U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
South Carolina

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
South Carolina 2366990 US 25 NB & SB over S-119 & North Saluda River and Safety Improvements $27,227,465.46 $59,790,594.55
South Carolina 3652370 Rehabilitation of eastbound and westbound lanes of I-26 with bridge jackings at: S-36-32 Jalapa Road Bridge; S-36-81 Old Whitmire Highway Bridge; SC 1 $106,451,450.59 $135,086,248.09
South Carolina 3962240 Closed and/or Load Restricted Bridge Replacements DB Package 2023-3 $40,848,291.68 $51,060,364.64
South Carolina 4069460 Bridge Replacements at US 76 over US 601 and US 601 over Colonels Creek $32,394,778.43 $40,493,473.03
South Carolina 4084120 Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive $35,987,310.51 $53,523,069.35
South Carolina 4462250 Closed and/or Load Restricted Bridge Replacements DB Package 2023-2 $52,980,037.00 $69,135,481.14
South Carolina 8888860 I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S-57) to SC 18 $382,438,116.88 $691,948,333.62
South Carolina BR10025 SC 174 Br Replacement over Store, Sand, and Russell Creeks north of Edisto - Charleston County $21,942,752.62 $27,428,440.78
South Carolina BR40004 REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 $27,437,679.98 $32,055,442.78
South Carolina BR88044 US 701 over Great Pee Dee River $47,608,527.28 $59,555,755.70
South Carolina CHMB010 Phase III Berlin Myers Parkway $70,052,502.76 $151,464,426.68
South Carolina EM05025 Port Access Road $8,000,000.00 $388,184,242.27
South Carolina EM13001 Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) $5,039,440.00 $27,956,140.23
South Carolina FLMB006 Widening S-29(South Cashua Dr) from SC 51 ( Second Loop Rd) to S-103(Knollwood Rd) as follows: South Cashua Dr. from SC 51 $20,196,837.13 $25,269,183.82
South Carolina GPAT002 Batesville Rd (S-164) (SC 14 to Roper Mountain Road) $22,892,058.39 $28,459,085.60
South Carolina GRID010 I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES $94,463,278.01 $118,119,611.51
South Carolina GSLA003 CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE $204,542,450.64 $295,515,917.74
South Carolina IM23009 I-85 @ I-385 (Design Build) $243,445,286.40 $324,404,081.50
South Carolina LSCG005 US 301 over North Edisto River & Swamp $28,669,423.40 $38,050,401.22
South Carolina P026862 US 21 over Harbor River $61,390,365.44 $77,287,956.80
South Carolina P027003 I-20 Widening (US 378 to Longs Pond) - Design Build $12,500,000.00 $120,716,784.25
South Carolina P027077 I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) $52,195,591.67 $67,242,611.08
South Carolina P027116 I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) $190,506,637.76 $243,686,335.55
South Carolina P027229 I-26/US 21 Interchange (Exit 119). Reconfigure existing I-26 @ US 21 interchange in Lexington County $48,767,364.81 $60,959,206.02
South Carolina P027413 SC 85 over Southern R.R. and S-995 $22,731,459.28 $29,695,162.61
South Carolina P027550 I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) $2,389,657.30 $92,762,969.67
South Carolina P029208 I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) $491,865,539.84 $567,340,421.78
South Carolina P029263 I-26 from near SC 27 (Exit 187) to near Jedburg Road (Exit 194) $16,910,032.21 $218,654,081.13
South Carolina P029270 I-77 at SC 160 Interchange Improvement $75,651,608.75 $160,177,510.95
South Carolina P029450 Design Build I-20 EB & WB over Wateree River and Wateree Swamp Overflow $111,946,945.82 $112,428,558.58
South Carolina P029503 Clements Ferry Road - Phase II $16,000,000.00 $48,887,327.82
South Carolina P029525 US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB $24,641,587.90 $35,148,152.88
South Carolina P029873 South Main Street Streetscaping Improvements $18,501,256.56 $28,191,923.96
South Carolina P029938 I-26 (Near MM 149 to near MM 172) $51,235,837.01 $57,090,539.20
South Carolina P030176 Seamless City Revitalization Project $17,666,966.50 $39,935,597.69
South Carolina P030462 US 76 WB over Wateree River $40,700,564.42 $50,875,705.54
South Carolina P030484 Country Club Road Corridor Project $30,852,004.96 $38,565,006.20
South Carolina P030487 SC 277 NB over I-77 $28,113,902.00 $31,237,668.89
South Carolina P030562 US 17 Bypass (Shetland to Backgate) $15,597,089.80 $30,643,553.26
South Carolina P030711 US 1 over I-20 Bridge Replacement $67,292,880.05 $76,422,505.92
South Carolina P038111 I-85 over Rocky Creek Bridge Design Build $36,161,048.76 $40,927,726.17
South Carolina P038652 I-77 Panther's Interchange (MM81) Design Build $34,597,743.00 $65,500,000.00
South Carolina P038677 I-26 Interchange Improvement from Exit 169 I-95 to Exit 187 Ridgeville Road $111,243,039.84 $236,786,261.79
South Carolina P039718 I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction $199,120,863.78 $226,259,229.92
South Carolina P039719 I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction $120,246,226.92 $134,933,105.35
South Carolina P040014 I-26 Corridor Improvement from Exit 125 to Exit 136 $36,734,960.00 $439,308,907.73
South Carolina P041767 US 17 over Waccamaw River Bridge Repair (Asset 4792) $47,075,386.82 $59,647,181.07
South Carolina RU27001 US 17 Widening $49,252,583.26 $62,426,418.87
South Carolina SB02002 FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY $115,753,610.50 $159,805,376.76
South Carolina SB07001 SC 170 - FROM ROAD S-20 TO SC ROUTE 280. $76,020,891.00 $95,027,499.84
South Carolina SU40013 Hardscrabble Road (S-83) $54,528,075.23 $97,547,567.76