U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
South Dakota

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
South Dakota 0010124 Aberdeen Area ; Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; On the following routes: 010 $2,185,280.80 $25,762,397.27
South Dakota 0012206 City of Morristown; Grading, Interim Surfacing, Replace Str Bridge; On the following routes: 012 $24,935,523.78 $31,627,845.02
South Dakota 0014194 Pierre Area ; Replace Structure (Bridge), Intersection Improvements; On the following routes: 014, 014 E, 014 W $39,618,065.98 $54,460,392.51
South Dakota 0018157 County of Lincoln; Grading, PCC Surfacing, Replace Str RCBC; On the following routes: 018 $39,565,797.94 $56,538,783.69
South Dakota 0037157 City of Mitchell; Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, Surfacing, Replace Bridge, Shared Use Path; On 037, 037 N, 037S $24,296,814.64 $31,234,918.18
South Dakota 0046060 County of Clay; Rural Reconstruction, Mill and Surfacing, Structure Replacement, On the following routes: 046 $40,148,430.36 $53,197,353.14
South Dakota 0046061 Lincoln and Union Counties; Grading, Interim Surfacing, Replace/Repair Str RCBC; On the following routes: 046 $11,055,250.72 $31,114,098.76
South Dakota 0083074 Winner Area; US83 Reconstruction - South of I-90 $35,359,313.84 $69,998,228.71
South Dakota 0100108 City of Sioux Falls; Grading, Str Bridge, PCC Surfacing, Curb and Gutter, Storm Sewer, Signals, Lighting $34,702,619.50 $56,329,810.92
South Dakota 0293106 City of Sioux Falls; Modify Interchange, Bent Strengthening; On routes: 029 N, 029 N1, 029 N2, 029 N7, 029 N8, 029 S, 029 S1, 029 S2, 029 S7 $20,738,109.34 $25,247,346.16
South Dakota 0385050 County of Pennington; Grading, Interim Surfacing; On the following routes: 385 $68,854,138.36
South Dakota 0901195 Meade County; Grading, Interchange Recon. (Exit 37), PCC Surfacing, Replace Bridge, Railroad Crossing,Tilford Port of Entry; I90 EBL $30,961,127.97 $38,124,540.62
South Dakota 0908095 County of McCook; Remove and Replace PCC, Pipe Work, Replace Str and Approach Grading, Deck Overlay, Polymer Chip Seal; On the following route I90E $34,449,329.11 $38,843,663.50
South Dakota 0908097 County of McCook; Rural Interstate Reconstruction, Replace Bridge; Structure  On the following routes 090W, 090E. $86,832,677.91 $112,627,956.89
South Dakota 0909046 County of Minnehaha; Interchange Reconstruction, Replace Str Bridge, Lighting, PCC Surfacing; On the following routes: 011, 090 E, 090 W $32,500,000.00 $44,490,711.92
South Dakota 2292098 Sioux Falls; Mod Interchange, LSDC, Approach Slab, Joints, Rail Replace and Repair, Signals, Lighting, Bike Path; Rroutes: 229 N, 229 N1, 229 N2, 229 $21,137,555.26 $25,723,859.04