RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
New Mexico 0261011 NM 26 PAVEMENT AND BRIDGE REHAB $7,010,903.89 $27,222,940.95
New Mexico 0401117 INTERSTATE 40 WEST OF GALLUP SEG. 1 $28,976,938.15 $38,792,786.26
New Mexico 0403144 I-40 COORS INTERCHANGE $124,224,369.70 $135,688,332.93
New Mexico 0403147 I-40, MP 177.15 TO MP 181.66 $26,187,021.95 $28,484,281.27
New Mexico 0403155 San Mateo I-40 Interchange, 160.73 MP TO 162.17 MP $41,647,247.01 $50,555,849.49
New Mexico 0403157 I-40 SAN MATEO TO PENNSYLVANIA STREET $18,504,763.25 $28,977,521.51
New Mexico 0403165 RECONSTRUCTION I-40, WEST CENTRAL TO 98TH ST. $6,792,005.38 $25,488,748.62
New Mexico 0403187 I-40, MP 173.73 TO MP 177.11 $23,496,376.24 $26,173,405.64
New Mexico 0405072 RECONSTRUCTION - NO ADDED CAPACITY I-40, MP 308 TO MP 313.87 $13,223,340.47 $26,899,965.03
New Mexico 0541031 6.5 MI N ORO GRANDE - N., MAJOR WIDENING $24,983,255.93 $57,695,706.62
New Mexico 0542027 US 54, FROM MP 94.23 TO MP 107.1, TULAROSA TO VAUGHN, RECONSTRUCTION $19,601,659.88 $28,705,677.65
New Mexico 0702031 1.4 MI. E I-25 INTERCHANGE - E., RECONSTRUCTION W/ADDED CAPACITY $11,872,809.13 $30,209,489.55
New Mexico 0702032 T.4 MI E I-25 INTERCHANGE-E., RECONSTRUCTION $17,023,463.20 $36,368,331.12
New Mexico 0704035 US 70, Hondo Valley, Design Build Project $54,578,454.91 $138,962,754.82
New Mexico 0846078 ALAMO DRIVE TO OPERA/FLEA MARKET, RECONSTRUCTION $40,386,399.52 $81,593,156.64
New Mexico 1100990 EXIT 75 AT WILLIAMSBURG INTERCHANGE PROJECT $38,793,435.20 $45,954,059.10
New Mexico 1101610 I-25 Pavement Preservation: NORTH OF LAS CRUCES $2,896,370.75 $29,052,066.82
New Mexico 1101841 US - 180 Capacity Improvement Project Phase I $5,143,606.36 $47,890,389.86
New Mexico 1101870 I-10 Pavement Rehab $2,146,172.60 $36,531,432.40
New Mexico 1102080 I-10 AZ State Line to MP 15 Pavement Preservation $21,868,367.92 $25,601,805.76
New Mexico 2100741 US 380 Corridor Priority 1 $18,013,251.97 $33,582,925.99
New Mexico 2101351 Downtown Clovis Reconstruction Project $19,101,363.34 $48,130,422.24
New Mexico 2101381 Downtown Lovington Construction Phase I $24,449,280.17 $29,568,121.98
New Mexico 2101771 US-82-P, FROM MP 107.4 TO MP 139.1, NOT SPECIFIED, ROADWAY CONSTRUCTION $40,039,974.61 $71,654,376.76
New Mexico 2102112 US 54 Corridor Construction Phase II $3,300,187.72 $41,925,932.32
New Mexico 2102113 US 54 Corridor Construction Phase III $2,789,304.37 $66,142,557.53
New Mexico 2102162 US 285 Corridor Construction Phase III $558,985.19 $57,968,116.76
New Mexico 2102163 US 285 Corridor Construction Phase IV $30,836,490.34 $37,530,533.18
New Mexico 4100401 US-54-P, FROM MP 324.9 TO MP 326.3, 22.1 MILES NORTH OF JCT. LOOP 36 - EAST, BRIDGE REPLACEMENT $22,713,536.45 $27,314,087.25
New Mexico 4100701 US 64 Palo Flechado Pass (US 64 Study (CN 4100700) Project 1) $9,105,759.19 $46,793,080.20
New Mexico 4100822 RATON PASS PROJECT 2 $23,410,067.51 $27,577,852.22
New Mexico 4100823 RATON PASS PROJECT 3 $4,140,781.83 $30,199,539.81
New Mexico 5100451 NM 41- Phase III $13,919,477.57 $34,722,956.41
New Mexico 5100750 NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY $22,948,316.54 $37,413,198.41
New Mexico 5101171 US 64- Phase I $22,116,495.53 $26,033,797.22
New Mexico 5101172 US 64- Phase II $44,782,611.00 $69,408,091.26
New Mexico 5101341 I-25 La Bajada Slope Mitigation $8,797,794.93 $81,576,796.27
New Mexico 5101441 US 285 Tres Piedras $27,113,687.30 $31,738,678.19
New Mexico 5101670 I-40 Pavement Preservation $10,588,172.02 $37,498,897.70
New Mexico 6100671 NEAR CHURCH ROCK, NM. $22,755,131.41 $27,121,771.59
New Mexico 6100783 US 491, FROM MP15.116 TO MP 36.984, 15 MILES NORTH OF I40, RECONSTRUCTION WITH ADDED CAPACITY $16,611,228.04 $92,926,456.88
New Mexico 6101221 East of Arizona/New Mexico State Line on NM 264 $9,345,722.86 $28,691,060.05
New Mexico A300160 T/LPA-SUNPORT BLVD EXTENSION-FROM BROADWAY TO I-25 EXIT 221 AT SUNPORT BLVD.CONSTRUCT NEW 4 LANE DIVIDED FACILITY WITH BIKE LANES $22,402,068.85 $26,238,098.78
New Mexico A300305 Unser and Paseo del Norte Widening $16,462,245.00 $56,987,608.00
New Mexico A300381 NM 528, FROM MP 8.32 TO MP 9.79, NM 528 RIO RANCHO BLVD IMPROVEMENTS (UPPER SECTION) - FROM RIDGECREST DR/LEON GRANDE AVE $31,023,410.78 $36,804,611.76
New Mexico A300962 Los Lunas Corridor River Crossing Phase 1 $25,000,000.00 $154,317,389.00
New Mexico A301234 US0550, FROM MP .6 TO MP 3, US 550 CONSTRUCTION & WIDENING PHASE 2 - FROM MP.6 TO  MP 3.0, ROW PURCHASE, $26,679,048.08 $35,042,987.71
New Mexico A301901 I25/Montgomery Blvd Interchange Reconstruction $75,035,044.48 $341,895,343.75
New Mexico E100203 NM 404 Widening Project $34,191,220.69 $55,501,350.86
New Mexico LC00290 University Ave Multimodal Project $23,753,095.43 $30,343,707.70
New Mexico LC00550 Charging and Fueling Infrastructure Grant Program $63,898,809.00 $80,884,568.00