RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Ohio | E034667 | IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project. | $76,257,886.37 | $112,446,681.03 |
Ohio | E036192 | FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT | $80,439,940.98 | $89,622,438.45 |
Ohio | E036466 | FRA IR 270 9.15 | $15,548,125.34 | $67,334,831.41 |
Ohio | E036702 | IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. | $86,187,633.58 | $104,998,745.04 |
Ohio | E040035 | SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. | $34,785,177.92 | $71,124,242.84 |
Ohio | E040090 | CUY IR 090 06.83 Major Rehab | $142,722,990.00 | |
Ohio | E040187 | US-33 in the vicinity of Carroll in Fairfield County. New interchange. | $33,029,637.14 | $50,343,886.14 |
Ohio | E040268 | IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND. | $57,749,254.23 | $138,295,953.60 |
Ohio | E040459 | CUY IR 077 11.11 Replace | $59,542,023.00 | |
Ohio | E040537 | US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project | $61,179,365.77 | $77,843,824.20 |
Ohio | E040542 | MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT.. | $65,724,159.84 | $76,916,038.44 |
Ohio | E040555 | MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes | $14,260,014.57 | $112,060,993.75 |
Ohio | E040631 | IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build | $227,511,800.96 | $247,546,208.02 |
Ohio | E040634 | FRA IR 70 13.54 (FOURTH PROJECT), South Trench - I-70/71 Overlap including western downtown connections | $199,897,203.07 | $393,461,042.45 |
Ohio | E040793 | IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond | $112,241,458.27 | $162,258,704.25 |
Ohio | E040822 | IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. | $54,215,826.86 | $65,011,744.66 |
Ohio | E040889 | Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements | $20,041,635.50 | $90,260,927.77 |
Ohio | E041146 | HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, | $81,109,446.55 | $89,720,150.40 |
Ohio | E050670 | JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg | $31,735,233.60 | $138,678,494.76 |
Ohio | E060287 | LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | $60,775,856.92 | $77,108,766.87 |
Ohio | E060288 | HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | $56,304,548.81 | $70,648,554.79 |
Ohio | E060290 | LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports | $33,942,125.40 | $44,391,468.23 |
Ohio | E060308 | IR-70 at US-40 in Belmont County. | $18,924,302.46 | $25,802,904.14 |
Ohio | E060482 | LAW SR 7 2.17 Phase 2A | $13,328,178.67 | $218,278,085.83 |
Ohio | E070090 | FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. | $43,531,849.19 | $89,324,447.18 |
Ohio | E070348 | HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. | $50,986,665.79 | $69,145,414.79 |
Ohio | E070405 | HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system | $98,723,444.11 | $132,264,373.10 |
Ohio | E080604 | LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project | $36,950,622.29 | $41,056,246.97 |
Ohio | E080951 | FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes | $16,914,445.95 | $58,012,738.71 |
Ohio | E081090 | FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures | $33,239,072.19 | $50,830,241.80 |
Ohio | E090644 | CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge | $36,438,714.30 | $51,096,098.53 |
Ohio | E100378 | LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St | $17,565,240.61 | $49,751,620.01 |
Ohio | E100633 | DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00. | $27,601,447.11 | $31,963,340.79 |
Ohio | E100634 | FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps | $28,827,686.63 | $95,168,606.59 |
Ohio | E100878 | Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. | $54,223,127.87 | $71,330,861.89 |
Ohio | E100995 | HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work | $25,993,676.92 | $36,405,733.64 |
Ohio | E110266 | R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville | $33,510,932.28 | $56,354,178.34 |
Ohio | E110547 | FRA Lazelle Road Ph B | $19,715,047.00 | $27,992,252.50 |
Ohio | E110820 | HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT | $80,079,403.43 | $152,837,846.35 |
Ohio | E111416 | CUY IR 480 18.42 L&R Deck | $122,597,028.07 | $244,917,898.05 |
Ohio | E120394 | MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. | $29,961,132.96 | $37,999,245.97 |
Ohio | E120441 | MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. | $18,486,899.02 | $33,349,696.65 |
Ohio | E120585 | LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges | $8,385,393.76 | $175,135,392.35 |
Ohio | E120602 | LUC IR 75 2.75 Pav Reconst, Bridge repl | $12,991,528.92 | $30,860,231.44 |
Ohio | E120609 | CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane. | $55,574,773.21 | $56,619,137.14 |
Ohio | E120958 | WOO/LUC IR75 30.70/0.00 Major | $21,035,118.11 | $192,003,732.74 |
Ohio | E130382 | RIC US 0030 09.13 | $61,349,800.83 | $75,772,001.02 |
Ohio | E130407 | SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures | $51,214,217.96 | $102,607,455.15 |
Ohio | E130869 | STA IR 0077 08.40/VAR | $23,694,366.75 | $65,533,753.02 |
Ohio | E130952 | HAM IR 275 39.81 | $9,861,216.28 | $37,435,644.61 |
Ohio | E131180 | FRA-70-22.61 (FEF 1A), Interchange, Reconstruction | $21,824,687.99 | $90,596,514.44 |
Ohio | E131486 | FRA-270-51.50/FRA-23-4.19 Pt 1&2 | $8,248,130.70 | $34,347,534.00 |
Ohio | E131510 | WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange | $13,999,392.63 | $26,690,516.81 |
Ohio | E140008 | PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements | $5,894,956.00 | $35,573,730.00 |
Ohio | E140310 | STW - Ohio Bridge Partnership Program Debt Service Authorization | $90,791,149.79 | $94,042,475.85 |
Ohio | E140985 | HAM IR 71 8.42 | $21,758,148.59 | $38,398,107.35 |
Ohio | E150336 | FRA CR 103 2.56 | $20,314,959.40 | $26,281,003.68 |
Ohio | E150345 | SUM IR 0076 05.62 | $16,869,933.90 | $30,344,471.52 |
Ohio | E150403 | LUC IR 475 1.85 @20A Interchnge, Build a new interchange | $15,040,920.00 | $117,964,212.48 |
Ohio | E150808 | GRE IR 675 0.00 - Pt. 1 | $23,861,003.59 | $26,792,926.63 |
Ohio | E150816 | SUM SR 0008 01.75. Replacement / re-alignment of High Level Bridge between Glenwood and Perkins. | $118,594,392.00 | $182,120,670.00 |
Ohio | E150996 | PRE IR 70 0.00 | $17,399,864.70 | $33,576,000.33 |
Ohio | E170580 | WAY SR 0021 00.00 | $27,898,593.66 | $32,897,170.00 |
Ohio | E170601 | SUM Main Street Corridor | $13,270,672.00 | $34,404,852.00 |
Ohio | E170641 | BUT SR 129 25.00 Liberty Way | $12,729,664.52 | $25,793,363.40 |
Ohio | E170713 | HAM IR 75 3.84 | $56,816,661.34 | $98,578,438.41 |
Ohio | E170982 | FRA-71-9.62/9.71 Part 1 & 2 | $59,084,578.39 | $127,374,599.89 |
Ohio | E171059 | FRA IR 670 3.920 | $41,400,390.36 | $68,923,599.79 |
Ohio | E171372 | FRA-70-22.85 (FEF-1B&C) | $63,711,735.01 | $79,768,230.01 |
Ohio | E171457 | SUM IR 77/277/US 224 Interchange | $9,278,333.24 | $60,176,026.67 |
Ohio | E180007 | DEL US 36/SR 37 11.03/11.25 | $34,795,561.74 | $43,153,952.26 |
Ohio | E180134 | FRA IR 70 14.54 (Proj 2E) | $44,177,979.98 | $87,577,969.67 |
Ohio | E180372 | MOT IR 75 7.15 | $49,898,997.00 | $55,443,330.00 |
Ohio | E180373 | GRE US 35 5.63 | $36,389,089.50 | $45,424,398.88 |
Ohio | E180428 | SUM IR 0076/0077 8.42/09.74 | $52,904,177.16 | $189,259,429.61 |
Ohio | E180439 | CLE 32-3.50 | $26,265,068.50 | $65,450,510.00 |
Ohio | E180746 | MUS IR 70 10.66 | $41,660,499.47 | $104,963,980.71 |
Ohio | E180796 | FRA IR 71 0.00 | $46,161,522.68 | $52,834,214.94 |
Ohio | E190121 | FRA IR 71 17.46 (Proj 3B) | $35,533,902.62 | $43,802,190.00 |
Ohio | E190122 | FRA-70/71-12.68/15.16 (Proj 4R) | $127,123,001.00 | $298,346,520.00 |
Ohio | E190184 | MOT IR 75 14.74 | $7,114,602.92 | $57,479,131.03 |
Ohio | E190304 | TRU SR 46/82 DDI | $19,430,131.90 | $26,108,881.00 |
Ohio | E190328 | WAY SR 0083 10.81 | $26,683,223.10 | $33,564,881.61 |
Ohio | E190498 | MAH Youngstown Smart 2 Network | $22,577,156.72 | $27,232,240.63 |
Ohio | E190542 | MAD/PIC-71-7.30/0.00 | $46,705,748.80 | $136,604,453.43 |
Ohio | E190934 | LAK US 020 24.99 Major Rehab | $21,224,288.00 | $26,530,360.00 |
Ohio | E191306 | FRA SR 16 8.24 | $3,026,279.00 | $25,968,661.74 |
Ohio | E191584 | LAK US 020 19.59 Major Rehab | $63,760,200.00 | |
Ohio | E200136 | SUM IR 0077 28.75 | $55,803,632.60 | $64,536,267.00 |
Ohio | E200167 | CUY Pleasant Valley Road Bridges | $13,951,120.00 | $29,715,823.54 |
Ohio | E200428 | CLE 32-2.33 | $26,865,531.50 | $34,775,239.99 |
Ohio | E200605 | UNI US 33 24.870 | $24,764,000.00 | $42,755,700.01 |
Ohio | E200816 | FRA IR 270 43.180 | $37,675,412.61 | $41,861,569.58 |
Ohio | E201074 | JEF SR 7 14.440 | $19,421,013.53 | $25,758,133.12 |
Ohio | E210099 | CUY IR 490 00.00 Major Rehab | $45,762,676.74 | $50,847,454.60 |
Ohio | E210348 | LUC Toledo Build Grant - GCR | $23,668,160.00 | $57,062,892.00 |
Ohio | E220056 | CUY IR 077 00.42 Interchange | $22,478,101.39 | $33,846,769.99 |
Ohio | E220165 | Brent Spence Bridge Corridor | $786,434,950.08 | $1,044,797,682.26 |
Ohio | E220273 | WAR SR 63 0.83 | $15,031,560.51 | $25,673,035.58 |
Ohio | E230890 | PAU/DEF US 24 12.30/0.00 | $27,972,904.00 | $34,966,130.00 |