RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Arizona | 008B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $327,179.56 | $1,135,579.06 |
Arizona | 008B213 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,248,758.30 | $14,746,645.66 |
Arizona | 008B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $62,680.93 | $113,424.53 |
Arizona | 008B213 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $813,975.48 | $1,472,799.01 |
Arizona | 008B213 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,887,082.37 | $14,441,115.25 |
Arizona | 008B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $376,334.30 | $1,112,051.42 |
Arizona | 008B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $46,960.84 | $133,309.18 |
Arizona | 008B213 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $546,075.96 | $1,663,335.34 |
Arizona | 008B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $74,137.94 | $78,586.04 |
Arizona | 008B213 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $200,106.06 | $212,111.96 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,251,879.00 | $3,448,440.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $198,293.00 | $765,725.54 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $362,269.00 | $442,487.89 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,682,434.00 | $40,183,665.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,040,429.00 | $9,100,492.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,392,682.00 | $4,239,475.96 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,081,669.74 | $7,579,743.71 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,669.00 | $19,800.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $28,147,860.00 | $30,681,167.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,716,393.00 | $1,870,869.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $3,135,747.00 | $3,417,964.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $487,409.00 | $4,000,860.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $55,578.00 | $354,440.00 |
Arizona | 010A232 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $57,013.00 | $540,567.00 |
Arizona | 010A235 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,014,249.00 | $21,215,019.00 |
Arizona | 010A235 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $943,058.00 | $999,638.00 |
Arizona | 010A235 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,345,821.00 | $2,686,784.00 |
Arizona | 010A235 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,186,636.00 | $3,399,243.97 |
Arizona | 010A235 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $357,101.00 | $378,526.00 |
Arizona | 010A236 | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $30,694,084.00 | $30,898,011.00 |
Arizona | 010A236 | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,319,943.00 | $3,342,000.00 |
Arizona | 010A236 | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,687,401.00 | $3,714,063.00 |
Arizona | 010A236 | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $409,465.00 | $434,031.00 |
Arizona | 010A236 | La Paz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,152.00 | $7,200.00 |
Arizona | 010A239 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $943,400.00 | $29,605,180.00 |
Arizona | 010A239 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,040,000.00 | |
Arizona | 010A239 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,104,044.00 | |
Arizona | 010A239 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,600.00 | |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINT DISC | Debt Service | $1,243,742.00 | $1,243,742.00 |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $1,254,500.00 | |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | $2,029,948.25 | |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $1,007,733.29 | |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $65,135,210.34 | $65,135,210.34 |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $25,597,763.36 | $25,597,763.36 |
Arizona | 010B201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,042,923.44 | $2,042,923.44 |
Arizona | 010B201 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $1,072,271.37 | $1,072,271.37 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Other | $15,305.00 | $16,223.73 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $447,553.00 | $474,404.00 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $80,706.00 | $85,548.00 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $80,516.00 | $85,347.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $18,158,707.00 | $22,698,384.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $1,841,293.00 | $2,301,616.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,182,368.81 | $5,227,961.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $8,411,922.00 | $10,514,902.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,727,509.19 | $4,536,076.79 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,880,946.93 | $2,304,593.65 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $20,400.00 | $25,500.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,037,740.00 | $1,100,000.00 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $375,150.00 | $397,657.00 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,123,531.00 | $2,250,934.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,193,862.00 | $2,325,484.00 |
Arizona | 010C206 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,421,021.00 | $1,506,276.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,330,194.00 | $1,410,000.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $81,259.00 | $101,574.00 |
Arizona | 010C206 | Pinal | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $357,078.19 | $446,348.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $25,437,655.00 | $25,437,655.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $426,921.00 | $452,534.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,695,411.00 | $3,917,120.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $322,544,306.96 | $401,490,005.61 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $65,204,512.00 | $123,049,693.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19,571,528.00 | $20,745,737.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,555,784.00 | $18,943,513.93 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $41,891,088.00 | $59,283,603.83 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $36,037,502.00 | |
Arizona | 010C220 | Maricopa | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $27,000,000.00 | $28,619,886.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $35,745,054.00 | $37,889,606.00 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,086,663.29 | $12,811,811.39 |
Arizona | 010C220 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $60,510,286.00 | $64,140,646.00 |
Arizona | 010C224 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $14,303,676.00 | $15,161,836.00 |
Arizona | 010C224 | Pinal | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $26,068,146.00 | $27,632,125.00 |
Arizona | 010C224 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $7,741,552.00 | $8,206,012.00 |
Arizona | 010C224 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $3,493,900.00 | $3,703,519.00 |
Arizona | 010C224 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $79,353.00 | $84,114.00 |
Arizona | 010C224 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $713,221.00 | $756,011.00 |
Arizona | 010C224 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,128,126.74 | $3,315,801.31 |
Arizona | 010C224 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,223,235.26 | $2,396,619.69 |
Arizona | 010C224 | Pinal | >= 200,000 | N/A | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $9,000,000.00 | $10,000,000.00 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,183,249.00 | $2,314,236.00 |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $7,768,712.37 | |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge New Construction | $2,519,036.00 | |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | $594,066.00 | |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $1,157,515.40 | |
Arizona | 010D013 | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $7,525,282.00 | $7,976,767.78 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $7,020,876.00 | $7,442,099.22 |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Training | $5,200.00 | |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $3,776,769.00 | |
Arizona | 010D013 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $7,844,505.00 | $8,315,142.19 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,643,294.61 | $9,161,855.63 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $40,638,007.00 | $45,959,304.36 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,601,562.00 | $2,757,645.00 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,570,909.00 | $3,785,148.00 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,525,287.00 | $4,796,784.55 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $16,755,968.06 | $20,702,032.40 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $24,057.00 | $25,500.00 |
Arizona | 010D013 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,218,231.55 | $5,531,303.66 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $4,605,263.00 | $4,881,559.26 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Construction Engineering | $394,737.00 | $418,419.55 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | SURF TRANS PROJ | Preliminary Engineering | $993,500.00 | $993,500.00 |
Arizona | 010D013 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,872,185.00 | $3,044,503.92 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Bridge New Construction | $2,195,543.92 | $2,195,543.92 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $2,286,905.00 | $2,858,632.00 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,697,974.00 | $2,122,468.00 |
Arizona | 010D201 | Pima | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Safety | $314,611.00 | $6,783,382.46 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | $14,000,000.00 | $14,839,941.00 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Bridge New Construction | $1,470,000.00 | $1,470,000.00 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $19,748,000.00 | $20,932,797.00 |
Arizona | 010D201 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $8,627,110.14 | |
Arizona | 010D205 | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $584,418.00 | |
Arizona | 010D205 | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Debt Service | $2,055,639.00 | $4,755,246.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $547,238.00 | |
Arizona | 010D205 | Pinal | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $4,812,402.00 | |
Arizona | 010D205 | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Other | $74,006.00 | $78,446.00 |
Arizona | 010D205 | Pinal | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $1,337,004.00 | $1,417,219.00 |
Arizona | 010D205 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $425,716.00 | $451,258.00 |
Arizona | 010D205 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,915,669.00 | $2,030,601.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $880,235.00 | $933,046.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $30,869,802.00 | $38,587,253.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $3,130,198.00 | $3,912,747.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,450,000.00 | $9,678,872.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $475,526.00 | |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $9,824,654.00 | |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,516,652.50 | $8,537,135.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $11,235,868.50 | $22,300,511.50 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $241,979.00 | $3,264,263.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $780,062.00 | $838,362.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,363,841.00 | $2,505,662.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,306,996.00 | $4,565,397.00 |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $60,000.00 | |
Arizona | 010D205 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $61,321.00 | $65,000.00 |
Arizona | 010D205 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $7,547,200.00 | $8,000,000.00 |
Arizona | 010D205 | Pinal | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,283,743.00 | $4,540,750.00 |
Arizona | 010D205 | Pinal | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | $88,920.00 | $94,255.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $12,793,251.94 | $12,878,248.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | $737.00 | $742.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $784,888.00 | $790,103.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $406,002.00 | $408,700.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | 4R - Added Capacity | $64,675.66 | $65,105.79 |
Arizona | 010D211 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $387,325.47 | $389,898.95 |
Arizona | 010D211 | Pima | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $66,192.00 | $66,632.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | MINIMUM GUARANTEE-CHRG TO LIM | 4R - Added Capacity | $2,397.00 | $2,413.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $41,775,579.00 | $46,383,287.00 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,330,157.00 | |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,685,553.50 | $6,729,971.50 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,718,553.50 | $1,729,971.50 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,771.50 | |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $602,257.50 | |
Arizona | 010D211 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,347,482.00 | $1,489,466.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,148,213.17 | $1,217,597.31 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,370,431.00 | $3,574,158.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $40,735.08 | $43,178.66 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $113,501.00 | $120,362.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $3,693,266.04 | $3,717,803.07 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $693,912.00 | $735,856.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $3,237,513.00 | $3,433,206.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $1,345,093.00 | $1,426,398.00 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $8,250,000.00 | $9,166,666.66 |
Arizona | 010D211 | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $457,266.26 | $460,304.44 |
Arizona | 010D211 | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $652,854.00 | $657,191.50 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $652,854.00 | $657,191.50 |
Arizona | 010D211 | Pima | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Other | $4,991,160.00 | $5,024,320.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $1,410,900.00 | $1,420,274.00 |
Arizona | 010D211 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,987,000.00 | $16,093,215.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,826,737.38 | $11,905,312.88 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,826,737.37 | $11,905,312.87 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $9,205,434.89 | $9,266,594.16 |
Arizona | 010D211 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $8,300,829.90 | $8,355,979.18 |
Arizona | 010D211 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,016,612.00 | $5,049,941.50 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,160,449.00 | $6,201,378.50 |
Arizona | 010D211 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $736,027.00 | $1,622,026.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $12,418,402.00 | $12,500,907.00 |
Arizona | 010D211 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,405,732.00 | $5,732,484.00 |
Arizona | 010D211 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,897.50 | $7,950.00 |
Arizona | 010D211 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $7,897.50 | $7,950.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | COORD BORDER INFRA PROGRAM | 4R - No Added Capacity | $3,011,018.56 | $3,191,666.91 |
Arizona | 010D213 | Pima | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $4,707,642.00 | $4,990,080.56 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,960,811.02 | $31,931,482.78 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,157,164.14 | $1,226,589.08 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $500,455.00 | $1,870,490.14 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,117,987.24 | $15,687,050.45 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,253,323.15 | $4,055,906.78 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $17,556,209.00 | $25,425,620.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $245,390.60 | $3,601,612.35 |
Arizona | 010D213 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $71,358.00 | $625,763.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $118,149.51 | |
Arizona | 010D213 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $875,558.00 | $1,428,390.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,179,136.49 | |
Arizona | 010D213 | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $634,809.69 | $672,895.58 |
Arizona | 010D213 | Pima | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Other | $312,330.00 | $331,209.00 |
Arizona | 010D213 | Pima | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $6,052,920.00 | $6,418,791.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Training | $70,000.00 | $74,200.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,132,935.51 | $5,440,890.18 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $21,410,342.44 | $22,764,918.98 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $8,416,337.00 | $8,921,281.54 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,856,139.50 | $1,967,500.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,860,830.00 | $3,302,668.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $189,602.50 | $385,312.19 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $115,095.00 | $122,000.00 |
Arizona | 010D213 | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $907,550.00 | $962,000.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $2,170.00 | $2,300.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $367,816.49 | $697,548.00 |
Arizona | 010D213 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $615,618.00 | $652,552.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $351,229.70 | $372,302.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | $272,001.00 | $288,320.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,099,168.02 | $2,225,109.03 |
Arizona | 010D216 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $293,048.00 | $310,629.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Other | $23,585.00 | $25,000.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Training | $7,076.00 | $7,500.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $30,791.51 | $32,638.87 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,909,226.75 | $38,798,794.53 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,207,542.00 | $10,843,898.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,243,826.00 | $6,389,957.00 |
Arizona | 010D216 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $651,984.00 | $691,394.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,034,618.00 | $1,108,456.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $8,991,473.83 | $29,268,309.96 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,836,868.65 | $7,249,990.34 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $23,921,861.57 | $25,362,011.48 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $54,906.00 | $58,200.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,351,318.24 | $6,841,127.49 |
Arizona | 010D216 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $110,989.33 | $117,648.22 |
Arizona | 010D216 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $303,081.00 | $321,401.00 |
Arizona | 010D216 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $3,718,784.00 | $3,943,567.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $5,279,404.05 | $5,596,145.91 |
Arizona | 010D216 | Pima | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $189,088.81 | $200,433.34 |
Arizona | 010D216 | Pima | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $16,073,519.13 | $17,037,862.13 |
Arizona | 010D216 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $472,912.00 | $501,284.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,199,449.00 | $8,747,057.00 |
Arizona | 010D216 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,140,325.00 | $1,600,360.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,536,884.00 | $1,894,838.00 |
Arizona | 010D216 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $775,352.00 | $822,218.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $667,316.55 | $707,353.00 |
Arizona | 010E221 | Pima | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,549,262.00 | $2,702,206.91 |
Arizona | 010E221 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,235,568.30 | $2,369,693.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Other | $353,935.00 | $375,170.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $302,065.00 | $320,187.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,768,096.82 | $12,474,133.12 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $4,449,202.51 | $4,716,136.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,321,711.00 | $3,521,000.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,857,365.00 | $3,028,795.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $105,457.00 | $111,784.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,124,526.00 | $1,191,993.00 |
Arizona | 010E221 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $566,555.00 | $600,546.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $8,491.00 | $9,000.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $912,907.82 | $967,679.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $341,842.00 | $362,351.00 |
Arizona | 010E221 | Pima | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Added Capacity | $735,000.00 | $779,096.88 |
Arizona | 010E221 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,670,301.00 | $2,830,508.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,649,737.00 | $283,328,643.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,400,000.00 | |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $116,411,699.00 | |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,504,079.00 | $37,840,865.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,595,537.00 | $37,807,142.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,415,023.00 | $3,619,910.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $18,472,895.00 | $19,581,190.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $742.00 | |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,253,915.00 | $2,389,140.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $41,254,784.00 | $43,729,896.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $13,399,043.00 | $14,202,928.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Training | $28,952.00 | $30,689.00 |
Arizona | 010E232 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,437,832.00 | $10,004,061.00 |
Arizona | 010E232 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $3,385,203.00 | $3,588,301.00 |
Arizona | 010E232 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,093,528.00 | $1,159,135.00 |
Arizona | 010E232 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,419,523.00 | $1,504,689.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,918,389.00 | $2,033,484.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $6,830,045.00 | $7,239,819.00 |
Arizona | 010E232 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $11,440,326.00 | $12,126,697.00 |
Arizona | 010E232 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $914.00 | $969.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - No Added Capacity | $2,588,400.35 | $2,605,597.29 |
Arizona | 015A216 | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,815,142.00 | $2,833,846.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $19,755,974.20 | $19,887,230.62 |
Arizona | 015A216 | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $850,480.80 | $856,131.37 |
Arizona | 015A216 | Mohave | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $7,106,384.00 | $7,153,598.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $164,629.27 | $165,723.04 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,753,152.00 | $27,117,309.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,155,965.18 | $6,196,864.05 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,028,814.20 | $6,114,340.63 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $495,738.00 | $548,625.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,989,994.00 | $5,289,373.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $436,933.00 | $463,147.00 |
Arizona | 015A216 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $30,398.00 | $30,600.00 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $21,038,902.26 | $21,038,902.26 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $17,137,294.91 | $17,137,294.91 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $70,328.72 | $70,328.72 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $86,340.30 | $86,340.30 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $31,688,349.27 | $39,610,436.80 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $38,902,760.73 | $48,628,451.20 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Rehabilitation - Added Capacity | $5,246,656.00 | $6,558,320.00 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $2,719,421.14 | $3,399,276.29 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $2,215,111.86 | $2,768,889.71 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $4,142,320.68 | $5,177,900.74 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $5,085,380.32 | $6,356,725.26 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $119,757,761.66 | |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $97,557,681.17 | |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $22,632,258.00 | |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $16,399,063.60 | |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,357,726.40 | |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $537,095.87 | $50,161,331.91 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $737,653.13 | $61,665,431.07 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,394,753.37 | $7,933,119.36 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,379,047.63 | $5,770,662.64 |
Arizona | 017A228 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $45,989.81 | $48,749.20 |
Arizona | 017A228 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $56,460.19 | $59,847.80 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,038,030.00 | $34,746,079.00 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,348,427.00 | $11,453,289.00 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,474,041.00 | $4,500,000.00 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,716,229.00 | $6,102,811.00 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,210,559.00 | $3,404,622.00 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $29,717.00 | $31,500.00 |
Arizona | 017A248 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,363,686.00 | $6,745,480.00 |
Arizona | 017A258 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $6,975,402.83 | $6,998,333.85 |
Arizona | 017A258 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $20,056,430.14 | $20,058,837.90 |
Arizona | 017A258 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Training | $3,600.00 | $3,600.00 |
Arizona | 017A258 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,594,923.38 | |
Arizona | 017A258 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $43,727.00 | $241,645.76 |
Arizona | 017A258 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $441,180.00 | $467,649.00 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $7,838,045.99 | $7,890,120.83 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Maintenance Resurfacing | $4,690.01 | $4,721.17 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $17,806,107.75 | $17,924,407.78 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,683.25 | $10,754.22 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,833,675.00 | $1,845,858.00 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,964,306.00 | $2,984,000.00 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,574.89 | $2,593.57 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,306,365.11 | $4,337,608.43 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $496,569.88 | $526,360.99 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $298.12 | $316.01 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,364.00 | $5,400.00 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,993,999.00 | $10,060,398.14 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $6,000.00 | $6,039.86 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,017.35 | $1,078.39 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,694,562.65 | $1,796,228.61 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $181,318.14 | $192,196.61 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $108.86 | $115.39 |
Arizona | 017B233 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $180.39 | $191.21 |
Arizona | 017B233 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $301,707.61 | $319,808.79 |
Arizona | 019A220 | Pima | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - Added Capacity | $22,703.92 | $24,066.06 |
Arizona | 019A220 | Pima | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Replacement - Added Capacity | $3,068,037.91 | $3,252,107.47 |
Arizona | 019A220 | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $560,323.51 | $593,940.92 |
Arizona | 019A220 | Pima | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $1,946,319.00 | $2,063,812.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $590,690.19 | $19,125,773.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,295,603.00 | $1,373,329.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $987,012.00 | $1,046,766.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,380,790.66 | $1,466,191.66 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,430.00 | $10,000.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,979,886.00 | $3,158,657.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $37,720.00 | $40,000.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,142,569.00 | $3,331,110.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $30,189.00 | $32,000.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $68,868.00 | $73,000.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $28,290.00 | $30,000.00 |
Arizona | 019A220 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $462,908.00 | $490,680.00 |
Arizona | 019A220 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $5,825,164.00 | $7,174,650.00 |
Arizona | 019A220 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $500,000.00 | |
Arizona | 019A220 | Pima | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $3,150,645.00 | $3,339,670.00 |
Arizona | 019A220 | Pima | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $5,112,130.00 | |
Arizona | 019A220 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,057,620.00 | $14,158,261.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $882,501.00 | $1,438,281.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,040,332.00 | $1,736,173.00 |
Arizona | 019A220 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,111,391.00 | $1,178,070.00 |
Arizona | 019A239 | Pima | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $4,500,000.00 | $4,769,981.00 |
Arizona | 019A239 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,955,869.00 | $20,132,521.00 |
Arizona | 019A239 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,237,987.00 | $5,552,244.00 |
Arizona | 019A239 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,639,352.00 | $1,737,706.00 |
Arizona | 019A239 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,108,087.54 | $6,491,990.61 |
Arizona | 019A239 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,138,706.53 | $3,920,934.89 |
Arizona | 019A239 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $19,104.00 | $20,250.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $143,365.00 | $267,862.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $1,681,238.00 | $4,075,497.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $188,452.00 | $1,649,191.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $40,242.00 | |
Arizona | 024A200 | Pinal | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $78,940.00 | $83,712.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Inspection and Bridge Related Training | $5,658.00 | $6,000.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,161,094.00 | $7,593,948.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,160,455.00 | $5,472,381.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $479,984.00 | $508,997.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,245,076.50 | $56,463,497.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $10,614,550.00 | $11,256,151.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,384,977.00 | $1,468,692.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $8,416,894.00 | |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $31,662,320.00 | $33,576,161.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,066.00 | $23,400.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $158,930.00 | $2,290,561.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $47,906.00 | $649,915.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $278,924.00 | $3,649,700.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,404,803.50 | $7,852,389.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $582,944.00 | $1,466,885.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $14,833.00 | $15,730.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $168,440.00 | $178,621.00 |
Arizona | 024A200 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $153,021.00 | $162,270.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $11,856.00 | $11,935.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,922,341.00 | $59,923,796.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $34,092,995.00 | |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $993,400.00 | $14,275,000.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,924,671.00 | $13,719,031.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $23,400.00 | |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $808.00 | $813.00 |
Arizona | 040A212 | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $1,172,526.00 | $1,243,400.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $37,720.00 | $40,000.00 |
Arizona | 040A212 | Mohave | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | Other | $53,786.00 | $57,013.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $1,612,475.00 | $1,709,410.00 |
Arizona | 040A212 | Mohave | >= 200,000 | N/A | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $512,254.00 | $542,987.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $7,749,635.00 | $8,216,491.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Right of Way | $6,997,313.00 | $7,417,122.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $853,755.00 | $904,977.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $315,788.00 | $317,886.00 |
Arizona | 040A212 | Mohave | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $17,898,629.00 | $18,017,546.00 |
Arizona | 040A382 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,988,055.00 | $26,487,232.00 |
Arizona | 040A382 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,074,541.00 | $3,259,000.00 |
Arizona | 040A382 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $44,528.00 | $47,199.00 |
Arizona | 040A382 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,013,687.00 | $3,194,495.00 |
Arizona | 040A382 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $442,267.00 | $468,801.00 |
Arizona | 040A382 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,094.00 | $5,400.00 |
Arizona | 040A383 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $29,293,662.00 | $31,051,158.00 |
Arizona | 040A383 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,284,317.00 | $1,361,370.00 |
Arizona | 040A383 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,740,581.00 | $3,997,000.00 |
Arizona | 040A383 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,730,404.00 | $3,957,636.00 |
Arizona | 040A383 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $413,655.00 | $438,473.00 |
Arizona | 040A383 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,094.00 | $5,400.00 |
Arizona | 040A385 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,412,197.00 | $34,257,158.00 |
Arizona | 040A385 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,635,864.00 | $3,854,000.00 |
Arizona | 040A385 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,913,003.00 | $4,147,767.00 |
Arizona | 040A385 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $572,870.00 | $607,240.00 |
Arizona | 040A385 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,094.00 | $5,400.00 |
Arizona | 040B226 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $29,314.02 | $13,407,052.35 |
Arizona | 040B226 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $83,726.22 | |
Arizona | 040B226 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,903,968.00 | $18,494,022.00 |
Arizona | 040B226 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,327,066.09 | |
Arizona | 040B226 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $35,517.00 | $37,648.00 |
Arizona | 040B226 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $340,794.59 | $361,240.69 |
Arizona | 040B231 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $19,544,489.77 | $20,717,076.39 |
Arizona | 040B231 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,564,150.23 | $1,657,992.61 |
Arizona | 040B231 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $190,843.22 | $205,501.53 |
Arizona | 040B231 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,384,638.78 | $2,567,798.47 |
Arizona | 040B231 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,384,266.10 | $2,531,601.86 |
Arizona | 040B231 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $190,813.90 | $202,605.24 |
Arizona | 040B231 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $22,649.45 | $24,008.28 |
Arizona | 040B231 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $282,947.55 | $299,922.72 |
Arizona | 040B231 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $1,572.18 | $1,666.62 |
Arizona | 040B231 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $125.82 | $133.38 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,857,768.90 | $36,427,872.47 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $544,661.00 | $548,280.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,321,463.00 | $5,356,818.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $12,578,750.00 | $29,338,000.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $29,566.00 | $31,339.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,483,941.00 | $4,513,731.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $284,102.20 | $301,147.96 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $23,842.00 | $24,000.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $16,594.00 | $17,590.00 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $197,861.24 | $209,731.86 |
Arizona | 040C213 | Coconino | >= 50,000 AND < 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | 4R - No Added Capacity | $50,000.00 | $50,000.00 |
Arizona | 040C225 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,612,897.00 | $35,853,957.00 |
Arizona | 040C225 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $734,100.00 | $738,978.00 |
Arizona | 040C225 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,831,190.00 | $2,850,000.00 |
Arizona | 040C225 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $15,414,288.34 | $33,597,038.34 |
Arizona | 040C225 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,997,326.00 | $4,023,884.00 |
Arizona | 040C225 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,948.00 | $23,100.00 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Other | $7,081.00 | $7,506.13 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Other | $35,517.00 | $37,648.00 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $108,602.63 | $115,117.87 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $341,843.00 | $362,352.00 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,189,596.88 | $10,276,231.59 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $619,543.99 | $656,714.00 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,401,373.21 | $1,485,449.66 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,097,333.33 | $12,101,583.33 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $279,511.89 | $1,256,017.47 |
Arizona | 040D236 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $857.48 | $908.93 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $5,660.40 | $6,000.00 |
Arizona | 040D236 | Navajo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $10,732.17 | $11,376.00 |
Arizona | 040E227 | Apache | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,097,179.00 | $27,662,899.00 |
Arizona | 040E227 | Apache | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $866,386.00 | $918,365.00 |
Arizona | 040E227 | Apache | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,061,325.00 | $1,125,000.00 |
Arizona | 040E227 | Apache | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,059,535.00 | $3,243,095.00 |
Arizona | 040E227 | Apache | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $480,276.00 | $509,090.00 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,945,355.13 | $3,123,388.77 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $311,860.00 | $330,710.00 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,999,605.47 | $3,180,917.70 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $16,558,781.49 | $16,558,781.49 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $13,655,000.00 | $14,480,382.39 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $21,193.63 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | $286,000.00 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $5,513,764.40 | $8,982,050.83 |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $2,730,908.30 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $507,000.00 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $559,972.01 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $3,845,907.00 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $311,000.00 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $85,000.00 | |
Arizona | 0532043 | Gila | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $187,734.56 | $201,469.36 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $3,980,000.00 | $4,220,573.64 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $3,298,854.00 | |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $24,804.00 | |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $5,393,500.00 | $5,393,500.00 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,018.00 | $3,200.00 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $49,036.00 | $52,000.00 |
Arizona | 060B006 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,799,384.36 | $10,888,125.72 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,263,183.00 | $5,581,317.00 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,689,309.00 | $1,791,420.00 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $39,547.00 | $39,547.00 |
Arizona | 060B006 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $291,712.00 | $309,345.00 |
Arizona | 060D207 | Pinal | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $23,033.65 | $24,425.93 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $16,572.35 | $17,574.07 |
Arizona | 060D207 | Pinal | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,290,175.77 | $1,368,160.48 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $1,066,711.00 | $1,131,189.79 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,409,535.35 | $4,676,071.75 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Mitigation of Water Pollution due to Highway Runoff | $22,937.00 | $24,323.00 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $2,720,125.85 | $2,884,544.89 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Training | $15,560.00 | $16,500.00 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,833,121.00 | $9,051,336.00 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $978,466.98 | $13,689,587.21 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,051,476.44 | $19,766,672.44 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $30,520.00 | $32,365.00 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $414,576.00 | $439,635.00 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $70,757.00 | $75,034.00 |
Arizona | 060D207 | Gila | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $716,648.00 | $759,966.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $6,552.00 | $6,948.00 |
Arizona | 060D208 | Pinal | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,735,695.00 | $2,901,055.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,985,564.00 | |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,648,503.07 | $11,568,291.35 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,368,523.00 | $5,693,025.20 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,073,233.00 | $1,138,105.40 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $627,344.00 | $665,264.25 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,287,689.00 | $1,365,523.50 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,077,690.00 | |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,034,333.00 | $3,217,745.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $788,990.00 | $2,473,426.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,471,912.00 | $2,651,586.79 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,697,811.00 | $1,800,436.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,606,892.93 | $2,764,467.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,412.00 | $6,800.00 |
Arizona | 060D208 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,821,137.00 | $4,052,107.00 |
Arizona | 060D208 | Pinal | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,335,005.12 | $1,415,700.00 |
Arizona | 060D208 | Pinal | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,874,464.88 | $3,048,213.00 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Preliminary Engineering | $52,982.00 | $56,184.00 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,022,171.00 | $1,083,956.69 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | BRIDGE REP & REHAB-15% OFF SYS | Preliminary Engineering | $56,446.69 | $59,859.00 |
Arizona | 060D216 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $12,560,728.00 | $13,319,966.00 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $25,901,622.00 | $27,467,257.00 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,179,549.91 | $3,371,739.03 |
Arizona | 060D216 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,320,162.00 | $3,520,850.00 |
Arizona | 060D216 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $5,019,778.84 | $5,323,201.08 |
Arizona | 060D216 | Pinal | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Training | $16,974.00 | $18,000.00 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,886,000.00 | $2,000,000.00 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,759,930.09 | $1,866,309.75 |
Arizona | 060D216 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $38,673.92 | $41,011.58 |
Arizona | 060D216 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $315,007.52 | $334,049.14 |
Arizona | 060D216 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,206,024.00 | $1,278,922.00 |
Arizona | 060D216 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $38,403.00 | $40,724.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,637,899.00 | $1,637,899.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $132,592.00 | $132,592.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $335,810.00 | $1,135,513.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $979,107.00 | $1,038,290.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,630,325.00 | $26,229,626.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,310,480.00 | $6,220,737.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,931,743.00 | $3,287,406.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $10,184.00 | $10,800.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $294,512.00 | $312,314.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,418,362.00 | $1,504,095.00 |
Arizona | 077A215 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,556,507.00 | $1,650,591.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $754,829.00 | $800,455.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,080,249.00 | $1,145,545.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Construction Engineering | $45,477.00 | $45,798.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $571,559.00 | $575,588.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $3,577,518.00 | $3,602,737.50 |
Arizona | 079A210 | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $2,438,084.00 | $2,505,471.10 |
Arizona | 079A210 | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $49,650.00 | $55,298.90 |
Arizona | 079A210 | Pinal | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Training | $7,150.00 | $7,200.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,742,633.00 | $4,852,018.00 |
Arizona | 079A210 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $14,114,456.00 | $14,217,750.50 |
Arizona | 079A210 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,932.00 | |
Arizona | 079A210 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,962,039.93 | $3,006,743.59 |
Arizona | 079A210 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $911,736.07 | $966,846.41 |
Arizona | 079A210 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $51,483.00 | $54,595.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $11,176,055.00 | $11,851,596.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $588,432.00 | $624,000.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $1,525,996.00 | $1,618,235.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge New Construction | $1,694,935.00 | $1,797,386.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge Rehabilitation - Added Capacity | $217,141.00 | $230,266.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Construction Engineering | $2,746,790.00 | $2,912,821.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Other | $2,957,863.00 | $3,136,652.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Training | $28,290.00 | $30,000.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,490,451.00 | $14,078,153.47 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,546,045.60 | $16,485,732.07 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $251,421.44 | $266,618.70 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $812,849.00 | $861,982.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,642,579.15 | $1,741,867.03 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $160,285.00 | $1,160,803.64 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $602,985.79 | $1,078,984.51 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $715,727.00 | $5,130,901.63 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,315,341.34 | $5,713,848.84 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,168,545.94 | $4,420,515.22 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,455,260.99 | $1,543,224.80 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,427,485.00 | $4,712,485.00 |
Arizona | 086A210 | Pima | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $5,527.87 | $5,862.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $35,242.00 | $37,372.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $889,355.00 | $943,112.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,061,153.24 | $8,548,412.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,725,183.76 | $25,152,999.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,190,550.00 | |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $358,380.52 | $380,043.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,390,000.00 | $2,322,375.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,338,986.70 | $3,540,812.62 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,346,456.57 | $1,418,792.99 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $47,150.00 | $50,000.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $302,283.00 | $320,555.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $40,334.00 | $42,772.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $489,632.00 | $519,228.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,474,677.54 | $2,624,260.38 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $13,953.00 | $14,797.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $528,997.00 | $560,972.00 |
Arizona | 089D201 | Coconino | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,430.00 | $10,000.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $61,492.22 | $610,161.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $51,309.00 | $1,088,209.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $298,339.00 | $1,042,744.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $965,227.04 | $4,786,400.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $643,450.00 | $682,343.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $208,020.00 | $220,594.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $2,122.00 | $2,250.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,432,048.00 | |
Arizona | 093A205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,717,638.89 | $13,944,888.89 |
Arizona | 093A205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $71,005.00 | $75,297.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $683,395.00 | $724,703.00 |
Arizona | 093A205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,365.00 | $6,750.00 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,853,437.54 | $1,965,468.58 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $29,508,027.45 | $31,291,651.60 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,429,471.62 | $4,697,212.74 |
Arizona | 093B205 | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $64,220.00 | $68,102.00 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,139,060.75 | $6,510,139.35 |
Arizona | 093B205 | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $454,012.00 | $481,455.00 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $247,437.00 | $262,393.00 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,994.00 | $6,356.00 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $21,783.30 | $23,100.00 |
Arizona | 093B205 | Mohave | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $863,033.00 | $915,199.00 |
Arizona | 093B205 | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $159,514.00 | $169,156.00 |
Arizona | 093B205 | Mohave | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,861,671.00 | $1,974,200.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,408,925.00 | $21,642,550.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $583,086.42 | $618,328.05 |
Arizona | 093B215 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $277,234.00 | $293,992.00 |
Arizona | 093B215 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $21,915.78 | $23,240.47 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $547,566.00 | $580,664.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,985,039.85 | $4,225,916.75 |
Arizona | 093B215 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $218,720.15 | $231,940.79 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,281,129.00 | $2,419,013.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $45,566.00 | $48,319.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $472,173.00 | $500,713.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $406,299.00 | $430,859.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | REPURPOSED SPECIAL | Preliminary Engineering | $3,200,552.80 | $3,394,012.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $29,786,540.00 | $31,586,999.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $756,467.00 | $802,192.00 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,185,983.00 | $6,351,112.48 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,393,397.83 | $7,014,681.01 |
Arizona | 093B215 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $101,987.17 | $108,151.84 |
Arizona | 093B215 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,005,162.27 | $1,065,919.68 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,848,601.73 | $7,262,567.98 |
Arizona | 093B215 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $11,882.00 | $12,600.00 |
Arizona | 093B223 | Mohave | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $349,371.00 | $68,876,183.00 |
Arizona | 093B223 | Mohave | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $4,111,137.00 | $23,026,860.00 |
Arizona | 093B223 | Mohave | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,480,715.00 | $7,712,575.00 |
Arizona | 093B223 | Mohave | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $10,063,753.00 | $19,015,060.00 |
Arizona | 093B223 | Mohave | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $19,800.00 | |
Arizona | 095B214 | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,426,448.00 | $20,667,375.00 |
Arizona | 095B214 | Yuma | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,950,759.00 | $4,683,633.00 |
Arizona | 095B214 | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,291,490.00 | $2,430,000.00 |
Arizona | 095B214 | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $202,471.00 | $912,709.00 |
Arizona | 095B214 | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,226,174.00 | $3,050,291.00 |
Arizona | 095B214 | Yuma | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $6,790.00 | $7,200.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,200,182.00 | $114,052,545.66 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Inspection and Bridge Related Training | $40,000.00 | |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,307,831.00 | $4,091,273.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,970,832.00 | $16,499,096.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,778,457.00 | $29,446,824.94 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $26,269.00 | $32,400.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $195,000.00 | |
Arizona | 101A214 | Maricopa | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $11,098,927.00 | $11,177,167.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $876,815.00 | $882,996.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,347,889.19 | $8,406,736.34 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $5,500,690.00 | $5,539,466.00 |
Arizona | 101A214 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,087,376.77 | $1,095,042.06 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,563,123.24 | $60,726,632.48 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $848,700.00 | $900,000.00 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,288,766.00 | $1,366,666.00 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $234,492.00 | $4,254,763.00 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,070,616.00 | $1,135,329.00 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $25,461.00 | $27,000.00 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,640,898.76 | $1,740,083.52 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,577,534.00 | $2,733,334.00 |
Arizona | 101B209 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,730,409.00 | $2,895,450.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,041,499.00 | $14,742,111.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,231,707.00 | $11,024,792.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $11,961,486.00 | $12,914,273.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $9,952,865.00 | |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,658,276.00 | |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $22,066.00 | $23,400.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $93,338,405.00 | $98,980,282.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $477,354.00 | $506,208.00 |
Arizona | 101B210 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $566,784.00 | $601,044.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $271,747.00 | $388,210.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $3,832,521.00 | $5,475,030.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $815,243.00 | $1,164,633.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $677,168.00 | $967,384.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $77,537,498.00 | $149,273,820.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $13,672,489.00 | $14,498,927.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,700,263.00 | $3,923,927.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $24,156,466.00 | $43,919,041.07 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $14,538,238.00 | $24,043,944.78 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $90,528.00 | $96,000.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $6,000,000.00 | $6,362,673.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,998,312.00 | $5,305,543.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,917,750.00 | $8,396,342.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $1,602,430.00 | $2,289,186.00 |
Arizona | 101B213 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $51,073.00 | |
Arizona | 101B213 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $51,073.00 | |
Arizona | 101B213 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $10,747.00 | |
Arizona | 189A201 | Maricopa | >= 200,000 | N/A | COORD BORDER INFRA PROGRAM | Preliminary Engineering | $1,733,411.00 | $1,838,190.00 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Right of Way | $29,137.40 | $30,898.87 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | INTERSTATE MAINTENANCE | Right of Way | $35.01 | $37.13 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE-CHRG TO LIM | Right of Way | $3,887.35 | $4,122.05 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | MINIMUM GUARANTEE-CHRG TO LIM | Right of Way | $4.67 | $4.95 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,183,727.01 | $1,255,277.84 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,443,218.12 | $22,739,361.29 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $9,338,114.47 | $9,902,560.41 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,195,919.65 | $4,449,543.64 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,173,655.81 | $6,546,826.17 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $7,054.06 | $7,480.44 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,018,745.04 | $1,080,323.06 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,223.96 | $1,297.94 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $20,198,328.15 | $21,419,224.04 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $24,267.12 | $25,733.96 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Training | $7,072.17 | $7,499.65 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,791,174.57 | $1,899,442.81 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $525.43 | $557.19 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $961,113.71 | $1,019,208.49 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,154.72 | $1,224.51 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $8,182,982.60 | $12,129,960.58 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $2,455.62 | $3,640.07 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - Added Capacity | $3,411,948.78 | $5,057,601.02 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,296,376.97 | $1,921,664.15 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HWY FREIGHT PGM | Construction Engineering | $389.03 | $576.68 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Other | $1,324,511.52 | $1,963,368.32 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HWY FREIGHT PGM | Other | $397.48 | $589.19 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Training | $2,697.19 | $3,998.78 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATIONAL HWY FREIGHT PGM | Training | $0.81 | $1.20 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $14,384,599.74 | $25,162,167.65 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $4,316.68 | $7,550.90 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | $5,997,776.58 | $10,491,498.87 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,278,862.14 | $3,986,276.29 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $683.86 | $1,196.24 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $2,328,317.30 | $4,072,786.48 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Other | $698.70 | $1,222.20 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Training | $4,743.58 | $8,297.89 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Training | $1.42 | $2.48 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $108,114.00 | $114,649.00 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $543,927.50 | $576,805.00 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Other | $653.50 | $693.00 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $632,141.00 | $670,351.00 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,372,263.54 | $5,696,992.40 |
Arizona | 189A201 | Santa Cruz | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $6,454.46 | $6,844.60 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $314,093.73 | $333,079.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $10,821,351.29 | $11,475,452.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $13,434,397.41 | $14,246,445.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $5,287,706.99 | $5,607,323.99 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $45,112,757.57 | $47,839,614.79 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $4,304,770.00 | $4,564,973.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,177,240.00 | $6,550,626.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,212,202.76 | $8,708,592.98 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $880,744.00 | $933,982.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,744,680.82 | $7,152,365.75 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $722,406.84 | $766,073.06 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,601,000.00 | $7,000,000.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $947,715.00 | $1,005,000.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,684,112.52 | $2,846,437.65 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,772.00 | $4,000.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $282,900.00 | $300,000.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $28,311.45 | $30,023.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $1,414,445.01 | $1,499,943.00 |
Arizona | 202A205 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,798,575.55 | $19,934,862.00 |
Arizona | 202C001 | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | $774,074.58 | $774,074.58 |
Arizona | 202C001 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $645,870.86 | $684,910.78 |
Arizona | 202C001 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $8,011,331.53 | $8,011,331.53 |
Arizona | 202C001 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $44,185,693.56 | $56,945,819.81 |
Arizona | 202C002 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $36,030.00 | |
Arizona | 202C002 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,086,075.00 | $6,086,075.00 |
Arizona | 202C002 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,500,000.00 | $9,804,621.00 |
Arizona | 202C002 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $19,347,205.39 | $20,530,045.39 |
Arizona | 202C002 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $12,263.00 | |
Arizona | 202C003 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $443,708.00 | |
Arizona | 202C003 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $8,289,956.86 | $8,289,956.86 |
Arizona | 202C003 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $52,134,819.00 | $69,654,439.90 |
Arizona | 202C005 | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | $1,861,725.00 | $1,861,725.00 |
Arizona | 202C005 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $3,723,200.00 | $3,723,200.00 |
Arizona | 202C005 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,120,000.00 | $4,369,035.00 |
Arizona | 202C005 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $17,827,505.15 | $18,905,095.60 |
Arizona | 202C009 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $101,418.00 | |
Arizona | 202C009 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $89,058.00 | |
Arizona | 202C009 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,451,792.61 | $6,451,792.61 |
Arizona | 202C009 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $15,453,771.00 | $24,319,674.80 |
Arizona | 202C009 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $27,458,393.38 | $29,926,089.54 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,647,714.00 | $1,747,311.00 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,431,310.00 | $21,264,512.00 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $285,245.00 | $302,487.00 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,261,373.00 | $1,937,513.00 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $198,750.00 | $396,387.00 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,093,738.00 | $2,309,114.00 |
Arizona | 202C207 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Training | $13,579.00 | $14,400.00 |
Arizona | 202C208 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $67,326,909.00 | $191,440,538.00 |
Arizona | 202C208 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $19,244,010.00 | |
Arizona | 202C208 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,195,996.00 | |
Arizona | 202C208 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $39,340,352.88 | |
Arizona | 202C208 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Training | $32,400.00 | |
Arizona | 202D200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,158,804.00 | $66,875,000.00 |
Arizona | 202D200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $283,211,196.00 | $989,792,755.24 |
Arizona | 202D200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,914,161.54 | $3,090,309.00 |
Arizona | 202D200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,100,000.00 | |
Arizona | 202D200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $346,584,838.46 | $515,731,744.38 |
Arizona | 202D200 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $15,805,879.00 | |
Arizona | 202D200 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $80,000,000.00 | $84,835,631.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $1,900,000.00 | $1,913,394.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,167,027.00 | $17,288,042.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $369,127.00 | $371,729.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,930,469.00 | $4,965,226.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,726,543.00 | $2,765,656.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,895,819.00 | $4,131,303.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $170,118.00 | $171,317.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $1,060,911.00 | $1,068,390.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $893,700.00 | $900,000.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $2,760,959.94 | $2,927,847.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $393,735.00 | $396,511.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Bridge New Construction | $1,772,416.00 | $1,784,910.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Training | $32,769.00 | $33,000.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,646,309.00 | $24,890,940.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $62,232.00 | |
Arizona | 260A208 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,218,327.00 | $1,238,947.00 |
Arizona | 260A208 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,527,965.00 | $1,620,324.08 |
Arizona | 260A208 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $361,169.00 | $383,000.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $367,770.00 | $390,000.00 |
Arizona | 260A208 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,501,677.00 | $5,834,228.00 |
Arizona | 260A208 | Yavapai | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,162,919.00 | $2,859,403.00 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $13,803,898.89 | $14,638,281.16 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $10,239,963.11 | $10,858,921.84 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,068,538.81 | $1,162,810.28 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,440,357.19 | $1,567,432.22 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Other | $22,865.43 | $24,247.00 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $80,905.00 | $85,796.00 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $1,618,581.47 | $1,720,618.82 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $1,209,976.53 | $1,286,231.21 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $146,381.35 | $155,229.21 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,319,022.61 | $1,398,751.00 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $207,136.65 | $219,656.79 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $2,168.68 | $2,299.86 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Training | $2,923.32 | $3,100.14 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $278,867.00 | $295,723.00 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $455,713.12 | $483,258.44 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $338,073.88 | $358,508.56 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $47,975.08 | $50,875.03 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $64,668.92 | $68,577.97 |
Arizona | 260B213 | Navajo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $54,769.14 | $58,079.40 |
Arizona | 260B213 | Coconino | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $40,630.86 | $43,086.60 |
Arizona | 303A201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,069,864.00 | $12,799,432.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,350,289.00 | $5,673,689.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,085,304.00 | $3,271,797.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,340,962.00 | $1,422,017.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $96,812.00 | $102,664.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $3,772.00 | $4,000.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $9,715,000.00 | $10,459,063.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $1,284,273.00 | $1,361,901.00 |
Arizona | 303A201 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $1,386,253.41 | |
Arizona | 303A201 | Maricopa | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Utilities | $46,467.41 | |
Arizona | 303A202 | Maricopa | >= 200,000 | State | EMERGENCY RELIEF | 4R - Added Capacity | $180,347.00 | $180,347.00 |
Arizona | 303A202 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $406,017.00 | $430,559.00 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $572,659.00 | $661,736.00 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,283,842.12 | $27,154,377.65 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,255,366.00 | $6,636,618.00 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $779,302.39 | $834,472.54 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,573,098.94 | $3,789,259.08 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $429,455.00 | |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,404,822.78 | $3,604,130.79 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,640.00 | $2,800.00 |
Arizona | 303A202 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,638,826.00 | |
Arizona | 303A202 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $18,738.00 | $18,738.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,812,174.88 | $9,344,830.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,651,568.00 | $1,751,398.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,269,417.00 | $2,406,593.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $15,709,111.00 | $16,658,653.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,776,549.00 | $2,944,378.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $36,925,127.12 | $39,522,177.00 |
Arizona | 303A203 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $3,501,129.00 | $4,016,960.74 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $63,030,422.61 | $66,840,321.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $2,400,385.00 | $2,545,477.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $816,563.00 | $865,920.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $685,515.00 | $726,951.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $9,683,048.39 | $10,268,344.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $790,988.00 | $838,800.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $14,920,805.00 | $15,822,699.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $10,635,288.00 | $11,278,142.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $16,722,576.00 | $18,478,188.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $2,752,581.00 | $2,918,961.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $8,487.00 | $9,000.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $32,900.00 | $34,889.00 |
Arizona | 303A204 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $12,975,000.00 | $13,759,278.90 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | EMERGENCY RELIEF | Construction Engineering | $516,537.68 | $516,537.68 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | EMERGENCY RELIEF | Other | $53,462.00 | $53,462.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | 4R - Added Capacity | $7,707,783.86 | $8,173,683.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | Construction Engineering | $1,152,018.00 | $1,221,652.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $1,356,777.00 | $1,438,787.67 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $8,301,293.01 | $8,803,067.89 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $1,822,765.00 | $1,932,942.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $8,656,790.00 | $9,180,053.41 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | HIGHWAY INFRASTRUCTURE | 4R - Added Capacity | $11,300,902.07 | $14,126,130.35 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Construction Engineering | $1,614,166.00 | $2,017,708.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $54,062,895.00 | $57,306,439.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | $24,860,445.11 | $26,351,967.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $11,125,698.29 | $11,793,193.11 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $8,795,379.00 | $9,327,019.52 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | INTERSTATE MAINTENANCE | Safety | $70,406.00 | $74,630.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Right of Way | $44,370.09 | $47,051.99 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | MINIMUM GUARANTEE-CHRG TO LIM | 4R - Added Capacity | $360,807.00 | $382,616.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,150,040.00 | $2,280,000.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $201,703.59 | $213,895.29 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,113,781.61 | $1,181,104.44 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $9,165,532.00 | $9,894,889.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $20,395,042.11 | $21,627,829.00 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,648,431.53 | $4,893,996.82 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $2,685,181.24 | $2,847,488.50 |
Arizona | 303A206 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $29,159,295.28 | $30,921,840.59 |
Arizona | 303A206 | Maricopa | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Training | $8,298.00 | $8,800.00 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,547,192.00 | $10,124,276.00 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $231,899.55 | $245,916.83 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,165,160.00 | $2,296,034.00 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,187,494.18 | $5,501,054.27 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $28,144,067.57 | $29,845,071.04 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,412,636.28 | $4,958,238.90 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,041.84 | |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,533,643.97 | $1,617,513.08 |
Arizona | 303A210 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $2,640.00 | $2,800.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $144,279.00 | $153,000.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | $319,918.00 | $339,112.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,925,382.00 | $4,160,888.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $590,522.05 | $625,951.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $24,548,328.00 | |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,106,798.00 | |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,400,885.00 | $3,606,453.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $2,571,166.00 | $2,726,581.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $37,745,180.00 | $40,057,677.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $791,501.00 | $839,344.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,643,592.00 | $7,730,782.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,709,107.00 | $1,812,415.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,734,175.00 | $1,838,218.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,162,209.00 | $5,474,241.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $42,435.00 | $45,000.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $750,000.00 | |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Other | $210,707.66 | $223,349.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,356,598.00 | $1,437,988.00 |
Arizona | 303A216 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $80,860.29 | $85,712.00 |
Arizona | 303A227 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,190,101.00 | $13,249,779.00 |
Arizona | 303A227 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $7,687,465.00 | $8,152,137.00 |
Arizona | 303A227 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,904,860.00 | $2,088,013.00 |
Arizona | 303A227 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,167,497.00 | $2,337,209.00 |
Arizona | 303A227 | Maricopa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | $6,790.00 | $7,200.00 |
Arizona | 347A204 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Other | $714.41 | $757.31 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,369.01 | $3,572.54 |
Arizona | 347A204 | Pinal | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $721,622.00 | $765,241.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,333,990.98 | $4,583,515.47 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $7,920,642.00 | $7,920,642.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $4,115,778.00 | $4,115,778.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,561,610.00 | $1,561,610.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $1,380,970.00 | $1,380,970.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Training | $21,000.00 | $21,000.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $121,890.00 | $129,258.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $61,553.00 | $65,274.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $103,287.00 | $11,458,382.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $884,059.00 | |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $71,370.63 | $1,904,992.63 |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,017,039.00 | $3,564,869.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,968,565.72 | $5,768,892.44 |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $14,904,530.00 | $15,805,440.00 |
Arizona | 347A204 | Pinal | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $230,092.00 | $244,000.00 |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | $63,811.86 | |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $506,310.24 | $711,914.40 |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,157,264.00 | $2,287,661.00 |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $7,408,921.00 | $8,696,334.00 |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $11,455,567.00 | $13,446,146.00 |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,474,942.00 | $2,905,000.00 |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Other | $53,489.00 | |
Arizona | GGI0204 | Gila | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Training | $6,134.00 | $7,200.00 |
Arizona | MMA0239 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,768,100.00 | $7,204,910.00 |
Arizona | MMA0239 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $33,471,464.00 | $36,024,548.00 |
Arizona | MMA0239 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $13,509,020.00 | $15,217,021.00 |
Arizona | MMA0239 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $500,000.00 | $4,536,215.00 |
Arizona | MMA0239 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $469,252.00 | $497,616.00 |
Arizona | MMA0249 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $18,797,676.00 | $30,337,342.00 |
Arizona | MMA0249 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $832,837.00 | $2,809,120.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,353,438.00 | $15,483,460.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $7,202,449.00 | $7,637,804.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $902,530.00 | $1,525,236.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $29,984.00 | $31,795.00 |
Arizona | MRN0014 | Pima | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $300,000.00 | $318,134.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $552,598.00 | $586,000.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $11,599.00 | $12,300.00 |
Arizona | MRN0014 | Pima | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $137,678.00 | $146,000.00 |
Arizona | PHX0363 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,141,591.00 | $24,953,840.00 |
Arizona | PHX0363 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,498,787.00 | |
Arizona | PHX0363 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $11,500.00 | |
Arizona | PPM0268 | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $5,422,084.00 | $5,422,084.00 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $456,958.00 | $456,958.00 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $664,562.00 | $704,433.00 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $51,009.00 | $54,069.00 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,098,880.00 | $28,441,226.00 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $559,409.00 | $2,449,261.43 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $110,267.00 | $221,440.00 |
Arizona | PPM0268 | Pima | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Training | $3,874.00 | $3,900.00 |
Arizona | SCT0238 | Maricopa | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,613,681.00 | $1,613,681.00 |
Arizona | SCT0238 | Maricopa | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Construction Engineering | $230,526.00 | $230,526.00 |
Arizona | SCT0238 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $25,627,632.00 | $36,610,901.00 |
Arizona | SCT0238 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,661,090.00 | $5,230,129.00 |
Arizona | SCT0238 | Maricopa | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $15,000.00 | |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | HIGH RISK RURAL ROAD | 4R - No Added Capacity | $5,033,031.00 | $5,033,031.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | HIGH RISK RURAL ROAD | Construction Engineering | $511,143.00 | $511,143.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $11,923,975.00 | $12,642,565.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,198,832.00 | $1,271,296.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Other | $1,997,367.00 | $2,082,010.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $28,033.00 | $29,727.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $283,157.00 | $300,273.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $21,009,896.00 | $22,279,848.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $779,866.00 | $827,006.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,064,756.00 | $2,189,561.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,965,293.37 | $3,144,530.95 |
Arizona | X60C202 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $27,183.00 | $28,826.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,393,946.63 | $3,599,095.05 |
Arizona | X60C202 | Maricopa | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $274,577.00 | $291,174.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Training | $8,487.00 | $9,000.00 |
Arizona | X60C202 | Maricopa | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $141,663.00 | $150,226.00 |