RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Vermont | 0102016 | READSBORO, VT100, BRIDGE NO. 25; SCOPING TO EVALUATE ALTERNATIVES, PENG, REPLACE BRIDGE. | $4,373,797.06 | $26,700,236.32 |
Vermont | 0134013 | WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY | $28,650,372.16 | $31,992,638.20 |
Vermont | 0281026 | NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. | $81,407,315.59 | $97,087,136.28 |
Vermont | 0281031 | COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, IMPROVE INTERSECTIONS, REPLACE US2 BR18A. | $15,700,000.00 | $35,860,443.00 |
Vermont | 0283026 | CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY | $25,867,840.85 | $28,768,444.88 |
Vermont | 0891063 | ROYALTON, I-89, BRIDGE NO. 26 N&S; SCOPING TO EVALUATE ALTERNATIVES. | $10,975,820.37 | $40,030,473.85 |
Vermont | 0911066 | ROCKINGHAM, I-91, BRIDGE NO. 24 N&S; PENG, CONST., REHAB BRIDGES. | $47,068,762.34 | $53,093,151.60 |
Vermont | 1444060 | HARTFORD, TH6, BR7; OTHER, SCOPING TO EVALUATE ALTERNATIVES. | $15,717,571.69 | $26,270,288.61 |
Vermont | 2940001 | BRATTLEBORO-NEWFANE, VT30, RESURFACING. | $22,568,454.19 | $28,567,132.29 |
Vermont | 2971001 | WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. | $24,326,901.26 | $28,306,283.85 |
Vermont | 5000001 | BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY | $80,990,870.80 | $128,884,331.49 |
Vermont | 5600014 | COLCHESTER, US7, AT I-89 EXIT #16; ROWA, INSTALL DOUBLE CROSSOVER ON US7, INCL. WIDENING, NEW SIGNALS, DRAINAGE. | $18,170,544.00 | $37,674,057.00 |
Vermont | A004152 | BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. | $17,770,009.89 | $27,457,771.09 |
Vermont | PS19001 | MARSHFIELD-DANVILLE, US2, BEGINNING AT MM 0.987 IN PLAINFIELD EXT. EASTERLY 16.669 MILES; PENG, RESURFACING. | $21,278,166.76 | $30,065,868.00 |
Vermont | WCRS023 | MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. | $79,837,809.34 | $93,167,850.49 |