 | $37,488,163.87 |
Illinois | 0698037 | 0.83 mile of the removal and replacement of the structure carrying IL 89 over the Illinois River located 1 mile south of US 6 in** | $31,880,859.45 | $39,970,747.23 |
Illinois | 0745305 | 7.957 mi of repl of bridge carrying IL104 over IL Rvr in Meredosia, bridge rehab, earthwork, lighting, sidewalks, landscaping etc | $60,920,779.61 | $77,541,730.59 |
Illinois | 0JQ6496 | Removal and replacement of structures carrying IL Route 2 over the Rock River in Rockton | $22,316,178.00 | $27,895,976.00 |
Illinois | 0VCS038 | Roadway reconstruction, construction of new path and various ADA improvements on Wood St from N of Little Calumet River to S of US 6 (159th St) | $49,485,749.00 | $62,035,819.75 |
Illinois | 1279114 | 5,110' of the removal and replacement of the structure carrying IL 178 over the Illinois River in Utica | $22,899,350.00 | $29,317,862.00 |
Illinois | 16I9181 | Bridge rehab, drainage improvements, pavement removal and replacement, and traffic signal improvements on IL 40 over Bob Michael Bridge at IL River | $21,608,264.00 | $27,112,486.00 |
Illinois | 1987002 | New I-74 Mississippi River Bridges | $243,904,120.53 | $272,420,287.76 |
Illinois | 1E7W301 | Designed overlay on I-57 from Coles County Line to 0.3 Mi N of US 36 | $16,420,000.00 | $40,722,497.00 |
Illinois | 202X000 | Milling/resurfacing and deck replacements on I-55 from 1.3 Mi S of Waggoner to Macoupin Creek, 0.4 Mi S of CH 17 | $24,536,266.00 | $27,262,520.02 |
Illinois | 2081100 | Pre-construction and construction activities on US 45/La Grange Road from 131st Street to 179th Street. 1.8 miles of additional** | $24,318,193.90 | $34,761,229.58 |
Illinois | 34FV643 | Bridge replacement of four structures on I-57 in Kankakee County | $22,574,795.00 | $25,585,820.01 |
Illinois | 3ELT222 | CONSTRUCTION OF A GRADE SEPARATION STRUCTURE TO CARRY FAU 7448 (BRUSH COLLEGE RD.) OVER THE NORFOLK SOUTHERN RAILROAD & FAIRIES PKWY. IN DECATUR. | $35,800,000.00 | $78,916,389.00 |
Illinois | 47CA169 | Replace four structures within Lincoln Park near Montrose Harbor in the City of Chicago. | $31,425,000.00 | |
Illinois | 5F4Z497 | Reconstruction of I-39/US 20 from 0.3 mile E of Mulford Rd to 0.2 mile N of Harrison Ave. (Rockford Bypass) | $98,860,000.00 | |
Illinois | 5JZQ983 | CREATE Project P3: Stage II construction of a rail-to-rail flyover and for a rail grade separation CREATE Project GS19 at 71st street. | $85,785,037.00 | $297,717,362.00 |
Illinois | 6000238 | Undertake access improvements to US.Rte.41, Chicago | $13,600,000.00 | $30,150,000.00 |
Illinois | 6000326 | 130th and Torrence Intersection Improvement, Chicago | $76,606,782.66 | $141,855,478.60 |
Illinois | 6000448 | For the improvement of the Adams Street Viaduct over Union Station | $18,155,400.00 | $42,183,000.00 |
Illinois | 60UH363 | Add lanes on I-57 from I-24 to Old IL 13 in Marion. | $46,600,000.00 | |
Illinois | 622K195 | Intersection and roadway reconstruction, bridge rehab, lighting and sidewalk on Wood Street, N of Little Calumet River to S of US 6 (159th St) | $32,409,613.50 | $45,844,819.01 |
Illinois | 64F1960 | Roadway reconstruction and ADA improvements on US 40 from W of Raney St to Banker St in Effingham | $20,055,997.00 | $25,070,000.00 |
Illinois | 69NC103 | Interchange reconstruction on I-55 from I-80 to US 52 | $20,000,000.00 | $65,466,095.00 |
Illinois | 6BY3902 | Roadway reconstruction and bridge preservation on I-74 from W of the Tazewell County line to e of the Carlock Interchange. | $52,944,129.37 | $59,031,626.40 |
Illinois | 6E4G695 | Standard overlay and bridge deck replacement on I-55 | $32,110,115.00 | $35,677,908.00 |
Illinois | 6FQN827 | Will County - Widening and Reconstruction of 80th Avenue (FAU 2755) | $19,618,077.00 | $49,583,996.00 |
Illinois | 6FXA534 | Pavement reconstruction, bridge replacement and widening and lighting on I-80 from Gardner St to Roswell Ave (Group A Structures WB) | $36,492,111.00 | $43,720,157.00 |
Illinois | 6QNF571 | Roadway reconstruction of I-39 and US 20 | $10,339,135.00 | $50,876,782.00 |
Illinois | 6T0L343 | New bridge deck, widening, bridge repair and lighting on US 12/20/45 over Santa Fe Drive, S&S Canal, IM CANAL and ICG RR in Cook County | $23,188,668.78 | $28,985,837.68 |
Illinois | 6V3V956 | Roadway reconstruction on I-57 from 0.5 mi N of IL 146 to I-24 | $36,471,331.61 | $40,523,702.58 |
Illinois | 7BJZ701 | Interchange improvement with bridge rehabilitation/repair on IL 43 at US 12/20 (95t Street) 0.6 Mi N of I-294 | $21,724,468.00 | $39,302,086.00 |
Illinois | 7MCE139 | CREATE GS9, Archer Avenue / Belt Railway of Chicago Grade Separation, INFRA FY21, located in the City of Chicago. | $19,137,780.00 | $66,000,000.00 |
Illinois | 8012014 | Demo IL416: City of Springfield, IL for improvements to Cockrell Lane; Demo IL512: Improvements to Cockrell Lane in the City of** | $20,830,431.40 | $26,299,325.65 |
Illinois | 8SAC171 | Rehab project for Jefferson Barracks on I-255 | $21,375,000.00 | $47,500,000.00 |
Illinois | 938E262 | Designed overlay on I-55 from 0.8 Mi N of Wolf Creek to 1.8 Mi S of IL 17 and bridge deck overlay from 1 Mi S of Ch 1 W of Odell to 2.2 Mi S of IL 17 | $40,275,493.00 | $45,278,578.01 |
Illinois | 9EGU245 | Reconstruction with additional lanes, bridge repairs, traffic signals and other improvements on IL 56, 0.3 Mi W of IL 53 to I-355 Ramp and at IL 53 | $15,000,000.00 | $44,783,871.00 |
Illinois | 9IGU899 | Bridge replacement and bridge deck overlay with additional lanes on I-57 | $4,497,008.00 | $54,761,260.00 |
Illinois | 9TBX208 | Designed overlay on I-57 from 2 Mi S of IL 54 to 2.4 Mi N of US 24 | $27,713,009.00 | $30,792,233.00 |
Illinois | 9TJY262 | NEW ROADWAY, INTERSECTION RECONSTRUCTION (LONGMEADOW PARKWAY CORRIDOR) | $4,222,377.00 | $27,777,277.00 |
Illinois | A2HA541 | REPLACE THE STRUCTURES CARRYING FAU 7355 (REAS BRIDGE ROAD) OVER LAKE DECATUR IN THE CITY OF DECATUR. | $9,840,532.53 | $29,000,000.47 |
Illinois | APXQ831 | Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd to Lake/Madison St in Chicago. | $63,269,788.76 | $71,626,720.65 |
Illinois | BDE6677 | Designed overlay and bridge and ramp repair on I-255 from 0.2 mi N of IL 157 to IL 15 in Cahokia Heights | $49,744,460.00 | $71,979,297.00 |
Illinois | BJ0V278 | Intersection reconstruction with culvert replacement on IL 47 at IL 176 (N & S Jct) and at Pleasant Valley Road | $25,356,592.00 | $52,645,740.00 |
Illinois | BRWL799 | Bridge rehabilitation and roadway work on IL 53 at various locations in Rolling Meadows and Palatine | $61,000,000.00 | |
Illinois | BWWL183 | Construct structure to carry relocated Iron Bridge Rd. over the UP RR, construct two structures to carry UP RR & Interurban Trail over Woodside Rd. | $36,288,483.32 | |
Illinois | C09W797 | Interchange reconstruction and retaining wall on I-80 at IL 7 (Larkin Avenue) | $25,390,000.00 | |
Illinois | C9B9786 | Reconstruction, designed overlay, bridge deck overlay and repair on I-74 from US 150 W of Danville to Vermilion River in Danville | $62,672,779.00 | $69,636,424.00 |
Illinois | CL44179 | City of Chicago - Resurfacing and Reconstruction of Milwaukee Avenue | $31,500,000.00 | |
Illinois | CLGU392 | Additional lane work with bridge replacement on I-57 over Middle Fork Big Muddy River N of West Frankfurt to 2.5 Mi S of IL 154 | $51,337,397.12 | $74,542,208.93 |
Illinois | CRP1462 | Single bridge replacement with dual bridges carrying I-270 over the Mississippi River | $198,000,000.00 | $526,872,260.00 |
Illinois | CW1X704 | Reconstruction and widening of I-80 from Rowell Ave to Gougar Road, including traffic signal modernization, lighting and other improvements | $85,179,023.00 | $95,010,586.00 |
Illinois | DIKS922 | Bridge rehabilitation on I-24 over the Ohio River | $42,000,000.00 | |
Illinois | F866342 | Bridge rehabilitation on I-74 over the IC RR/TR 158 and over FAU 7169 (Market St.) in Champaign. | $33,511,957.31 | $37,237,346.40 |
Illinois | FB4M631 | Reconstruction, ramp modification and retaining walls on I-90/94/290. | $50,298,647.99 | $56,939,765.12 |
Illinois | FF3X145 | CREATE Project P3: Stage I construction of a rail-to-rail flyover at Forest Hill Junction and for a grade separation at 71st street. | $15,000,000.00 | $27,800,000.00 |
Illinois | G3Q5348 | Designed overlay with patching, pavement markings, drainage and ITS improvements on I-55 from S of I-80 to S of Weber Road (SB) | $27,243,828.00 | $27,609,493.00 |
Illinois | GYUQ685 | Resurfacing project with bridge improvements on I-39 from 1 Mi N of IL 116 to 2 MI S of IL 17 | $25,709,179.00 | $28,565,756.00 |
Illinois | H8EV623 | Rubblization and overlay on I-72 from 4.4 Mi W to 0.3 Mi W of Piatt County Line | $25,620,750.01 | $28,467,500.02 |
Illinois | HB1K096 | Pavement reconstruction, bridge replacement and widening and lighting improvements on I-80 from IL 53 (Chicago St) to Roswell Ave | $42,357,942.00 | $47,760,857.00 |
Illinois | HCTJ498 | Reconstruction of the I-39/US 20 Interchange | $97,622,575.00 | $108,478,381.78 |
Illinois | HISX005 | New bridge, interchange reconstruction and retaining wall on I-80 at I-55 | $32,300,000.00 | |
Illinois | HJVN698 | PAVEMENT RECONSTRUCTION OF FAU 2574 (QUENTIN ROAD) FROM ILLINOIS ROUTE 22 TO WHITE PINE ROAD. | $23,393,847.98 | $30,175,064.64 |
Illinois | HPFI749 | Reconstruction, bridge replacement, bridge widening, and new culverts on I-80 from W of Joliet Junction Trail to Wheeler Avenue | $24,921,115.00 | $107,443,737.00 |
Illinois | HTBZ252 | Add dual right turn lanes, roadway reconstruction, superstructure replacement, retaining walls, lighting & traffic signals, at Old Orchard Rd. & I-94. | $17,682,326.00 | $27,851,819.00 |
Illinois | I4WJ714 | Pavement reconstruction and culvert replacement on I-80 from Ridge Rd to River Rd | $58,690,421.05 | $65,523,927.96 |
Illinois | IH44562 | Reconstruction with drainage improvements on US 20 from Gear Street to Main Street in Galena | $36,229,402.16 | $36,254,516.16 |
Illinois | IQDY843 | Bridge deck replacement and rehabilitation of structures on I-474 over Kickapoo Creek/BNSF RR E of I-74 Interchange | $12,342,155.00 | $26,159,248.00 |
Illinois | J498286 | Bridge Investment Program (BIP) grant: Illinois International Port - Rehabilitation of Calumet River Bridges. | $144,000,000.00 | $289,500,000.00 |
Illinois | J7VU032 | Reconstruction of the Adams St and Jackson Blvd bridges over I-90/94, includes ramps, retaining walls, and lighting, in Chicago. | $44,058,083.00 | $49,005,558.00 |
Illinois | J86L198 | CONSTRUCTION OF A GRADE SEPERATED STRUCTURE TO CARRY THE BELT RAILWAY COMPANY OF CHICAGO OVER FAU 3578 (COLUMBUS AVE.) IN CHICAGO. CREATE PROJECT GS11 | $80,402,667.00 | |
Illinois | K6CZ725 | REPLACE THE STRUCTURE / VIADUCT CARRYING FAU 2885 (CANAL ST.) OVER CHICAGO UNION STATION TRACKS BETWEEN MADISON AND ADAMS ST. IN THE CITY OF CHICAGO. | $30,000,000.00 | |
Illinois | KC9D768 | Pavement reconstruction and bridge repairs on I-57 from Jefferson County Line to 0.7 Mi N of IL 161 | $67,870,217.00 | $75,411,353.25 |
Illinois | KENY416 | Bridge replacement, Bridge rehabilitations, Retaining walls, and lighting on The MLK ramps in East St. Louis. | $25,136,277.64 | $30,519,201.75 |
Illinois | KKGI625 | Bridge rehabilitation on I-180 over the Illinois River. | $26,237,423.50 | $29,152,694.22 |
Illinois | L3MU512 | Rehab of Reversible Lane Access Control System on I-90/94 at Foster Avenue and Lawrence Avenue to Ohio Street | $31,537,194.00 | $35,046,686.00 |
Illinois | LPYF801 | Interchange reconstruction and bridge replacement on I-80 at US 30 in the Village of New Lenox. | $48,982,320.00 | $54,458,468.00 |
Illinois | MAMH434 | Resurfacing and Bridge rehabilitation on I-55 from 0.8 mile N of IL 16 to 0.6 mile N of IL 108. | $31,032,181.33 | $34,480,201.51 |
Illinois | MID2911 | Interchange rehabilitation and reconstruction at I-57 and I-74 | $96,709,086.00 | $131,297,660.36 |
Illinois | MME4425 | Bridge replacement with ADA improvements of structure on US 30 at Des Plaines River | $20,091,853.00 | $25,114,818.01 |
Illinois | N60V808 | Roadway reconstruction and bridge repairs on I-55 from 1.7 miles S of IL 116 to 0.6 mile N of IL 23 in Pontiac. | $39,452,582.65 | $43,850,609.42 |
Illinois | N8RC715 | Designed overlay on US 51 from Dewitt County Line to 0.1 mi N of Forsyth Road | $21,540,153.32 | $26,925,192.90 |
Illinois | NI5S589 | NEW CONSTRUCTION, RECONSTRUCTION, NEW BRIDGE | $5,000,450.00 | $49,068,150.00 |
Illinois | NUW3186 | 43rd Street Pedestrian Bridge over Metra and South Lake Shore Drive | $29,600,000.00 | $37,000,000.00 |
Illinois | NWQA467 | Widening, resurfacing, lighting, and retaining walls on I-90 fron Cumberland Ave to Harlem Ave in Chicago. | $47,019,728.16 | $57,457,326.39 |
Illinois | PW2V306 | RECONSTRUCTION | $23,248,831.00 | $42,993,892.00 |
Illinois | Q8NN046 | Resurfacing on I-74/IL 110 from N of Woodhull to N of US 34 | $28,450,726.00 | $31,639,860.90 |
Illinois | R0J4100 | Concrete overlay, patching, deck replacement and expansion joints on I-55/I-64, Poplar Street Collector-Distributor ramps | $29,546,377.00 | $32,829,306.00 |
Illinois | RBV9665 | Smart overlay on I-57 from Will County Line/Steger Road to US 6 (159th Street) | $25,440,807.00 | $28,267,564.00 |
Illinois | RG7G713 | Bridge replacement on I-180 over Bureau Creek, 1.2 Mi S of IL 26 and Bridge superstructure replacement over Tiskilwa Bottom Rd, 1.4 Mi S of IL 26 | $23,964,883.00 | $26,627,651.01 |
Illinois | SBVK122 | Roadway reconstruction on IL 79 from 0.5 Mi E of IL 126 to W of Orchard Road W of Oswego | $28,388,024.00 | $35,493,338.00 |
Illinois | SNBI724 | Removal and replacement of structures carrying I-64 over the Wabash River | $70,943,618.55 | $157,605,819.00 |
Illinois | SQHC418 | Roadway reconstruction and bridge rehabilitation on I-64 from Washington County Line to I-57 | $93,133,027.00 | $103,481,144.00 |
Illinois | T8V5526 | Reconstruction, superstructure replacement, culvert (new), drainage, lighting and traffic signals on I-80 from Houbolt Rd to Joliet Junction Trail | $25,167,251.00 | $87,739,799.00 |
Illinois | TJQZ898 | 1.55 miles interchange reconstruction & additional lanes I-55 at Weber Road and 1.6 M recon Weber Road from Normantown Rd to Rodeo Dr. | $39,536,657.00 | $53,708,837.00 |
Illinois | TRTJ747 | Pump station reconstruction on I-290 at the DesPlaines River in the Village of Forrest Park. | $53,454,760.75 | $54,370,995.75 |
Illinois | U7JU108 | Interchange reconstruction on I-270 at IL 111 Interchange | $22,106,282.00 | $27,632,855.01 |
Illinois | UH3A902 | Bridge deck overlay and joint repair, patching, sign replacement and lighting on I-90 from I-94(Edens Expwy) to Hubbard St (Express/Reversible Lanes) | $67,334,194.00 | $78,351,874.00 |
Illinois | UI98917 | Resurfacing and bridge rehabilitation on I-255 from IL 15 to collinsville Road in East St. Louis. | $66,666,043.00 | $74,073,382.00 |
Illinois | V02M043 | County Line Road, I-294 to North Avenue | $23,921,870.00 | $29,902,337.51 |
Illinois | V5RS781 | Bridge replacement, new bridge construction and pavement reconstruction on I-80 from River Road to Houbolt Road | $27,970,220.00 | $104,691,747.00 |
Illinois | VDCD210 | Interchange reconstruction and bridge replacement reconstruction on I-57 at I-74 Interchange | $124,739,991.00 | $138,599,992.00 |
Illinois | VMQP214 | Designed overlay with bridge repairs on I-80 from Henry County Line to 0.5 mi E of IL 40 | $34,307,898.25 | $38,119,889.06 |
Illinois | VQ14255 | Bridge replacement/rehabilitation, reconstruction, retaining walls at various locations on I-90/94 from SB taylor exit ramp to EB Taylo exit ramp. | $71,554,364.23 | $80,090,038.18 |
Illinois | W166112 | Designed overlay with pavement markings, drainage, ITS and landscaping improvements on I-55 from S of I-80 to S of Weber Road (NB) | $26,555,512.00 | $27,391,272.00 |
Illinois | W46U596 | Lakefront Bicycle Trail #3 over the Chicago River | $29,820,000.00 | $50,598,000.00 |
Illinois | W793945 | Roadway reconstruction and bridge replacement on US 20 from Simson Road to Rock River and S of Southrock Dr to S of US 20 in Rockford. | $19,894,649.57 | $25,219,787.68 |
Illinois | WKBE580 | Bridge deck overlay, joint repairs, sign maintenance and pavement patching on I-90/94 from I-94 (Eden's Expressway) to Hubbard St | $1,303,598.93 | $49,718,540.00 |
Illinois | WVIF253 | Construction of a grade separated underpass to carry the CN/WCL Railroad over US 14 & reconstruct US 14 between IL 59 and Valencia Ave. in Barrington. | $72,970,855.00 | |
Illinois | X0VJ339 | Chester Bridge Replacement IL 150 | $50,000,000.00 | $260,052,000.00 |
Illinois | X5LE481 | NEW ROADWAY AND BRIDGE CONSTRUCTION | $32,000,000.00 | $45,000,000.00 |
Illinois | X8AF608 | RECONSTRUCTION OF FAU 3533 (FRANKLIN AVENUE) FROM RUNGE ST. TO MANNHEIM RD. | $22,511,723.00 | $28,146,404.00 |
Illinois | XBRG797 | Rubblization and overlay with culvert removal and replacement and bridge deck replacement on I-70 from 1 Mi E of I-57 Intchg to Cumberland County Line | $49,774,242.92 | $55,304,717.14 |
Illinois | XFIF742 | Bridge replacement, ADA improvements, traffic signal and lighting on I-90 at Foster Avenue | $24,957,544.00 | $27,742,145.01 |
Illinois | XIL3358 | Standard Overlay, Resurfacing, Rest Area Improvements, Weigh Station Repairs, and Bridge Deck Sealing on I-57 from Kankakee Co Rd to Steger Rd | $45,808,609.61 | $50,898,455.16 |
Illinois | XPV5974 | Resurfacing and bridge rehabilitation on I-70 from W of Sugar Loaf Rd to the BNSF railroad. | $26,718,410.86 | $30,163,716.10 |
Illinois | Y4TH575 | Bridge rehabilitation on I-74/IL 29 (Murray Baker Bridge) over the Illinois River in Peoria. | $34,520,098.91 | $43,579,007.50 |
Illinois | Y5Y0871 | Bridge rehabilitation on I-55/70 over the CSX and NS Railroads in East St. Louis | $27,200,000.00 | |
Illinois | YA23869 | Patching, resurfacing and bridge repairs on I-24 from Johnson County Line to Ohio River | $27,622,633.20 | $30,691,817.73 |
Illinois | YJ7X870 | PAVEMENT RECONSTRUCTION, CONSTRUCT A MULTI-USE PATH, & REPLACE TWO BRIDGES ON FAP 336 (RANDALL RD.) FROM ACKMAN RD. TO ACORN LN./POLARIS DRIVE. | $8,000,000.00 | $59,178,840.00 |
Illinois | YJLB572 | Removal and replacement of concrete bridge deck and resurfacing on I-280 from the Mississippi River Bridge to east of the IL 92 interchange | $29,499,033.54 | $51,860,874.97 |
Illinois | YQT9213 | Standard overlay resurfacing and various bridge repairs on I-70/ 270 from I-55 to 2.5 miles east of the I-55/70/270 interchange | $24,970,789.19 | $27,765,321.33 |
Illinois | YRP3905 | Bridge replacement on US 150 (McClugage Bridge) over the Illinois River in Peoria. | $144,184,306.00 | $185,853,828.00 |
Illinois | ZAGE365 | Reconstruct FAU 3533 (Green St. / Franklin Ave.) from York Rd. to Runge St, & County Line Rd. at Franklin Ave. located in Bensenville & Franklin Park. | $26,689,290.00 | |
Illinois | ZDW0068 | Standard overlay, Class A patching, drainage, ITS improvements and bridge deck sealing on I-57 from S of I-294 (Tri-State Tlwy) to IL 1 (Halstad St) | $34,096,996.00 | $37,895,552.00 |
Illinois | ZEC3030 | Widening, reconstruction, bridge replacement, and retaining walls on I-290/Congress Pkwy (Jane Byrne Intchg(EB ramp to I-90/94 (NB). | $39,438,176.76 | $44,115,602.43 |
Illinois | ZWEL759 | Pavement reconstruction, structure improvements and all other incidental items on US 20 from E of Grace St to W of Lavoie Ave | $23,512,036.00 | $29,396,551.00 |
Illinois | ZZKI017 | Lake Cook Road, Raupp Boulevard to Hasting Lane | $19,973,978.84 | $27,611,430.05 |