RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
South Dakota | 0010124 | Aberdeen Area ; Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; On the following routes: 010 | $2,185,280.80 | $25,762,397.27 |
South Dakota | 0012206 | City of Morristown; Grading, Interim Surfacing, Replace Str Bridge; On the following routes: 012 | $24,935,523.78 | $31,627,845.02 |
South Dakota | 0014194 | Pierre Area ; Replace Structure (Bridge), Intersection Improvements; On the following routes: 014, 014 E, 014 W | $39,618,065.98 | $54,460,392.51 |
South Dakota | 0018157 | County of Lincoln; Grading, PCC Surfacing, Replace Str RCBC; On the following routes: 018 | $39,565,797.94 | $56,538,783.69 |
South Dakota | 0037157 | City of Mitchell; Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, Surfacing, Replace Bridge, Shared Use Path; On 037, 037 N, 037S | $24,296,814.64 | $31,234,918.18 |
South Dakota | 0046060 | County of Clay; Rural Reconstruction, Mill and Surfacing, Structure Replacement, On the following routes: 046 | $40,148,430.36 | $53,197,353.14 |
South Dakota | 0046061 | Lincoln and Union Counties; Grading, Interim Surfacing, Replace/Repair Str RCBC; On the following routes: 046 | $11,055,250.72 | $31,114,098.76 |
South Dakota | 0083074 | Winner Area; US83 Reconstruction - South of I-90 | $35,359,313.84 | $69,998,228.71 |
South Dakota | 0100108 | City of Sioux Falls; Grading, Str Bridge, PCC Surfacing, Curb and Gutter, Storm Sewer, Signals, Lighting | $34,702,619.50 | $56,329,810.92 |
South Dakota | 0293106 | City of Sioux Falls; Modify Interchange, Bent Strengthening; On routes: 029 N, 029 N1, 029 N2, 029 N7, 029 N8, 029 S, 029 S1, 029 S2, 029 S7 | $20,738,109.34 | $25,247,346.16 |
South Dakota | 0385050 | County of Pennington; Grading, Interim Surfacing; On the following routes: 385 | $68,854,138.36 | |
South Dakota | 0901195 | Meade County; Grading, Interchange Recon. (Exit 37), PCC Surfacing, Replace Bridge, Railroad Crossing,Tilford Port of Entry; I90 EBL | $30,961,127.97 | $38,124,540.62 |
South Dakota | 0908095 | County of McCook; Remove and Replace PCC, Pipe Work, Replace Str and Approach Grading, Deck Overlay, Polymer Chip Seal; On the following route I90E | $34,449,329.11 | $38,843,663.50 |
South Dakota | 0908097 | County of McCook; Rural Interstate Reconstruction, Replace Bridge; Structure On the following routes 090W, 090E. | $86,832,677.91 | $112,627,956.89 |
South Dakota | 0909046 | County of Minnehaha; Interchange Reconstruction, Replace Str Bridge, Lighting, PCC Surfacing; On the following routes: 011, 090 E, 090 W | $32,500,000.00 | $44,490,711.92 |
South Dakota | 2292098 | Sioux Falls; Mod Interchange, LSDC, Approach Slab, Joints, Rail Replace and Repair, Signals, Lighting, Bike Path; Rroutes: 229 N, 229 N1, 229 N2, 229 | $21,137,555.26 | $25,723,859.04 |