SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Ohio E034667 IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project. $76,257,886.37 $112,446,681.03
Ohio E036192 FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT $80,439,940.98 $89,622,438.45
Ohio E036466 FRA IR 270 9.15 $15,548,125.34 $67,334,831.41
Ohio E036702 IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. $86,187,633.58 $104,998,745.04
Ohio E040035 SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. $34,785,177.92 $71,124,242.84
Ohio E040090 CUY IR 090 06.83 Major Rehab $142,722,990.00
Ohio E040187 US-33 in the vicinity of Carroll in Fairfield County. New interchange. $33,029,637.14 $50,343,886.14
Ohio E040268 IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND. $57,749,254.23 $138,295,953.60
Ohio E040459 CUY IR 077 11.11 Replace $59,542,023.00
Ohio E040537 US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project $61,179,365.77 $77,843,824.20
Ohio E040542 MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT.. $65,724,159.84 $76,916,038.44
Ohio E040555 MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes $14,260,014.57 $112,060,993.75
Ohio E040631 IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build $227,511,800.96 $247,546,208.02
Ohio E040634 FRA IR 70 13.54 (FOURTH PROJECT), South Trench - I-70/71 Overlap including western downtown connections $199,897,203.07 $393,461,042.45
Ohio E040793 IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond $112,241,458.27 $162,258,704.25
Ohio E040822 IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. $54,215,826.86 $65,011,744.66
Ohio E040889 Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements $20,041,635.50 $90,260,927.77
Ohio E041146 HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, $81,109,446.55 $89,720,150.40
Ohio E050670 JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg $31,735,233.60 $138,678,494.76
Ohio E060287 LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. $60,775,856.92 $77,108,766.87
Ohio E060288 HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. $56,304,548.81 $70,648,554.79
Ohio E060290 LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports $33,942,125.40 $44,391,468.23
Ohio E060308 IR-70 at US-40 in Belmont County. $18,924,302.46 $25,802,904.14
Ohio E060482 LAW SR 7 2.17 Phase 2A $13,328,178.67 $218,278,085.83
Ohio E070090 FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. $43,531,849.19 $89,324,447.18
Ohio E070348 HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. $50,986,665.79 $69,145,414.79
Ohio E070405 HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system $98,723,444.11 $132,264,373.10
Ohio E080604 LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project $36,950,622.29 $41,056,246.97
Ohio E080951 FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes $16,914,445.95 $58,012,738.71
Ohio E081090 FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures $33,239,072.19 $50,830,241.80
Ohio E090644 CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge $36,438,714.30 $51,096,098.53
Ohio E100378 LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St $17,565,240.61 $49,751,620.01
Ohio E100633 DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00. $27,601,447.11 $31,963,340.79
Ohio E100634 FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps $28,827,686.63 $95,168,606.59
Ohio E100878 Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. $54,223,127.87 $71,330,861.89
Ohio E100995 HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work $25,993,676.92 $36,405,733.64
Ohio E110266 R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville $33,510,932.28 $56,354,178.34
Ohio E110547 FRA Lazelle Road Ph B $19,715,047.00 $27,992,252.50
Ohio E110820 HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT $80,079,403.43 $152,837,846.35
Ohio E111416 CUY IR 480 18.42 L&R Deck $122,597,028.07 $244,917,898.05
Ohio E120394 MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. $29,961,132.96 $37,999,245.97
Ohio E120441 MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. $18,486,899.02 $33,349,696.65
Ohio E120585 LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges $8,385,393.76 $175,135,392.35
Ohio E120602 LUC IR 75 2.75 Pav Reconst, Bridge repl $12,991,528.92 $30,860,231.44
Ohio E120609 CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane. $55,574,773.21 $56,619,137.14
Ohio E120958 WOO/LUC IR75 30.70/0.00 Major $21,035,118.11 $192,003,732.74
Ohio E130382 RIC US 0030 09.13 $61,349,800.83 $75,772,001.02
Ohio E130407 SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures $51,214,217.96 $102,607,455.15
Ohio E130869 STA IR 0077 08.40/VAR $23,694,366.75 $65,533,753.02
Ohio E130952 HAM IR 275 39.81 $9,861,216.28 $37,435,644.61
Ohio E131180 FRA-70-22.61 (FEF 1A), Interchange, Reconstruction $21,824,687.99 $90,596,514.44
Ohio E131486 FRA-270-51.50/FRA-23-4.19 Pt 1&2 $8,248,130.70 $34,347,534.00
Ohio E131510 WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange $13,999,392.63 $26,690,516.81
Ohio E140008 PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements $5,894,956.00 $35,573,730.00
Ohio E140310 STW - Ohio Bridge Partnership Program Debt Service Authorization $90,791,149.79 $94,042,475.85
Ohio E140985 HAM IR 71 8.42 $21,758,148.59 $38,398,107.35
Ohio E150336 FRA CR 103 2.56 $20,314,959.40 $26,281,003.68
Ohio E150345 SUM IR 0076 05.62 $16,869,933.90 $30,344,471.52
Ohio E150403 LUC IR 475 1.85 @20A Interchnge, Build a new interchange $15,040,920.00 $117,964,212.48
Ohio E150808 GRE IR 675 0.00 - Pt. 1 $23,861,003.59 $26,792,926.63
Ohio E150816 SUM SR 0008 01.75. Replacement / re-alignment of High Level Bridge between Glenwood and Perkins. $118,594,392.00 $182,120,670.00
Ohio E150996 PRE IR 70 0.00 $17,399,864.70 $33,576,000.33
Ohio E170580 WAY SR 0021 00.00 $27,898,593.66 $32,897,170.00
Ohio E170601 SUM Main Street Corridor $13,270,672.00 $34,404,852.00
Ohio E170641 BUT SR 129 25.00 Liberty Way $12,729,664.52 $25,793,363.40
Ohio E170713 HAM IR 75 3.84 $56,816,661.34 $98,578,438.41
Ohio E170982 FRA-71-9.62/9.71 Part 1 & 2 $59,084,578.39 $127,374,599.89
Ohio E171059 FRA IR 670 3.920 $41,400,390.36 $68,923,599.79
Ohio E171372 FRA-70-22.85 (FEF-1B&C) $63,711,735.01 $79,768,230.01
Ohio E171457 SUM IR 77/277/US 224 Interchange $9,278,333.24 $60,176,026.67
Ohio E180007 DEL US 36/SR 37 11.03/11.25 $34,795,561.74 $43,153,952.26
Ohio E180134 FRA IR 70 14.54 (Proj 2E) $44,177,979.98 $87,577,969.67
Ohio E180372 MOT IR 75 7.15 $49,898,997.00 $55,443,330.00
Ohio E180373 GRE US 35 5.63 $36,389,089.50 $45,424,398.88
Ohio E180428 SUM IR 0076/0077 8.42/09.74 $52,904,177.16 $189,259,429.61
Ohio E180439 CLE 32-3.50 $26,265,068.50 $65,450,510.00
Ohio E180746 MUS IR 70 10.66 $41,660,499.47 $104,963,980.71
Ohio E180796 FRA IR 71 0.00 $46,161,522.68 $52,834,214.94
Ohio E190121 FRA IR 71 17.46 (Proj 3B) $35,533,902.62 $43,802,190.00
Ohio E190122 FRA-70/71-12.68/15.16 (Proj 4R) $127,123,001.00 $298,346,520.00
Ohio E190184 MOT IR 75 14.74 $7,114,602.92 $57,479,131.03
Ohio E190304 TRU SR 46/82 DDI $19,430,131.90 $26,108,881.00
Ohio E190328 WAY SR 0083 10.81 $26,683,223.10 $33,564,881.61
Ohio E190498 MAH Youngstown Smart 2 Network $22,577,156.72 $27,232,240.63
Ohio E190542 MAD/PIC-71-7.30/0.00 $46,705,748.80 $136,604,453.43
Ohio E190934 LAK US 020 24.99 Major Rehab $21,224,288.00 $26,530,360.00
Ohio E191306 FRA SR 16 8.24 $3,026,279.00 $25,968,661.74
Ohio E191584 LAK US 020 19.59 Major Rehab $63,760,200.00
Ohio E200136 SUM IR 0077 28.75 $55,803,632.60 $64,536,267.00
Ohio E200167 CUY Pleasant Valley Road Bridges $13,951,120.00 $29,715,823.54
Ohio E200428 CLE 32-2.33 $26,865,531.50 $34,775,239.99
Ohio E200605 UNI US 33 24.870 $24,764,000.00 $42,755,700.01
Ohio E200816 FRA IR 270 43.180 $37,675,412.61 $41,861,569.58
Ohio E201074 JEF SR 7 14.440 $19,421,013.53 $25,758,133.12
Ohio E210099 CUY IR 490 00.00 Major Rehab $45,762,676.74 $50,847,454.60
Ohio E210348 LUC Toledo Build Grant - GCR $23,668,160.00 $57,062,892.00
Ohio E220056 CUY IR 077 00.42 Interchange $22,478,101.39 $33,846,769.99
Ohio E220165 Brent Spence Bridge Corridor $786,434,950.08 $1,044,797,682.26
Ohio E220273 WAR SR 63 0.83 $15,031,560.51 $25,673,035.58
Ohio E230890 PAU/DEF US 24 12.30/0.00 $27,972,904.00 $34,966,130.00