SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Massachusetts 002S318  SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE $56,395,210.19 $116,121,177.17
Massachusetts 002S372  QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON STREET) OVER THE FORE RIVER $136,683,160.76 $290,959,615.99
Massachusetts 002S386  BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE)  (AKA - LONGFEL $145,227,928.85 $337,781,419.68
Massachusetts 002S421  AMESBURY- NEWBURYPORT- SALISBURY- BRIDGE REPLACEMENT ON ROUTE I-95, A-07-016=N-11-007, OVER MERRIMACK RIVER (WHITTIER BRIDGE) & A-07-017 OVER EVANS P $146,164,560.92 $345,599,248.00
Massachusetts 002S425  FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS $149,139,557.18 $278,751,904.97
Massachusetts 002S760  EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018 OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OV $32,652,900.13 $86,546,471.18
Massachusetts 002S797 CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET. $57,449,890.66 $71,034,808.54
Massachusetts 002S937 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INC $69,402,843.16 $89,626,580.52
Massachusetts 002S969  BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) $34,097,539.39 $43,544,189.74
Massachusetts 0032020 HADLEY- RECONSTRUCTION ON ROUTE 9, FROM MIDDLE STREET TO MAPLE/SOUTH MAPLE STREET $26,058,734.48 $33,929,004.35
Massachusetts 0032022 WEST SPRINGFIELD- RECONSTRUCTION OF MEMORIAL AVENUE (ROUTE 147), FROM COLONY ROAD TO THE MEMORIAL AVENUE ROTARY (1.4 MILES) $23,217,723.84 $33,403,159.80
Massachusetts 0032044 SPRINGFIELD- RECONSTRUCTION OF SUMNER AVENUE AT DICKINSON STREET AND BELMONT AVENUE (THE "X") $21,505,103.64 $30,748,368.65
Massachusetts 0033041 LEOMINSTER- RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET), INCLUDING REHABILITATION OF L-08-022 $15,490,932.61 $32,090,383.96
Massachusetts 0034007 EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET $23,626,416.58 $39,929,034.73
Massachusetts 0034012 WOBURN- BRIDGE REPLACEMENT, W-43-017, NEW BOSTON STREET OVER MBTA $23,285,066.48 $29,168,301.10
Massachusetts 0035003 WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER $31,916,031.49 $40,288,024.36
Massachusetts 0035015 TAUNTON- RECONSTRUCTION OF ROUTE 44 (DEAN STREET), FROM ARLINGTON STREET TO ROUTE 104 (SOUTH MAIN STREET) $21,669,737.64 $27,837,744.20
Massachusetts 0035043  BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD $23,214,527.43 $31,499,191.35
Massachusetts 0035057 MASHPEE- CORRIDOR IMPROVEMENTS & RELATED WORK ON ROUTE 151, FROM THE FALMOUTH T.L. TO OLD BARNSTABLE ROAD (PHASE 2) $17,379,950.25 $41,023,807.35
Massachusetts 0036009  NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON $32,125,770.37 $38,651,164.86
Massachusetts 0036012 BOSTON- SUPERSTRUCTURE REPLACEMENT, B-16-067 (3GV), MAFFA WAY & B-16-068=S-17-027 (3GW), MYSTIC AVENUE OVER ORANGE & MBTA/BMRR $52,217,579.68 $66,178,619.60
Massachusetts 0036017 WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) $24,375,224.18 $32,129,539.50
Massachusetts 0036019 NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER $21,787,073.38 $27,584,841.73
Massachusetts 0036278  BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD $25,410,209.78 $32,068,747.22
Massachusetts 003S024  RAYNHAM- BRIDGE REPLACEMENT, R-02-013 (3PA), US 44 (CAPE HIGHWAY) OVER SR 24 $19,964,103.49 $25,720,610.07
Massachusetts 003S054  BOSTON- BRIDGE REPLACEMENT, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR $154,511,304.04 $211,876,058.31
Massachusetts 003S070  AGAWAM- WEST SPRINGFIELD- BRIDGE REPLACEMENT, A-05-002=W-21-014, ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATION $21,718,892.61 $28,384,361.14
Massachusetts 003S103  DANVERS- BRIDGE REPLACEMENT, D-03-018, ST 128 OVER WATERS RIVER $20,409,854.68 $25,852,223.18
Massachusetts 003S113  HAVERHILL- BRIDGE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER MERRIMACK RIVER $84,819,896.64 $107,311,915.85
Massachusetts 003S179 SOMERVILLE-BRIDGE PRESERVATION,S-17-031,I-93 NB AND SB FROM ROUTE 28 TO TEMPLE STREET $26,998,522.48 $40,539,523.10
Massachusetts 003S180  CHELSEA- ROUTE 1 VIADUCT REHABILITATION (SB/NB) ON C-09-007 & C-09-011 $167,153,833.83 $209,325,017.29
Massachusetts 003S191 FALL RIVER- CORRIDOR IMPROVEMENTS ON ROUTE 79/DAVOL STREET $94,850,493.85 $140,832,478.77
Massachusetts 003S196 CHARLTON- OXFORD- RECONSTRUCTION ON ROUTE 20, FROM RICHARDSON'S CORNER EASTERLY TO ROUTE 12, INCLUDES REHAB OF C-06-023 & REPLACEMENT OF O-06-002 $98,184,723.30 $121,751,205.98
Massachusetts 003S201 NORTHFIELD- BIKE/PED BRIDGE CONSTRUCTION TO REPLACE N-22-002, SCHELL BRIDGE OVER THE CONNECTICUT RIVER $24,002,744.70 $30,108,430.88
Massachusetts 003S238 DUXBURY - BRIDGE REPLACEMENT, D-14-010 (48H &48J), ROUTE 3 (PILGRIM HIGHWAY) NB/SB OVER FRANKLIN STREET $27,186,001.21 $34,378,475.39
Massachusetts 003S263  LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) $82,380,601.00 $103,929,811.25
Massachusetts 003S390 ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. $22,716,500.38 $30,079,456.68
Massachusetts 003S398 TAUNTON- INTERCHANGE IMPROVEMENTS AT ROUTES 24 & 140, INCLUDING REPLACING T-01-045 AND T-01-046 $91,306,365.37 $142,076,039.78
Massachusetts 003S468 BOSTON- ROADWAY, CEILING, ARCH & WALL RECONSTRUCTION AND OTHER CONTROL SYSTEMS IN SUMNER TUNNEL $130,815,386.92 $163,834,233.66
Massachusetts 003S623 ANDOVER- LAWRENCE- BRIDGE REHABILITATION, A-09-036, I-495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB) $105,478,497.19 $122,356,375.89
Massachusetts 003S624 LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128 $24,280,565.80 $30,536,141.45
Massachusetts 003S664 HOLYOKE- WEST SPRINGFIELD- REHABILITATION OF ROUTE 5 (RIVERDALE ROAD), FROM I-91 (INTERCHANGE 13) TO MAIN STREET IN HOLYOKE & FROM ELM STREET TO NORTH $42,749,466.22 $62,043,952.28
Massachusetts 003S688 BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495 $23,141,200.72 $29,182,100.90
Massachusetts 003S720 CHELMSFORD- LOWELL- BRIDGE REPLACEMENT, C-08-039, GORHAM STREET (ST 3A) OVER I-495 AND C-08-036, WESTFORD STREET OVER I-495 (DB) $50,970,626.00
Massachusetts 003S726 NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS $69,314,651.80 $87,707,714.75
Massachusetts 003S733 LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL $10,660,000.00 $30,737,306.50
Massachusetts 003S764 FITCHBURG- TWIN CITIES RAIL TRAIL CONSTRUCTION (PHASE II) $800,000.00 $28,010,996.18
Massachusetts 003S775 BOSTON- BRIDGE SUPERSTRUCTURE REPLACEMENT AND WIDENING, B-16-052, BOWKER OVERPASS OVER I-90, MBTA/CSX AND IPSWICH STREET $98,121,694.26
Massachusetts 003S776 NEW BEDFORD- BRIDGE REPLACEMENT, N-06-020, I-195 (EB & WB), RAMP C & F OVER ST 18, COUNTY STREET, STATE STREET, MASS COASTAL RAILROAD, PURCHASE STREET $120,000,000.00 $380,362,841.70
Massachusetts 003S786 MARION- WAREHAM- BRIDGE REPLACEMENT, M-05-001=W-06-013 & W-06-016, MARION ROAD/WAREHAM ROAD (ROUTE 6) OVER WEWEANTIC RIVER $54,510,018.25
Massachusetts 003S789 DENNIS- YARMOUTH- BRIDGE REPLACEMENT, D-07-004=Y-01-003, ROUTE 28 OVER BASS RIVER INCLUDING INTERSECTION IMPROVEMENTS AT MAIN STREET(ROUTE 28)/NORTH M $46,356,155.74 $57,419,412.58
Massachusetts 003S801 FITCHBURG- BRIDGE REPLACEMENT AND RELATED WORK, F-04-017, WATER STREET (STATE 2A) OVER BOULDER DRIVE AND PANAM RAILROAD & F-04-018, WATER STREET (ROUT $27,160,690.28 $35,635,106.85
Massachusetts 00DB004 DUXBURY- LAKEVILLE- MANSFIELD- PLYMOUTH- WAREHAM- BRIDGE DECK REPLACEMENTS, D-14-008, L-01-011, L-01-015, M-03-018, P-13-031, P-13-035, W-06-038 (DB) $35,194,813.00 $44,458,738.70
Massachusetts 00DB005 HAVERHILL- METHUEN- BRIDGE REPLACEMENT, H-12-040=M-17-030, I-495 (NB & SB) OVER MERRIMACK RIVER AND M-17-031, I-495 (NB & SB) OVER ROUTE 110 AND H-12- $275,680,960.07 $416,234,924.72
Massachusetts 091S001 NORTHAMPTON– BRIDGE REPLACEMENT, N-19-059, I-91 OVER US ROUTE 5 AND B&MRR, BRIDGE REPLACEMENT, N-19-060, I-91 OVER HOCKANUM ROAD AND IMPROVEMENTS ... $40,939,927.45 $51,934,809.31
Massachusetts 091S309 SPRINGFIELD- CHICOPEE- INTERSTATE MAINTENANCE AND RELATED WORK ON I-91 AND I-391 $29,621,634.48 $33,332,282.20
Massachusetts 0931524  MEDFORD- BRIDGE REPLACEMENT ON I-93 CORRIDOR $54,229,100.79 $98,127,600.00
Massachusetts 0934002 MEDFORD-READING-SOMERVILLE-STONEHAM-WINCHESTER-WOBURN - INTERSTATE PAVEMENT PRESERVATION ON I-93 $36,832,043.75 $43,577,216.16
Massachusetts 093S001 BOSTON- MILTON- QUINCY- SOUTHEAST EXPRESSWAY/INTERSTATE 93 REPLACEMENT OF BARRIERS FOR HIGH OCCUPANCY VEHICLE LANE (HOV) $35,468,451.65 $35,934,981.65
Massachusetts 0954001 DANVERS- TOPSFIELD- BOXFORD- ROWLEY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 $27,460,207.87 $31,138,837.08
Massachusetts 495S002 MILFORD- HOPKINTON- WESTBOROUGH- SOUTHBOROUGH- MARLBORO- HUDSON- BERLIN- PAVEMENT PRESERVATION AND RELATED WORK ON I-495 $23,321,828.63 $26,459,819.73
Massachusetts 495S301 HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE $207,290,437.61 $473,957,930.27
Massachusetts DBPS001 LOWELL- ROURKE BRIDGE REPLACEMENT, L-15-088, WITH NEW BRIDGE, L-15-114, WOOD STREET EXTENSION OVER MERRIMACK RIVER AND MBTA/CSX RAILROAD $86,478,485.06 $241,798,600.59