Virginia | 000S321 | Statewide | $11,825,581.67 | $37,826,697.13 |
Virginia | 000S328 | Statewide ATMS FY17-20; Sole Source | $195,916.00 | $107,257,535.00 |
Virginia | 000S338 | Statewide ITS maintenance | $21,426,512.00 | $56,426,835.00 |
Virginia | 000S343 | Statewide Transportation Operations Center for Safety Services Patrol Program - Eastern, Central, Northern, Northwest and Southwest Regional Offices | $52,403,954.97 | $252,601,574.00 |
Virginia | 000S345 | Statewide - I-95 Express Lanes Extension Exit 160 to Exit 133 | $40,000,000.00 | $50,000,000.00 |
Virginia | 0015024 | Accomack Co, State Rte 175: Bridge over Black Narrows, Chincoteague, & Lewis Creek Channels -- Bridge Replacement (1 of 2 fed #) | $54,809,537.00 | $75,645,366.00 |
Virginia | 0081415 | Decel/Accel Lane w/Bridges | $72,582,440.00 | |
Virginia | 0131067 | BUCHANAN COUNTY | $147,776,624.10 | $178,879,832.00 |
Virginia | 0131069 | Buchanan Co; Rt 460 Connector Phase II FR: Rt. 460 Conn Phase I Approx 7 Mi to Rt 121/460 Connection; Design-Build to Rough Grade | $108,817,409.00 | $120,000,000.00 |
Virginia | 0131087 | Buchanan County; Route 460; Corridor Q - 460 Connector Phase II Finish Grade | $24,672,344.00 | $33,810,731.00 |
Virginia | 0131088 | CFX - Poplar Creek Phase B - VDOT Oversight and RW Acq. Cost | $13,527,224.00 | $25,099,684.00 |
Virginia | 0131089 | Buchanan County; Route 460 (Coalfield Expressway); Poplar Creek Phase B | $67,495,277.00 | $171,991,592.00 |
Virginia | 0193046 | Route 92 Bridge & Approaches over Staunton River | $1,969,705.00 | $25,923,444.00 |
Virginia | 0327032 | Culpeper District - Design Build for CONST INTERCHANGE U.S. RTE 15/17/29 AT U.S. RTE 15/17/29 BUS | $10,579,995.37 | $36,005,329.83 |
Virginia | 0643479 | Hampton City, I-64: From: Rte 143 To: Rte 199; PE for capacity improvements from Newport News to Williamsburg; also design-build | $65,065,523.67 | $138,003,915.26 |
Virginia | 0643488 | Chesapeake City, I-64; From I-464 to I-664/I-264; Design-Build for Southside widening - including high rise bridge. | $48,552,554.00 | $558,139,606.00 |
Virginia | 0643498 | Hampton Roads Districtwide capacity improvements | $118,022,660.00 | $261,874,144.00 |
Virginia | 0643499 | Henrico County; I-64 | $34,900,569.78 | $74,343,299.07 |
Virginia | 0643511 | City of Newport News-Replace Denbigh Blvd Bridge i-64 and CSX Railroad. | $18,676,601.00 | $29,529,369.00 |
Virginia | 0643528 | I-64/I-464 INTERCHANGE Exit 291 Ramp Improvements | $79,407,227.00 | $180,862,923.00 |
Virginia | 0643532 | Hampton Roads Express Lanes, Segment 1A | $61,799,343.09 | $197,612,207.00 |
Virginia | 0643533 | City of Hampton; I-64; Hampton Roads express lanes, segment 4C - Phase 1 PE; | $429,754,878.00 | |
Virginia | 0643541 | Hampton Roads Express Lane, Segment 4A-4B | $13,208,333.00 | $150,327,758.00 |
Virginia | 0643545 | I-64 Widening- Segment A | $51,822,202.00 | $243,797,201.00 |
Virginia | 0643549 | Interstate 64 Gap Improvements - Segment C | $49,620,154.00 | $227,902,401.00 |
Virginia | 0643552 | I-64 Gap Widening - Segment B | $28,309,708.00 | $272,609,100.00 |
Virginia | 0661318 | Capital Beltway HOT Lanes Project, Route 66 & 495 Access Improvement & Flyover & Pavement Rehab & Other CN | $103,860,943.00 | $1,792,214,461.00 |
Virginia | 0661341 | Prince William Co.- Fr: Rt1 15 To: I-66 DESIGN BUILD to reconstruct interchange at Rt 15 and I-66 | $39,303,109.58 | $66,407,816.52 |
Virginia | 0661356 | NORTHERN VIRGINIA | $50,099,106.07 | $153,063,015.91 |
Virginia | 0713048 | Bridge Replacement - Route 40 over Pigg River | $17,787,358.00 | $25,310,251.00 |
Virginia | 0811342 | MONTGOMERY COUNTY | $49,315,883.39 | $60,095,798.00 |
Virginia | 0811417 | SB MM 8.1 WIDEN TO THREE LANES | $36,501,673.00 | |
Virginia | 0812302 | Roanoke County, I-81; NB auxilary lane | $9,256,532.46 | $31,473,308.56 |
Virginia | 0812318 | #SMART18 - I-81 SB Auxiliary Lane from Exit 143 to 141 | $2,213,207.00 | $47,892,990.00 |
Virginia | 0812321 | #I-81 CIP - MM 144 to Exit 150 adding North Bound and South Bound lanes | $462,353,500.00 | |
Virginia | 0812329 | North Bound & South Bound I-81 Mile Marker 221 to 225, 3-Lane Wideing | $140,523,329.00 | |
Virginia | 0812330 | Roanoke County: I-81;Corridor Improvement Plan (CIP) ADD LANE IN EACH DIRECTION (ID #39) | $227,671,728.00 | |
Virginia | 0812337 | Critical Infrastructure Protection (CIP) Northbound Mile Marker 234 to Mile Marker 237, Weyers Cave Truck Climbing Lane | $40,107,779.00 | |
Virginia | 0812339 | Critical Infrastructure Protection (CIP) Southbound Mile Marker 234 to 237, Weyers Cave Truck Climbing Lane | $35,229,554.00 | |
Virginia | 0813216 | SOUTH BOUND MILE MARKER 296 TO 299, 3 LANE WIDENING | $89,261,117.00 | |
Virginia | 0851102 | Interstate 85 Southbound Lane over Roanoke River Drive | $15,623,337.00 | $25,026,488.00 |
Virginia | 0951364 | I-95 Aux Lanes (NB & SB) between Route 288 and Route 10 | $6,681,782.00 | $47,757,133.15 |
Virginia | 0952525 | Northern Virginia Region - I95 HOV/HOT Lanes; I95 HOV/HOT Lanes Debt Service | $88,744,053.88 | $110,089,071.24 |
Virginia | 0952537 | STAFFORD COUNTY | $72,432,082.51 | $232,355,064.22 |
Virginia | 0952545 | I-95 Rappahannock River Crossing - Northbound | $41,201,366.00 | $127,000,000.00 |
Virginia | 0981045 | #SMART20 - Progress Park Connector | $5,099,129.00 | $42,434,521.43 |
Virginia | 2646106 | I-264/Witchduck Road interchange and ramp | $23,707,384.00 | $126,028,464.00 |
Virginia | 3954190 | I-395 Design Build | $87,093,966.00 | $602,647,237.00 |
Virginia | 4601005 | Buchanan Co Rte 460 Connector Phase 1-KY State Line approx 1 mile to Rte 460 Connector Phase II=Design Build PE, RW, CN | $98,959,280.00 | $129,218,501.26 |
Virginia | 5104230 | DESIGN BUILD PROJECT FOR 29 SOLUTIONS PROJECTS | $90,746,013.55 | $185,572,992.00 |
Virginia | 5104296 | #SGR19LB - RT 20 - BRIDGE REPLACEMENT | $9,777,288.53 | $31,088,610.00 |
Virginia | 5104299 | Culpeper District: Hydraulic Road and Route 29 | $23,899,259.00 | $29,518,719.00 |
Virginia | 5111235 | City of Fredericksburg-I95 Southbound-Rappahannock River Crossing | $87,094,624.00 | $146,212,597.71 |
Virginia | 5111407 | I-95 EXIT 126 STARS STUDY IMPROVEMENTS | $11,160,132.33 | $26,881,466.00 |
Virginia | 5118209 | Lynchburg - 1.6 Mi W, to: 0.6 Mi W Rte 501 - DB: extend OddFellows Rd to new intrchnge w/ Rte 29/460 & related options on Odd F.Rd | $27,522,289.52 | $48,627,369.22 |
Virginia | 5128326 | Botetourt County – Fr South of Int. Rte 43 To Int. Rte 727; PE, RW, CN for Route 220 Reconstruction and Safety – Ph. 1, 2, & 3 | $78,025,833.03 | $80,450,448.00 |
Virginia | 5138172 | Frederick County - Route 277 - Widen to 5 lanes | $13,660,708.47 | $58,757,386.73 |
Virginia | 5150184 | Montgomery Co; Rte 460; Fr: .156 Mi. W. Int. Southgate Dr To: .799 Mi. E. Int. Southgate Dr.; CN: Interchange & Connector | $32,563,117.20 | $44,047,862.25 |
Virginia | 5401571 | NORTHERN VA DISTRICTWIDE: FR: ROUTE 28 TO: POLAND ROAD - CN for 6-LANE WIDENING- DESIGN BUILD | $38,228,546.00 | $94,912,504.00 |
Virginia | 5A01165 | Loudoun Co. - From Old Ox Road, Rt. 621 to Rt. 267, All phases Rte 606,, Dulles Loop. Design Build | $23,263,136.00 | $118,470,918.00 |
Virginia | 5A01181 | Fredericksburg Dist.; D-B job on Fall Hill Ave., 0.12 mi W of Gordon Shel. Blvd. to Int. of Mary W.Blvd. & Rte.1, incl. I-95 BR | $23,216,288.60 | $52,841,781.78 |
Virginia | 5A01553 | Loudun Co; CN For Rte 7; Fr:0.7 Mi. W. Of Rte 659 To:0.8 Mi. E. of Rte 659 | $16,248,900.82 | $62,737,749.00 |
Virginia | 5A01569 | Arlington Co; Route 27; Major Bridge Rehabilitation | $13,982,315.87 | $29,024,382.50 |
Virginia | 5A01583 | Loudoun Co; Rte 659; Fr: Hay Rd To: Gloucester Parkway; CN : Reconstruct to 4 lanes: Design Buildi | $1,831,436.00 | $51,449,852.72 |
Virginia | 5A01644 | Prince William County | $49,534,343.00 | $59,490,380.00 |
Virginia | 5A01704 | Town of Leesburg; Route 7 Interchange at Battlefield Parkway | $11,335,520.00 | $77,288,540.00 |
Virginia | 5A01745 | HB2 FY17 RTE 7 CORRIDOR IMPROVEMENTS - PHASE 1 and PHASE 2 | $92,920,733.95 | $225,779,197.26 |
Virginia | 5A01790 | Fairfax County - FY17 Route 7 Corridor Improvements - Phase 2 | $66,758,337.40 | $132,672,243.94 |
Virginia | 5A01907 | Potomac Town Center Garage | $20,786,672.00 | $66,332,355.90 |
Virginia | 5A01917 | Route 29 Widening - Phase II | $4,435,332.00 | $101,096,674.24 |
Virginia | 5A01992 | SPRINGFIELD CBC COMMUTER PARKING GARAGE | $43,312,000.00 | $54,140,000.00 |
Virginia | 5A03662 | CITY OF VIRGINIA BEACH-FROM 0.207 MI NORTH OF DAM NECK RD TO 0.152 MI SOUTH OF NIMMO PWY. CN FOR HOLLAND RD-UPGRADE TO 4 LANES. | $30,722,001.00 | |
Virginia | 5A03755 | City of Norfolk; Military Highway; Design Build | $55,957,739.57 | $105,193,209.68 |
Virginia | 5A03761 | City of Suffolk Rte 58; From Rte 58/13/32 bypass to .7 Mi West of Manning Bridge Rd: RW for Holland Rd Corridor Improvements. | $1,613,184.12 | $94,293,184.30 |
Virginia | 5A03793 | Elbows Road Phase 2B | $9,481,864.00 | $62,684,685.00 |
Virginia | 5A03794 | CITY OF VIRGINIA BEACH | $700,008.00 | $26,927,288.00 |
Virginia | 5A03857 | City of Newport News - #HB2 Atkinson Boulevard - 4 lanes | $37,095,844.00 | $60,537,493.00 |
Virginia | 5A03950 | #SMART18 - Laskin Road Phase 1-A | $27,754,965.00 | $49,616,391.00 |
Virginia | 5A03956 | #HB2.FY17 RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY | $12,515,031.00 | $43,711,511.00 |
Virginia | 5A03972 | #SMART18 - SKIFFES CREEK CONNECTOR | $29,481,144.00 | $36,851,433.00 |
Virginia | 5A03992 | I-64 HRBT Expansion Project - Design-Build Contract | $267,491,666.99 | $3,935,409,912.00 |
Virginia | 5A27328 | Chesterfield Co, FR: 1.73 Miles W TO: 0.27 MIles E of Rte 618 (Old Bermuda Hundred Road), Rte 10 Major Widening | $26,815,763.77 | $69,750,955.06 |
Virginia | 5A27911 | COMMERCE ROAD WIDENING | $13,520,759.25 | $33,181,888.00 |
Virginia | 5A27943 | Southern Section Patton Park to West Hundred Road | $2,000,000.00 | $66,346,850.00 |
Virginia | 5A27949 | I US 360 Hull Street Safety / Operational Improvements - Phase I | $14,882,191.00 | $26,059,885.00 |
Virginia | 5A27950 | Sadler Road-Reconstruction | $16,154,773.00 | $29,059,607.00 |
Virginia | 5B01078 | Widen Route 28 from 4 to 6 Lanes Divided | $32,393,482.31 | $73,982,000.00 |
Virginia | 5B01104 | NORTHSTAR BLVD EXTENSION SHREVEPORT DR TO ROUTE 50 | $25,000,000.00 | $89,996,999.40 |
Virginia | 5B01135 | #HB2.FY17 WIDEN ROUTE 1 TO SIX LANES | $30,421,827.91 | $39,492,681.00 |
Virginia | 5B01444 | ROLLING ROAD - RTE 638 - WIDEN TO 4 LANES - PH II | $47,719,526.00 | |
Virginia | 5B01449 | POPES HEAD ROAD INTERCHANGE | $27,671,595.55 | $67,361,338.55 |
Virginia | 5B01488 | Route 286 (Fairfax County Parkway) - Widen from four to six Lanes | $90,384,494.00 | |
Virginia | 5B01540 | Fairfax County Parkway Widening - Southern Segment | $3,706,863.00 | $128,770,360.00 |
Virginia | 5B03361 | Wythe Creek Road-Widen 3 Lanes | $35,341,419.00 | $54,118,689.00 |
Virginia | 9611099 | City of Bristol; Various Locations I-81 | $18,785,285.80 | $40,751,279.75 |
Virginia | 9655077 | Hampton Rds Districtwide - Rte 58 - Downtown & Midtown Tunnels; extension of MLK to I-264 - PE for DT/MT/MLK Primary Debt Service | $445,843,211.07 | $564,265,078.23 |
Virginia | 9655079 | Hampton Rds PPTA: Interstate/Primary Design/ROW/Upgrade and Construction of Downtown & Midtown Tunnels; extension of MLK to I-264 | $2,139,358,000.00 | |
Virginia | BR09247 | Fairfax Co: WWB - TAMS Contract- I-95 Fr: Eisenhower Ave Connector - Rte 414 Marlyland; Interstate TAMS Contract for maintenance | $8,944,144.00 | $36,404,057.00 |
Virginia | PM00216 | Statewide: Contract for Pavement data collection -- condition of roadway - Multi-year contract | $26,043,832.10 | $35,273,320.55 |
Virginia | PM01339 | Bristol Districtwide Paving | $11,771,020.00 | $97,999,999.52 |
Virginia | PM01348 | Bristol Districtwide Paving | $13,130,966.00 | $95,000,000.00 |
Virginia | PM01352 | Bristol Districtwide Paving | $98,000,000.00 | |
Virginia | PM02458 | Salem Districtwide Paving; Interstate and Secondary | $49,885,946.00 | $52,186,185.00 |
Virginia | PM02461 | Salem Districtwide Paving - Plant mix | $61,477,034.53 | $98,000,000.00 |
Virginia | PM02477 | Salem Districtwide Paving | $10,147,238.00 | $95,000,000.00 |
Virginia | PM02492 | Salem Districtwide Paving | $5,630,227.00 | $98,000,000.00 |
Virginia | PM03369 | Lynchburg Districtwide Paving | $59,764,178.30 | $90,000,000.00 |
Virginia | PM03371 | Lynchburg Districtwide Paving | $27,715,849.00 | $56,000,000.00 |
Virginia | PM03380 | Lynchburg Districtwide Paving | $10,468,508.00 | $60,000,000.00 |
Virginia | PM03384 | Lynchburg Districtwide Paving | $705,140.00 | $60,000,000.00 |
Virginia | PM04473 | Richmond Districtwide Paving; Interstate and Secondary | $47,925,339.00 | $49,981,025.16 |
Virginia | PM04474 | Richmond Districtwide Paving; Primary | $64,070,300.00 | $90,148,885.85 |
Virginia | PM04498 | Richmond Districtwide Paving: Interstate and Primary | $31,982,300.00 | $84,000,000.00 |
Virginia | PM04499 | Richmond Districtwide Paving: Secondary | $40,000,000.00 | |
Virginia | PM04516 | Richmond Districtwide Paving | $12,138,141.14 | $110,000,000.00 |
Virginia | PM04531 | Richmond Disrtictwide Paving | $471,766.00 | $98,000,000.00 |
Virginia | PM05443 | Hampton Roads Districtwide Paving | $32,590,560.00 | $90,000,000.00 |
Virginia | PM05462 | Hampton Roads Districtwide Paving | $14,311,423.15 | $98,000,000.00 |
Virginia | PM05521 | Hampton Roads Districtwide Paving | $10,340,635.00 | $90,000,000.00 |
Virginia | PM05537 | Hampton Roads Districtwide Paving | $98,000,000.00 | |
Virginia | PM06399 | Fredericksburg Districtwide Paving | $21,106,297.00 | $98,000,000.00 |
Virginia | PM06403 | Fredericksburg Districtwide Paving | $1,750,000.00 | $90,000,000.00 |
Virginia | PM06406 | Fredericksburg Districtwide Paving | $1,251,457.00 | $98,000,000.00 |
Virginia | PM07314 | Culpeper Districtwide Paving | $45,275,193.00 | $47,711,814.12 |
Virginia | PM07318 | Culpeper Districtwide Paving | $15,432,500.00 | $70,000,000.00 |
Virginia | PM07325 | Culpeper Districtwide Paving | $1,750,000.00 | $60,000,000.00 |
Virginia | PM07329 | Culpeper Districtwide Paving | $1,156,545.00 | $60,000,000.00 |
Virginia | PM08451 | Staunton Districtwide Paving | $72,955,400.00 | $90,000,000.00 |
Virginia | PM08452 | Staunton Districtwide Paving | $66,782,188.91 | $88,228,490.68 |
Virginia | PM08465 | Staunton Districtwide Paving | $36,015,386.00 | $95,000,000.00 |
Virginia | PM08469 | Staunton Districtwide Paving | $950,000.00 | $98,000,000.00 |
Virginia | PM09356 | Northern Virginia Districtwide Paving; Interstate and Primary; NHS Routes | $23,629,711.00 | $52,604,908.17 |
Virginia | PM09357 | Northern Virginia Districtwide Paving; Secondary | $90,000,000.00 | |
Virginia | PM09360 | Northern Virginia Districtwide Paving: Interstate and Primary | $22,500,700.15 | $85,000,000.00 |
Virginia | PM09361 | Northern Virginia Districtwide Paving: Secondary | $90,000,000.00 | |
Virginia | PM09369 | Northern Virginia Districtwide Paving | $7,536,455.00 | $90,000,000.00 |
Virginia | PM09370 | Northern Virginia Districtwide Paving | $90,000,000.00 | |
Virginia | PM09374 | Northen Virginia Districtwide Paving | $1,133,755.00 | $90,000,000.00 |
Virginia | PM09375 | Northern Virginia Districtwide Paving | $98,000,000.00 | |
Virginia | TS00252 | Statewide- Multiple Districts- Various Locations- Project to support Statewide TOCs, SSP, and ITS | $263,845,620.36 | $280,142,584.15 |
Virginia | TS00263 | Statewide;Multiple Districts; Statewide TOC, SSP, & ITS Devices Contract-Statewide Task Order | $67,392,068.00 | |
Virginia | TS05271 | CITY OF HAMPTON-FROM HRBT SOUTH SHORE NORFOLK TO HRBT NORTH SHORE-HAMPTON. CN FOR HRBT SWITCHGEAR INSTALLATION. | $15,739,002.00 | $26,633,756.00 |
Virginia | TS05293 | Tunnels and Movable Bridge Staff Augmentation | $23,120,900.00 | $87,500,000.00 |
Virginia | TS05305 | CONTROL ROOM & FIELD OPS FOR MONITOR MERRIMAC BRIDGE TUNNEL | $35,816,875.00 | |
Virginia | TS05306 | CONTROL ROOM & FIELD OPS FOR HAMPTON RDS BRIDGE TUNNEL | $55,083,125.00 |