RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Alabama 0001610 Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $35,323,246.66 $44,154,058.33
Alabama 0001610 Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,768,908.74 $7,211,135.93
Alabama 0002516 Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $13,371,939.74 $16,714,924.68
Alabama 0002516 Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,261,832.45 $1,577,290.57
Alabama 0002516 Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,917,477.00 $3,646,846.25
Alabama 0002516 Lauderdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,651,761.49 $5,814,701.86
Alabama 0002516 Lauderdale >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity $11,675,077.00 $14,593,846.25
Alabama 0002516 Lauderdale >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way $3,204,923.00 $4,006,153.75
Alabama 0006562 Pickens >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP New  Construction Roadway $3,223,186.98 $3,223,186.98
Alabama 0006562 Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $25,839,863.88 $32,299,829.85
Alabama 0006562 Pickens >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM New  Construction Roadway $21,744,588.00 $27,180,735.00
Alabama 0006562 Pickens >= 5,000 AND < 50,000 State TECHNOLOGY DEPLOYMENT GRANTS T New  Construction Roadway $524,348.58 $655,435.73
Alabama 0006576 Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $47,816,532.75 $59,770,665.94
Alabama 0006576 Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $705,330.85 $881,663.57
Alabama 0006576 Pickens >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $386,468.21 $483,085.26
Alabama 0007549 Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Preliminary Engineering $1,365,049.82 $1,365,049.82
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Preliminary Engineering $871,852.18 $871,852.18
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way $1,099,632.28 $1,099,632.28
Alabama 0007549 Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way $1,721,682.72 $1,721,682.72
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Utilities $423,642.43 $529,553.05
Alabama 0007549 Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $663,292.52 $829,115.64
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $21,282,261.38 $26,613,641.12
Alabama 0007549 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $33,321,413.34 $41,668,698.67
Alabama 0007549 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,419,538.89 $1,774,423.61
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $906,654.14 $1,133,317.68
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,923,649.00 $3,654,561.24
Alabama 0007549 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,577,526.54 $5,721,908.18
Alabama 0007549 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,714,698.20 $3,393,372.74
Alabama 0007549 Bibb >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,733,867.53 $2,167,334.43
Alabama 0013568 Tuscaloosa >= 200,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity $34,109.25 $42,636.56
Alabama 0013568 Tuscaloosa >= 200,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity $360,000.00 $450,000.00
Alabama 0013568 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $6,118,821.09 $13,373,512.65
Alabama 0013568 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $466,248.18 $582,810.23
Alabama 0013568 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $5,002,287.88 $6,252,859.87
Alabama 0013568 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $466,312.19 $582,890.24
Alabama 0013568 Tuscaloosa >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity $8,265.00 $10,331.25
Alabama 0013568 Tuscaloosa >= 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity $965,135.00 $1,206,418.75
Alabama 0013568 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $3,639,295.49 $4,549,119.36
Alabama 0016522 Mobile >= 200,000 State BRIDGE PROGRAM - 15% OFF SYST Preliminary Engineering $1,851.43 $2,314.29
Alabama 0016522 Baldwin >= 200,000 State BRIDGE PROGRAM - 15% OFF SYST Preliminary Engineering $1,656.20 $2,070.25
Alabama 0016522 Baldwin >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $267,058.38 $333,822.98
Alabama 0016522 Mobile >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $298,541.62 $373,177.02
Alabama 0016522 Baldwin >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $241,750.17 $302,187.71
Alabama 0016522 Mobile >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $270,249.83 $337,812.29
Alabama 0016522 Baldwin >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $21,101,821.34 $26,377,276.68
Alabama 0016522 Mobile >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $16,879,970.51 $21,099,963.13
Alabama 0016522 Mobile >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $473,359.48 $591,699.35
Alabama 0016522 Baldwin >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $423,440.52 $529,300.65
Alabama 0025556 Cherokee >= 5,000 AND < 50,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity $1,502,432.00 $1,924,529.60
Alabama 0025556 Etowah >= 50,000 AND < 200,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity $3,137,568.00 $4,019,045.45
Alabama 0025556 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $10,794,031.96 $13,795,157.19
Alabama 0025556 Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $22,541,458.96 $28,808,787.20
Alabama 0025556 Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,737,240.12 $2,171,550.15
Alabama 0025556 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $831,881.62 $1,039,852.03
Alabama 0025556 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $664,479.48 $842,526.93
Alabama 0025556 Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,387,649.85 $1,759,471.00
Alabama 0035521 Montgomery >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Bridge New Construction $2,197,328.09 $2,746,660.11
Alabama 0035521 Montgomery >= 200,000 N/A TRANSPORTATION IMP PROJ New  Construction Roadway $26,972,965.90 $33,716,207.38
Alabama 0042501 Mobile >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way $57,407.50 $71,759.37
Alabama 0042501 Mobile >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Bridge New Construction $48,863,096.60 $61,078,870.75
Alabama 0042501 Mobile >= 200,000 N/A NATIONAL HIGHWAY SYSTEM New  Construction Roadway $1,118,654.77 $1,398,318.47
Alabama 0042501 Mobile >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way $3,641,610.82 $4,552,013.53
Alabama 0042501 Mobile >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $1,355,024.56 $1,693,780.71
Alabama 0042501 Mobile >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $11,637,990.40 $14,547,488.00
Alabama 0042501 Mobile >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $296,985.77 $371,232.21
Alabama 0042509 Mobile >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $29,230,400.00 $36,538,000.00
Alabama 0042509 Mobile >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $24,908.50 $31,135.63
Alabama 0042509 Mobile >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $163,040.00 $203,800.00
Alabama 0042509 Mobile >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $324,592.94 $405,741.18
Alabama 0042509 Mobile >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $216,784.12 $270,980.15
Alabama 0157506 Cullman >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Utilities $535,800.00 $669,750.00
Alabama 0157506 Cullman >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $2,933,863.00 $3,667,328.75
Alabama 0157506 Cullman >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $147,640.80 $184,551.00
Alabama 0157506 Cullman >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,406,180.22 $3,007,725.28
Alabama 0157506 Cullman >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $20,359.20 $25,449.00
Alabama 0157506 Cullman >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - No Added Capacity $14,000,000.00 $17,500,000.00
Alabama 0193509 Mobile >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $8,713,192.06 $10,891,490.08
Alabama 0193509 Mobile >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $28,134,280.19 $35,167,850.24
Alabama 0193509 Mobile >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $800,000.00 $1,000,000.00
Alabama 0210509 Houston >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $200,405.27 $250,506.59
Alabama 0210509 Houston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $44,400,505.74 $55,500,632.18
Alabama 0220253 Baldwin >= 200,000 N/A NATL INTRASTRUCTURE INVESTMENT Other $14,404,831.00 $25,060,134.88
Alabama 0355503 Franklin >= 5,000 AND < 50,000 State APPALACHIA DEVELOPMENT HWY Utilities $270,080.01 $337,600.01
Alabama 0355503 Franklin >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - No Added Capacity $24,522,247.28 $29,587,447.28
Alabama 0355503 Franklin >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering $624,800.00 $781,000.00
Alabama 0355503 Franklin >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $220,898.42 $276,123.03
Alabama 0355503 Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $72,800.00 $91,000.00
Alabama 1602542 Jefferson >= 200,000 State APPALACHIAN DEV HWY INFRA PRGM New  Construction Roadway $64,356,037.86 $64,356,037.86
Alabama 1602542 Jefferson >= 200,000 State APPALACHIAN DEV HWY INFRA PRGM Preliminary Engineering $1,450,000.00 $1,450,000.00
Alabama 1602542 Jefferson >= 200,000 State APPALACHIAN DEVEL HWY New  Construction Roadway $8,578,914.48 $8,578,914.48
Alabama 1602542 Jefferson >= 200,000 State HIGHWAY PROJECTS,DEMOS S378 New  Construction Roadway $11,988,476.87 $11,988,476.87
Alabama 3716258 Jefferson >= 200,000 Other CONGESTION AIR QUALITY Facilities for Pedestrians and Bicycles $8,000,000.00 $10,000,000.02
Alabama 3716258 Jefferson >= 200,000 Other HIGHWAY INFRA PRGM - COVID APP Facilities for Pedestrians and Bicycles $2,500,000.00 $2,500,000.00
Alabama 3716258 Statewide N/A Other NATIONAL HIGHWAY PERF PROGRAM Debt Service $1,635,200.00 $2,044,000.00
Alabama 3716258 Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles $33,170,923.52
Alabama 3716258 Statewide N/A Other NATIONAL HWY FREIGHT PGM Debt Service $719,942.22 $899,927.78
Alabama 4517252 Madison >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity $4,936,028.31 $17,911,760.64
Alabama 4517252 Madison >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT Right of Way $938,138.00 $1,200,000.00
Alabama 4517252 Madison >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT Utilities $3,394,637.69 $4,243,297.11
Alabama 4517252 Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,378,889.66 $2,973,612.08
Alabama 4917250 Mobile >= 200,000 Other NATL INTRASTRUCTURE INVESTMENT Other $14,465,044.00 $16,951,777.00
Alabama 4917250 Mobile >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Other $6,660,000.00 $8,325,000.00
Alabama 7002600 Jefferson >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $3,284,740.11 $4,105,925.14
Alabama 7002600 Jefferson >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Utilities $1,183,133.89 $1,478,917.37
Alabama 7002600 Jefferson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $19,171,934.71 $23,964,918.39
Alabama 7002600 Jefferson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,426,842.49 $6,783,553.11
Alabama 7002600 Jefferson >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $978,870.14 $1,223,587.68
Alabama 7009600 Jefferson >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Right of Way $1,571,648.38 $1,964,560.48
Alabama 7009600 Jefferson >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities $78,599.33 $98,249.17
Alabama 7009600 Jefferson >= 200,000 State HIGHWAY BRIDGE PROGRAM Right of Way $652,432.00 $815,540.00
Alabama 7009600 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $19,975,581.06 $24,969,476.33
Alabama 7009600 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $518,432.67 $673,849.26
Alabama 7503600 Mobile >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $853,635.00 $1,067,043.75
Alabama 7503600 Mobile >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,100,000.00 $1,375,000.00
Alabama 7503600 Mobile >= 200,000 Local NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $500,000.00 $625,000.00
Alabama 7503600 Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $8,580,754.71 $10,729,545.00
Alabama 7503600 Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $1,195,188.70 $1,497,162.57
Alabama 7503600 Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $11,363,000.00 $14,204,800.66
Alabama 7503600 Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,313,819.48 $1,642,274.35
Alabama 7503600 Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,193,362.08 $6,491,702.60
Alabama 7503600 Mobile >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,263,530.41 $1,579,413.02
Alabama 9070900 Morgan >= 50,000 AND < 200,000 State EMERGENCY RELIEF 4R - Restoration & Rehabilitation $20,950,118.45 $26,187,648.07
Alabama 9070900 Morgan >= 50,000 AND < 200,000 State EMERGENCY RELIEF Preliminary Engineering $1,073,447.97 $1,341,809.96
Alabama 9070900 Morgan >= 50,000 AND < 200,000 State EMERGENCY RELIEF Right of Way $13,607.25 $17,009.06
Alabama 9070900 Morgan >= 50,000 AND < 200,000 State TECHNOLOGY DEPLOYMENT GRANTS T 4R - Restoration & Rehabilitation $741,493.00 $926,866.25
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $212,912.35 $266,140.44
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $1,254,204.22 $1,567,755.29
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,603,046.73 $2,003,808.43
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $1,561,875.71 $1,952,344.64
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,208,132.34 $20,260,165.42
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $400,000.00 $500,000.00
Alabama A107900 Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $598,893.08 $748,616.35
Alabama A115900 Coffee >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Utilities $291,525.42 $364,406.78
Alabama A115900 Coffee >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,699,133.00 $2,123,916.25
Alabama A115900 Coffee >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $243,780.00 $304,725.00
Alabama A115900 Coffee >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $7,529,662.00 $9,412,077.50
Alabama A115900 Coffee >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way $164,169.03 $205,211.29
Alabama A115900 Coffee >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Utilities $739,706.01 $924,632.51
Alabama A115900 Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $5,939,494.66 $7,424,368.32
Alabama A115900 Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $238,451.00 $298,063.75
Alabama A115900 Coffee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,988,112.15 $6,235,140.19
Alabama ATRP001 Statewide N/A N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way $270,111.39 $337,639.24
Alabama ATRP001 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $18,611,317.52 $21,335,563.70
Alabama ATRP001 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $7,002,879.84 $8,753,679.82
Alabama ATRP001 Geneva >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $30,430.46 $38,038.08
Alabama ATRP001 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $4,172,213.00 $5,215,228.30
Alabama ATRP001 Russell >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $345,253.18 $431,566.48
Alabama ATRP001 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $448,444,304.96 $563,952,324.48
Alabama ATRP002 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $688,107.82 $20,597,520.69
Alabama ATRP002 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,315,926.24
Alabama ATRP002 Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $516,703.04 $722,271.98
Alabama ATRP002 Fayette >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $516,703.04 $722,271.97
Alabama ATRP002 Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $3,169,652.94 $3,962,165.87
Alabama ATRP002 Shelby >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $40,162.29 $50,202.87
Alabama ATRP002 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $33,166,265.26 $41,915,052.19
Alabama ATRP003 Statewide N/A State BRIDGE PROGRAM - 15% OFF SYST Debt Service $23,407.87 $29,249.50
Alabama ATRP003 Statewide N/A State BRIDGE PROGRAM - 85% ON/OFF 4R - No Added Capacity $577,413.66
Alabama ATRP003 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $1,821,408.00 $2,277,287.22
Alabama ATRP003 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $9,120,842.83
Alabama ATRP003 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $1,355,086.23 $31,630,106.22
Alabama ATRP003 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $10,099,993.60
Alabama ATRP003 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $11,533,796.34
Alabama ATRP003 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $7,699,725.07 $10,237,182.41
Alabama ATRP003 Statewide N/A State TECHNOLOGY DEPLOYMENT GRANTS T Bridge Replacement - Added Capacity $479,670.00 $599,587.50
Alabama ATRP004 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $1,355,876.14 $33,535,813.59
Alabama ATRP004 Lowndes >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $1,053,326.02 $1,360,397.63
Alabama ATRP004 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $52,931.90 $1,776,164.69
Alabama ATRP004 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,630,835.85
Alabama ATRP004 Lawrence >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $267,054.08 $1,337,930.96
Alabama ATRP004 Fayette >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,466,873.54
Alabama ATRP004 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $3,917,658.94 $5,009,507.39
Alabama ATRP005 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $731,450.15 $34,380,518.74
Alabama ATRP005 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $873,000.00
Alabama ATRP005 Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $474,853.48 $602,846.47
Alabama ATRP005 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $481,648.46
Alabama ATRP005 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $196,168.00 $12,901,171.61
Alabama ATRP005 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $749,624.81 $1,029,798.24
Alabama ATRP006 Statewide N/A State CARBON REDUCTION PROGRAM Debt Service $257,615.07 $514,256.38
Alabama ATRP006 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $453,498.32 $22,460,581.60
Alabama ATRP006 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $2,476,376.79
Alabama ATRP006 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,246,330.23
Alabama ATRP006 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $847,457.84 $2,982,080.00
Alabama ATRP006 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $6,056,827.06
Alabama ATRP006 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $286,905.34 $358,631.69
Alabama ATRP007 Macon >= 5,000 AND < 50,000 Local BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity $1,640,908.85
Alabama ATRP007 Macon >= 5,000 AND < 50,000 Local BRIDGE PROGRAM - 15% OFF SYST Debt Service $11,420.42 $14,275.53
Alabama ATRP007 Statewide N/A State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity $4,311,305.81
Alabama ATRP007 Russell >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM -APPOR Debt Service $20,250,000.00 $20,250,000.00
Alabama ATRP007 Russell >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Debt Service $402,800.00 $476,416.67
Alabama ATRP007 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $1,201,737.23 $29,018,902.51
Alabama ATRP007 Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $8,351,592.56
Alabama ATRP007 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $2,272,932.70
Alabama ATRP007 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $649,822.86 $11,191,602.15
Alabama ATRP007 Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $9,348,749.81
Alabama ATRP007 Russell >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $3,274,800.95
Alabama ATRP007 Russell >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $9,903,629.04 $12,379,536.31
Alabama ATRP008 Statewide N/A N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity $853,741.20
Alabama ATRP008 Statewide N/A N/A CONGESTION AIR QUALITY 4R - Maintenance  Resurfacing $222,884.77 $278,605.96
Alabama ATRP008 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $5,551,524.16
Alabama ATRP008 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $661,056.52 $24,812,520.31
Alabama ATRP008 Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $734,034.03 $969,105.05
Alabama ATRP008 Marion >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $21,675.18 $27,093.98
Alabama ATRP008 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,902,156.33 $20,722,825.96
Alabama ATRP008 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $402,592.00 $503,240.01
Alabama ATRP009 Statewide N/A N/A BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity $597,911.60
Alabama ATRP009 Jefferson >= 200,000 Local CONGESTION AIR QUALITY 4R - Maintenance  Resurfacing $380,546.47 $475,683.09
Alabama ATRP009 Shelby >= 200,000 Local CONGESTION AIR QUALITY 4R - Maintenance  Resurfacing $114.20 $142.75
Alabama ATRP009 Statewide N/A N/A RAIL HWY CROSSING HAZ ELI Rail/Hwy Crossing $605,320.34 $605,320.34
Alabama ATRP009 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $4,800,032.06
Alabama ATRP009 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $19,799,375.60
Alabama ATRP009 Jefferson >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $629,726.06 $787,157.58
Alabama ATRP009 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $9,111,660.03
Alabama ATRP009 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,314,266.78 $21,802,882.80
Alabama ATRP009 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $437,645.19 $649,972.44
Alabama ATRP009 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $436,177.30
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $18,750,364.14
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $3,447,666.49
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $7,664,986.07
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $23,554,277.18
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $4,060,710.57 $5,078,613.30
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $5,306,625.50
Alabama ATRP010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Utilities $199,405.88 $291,498.60
Alabama ATRP011 Russell >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $262,806.00 $328,507.50
Alabama ATRP011 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $17,748,422.41
Alabama ATRP011 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $2,970,332.10
Alabama ATRP011 Russell >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $2,835,571.01 $3,544,463.76
Alabama ATRP011 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $17,196,206.86
Alabama ATRP011 Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $7,530.30 $11,056.53
Alabama ATRP011 Lamar >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $624,955.71
Alabama ATRP011 Coosa >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $498,059.96 $622,574.95
Alabama ATRP012 Statewide N/A N/A BRIDGE PROGRAM - 15% OFF SYST Bridge Replacement - No Added Capacity $279,272.14
Alabama ATRP012 Statewide N/A N/A CONGESTION AIR QUALITY 4R - Maintenance  Resurfacing $420,363.85 $525,454.82
Alabama ATRP012 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $9,664,310.00
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,064,451.71
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $29,424,718.49
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,627,049.28 $3,228,570.65
Alabama ATRP012 Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $6,929,101.80
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $923,351.76
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $2,400,561.33 $10,803,649.24
Alabama ATRP012 Shelby >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $5,288,820.81 $6,611,026.01
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $183,124.78 $228,926.14
Alabama ATRP012 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,086,112.70
Alabama ATRP013 Cleburne >= 5,000 AND < 50,000 Local HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $2,815,132.20 $3,810,882.23
Alabama ATRP013 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $9,515,402.99 $11,216,231.01
Alabama ATRP013 Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $31,438.09
Alabama ATRP013 Limestone >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $1,212,240.10
Alabama ATRP013 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,425,224.95
Alabama ATRP013 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $517,842.12 $13,569,434.93
Alabama ATRP013 Russell >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $184,472.15 $230,590.19
Alabama ATRP013 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $11,568,366.14
Alabama ATRP013 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $12,697,452.76
Alabama ATRP013 Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $88,567.38 $113,198.31
Alabama ATRP013 Lauderdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $142,292.03 $177,865.04
Alabama ATRP013 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $415,009.96 $518,762.46
Alabama ATRP016 Statewide N/A State CARBON REDUCTION PROGRAM Debt Service $206,995.68 $258,994.03
Alabama ATRP016 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $10,117,737.96
Alabama ATRP016 Madison >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $10,285,552.48 $12,856,940.60
Alabama ATRP016 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $1,385,141.05 $2,709,445.62
Alabama ATRP016 Greene >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $57,449.49 $71,811.87
Alabama ATRP016 Greene >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Debt Service $9,554,228.51 $12,602,933.20
Alabama ATRP016 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $9,854,141.87 $12,447,789.32
Alabama ATRP017 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $4,644,311.63 $25,035,128.20
Alabama ATRP017 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $7,990,356.12
Alabama ATRP017 Tuscaloosa >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $740,566.42
Alabama ATRP017 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,743,567.50
Alabama ATRP017 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $209,959.53 $8,514,226.00
Alabama ATRP017 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $597,322.82 $746,653.55
Alabama ATRP017 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $573,738.19
Alabama I022309 Marion >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering $78,089.59 $86,766.21
Alabama I022309 Marion >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $22,433,329.48 $24,925,921.64
Alabama I059383 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $286,168,734.50
Alabama I059383 Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service $10,005,352.23 $11,117,058.04
Alabama I059383 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $7,592,848.63 $8,499,748.43
Alabama I059383 Jefferson >= 200,000 Other NATIONAL HWY FREIGHT PGM Debt Service $40,583,177.75 $45,092,419.74
Alabama I059383 Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $438,105.96 $486,784.40
Alabama I059385 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $182,460,146.50
Alabama I059385 Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $162,846,716.69
Alabama I059385 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $42,959,966.44 $47,733,296.06
Alabama I059385 Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service $4,945,634.00 $5,495,148.89
Alabama I059385 Jefferson >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service $38,346,473.31 $42,607,192.56
Alabama I059385 Jefferson >= 200,000 State NATIONAL HWY FREIGHT PGM Debt Service $68,633,548.59 $76,259,498.44
Alabama I059385 Jefferson >= 200,000 Other NATIONAL HWY FREIGHT PGM Debt Service $61,261,818.77 $68,068,687.52
Alabama I059385 Jefferson >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,487,306.76 $1,859,133.45
Alabama I059387 Tuscaloosa >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Maintenance  Resurfacing $19,909,113.42 $19,909,113.42
Alabama I059387 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $34,121,182.87 $42,651,478.59
Alabama I059387 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance  Resurfacing $36,448,626.93 $41,324,371.01
Alabama I059387 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,150,082.76 $1,277,869.73
Alabama I059387 Tuscaloosa >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $2,423.67 $3,029.59
Alabama I059387 Tuscaloosa >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Maintenance  Resurfacing $502,681.51 $628,351.88
Alabama I059387 Tuscaloosa >= 200,000 State REPURPOSED SPECIAL 4R - Maintenance  Resurfacing $4,722,673.82 $5,903,342.28
Alabama I059387 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $7,904,834.87 $9,367,456.24
Alabama I059387 Tuscaloosa >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,667,956.28 $2,084,945.35
Alabama I059387 Tuscaloosa >= 200,000 State TECHNOLOGY DEPLOYMENT GRANTS T 4R - Maintenance  Resurfacing $100,000.00 $125,000.00
Alabama I059394 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $15,315,692.49
Alabama I059394 Statewide N/A Other NATIONAL HIGHWAY PERF PROGRAM Debt Service $26,532,615.68 $29,480,684.10
Alabama I059394 Statewide N/A Other NATIONAL HWY FREIGHT PGM Debt Service $11,795,616.68 $13,106,240.76
Alabama I059407 DeKalb >= 50,000 AND < 200,000 State INTERSTATE - 56 4R - No Added Capacity $67,471.21 $74,968.01
Alabama I059407 DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity $479,564.13 $532,849.04
Alabama I059407 DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $630,540.00 $700,600.00
Alabama I059407 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $22,069,510.04 $24,521,677.82
Alabama I059407 DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $11,783,349.38 $13,092,610.42
Alabama I059409 DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $380,801.65 $423,112.95
Alabama I059409 Etowah >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $280,786.32 $311,984.80
Alabama I059409 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $21,572,683.13 $23,969,647.92
Alabama I059409 Etowah >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $15,906,744.48 $17,674,160.53
Alabama I059409 Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $6,367,222.69 $7,074,691.88
Alabama I059409 DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $8,635,209.90 $9,594,677.66
Alabama I059422 DeKalb >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $420,542.45 $467,269.40
Alabama I059422 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $16,792,693.45 $18,658,548.28
Alabama I059422 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $508,499.97 $564,999.97
Alabama I059422 DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $31,500,000.00 $35,000,000.00
Alabama I059423 DeKalb >= 50,000 AND < 200,000 State FTA HWY PROJ. TRF FHWA 4R - No Added Capacity $10,000,000.00 $12,500,000.00
Alabama I059423 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $27,999,633.02 $31,110,703.36
Alabama I059423 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $813,486.79 $903,874.21
Alabama I059423 DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $8,695,796.49 $9,661,996.10
Alabama I059426 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $1,661,725.93 $1,846,362.14
Alabama I059426 Etowah >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $1,170,671.71 $1,300,746.35
Alabama I059426 Etowah >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $557,974.91 $619,972.12
Alabama I059426 DeKalb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $792,025.09 $880,027.88
Alabama I059426 Etowah >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - No Added Capacity $5,629,754.09 $6,255,282.32
Alabama I059426 DeKalb >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - No Added Capacity $7,991,231.19 $8,879,145.77
Alabama I059426 DeKalb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $23,803,648.38 $26,448,498.20
Alabama I059426 Etowah >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $16,769,466.88 $18,632,740.98
Alabama I059429 Jefferson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $88,548,990.28 $100,055,356.25
Alabama I065354 Shelby >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $77,735,925.07 $96,194,906.34
Alabama I065354 Shelby >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $114,539.04 $143,173.80
Alabama I065416 Conecuh >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $816,303.82 $1,020,379.78
Alabama I065416 Conecuh >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - No Added Capacity $1,150,000.00 $1,150,000.00
Alabama I065416 Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $16,886,100.00 $21,107,625.00
Alabama I065416 Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $914,022.51 $1,142,528.13
Alabama I065416 Conecuh >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity $406,314.41 $507,893.01
Alabama I065416 Conecuh >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity $3,599,585.59 $4,499,481.99
Alabama I065497 Conecuh >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $46,604,500.19 $51,782,777.98
Alabama I065497 Conecuh >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,530,000.00 $1,700,000.00
Alabama I065505 Morgan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preservation $7,156,569.68 $7,951,744.08
Alabama I065505 Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preservation $20,689,205.68 $22,988,006.32
Alabama I065505 Morgan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $165,633.12 $184,036.80
Alabama I065505 Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $478,835.26 $532,039.18
Alabama I085362 Lee >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Restoration & Rehabilitation $16,000,000.00 $17,777,777.78
Alabama I085362 Lee >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -ALLOC 4R - Restoration & Rehabilitation $10,855,000.00 $13,568,750.00
Alabama I085362 Lee >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $613,000.00 $681,111.11
Alabama I085362 Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $10,197,141.22 $11,330,156.91
Alabama I085362 Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,921,016.48 $2,134,462.76
Alabama I085362 Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $136,802.25 $152,002.50
Alabama I085362 Lee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $346,129.50 $384,588.33
Alabama I085362 Lee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $390,735.26 $434,150.29
Alabama I085365 Macon >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $426,654.94 $474,061.01
Alabama I085365 Montgomery >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $473,345.06 $525,938.99
Alabama I085365 Montgomery >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $655,597.37 $728,441.51
Alabama I085365 Macon >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $590,930.07 $656,588.98
Alabama I085365 Montgomery >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $67,840.43 $75,378.26
Alabama I085365 Macon >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering $61,148.79 $67,943.09
Alabama I085365 Macon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $18,394,254.83 $20,438,060.92
Alabama I085365 Montgomery >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $20,407,194.50 $22,674,660.56
Alabama I085365 Montgomery >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $122,659.18 $136,288.00
Alabama I085365 Macon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $110,560.24 $122,844.69
Alabama I565315 Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $4,489,149.94 $5,611,437.42
Alabama I565315 Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $25,744,091.60 $32,180,114.50
Alabama I565315 Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance  Resurfacing $2,941,648.39 $3,268,498.21
Alabama I565315 Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance  Resurfacing $512,952.68 $569,947.42
Alabama I565315 Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $424,663.99 $504,845.30
Alabama I565315 Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,435,336.01 $2,895,154.70
Alabama I565315 Madison >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $25,071.34 $31,339.18
Alabama I565315 Limestone >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,371.84 $5,464.80
Alabama PE10917 Madison >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $30,000,000.00 $30,000,000.00
Alabama PE10917 Madison >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Utilities $404,417.00 $505,521.25
Alabama PE10917 Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $6,819,777.36 $8,524,721.70
Alabama PE10917 Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $842,234.54 $1,052,793.17
Alabama PE10917 Madison >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,431,972.14 $5,539,965.17