RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Massachusetts | 002S318 | SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE | $56,395,210.19 | $116,121,177.17 |
Massachusetts | 002S372 | QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON STREET) OVER THE FORE RIVER | $136,683,160.76 | $290,959,615.99 |
Massachusetts | 002S386 | BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE) (AKA - LONGFEL | $145,227,928.85 | $337,781,419.68 |
Massachusetts | 002S421 | AMESBURY- NEWBURYPORT- SALISBURY- BRIDGE REPLACEMENT ON ROUTE I-95, A-07-016=N-11-007, OVER MERRIMACK RIVER (WHITTIER BRIDGE) & A-07-017 OVER EVANS P | $146,164,560.92 | $345,599,248.00 |
Massachusetts | 002S425 | FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS | $149,139,557.18 | $278,751,904.97 |
Massachusetts | 002S760 | EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018 OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OV | $32,652,900.13 | $86,546,471.18 |
Massachusetts | 002S797 | CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON DEDHAM ST/CANTON STREET. | $57,449,890.66 | $71,034,808.54 |
Massachusetts | 002S937 | WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INC | $69,402,843.16 | $89,626,580.52 |
Massachusetts | 002S969 | BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) | $34,097,539.39 | $43,544,189.74 |
Massachusetts | 0032020 | HADLEY- RECONSTRUCTION ON ROUTE 9, FROM MIDDLE STREET TO MAPLE/SOUTH MAPLE STREET | $26,058,734.48 | $33,929,004.35 |
Massachusetts | 0032022 | WEST SPRINGFIELD- RECONSTRUCTION OF MEMORIAL AVENUE (ROUTE 147), FROM COLONY ROAD TO THE MEMORIAL AVENUE ROTARY (1.4 MILES) | $23,217,723.84 | $33,403,159.80 |
Massachusetts | 0032044 | SPRINGFIELD- RECONSTRUCTION OF SUMNER AVENUE AT DICKINSON STREET AND BELMONT AVENUE (THE "X") | $21,505,103.64 | $30,748,368.65 |
Massachusetts | 0033041 | LEOMINSTER- RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET), INCLUDING REHABILITATION OF L-08-022 | $15,490,932.61 | $32,090,383.96 |
Massachusetts | 0034007 | EVERETT- RECONSTRUCTION OF FERRY STREET, SOUTH FERRY STREET AND A PORTION OF ELM STREET | $23,626,416.58 | $39,929,034.73 |
Massachusetts | 0034012 | WOBURN- BRIDGE REPLACEMENT, W-43-017, NEW BOSTON STREET OVER MBTA | $23,285,066.48 | $29,168,301.10 |
Massachusetts | 0035003 | WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER | $31,916,031.49 | $40,288,024.36 |
Massachusetts | 0035015 | TAUNTON- RECONSTRUCTION OF ROUTE 44 (DEAN STREET), FROM ARLINGTON STREET TO ROUTE 104 (SOUTH MAIN STREET) | $21,669,737.64 | $27,837,744.20 |
Massachusetts | 0035043 | BARNSTABLE- INTERSECTION IMPROVEMENTS AT IYANOUGH ROAD (ROUTE 28) AND YARMOUTH ROAD | $23,214,527.43 | $31,499,191.35 |
Massachusetts | 0035057 | MASHPEE- CORRIDOR IMPROVEMENTS & RELATED WORK ON ROUTE 151, FROM THE FALMOUTH T.L. TO OLD BARNSTABLE ROAD (PHASE 2) | $17,379,950.25 | $41,023,807.35 |
Massachusetts | 0036009 | NEEDHAM- NEWTON- RECONSTRUCTION OF HIGHLAND AVENUE, NEEDHAM STREET & CHARLES RIVER BRIDGE, N-04-002, FROM WEBSTER STREET (NEEDHAM) TO ROUTE 9 (NEWTON | $32,125,770.37 | $38,651,164.86 |
Massachusetts | 0036012 | BOSTON- SUPERSTRUCTURE REPLACEMENT, B-16-067 (3GV), MAFFA WAY & B-16-068=S-17-027 (3GW), MYSTIC AVENUE OVER ORANGE & MBTA/BMRR | $52,217,579.68 | $66,178,619.60 |
Massachusetts | 0036017 | WATERTOWN- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16) | $24,375,224.18 | $32,129,539.50 |
Massachusetts | 0036019 | NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER | $21,787,073.38 | $27,584,841.73 |
Massachusetts | 0036278 | BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD | $25,410,209.78 | $32,068,747.22 |
Massachusetts | 003S024 | RAYNHAM- BRIDGE REPLACEMENT, R-02-013 (3PA), US 44 (CAPE HIGHWAY) OVER SR 24 | $19,964,103.49 | $25,720,610.07 |
Massachusetts | 003S054 | BOSTON- BRIDGE REPLACEMENT, B-16-016, NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR | $154,511,304.04 | $211,876,058.31 |
Massachusetts | 003S070 | AGAWAM- WEST SPRINGFIELD- BRIDGE REPLACEMENT, A-05-002=W-21-014, ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATION | $21,718,892.61 | $28,384,361.14 |
Massachusetts | 003S103 | DANVERS- BRIDGE REPLACEMENT, D-03-018, ST 128 OVER WATERS RIVER | $20,409,854.68 | $25,852,223.18 |
Massachusetts | 003S113 | HAVERHILL- BRIDGE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER MERRIMACK RIVER | $84,819,896.64 | $107,311,915.85 |
Massachusetts | 003S179 | SOMERVILLE-BRIDGE PRESERVATION,S-17-031,I-93 NB AND SB FROM ROUTE 28 TO TEMPLE STREET | $26,998,522.48 | $40,539,523.10 |
Massachusetts | 003S180 | CHELSEA- ROUTE 1 VIADUCT REHABILITATION (SB/NB) ON C-09-007 & C-09-011 | $167,153,833.83 | $209,325,017.29 |
Massachusetts | 003S191 | FALL RIVER- CORRIDOR IMPROVEMENTS ON ROUTE 79/DAVOL STREET | $94,850,493.85 | $140,832,478.77 |
Massachusetts | 003S196 | CHARLTON- OXFORD- RECONSTRUCTION ON ROUTE 20, FROM RICHARDSON'S CORNER EASTERLY TO ROUTE 12, INCLUDES REHAB OF C-06-023 & REPLACEMENT OF O-06-002 | $98,184,723.30 | $121,751,205.98 |
Massachusetts | 003S201 | NORTHFIELD- BIKE/PED BRIDGE CONSTRUCTION TO REPLACE N-22-002, SCHELL BRIDGE OVER THE CONNECTICUT RIVER | $24,002,744.70 | $30,108,430.88 |
Massachusetts | 003S238 | DUXBURY - BRIDGE REPLACEMENT, D-14-010 (48H &48J), ROUTE 3 (PILGRIM HIGHWAY) NB/SB OVER FRANKLIN STREET | $27,186,001.21 | $34,378,475.39 |
Massachusetts | 003S263 | LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) | $82,380,601.00 | $103,929,811.25 |
Massachusetts | 003S390 | ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. | $22,716,500.38 | $30,079,456.68 |
Massachusetts | 003S398 | TAUNTON- INTERCHANGE IMPROVEMENTS AT ROUTES 24 & 140, INCLUDING REPLACING T-01-045 AND T-01-046 | $91,306,365.37 | $142,076,039.78 |
Massachusetts | 003S468 | BOSTON- ROADWAY, CEILING, ARCH & WALL RECONSTRUCTION AND OTHER CONTROL SYSTEMS IN SUMNER TUNNEL | $130,815,386.92 | $163,834,233.66 |
Massachusetts | 003S623 | ANDOVER- LAWRENCE- BRIDGE REHABILITATION, A-09-036, I-495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB) | $105,478,497.19 | $122,356,375.89 |
Massachusetts | 003S624 | LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128 | $24,280,565.80 | $30,536,141.45 |
Massachusetts | 003S664 | HOLYOKE- WEST SPRINGFIELD- REHABILITATION OF ROUTE 5 (RIVERDALE ROAD), FROM I-91 (INTERCHANGE 13) TO MAIN STREET IN HOLYOKE & FROM ELM STREET TO NORTH | $42,749,466.22 | $62,043,952.28 |
Massachusetts | 003S688 | BOXBOROUGH- BRIDGE REPLACEMENT, B-18-002, ROUTE 111 OVER I-495 | $23,141,200.72 | $29,182,100.90 |
Massachusetts | 003S720 | CHELMSFORD- LOWELL- BRIDGE REPLACEMENT, C-08-039, GORHAM STREET (ST 3A) OVER I-495 AND C-08-036, WESTFORD STREET OVER I-495 (DB) | $50,970,626.00 | |
Massachusetts | 003S726 | NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS | $69,314,651.80 | $87,707,714.75 |
Massachusetts | 003S733 | LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL | $10,660,000.00 | $30,737,306.50 |
Massachusetts | 003S764 | FITCHBURG- TWIN CITIES RAIL TRAIL CONSTRUCTION (PHASE II) | $800,000.00 | $28,010,996.18 |
Massachusetts | 003S775 | BOSTON- BRIDGE SUPERSTRUCTURE REPLACEMENT AND WIDENING, B-16-052, BOWKER OVERPASS OVER I-90, MBTA/CSX AND IPSWICH STREET | $98,121,694.26 | |
Massachusetts | 003S776 | NEW BEDFORD- BRIDGE REPLACEMENT, N-06-020, I-195 (EB & WB), RAMP C & F OVER ST 18, COUNTY STREET, STATE STREET, MASS COASTAL RAILROAD, PURCHASE STREET | $120,000,000.00 | $380,362,841.70 |
Massachusetts | 003S786 | MARION- WAREHAM- BRIDGE REPLACEMENT, M-05-001=W-06-013 & W-06-016, MARION ROAD/WAREHAM ROAD (ROUTE 6) OVER WEWEANTIC RIVER | $54,510,018.25 | |
Massachusetts | 003S789 | DENNIS- YARMOUTH- BRIDGE REPLACEMENT, D-07-004=Y-01-003, ROUTE 28 OVER BASS RIVER INCLUDING INTERSECTION IMPROVEMENTS AT MAIN STREET(ROUTE 28)/NORTH M | $46,356,155.74 | $57,419,412.58 |
Massachusetts | 003S801 | FITCHBURG- BRIDGE REPLACEMENT AND RELATED WORK, F-04-017, WATER STREET (STATE 2A) OVER BOULDER DRIVE AND PANAM RAILROAD & F-04-018, WATER STREET (ROUT | $27,160,690.28 | $35,635,106.85 |
Massachusetts | 00DB004 | DUXBURY- LAKEVILLE- MANSFIELD- PLYMOUTH- WAREHAM- BRIDGE DECK REPLACEMENTS, D-14-008, L-01-011, L-01-015, M-03-018, P-13-031, P-13-035, W-06-038 (DB) | $35,194,813.00 | $44,458,738.70 |
Massachusetts | 00DB005 | HAVERHILL- METHUEN- BRIDGE REPLACEMENT, H-12-040=M-17-030, I-495 (NB & SB) OVER MERRIMACK RIVER AND M-17-031, I-495 (NB & SB) OVER ROUTE 110 AND H-12- | $275,680,960.07 | $416,234,924.72 |
Massachusetts | 091S001 | NORTHAMPTON– BRIDGE REPLACEMENT, N-19-059, I-91 OVER US ROUTE 5 AND B&MRR, BRIDGE REPLACEMENT, N-19-060, I-91 OVER HOCKANUM ROAD AND IMPROVEMENTS ... | $40,939,927.45 | $51,934,809.31 |
Massachusetts | 091S309 | SPRINGFIELD- CHICOPEE- INTERSTATE MAINTENANCE AND RELATED WORK ON I-91 AND I-391 | $29,621,634.48 | $33,332,282.20 |
Massachusetts | 0931524 | MEDFORD- BRIDGE REPLACEMENT ON I-93 CORRIDOR | $54,229,100.79 | $98,127,600.00 |
Massachusetts | 0934002 | MEDFORD-READING-SOMERVILLE-STONEHAM-WINCHESTER-WOBURN - INTERSTATE PAVEMENT PRESERVATION ON I-93 | $36,832,043.75 | $43,577,216.16 |
Massachusetts | 093S001 | BOSTON- MILTON- QUINCY- SOUTHEAST EXPRESSWAY/INTERSTATE 93 REPLACEMENT OF BARRIERS FOR HIGH OCCUPANCY VEHICLE LANE (HOV) | $35,468,451.65 | $35,934,981.65 |
Massachusetts | 0954001 | DANVERS- TOPSFIELD- BOXFORD- ROWLEY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 | $27,460,207.87 | $31,138,837.08 |
Massachusetts | 495S002 | MILFORD- HOPKINTON- WESTBOROUGH- SOUTHBOROUGH- MARLBORO- HUDSON- BERLIN- PAVEMENT PRESERVATION AND RELATED WORK ON I-495 | $23,321,828.63 | $26,459,819.73 |
Massachusetts | 495S301 | HOPKINTON- WESTBOROUGH- RECONSTRUCTION OF I-90/I-495 INTERCHANGE | $207,290,437.61 | $473,957,930.27 |
Massachusetts | DBPS001 | LOWELL- ROURKE BRIDGE REPLACEMENT, L-15-088, WITH NEW BRIDGE, L-15-114, WOOD STREET EXTENSION OVER MERRIMACK RIVER AND MBTA/CSX RAILROAD | $86,478,485.06 | $241,798,600.59 |