RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
South Carolina | 2366990 | US 25 NB & SB over S-119 & North Saluda River and Safety Improvements | $27,227,465.46 | $59,790,594.55 |
South Carolina | 3652370 | Rehabilitation of eastbound and westbound lanes of I-26 with bridge jackings at: S-36-32 Jalapa Road Bridge; S-36-81 Old Whitmire Highway Bridge; SC 1 | $106,451,450.59 | $135,086,248.09 |
South Carolina | 3962240 | Closed and/or Load Restricted Bridge Replacements DB Package 2023-3 | $40,848,291.68 | $51,060,364.64 |
South Carolina | 4069460 | Bridge Replacements at US 76 over US 601 and US 601 over Colonels Creek | $32,394,778.43 | $40,493,473.03 |
South Carolina | 4084120 | Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive | $35,987,310.51 | $53,523,069.35 |
South Carolina | 4462250 | Closed and/or Load Restricted Bridge Replacements DB Package 2023-2 | $52,980,037.00 | $69,135,481.14 |
South Carolina | 8888860 | I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S-57) to SC 18 | $382,438,116.88 | $691,948,333.62 |
South Carolina | BR10025 | SC 174 Br Replacement over Store, Sand, and Russell Creeks north of Edisto - Charleston County | $21,942,752.62 | $27,428,440.78 |
South Carolina | BR40004 | REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 | $27,437,679.98 | $32,055,442.78 |
South Carolina | BR88044 | US 701 over Great Pee Dee River | $47,608,527.28 | $59,555,755.70 |
South Carolina | CHMB010 | Phase III Berlin Myers Parkway | $70,052,502.76 | $151,464,426.68 |
South Carolina | EM05025 | Port Access Road | $8,000,000.00 | $388,184,242.27 |
South Carolina | EM13001 | Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) | $5,039,440.00 | $27,956,140.23 |
South Carolina | FLMB006 | Widening S-29(South Cashua Dr) from SC 51 ( Second Loop Rd) to S-103(Knollwood Rd) as follows: South Cashua Dr. from SC 51 | $20,196,837.13 | $25,269,183.82 |
South Carolina | GPAT002 | Batesville Rd (S-164) (SC 14 to Roper Mountain Road) | $22,892,058.39 | $28,459,085.60 |
South Carolina | GRID010 | I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES | $94,463,278.01 | $118,119,611.51 |
South Carolina | GSLA003 | CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE | $204,542,450.64 | $295,515,917.74 |
South Carolina | IM23009 | I-85 @ I-385 (Design Build) | $243,445,286.40 | $324,404,081.50 |
South Carolina | LSCG005 | US 301 over North Edisto River & Swamp | $28,669,423.40 | $38,050,401.22 |
South Carolina | P026862 | US 21 over Harbor River | $61,390,365.44 | $77,287,956.80 |
South Carolina | P027003 | I-20 Widening (US 378 to Longs Pond) - Design Build | $12,500,000.00 | $120,716,784.25 |
South Carolina | P027077 | I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) | $52,195,591.67 | $67,242,611.08 |
South Carolina | P027116 | I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) | $190,506,637.76 | $243,686,335.55 |
South Carolina | P027229 | I-26/US 21 Interchange (Exit 119). Reconfigure existing I-26 @ US 21 interchange in Lexington County | $48,767,364.81 | $60,959,206.02 |
South Carolina | P027413 | SC 85 over Southern R.R. and S-995 | $22,731,459.28 | $29,695,162.61 |
South Carolina | P027550 | I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) | $2,389,657.30 | $92,762,969.67 |
South Carolina | P029208 | I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) | $491,865,539.84 | $567,340,421.78 |
South Carolina | P029263 | I-26 from near SC 27 (Exit 187) to near Jedburg Road (Exit 194) | $16,910,032.21 | $218,654,081.13 |
South Carolina | P029270 | I-77 at SC 160 Interchange Improvement | $75,651,608.75 | $160,177,510.95 |
South Carolina | P029450 | Design Build I-20 EB & WB over Wateree River and Wateree Swamp Overflow | $111,946,945.82 | $112,428,558.58 |
South Carolina | P029503 | Clements Ferry Road - Phase II | $16,000,000.00 | $48,887,327.82 |
South Carolina | P029525 | US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB | $24,641,587.90 | $35,148,152.88 |
South Carolina | P029873 | South Main Street Streetscaping Improvements | $18,501,256.56 | $28,191,923.96 |
South Carolina | P029938 | I-26 (Near MM 149 to near MM 172) | $51,235,837.01 | $57,090,539.20 |
South Carolina | P030176 | Seamless City Revitalization Project | $17,666,966.50 | $39,935,597.69 |
South Carolina | P030462 | US 76 WB over Wateree River | $40,700,564.42 | $50,875,705.54 |
South Carolina | P030484 | Country Club Road Corridor Project | $30,852,004.96 | $38,565,006.20 |
South Carolina | P030487 | SC 277 NB over I-77 | $28,113,902.00 | $31,237,668.89 |
South Carolina | P030562 | US 17 Bypass (Shetland to Backgate) | $15,597,089.80 | $30,643,553.26 |
South Carolina | P030711 | US 1 over I-20 Bridge Replacement | $67,292,880.05 | $76,422,505.92 |
South Carolina | P038111 | I-85 over Rocky Creek Bridge Design Build | $36,161,048.76 | $40,927,726.17 |
South Carolina | P038652 | I-77 Panther's Interchange (MM81) Design Build | $34,597,743.00 | $65,500,000.00 |
South Carolina | P038677 | I-26 Interchange Improvement from Exit 169 I-95 to Exit 187 Ridgeville Road | $111,243,039.84 | $236,786,261.79 |
South Carolina | P039718 | I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction | $199,120,863.78 | $226,259,229.92 |
South Carolina | P039719 | I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction | $120,246,226.92 | $134,933,105.35 |
South Carolina | P040014 | I-26 Corridor Improvement from Exit 125 to Exit 136 | $36,734,960.00 | $439,308,907.73 |
South Carolina | P041767 | US 17 over Waccamaw River Bridge Repair (Asset 4792) | $47,075,386.82 | $59,647,181.07 |
South Carolina | RU27001 | US 17 Widening | $49,252,583.26 | $62,426,418.87 |
South Carolina | SB02002 | FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY | $115,753,610.50 | $159,805,376.76 |
South Carolina | SB07001 | SC 170 - FROM ROAD S-20 TO SC ROUTE 280. | $76,020,891.00 | $95,027,499.84 |
South Carolina | SU40013 | Hardscrabble Road (S-83) | $54,528,075.23 | $97,547,567.76 |