RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $178,558.40 | $223,198.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | $4,160.00 | $5,200.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,149,535.41 | $21,436,919.26 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,200,000.00 | $4,000,000.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $876,772.18 | $1,095,965.23 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $81,184.00 | $101,480.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $52,460.14 | $65,575.17 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $935,628.92 | $1,169,536.15 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,305,974.80 | $1,632,468.51 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $60,808.00 | $67,564.44 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,914,925.05 | |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,544,206.00 | |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,765,256.80 | $5,956,571.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,237,483.00 | |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $294,745.00 | |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,000,000.00 | |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $806,228.00 | $1,007,785.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Construction Engineering | $493,740.00 | $617,175.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $630.52 | $788.15 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $17,661,676.00 | $22,077,095.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $215,644.00 | $269,555.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $431,762.00 | $539,702.50 |
Arkansas | 0004031 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $164,490.00 | $205,612.50 |
Arkansas | 0004031 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $4,172,384.00 | $5,215,480.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $756,786.00 | $945,982.50 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $67,275.00 | $84,093.75 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Utilities | $194,708.00 | $243,385.00 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | Bridge New Construction | $101,278.00 | $126,597.50 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | Construction Engineering | $5,805.64 | $7,257.05 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | New Construction Roadway | $8,061,160.30 | $10,076,450.38 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,609,446.00 | $5,761,807.50 |
Arkansas | 0004045 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $610,875.06 | $763,593.82 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $366,565.79 | $458,207.24 |
Arkansas | 0004045 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,489.32 | $3,111.66 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,173,511.46 | $3,966,889.32 |
Arkansas | 0004045 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $130,190.00 | $162,737.50 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,242,843.00 | $4,053,553.75 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Construction Engineering | $89,055.00 | $98,950.00 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Safety | $890,546.00 | $989,495.56 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,360,136.00 | $5,450,170.00 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,121,282.00 | $2,651,602.50 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $16,852,692.00 | $21,065,865.00 |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge New Construction | $68,926,860.45 | |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | $6,392,931.82 | |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $36,431,168.30 | |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $6,971,957.46 | $8,714,946.82 |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $5,475,174.54 | $7,743,968.18 |
Arkansas | 0004080 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Safety | $1,336,125.70 | |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Traffic Management/Engineering - HOV | $786,063.96 | |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | $16,000.00 | $5,020,000.00 |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $8,000.00 | $10,000.00 |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $6,939,115.20 | $8,673,894.00 |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $52,884.80 | $66,106.00 |
Arkansas | 0004080 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $9,273,550.22 | $11,591,937.78 |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,873,085.63 | |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $4,550,751.00 | |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $344,000.00 | $430,000.00 |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $14,450.00 | |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $281,797.11 | |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $231,622.41 | |
Arkansas | 0007025 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $450,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $938,307.20 | $1,172,884.00 |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Right of Way | $280,000.00 | $350,000.00 |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Utilities | $16,000.00 | $20,000.00 |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $6,675,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,520,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $62,300,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,500,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Safety | $475,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $950,000.00 | |
Arkansas | 0011066 | Clay | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,300,000.00 | |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $33,153,935.47 | |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $8,916,725.00 | |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $800,000.00 | $1,000,000.00 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $300,000.00 | |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $235,000.00 | |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $365,543.75 | |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $249,742.54 | |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Bridge New Construction | $4,322,218.99 | $5,402,773.74 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $1,497,600.00 | $1,872,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $10,224,977.26 | $12,781,221.57 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Right of Way | $1,529,300.00 | |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Utilities | $1,420,000.00 | |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $3,814,022.00 | $4,237,802.22 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $24,826.04 | $27,584.49 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,000.00 | $100,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,800,000.00 | $4,750,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $677,564.91 | $846,956.14 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,096,560.00 | $3,870,700.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,342,265.30 | $2,927,831.62 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $512,077.00 | $640,096.25 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $70,764.00 | $88,455.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,365,423.40 | $14,206,779.25 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,248,616.00 | $7,810,770.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $892,860.00 | $1,116,075.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $21,601.00 | $27,001.25 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $47,035.00 | $58,793.75 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $107,133.60 | $133,917.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $209,160.00 | $261,450.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $141,643.00 | $177,053.75 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $417,507.36 | $521,884.20 |
Arkansas | 0028060 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,000,000.00 | |
Arkansas | 0028060 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,400,000.00 | |
Arkansas | 0028060 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $81,840.00 | $102,300.00 |
Arkansas | 0028060 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,254,500.00 | |
Arkansas | 0028060 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,342,215.00 | |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $1,074,808.12 | $1,343,510.15 |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,783,232.73 | |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,048,489.85 | |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $362,257.60 | $452,822.00 |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $779,982.50 | |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,434,734.85 | |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $160,000.00 | $500,000.00 |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Right of Way | $628,014.00 | $785,017.50 |
Arkansas | 0035049 | Jefferson | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Utilities | $480,000.00 | $600,000.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | 4R - Added Capacity | $2,881,851.21 | $3,602,314.01 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $26,359,133.60 | $32,948,917.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $638,150.53 | $797,688.16 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $988,519.31 | $1,235,649.14 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $198,400.00 | $248,000.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $23,116.35 | $28,895.44 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $832,427.00 | $1,040,533.75 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $22,978.00 | $28,722.50 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | SAFETEA-LU MISC. 1900 & UP | 4R - Added Capacity | $1,553,704.00 | $1,942,130.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,176,942.00 | $8,971,177.50 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,092,019.39 | $1,471,875.11 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $14,251,868.70 | $17,814,835.87 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $929,006.30 | |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $50,724.00 | $63,405.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,158,381.02 | |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,993.00 | $1,985,760.29 |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $20,520,018.28 | $25,650,022.85 |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $74,782.50 | |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,412,505.71 | |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $507,990.46 | $3,136,988.08 |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $382,840.00 | $478,550.00 |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $77,000.00 | |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $20,000.00 | |
Arkansas | 0043037 | Lonoke | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $739,000.00 | $1,291,829.10 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,170,714.00 | |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $15,000,000.00 | $24,000,000.00 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,811,289.00 | |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $749,894.60 | |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $649,685.00 | |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - Added Capacity | $15,911,000.00 | $19,888,750.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $250,000.00 | $312,500.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $20,000,000.00 | $25,000,000.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,019,659.01 | $4,774,573.76 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,681,248.26 | $2,101,720.36 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $107,875.82 | $3,750,384.78 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $470,000.00 | |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,415,000.00 | |
Arkansas | 0059016 | Prairie | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $12,800,000.00 | $16,000,000.00 |
Arkansas | 0059016 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $7,484,085.39 | |
Arkansas | 0059016 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $405,686.77 | |
Arkansas | 0059016 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $50,000.00 | |
Arkansas | 0059016 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $80,625.00 | |
Arkansas | 0059016 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,610,902.22 | $2,013,627.77 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $560,299.56 | $700,374.45 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $150,722.44 | $188,403.05 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,030,738.98 | $18,629,926.17 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,278,224.39 | $5,495,811.34 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,188,138.72 | $1,485,173.40 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $358,261.28 | $447,826.60 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $646,795.31 | $808,494.13 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $174,115.09 | $217,643.87 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $639,936.00 | $957,500.00 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $320,064.00 | $442,500.00 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $12,606.40 | $801,679.40 |
Arkansas | 0065052 | Sebastian | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,393.60 | $397,320.60 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,055,882.33 | |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,800,000.00 | |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,000,000.00 | $2,500,000.00 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $340,000.00 | |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,300,000.00 | |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $875,000.00 | |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,257,102.53 | $32,821,378.18 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,077,227.00 | $1,346,533.75 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,374,043.37 | $1,717,554.21 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $944,271.96 | $1,180,339.95 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $92,597.00 | $115,746.25 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,891,847.42 | $2,364,809.28 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,584,705.01 | |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,472,585.33 | $1,840,731.66 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $440,800.63 | |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,067,012.67 | |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,019,001.36 | |
Arkansas | 0073080 | White | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Restoration & Rehabilitation | $413,645.78 | $517,057.22 |
Arkansas | 0073080 | Lonoke | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Restoration & Rehabilitation | $103.22 | $129.03 |
Arkansas | 0073080 | White | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | $2,062,712.27 | $2,578,390.34 |
Arkansas | 0073080 | Lonoke | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | $514.73 | $643.41 |
Arkansas | 0073080 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $15,712,516.84 | $19,640,646.06 |
Arkansas | 0073080 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,623.37 | $4,529.21 |
Arkansas | 0073080 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,978,456.00 | $2,473,070.00 |
Arkansas | 0073080 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,013,384.32 | $1,266,730.40 |
Arkansas | 0073080 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $252.48 | $315.60 |
Arkansas | 0076135 | Hot Spring | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,028,259.43 | $17,367,559.51 |
Arkansas | 0076135 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,757,064.85 | $4,341,889.88 |
Arkansas | 0076135 | Hot Spring | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $735,094.12 | |
Arkansas | 0076135 | Hot Spring | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,420,456.59 | $1,775,570.73 |
Arkansas | 0076135 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $355,114.15 | $443,892.69 |
Arkansas | 0076135 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $105,612.04 | $132,015.05 |
Arkansas | 0076135 | Hot Spring | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $325,798.19 | $407,247.74 |
Arkansas | 0076135 | Hot Spring | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $731,250.00 | |
Arkansas | 0076135 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $243,750.00 | |
Arkansas | 0076135 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $711,716.70 | |
Arkansas | 0076135 | Hot Spring | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,118,283.30 | |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $49,985.00 | |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $50,015.00 | |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $8,507.59 | $9,452.87 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $8,502.49 | $9,447.22 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,172,305.72 | $23,524,784.13 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $14,706,125.32 | $16,340,139.25 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $1,077,300.00 | $1,197,000.00 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $182,700.00 | $203,000.00 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $965,202.53 | $1,072,447.26 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,803,169.71 | $2,003,521.90 |
Arkansas | 0076269 | Statewide | N/A | N/A | CARBON REDUCTION PROGRAM | Construction Engineering | $2,121,813.00 | $4,927,269.00 |
Arkansas | 0076269 | Statewide | N/A | N/A | CARBON REDUCTION PROGRAM | Preliminary Engineering | $2,128,743.20 | $2,660,929.00 |
Arkansas | 0076269 | Statewide | N/A | N/A | CARBON REDUCTION PROGRAM | Safety | $14,774,983.80 | $26,089,135.41 |
Arkansas | 0076269 | Statewide | N/A | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $7,043,005.00 | $11,436,500.42 |
Arkansas | 0076269 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Other | $77,598.00 | $86,220.00 |
Arkansas | 0076269 | Statewide | N/A | N/A | HSIP LIMITING FLEXIBLE | Safety | $13,400,000.00 | $14,888,888.89 |
Arkansas | 0076335 | Cleveland | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $341,531.00 | |
Arkansas | 0076335 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $341,531.00 | |
Arkansas | 0076335 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $340,814.00 | |
Arkansas | 0076335 | Grant | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $683,062.00 | |
Arkansas | 0076335 | Dallas | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $683,062.00 | |
Arkansas | 0076335 | Grant | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $22,676.77 | $25,196.41 |
Arkansas | 0076335 | Dallas | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $22,748.28 | $25,275.86 |
Arkansas | 0076335 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $13,254.27 | $14,726.97 |
Arkansas | 0076335 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $8,345.00 | $9,272.22 |
Arkansas | 0076335 | Cleveland | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $21,752.58 | $24,169.54 |
Arkansas | 0076335 | Cleveland | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,415,310.00 | |
Arkansas | 0076335 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,415,310.00 | |
Arkansas | 0076335 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,408,140.00 | |
Arkansas | 0076335 | Grant | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,830,620.00 | |
Arkansas | 0076335 | Dallas | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,830,620.00 | |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | $48,620.00 | $60,775.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HIGH RISK RURAL ROAD | Construction Engineering | $93,184.00 | $103,538.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HIGH RISK RURAL ROAD | Safety | $931,843.00 | $1,035,381.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $23,947.00 | $23,947.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $673,785.00 | $673,785.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,933,038.00 | $27,703,376.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,041,203.00 | $1,156,892.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $385,956.00 | $428,840.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $395,413.00 | $439,347.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $243,084.00 | $303,856.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $53,311,410.00 | $66,639,262.50 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $1,267,200.00 | $1,408,000.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $411,945.09 | $94,624,184.83 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $49,271,578.17 | |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,368,114.00 | |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,304,028.00 | |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,675,000.00 | |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,659,185.00 | |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,468,912.00 | |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $16,431,487.96 | $20,539,359.95 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $5,463,417.40 | $6,829,271.75 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,079,880.00 | $1,349,850.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,341,854.10 | $54,177,317.63 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $126,784,783.90 | $205,404,215.06 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $35,000,000.00 | |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $107,675,633.74 | $170,636,929.45 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $47,215,020.61 | |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $18,914,270.41 | |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $20,000.00 | |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $8,482,540.00 | $10,603,175.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $6,431,345.90 | $8,039,182.38 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - Added Capacity | $8,000,000.00 | $10,000,000.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,200,000.00 | $85,798,000.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $20,600,000.00 | $50,170,678.00 |
Arkansas | 0302273 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $25,002.50 | |
Arkansas | 0302273 | Hot Spring | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $24,997.50 | |
Arkansas | 0302273 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $4,499,727.03 | $13,808,952.18 |
Arkansas | 0302273 | Hot Spring | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $4,498,827.17 | $13,806,190.64 |
Arkansas | 0302273 | Hot Spring | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Resurfacing | $901,445.80 | $1,001,606.44 |
Arkansas | 0302273 | Hot Spring | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $434,305.12 | $482,561.25 |
Arkansas | 0302273 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $420,694.88 | $467,438.75 |
Arkansas | 0302273 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $115,840.96 | $128,712.18 |
Arkansas | 0302273 | Hot Spring | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $119,591.84 | $132,879.82 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $60,936.84 | $67,707.60 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $60,936.84 | $67,707.60 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $1,865,390.78 | $2,072,656.42 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $420,347.22 | $467,052.47 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $5,506,214.99 | $6,118,016.66 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,435,138.99 | $27,150,154.43 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $6,000,891.75 | $6,667,657.56 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $3,337,564.25 | $3,708,404.66 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $228,957.85 | $254,397.61 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,016,054.95 | $1,128,949.96 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $163,975.33 | $182,194.81 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $36,950.21 | $41,055.79 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $7,902,774.45 | $8,780,860.50 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $1,780,811.45 | $1,978,679.39 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $174,647.99 | $218,309.99 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $775,042.01 | $968,802.51 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | $60,939.48 | $67,710.54 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | $374,342.52 | $415,936.13 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $22,856.08 | $25,395.65 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $22,885.82 | $25,428.68 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $22,881.23 | $25,423.59 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $7,965.54 | $8,850.60 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $7,955.20 | $8,839.11 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $7,963.97 | $8,848.86 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,838,044.88 | $3,153,383.20 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,052,094.72 | $3,391,216.35 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,754,438.97 | $3,060,487.74 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,437,056.00 | $2,707,840.00 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $442,944.00 | $492,160.00 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $168,750.00 | $187,500.00 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $56,250.00 | $62,500.00 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $145,947.91 | $162,164.34 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $145,758.30 | $161,953.67 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $145,918.75 | $162,131.95 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $371,292.10 | $412,546.76 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $1,098,046.16 | $1,220,051.29 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $582,780.74 | $647,534.17 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,398,424.79 | $2,664,916.43 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $17,381,303.80 | $19,312,559.78 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $6,764,594.83 | $7,516,216.48 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $295,141.61 | $327,935.13 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $429,841.97 | $477,602.20 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $240,088.13 | $266,764.57 |
Arkansas | 0402083 | Johnson | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $25,000.00 | |
Arkansas | 0402083 | Pope | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $25,000.00 | |
Arkansas | 0402083 | Johnson | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $717,806.86 | $797,563.17 |
Arkansas | 0402083 | Pope | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $1,140,737.12 | $1,267,485.69 |
Arkansas | 0402083 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,279,779.88 | $21,219,107.12 |
Arkansas | 0402083 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,279,779.88 | $21,219,107.11 |
Arkansas | 0402083 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $435,499.35 | $483,888.18 |
Arkansas | 0402083 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $204,940.88 | $227,712.08 |
Arkansas | 0402083 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $36,428.02 | $40,475.58 |
Arkansas | 0402083 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $36,428.01 | $40,475.56 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $85.59 | $95.09 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $85.34 | $94.83 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,288,713.14 | $15,876,347.93 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,248,760.67 | $15,831,956.30 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $900,000.00 | $1,000,000.00 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $450,000.00 | $500,000.00 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $249,643.90 | $277,382.11 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $250,343.88 | $278,159.87 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $11,797,037.67 | $13,107,819.63 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $50,000.00 | $50,000.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,189,645.00 | $3,544,050.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Right of Way | $12,370.00 | $13,744.44 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Utilities | $13,500.00 | $15,000.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,349,562.00 | $9,277,291.11 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $82,154,296.00 | $93,782,551.11 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,704,711.00 | $1,894,123.33 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,962,632.00 | $2,180,702.22 |
Arkansas | 0404087 | Prairie | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $28,248.68 | |
Arkansas | 0404087 | Lonoke | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $21,751.32 | |
Arkansas | 0404087 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $13,795,733.44 | $15,328,592.71 |
Arkansas | 0404087 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,622,639.30 | $11,802,932.56 |
Arkansas | 0404087 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $106,555.50 | $118,395.00 |
Arkansas | 0404087 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $106,555.50 | $118,395.00 |
Arkansas | 0404087 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $696,103.84 | $773,448.71 |
Arkansas | 0404087 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $535,996.16 | $595,551.29 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $40,000.00 | $40,000.00 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $109,248.52 | $121,387.24 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $694,590.00 | $694,590.00 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $22,372.00 | $24,857.78 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,555,106.52 | $26,172,340.58 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $3,351,074.00 | $3,723,415.56 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,559,068.48 | $1,732,298.31 |
Arkansas | 0472010 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,270,927.31 | $10,528,026.38 |
Arkansas | 0472010 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $25,000,000.00 | |
Arkansas | 0472010 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $62,301,105.01 | |
Arkansas | 0472010 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $992.21 | $1,240.26 |
Arkansas | 0472010 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $89,380,615.76 | |
Arkansas | 0472010 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,474,904.80 | $1,843,631.00 |
Arkansas | 0472010 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $679,880.00 | $849,850.00 |
Arkansas | 0472010 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $20,000,000.00 | |
Arkansas | 0472010 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,732,774.09 | |
Arkansas | 0472010 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,372,849.87 | |
Arkansas | 0472010 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $13,794,000.00 | |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,681,167.37 | |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $7,693,860.00 | |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,373,317.39 | $1,757,132.93 |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,318.23 | |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,288,487.41 | |
Arkansas | 0491021 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $14,400,000.00 | $35,848,184.60 |
Arkansas | 0491021 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $3,010,459.16 | $3,344,954.62 |
Arkansas | 0491021 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $135,000.00 | $2,928,000.00 |
Arkansas | 0551148 | Mississippi | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $110,541.05 | $301,459.30 |
Arkansas | 0551148 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $34,179,621.94 | $37,977,357.71 |
Arkansas | 0551148 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,512,000.00 | $1,680,000.00 |
Arkansas | 0551148 | Mississippi | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $288,000.00 | $320,000.00 |
Arkansas | 0551148 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,610,000.00 | $2,900,000.00 |
Arkansas | 0551151 | Mississippi | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $78,386.40 | $87,096.00 |
Arkansas | 0551151 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $42,300,000.00 | $95,187,424.08 |
Arkansas | 0551151 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $391,249.19 | $434,721.32 |
Arkansas | 0551151 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,577,500.00 | $3,975,000.00 |
Arkansas | 0551151 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $421,773.00 | |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $224,878.36 | $281,097.96 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $225,013.32 | $281,266.65 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $13,209,475.83 | $16,511,844.79 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $6,117,743.24 | $7,647,179.05 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $1,718,132.40 | $2,147,665.50 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | $2,577,198.60 | $3,221,498.25 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $996,937.76 | $1,246,172.20 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $461,714.71 | $577,143.38 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $14,793.56 | $18,491.95 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $31,942.34 | $39,927.93 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $363,900.86 | $454,876.08 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $168,532.20 | $210,665.25 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $109,441.23 | $136,801.53 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $236,306.27 | $295,382.84 |
Arkansas | 1656005 | Craighead | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $1,984,992.00 | |
Arkansas | 1656005 | Poinsett | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $11,935,008.00 | |
Arkansas | 1656005 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $715,660.78 | |
Arkansas | 1656005 | Poinsett | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $4,302,998.34 | |
Arkansas | 1656005 | Poinsett | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,689,081.03 | |
Arkansas | 1656005 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $282,671.88 | |
Arkansas | 1656005 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $344,954.42 | |
Arkansas | 1656005 | Poinsett | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,011,307.58 | |
Arkansas | 1656005 | Poinsett | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,176,000.00 | |
Arkansas | 1656005 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $224,000.00 | |
Arkansas | 1656005 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $140,096.00 | |
Arkansas | 1656005 | Poinsett | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $735,504.00 | |
Arkansas | 1765009 | Statewide | N/A | State | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $67,000,000.00 | $83,750,000.00 |
Arkansas | 1765009 | Statewide | N/A | State | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $23,000,000.00 | $28,750,000.00 |
Arkansas | 1765009 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,000.00 | $10,150,000.00 |
Arkansas | 1765009 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $47,850,000.00 | |
Arkansas | 1765009 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $7,000,000.00 | |
Arkansas | 1765009 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $3,300,000.00 | |
Arkansas | 1765009 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $119,702,147.00 | |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $2,000,000.00 | $2,500,000.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $16,000,000.00 | $20,000,000.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | I-69 PROJ-AR-TEA21 | New Construction Roadway | $8,064,432.41 | $8,064,432.41 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | I-69 PROJ-AR-TEA21 | Preliminary Engineering | $234,812.59 | $234,812.59 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | I-69 PROJ-AR-TEA21 | Right of Way | $558,630.00 | $558,630.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Bridge New Construction | $8,000,000.00 | $10,000,000.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Construction Engineering | $2,575,440.80 | $3,219,301.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $2,897,926.00 | $3,622,407.50 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $17,066,716.52 | $21,333,395.65 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Right of Way | $560,000.00 | $700,000.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $639,395.00 | $799,243.75 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,603,577.00 | |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,495,000.00 | |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | REPURPOSED EARMARKS EXEMPT | Preliminary Engineering | $1,200,000.00 | $1,200,000.00 |
Arkansas | 2221002 | Drew | >= 5,000 AND < 50,000 | N/A | REPURPOSED EARMARKS EXEMPT | Right of Way | $676,423.00 | $676,423.00 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,471,928.22 | $5,589,910.27 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,900,805.44 | $13,626,006.80 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $684,553.00 | $855,691.25 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $236,121.53 | $295,151.91 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $575,571.58 | $719,464.48 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,127,509.75 | $1,409,387.18 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $463,408.15 | $579,260.19 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $62,781.75 | $78,477.19 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $153,037.25 | $191,296.56 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $1,179,532.74 | $1,474,415.92 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $483,901.36 | $604,876.70 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $10,680.00 | $10,680.00 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $23,507,370.00 | $26,119,300.00 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,428,261.91 | $1,587,040.45 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $9,479.16 | $11,848.95 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $172,381.00 | $215,476.25 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $328,755.00 | $365,283.33 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $211,979.00 | $264,973.75 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $386,019.00 | $482,523.75 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $160,015.00 | $200,018.75 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Traffic Management/Engineering - HOV | $405,000.00 | $450,000.00 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $4,282.30 | $4,758.11 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,222,176.82 | $18,024,640.91 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $16,851,923.18 | $18,724,359.09 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $551,474.53 | $612,749.47 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $96,768.00 | $107,520.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $59,749.00 | $66,388.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $34,862.00 | $38,735.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,971,977.00 | $34,413,308.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $949,196.00 | $1,054,662.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $350,229.00 | $389,143.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,652,125.01 | $4,245,068.58 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,975,216.00 | $5,528,017.78 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,428,948.32 | $1,587,720.36 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,005,715.56 | |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $21,723,526.90 | $24,137,252.11 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,170,000.00 | $1,300,000.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $2,288,117.00 | $2,860,146.25 |
Arkansas | 4928001 | Washington | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,330,000.00 | $3,700,000.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Bridge New Construction | $332,000.00 | $415,000.00 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $35,520.40 | $39,467.11 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $51,347,042.88 | $57,052,269.87 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,141,820.76 | $2,379,800.85 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $113,783.27 | $126,425.85 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $13,116,379.00 | $14,573,754.44 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $360,866.74 | $400,963.04 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $2,282,521.00 | $2,853,151.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $2,884,390.00 | $3,605,487.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | $74,090.00 | $92,612.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $138,475.40 | $173,094.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,051,938.00 | $1,314,922.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,438,848.35 | $5,548,560.44 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,445,849.00 | $4,307,311.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,680,000.00 | $2,100,000.00 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $272,895.00 | $341,118.75 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,276,000.00 | $6,595,000.00 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,292,361.00 | $1,615,451.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $516,000.00 | $2,382,000.00 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,480,700.46 | $1,850,875.58 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $8,398,902.00 | $10,498,627.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $1,214,398.00 | $1,517,997.50 |
Arkansas | 5401262 | Washington | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $235.00 | $235.00 |
Arkansas | 5401262 | Washington | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,664,821.00 | $2,960,912.22 |
Arkansas | 5401262 | Washington | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,486,760.00 | $1,651,955.55 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $50,472,754.70 | $56,080,838.56 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,959,949.99 | $11,066,611.10 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,328,023.00 | $2,586,692.22 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,700,881.00 | $3,000,978.89 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,570,437.05 | $3,967,152.28 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $963,261.62 | $1,070,290.68 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $7,067,290.98 | $7,852,545.53 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $606,879.00 | $674,310.00 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,421,634.94 | $4,912,927.72 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $13,094,089.21 | $14,548,988.01 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $163,428.04 | $181,587.27 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,189,582.55 | $27,988,424.72 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $1,280,248.34 | $1,422,498.14 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $182,892.66 | $203,214.08 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $473,152.83 | $525,725.37 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $4,189,549.40 | $4,655,054.89 |
Arkansas | 5763002 | Scott | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,375,952.00 | $4,219,940.00 |
Arkansas | 5763002 | Polk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,685,377.08 | $19,606,721.35 |
Arkansas | 5763002 | Polk | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $476,533.24 | $595,666.54 |
Arkansas | 5763002 | Scott | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $476,533.22 | $595,666.53 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $83,395.82 | $84,108.52 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $280,636.87 | $285,570.02 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $79,876,926.57 | |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,540,265.93 | |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,500,000.00 | |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,449,004.96 | $5,823,384.99 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $642,772.63 | $841,337.00 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $94,258.60 | |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $652,418.90 | |
Arkansas | 6062001 | Pulaski | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,278,860.34 | $11,598,575.42 |
Arkansas | 6062001 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,278,860.34 | $11,598,575.43 |
Arkansas | 6062001 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $396,431.10 | $495,538.88 |
Arkansas | 6062001 | Pulaski | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Resurfacing | $161,883.50 | $202,354.37 |
Arkansas | 6062001 | Pulaski | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $478,000.00 | $597,500.00 |
Arkansas | 6062001 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $478,000.00 | $597,500.00 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $363,256.34 | $403,618.15 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,000,000.00 | $73,113,630.44 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $22,060,472.00 | |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,044,358.49 | |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,470,628.00 | |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $18,048,733.90 | $22,560,917.37 |
Arkansas | 7007001 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $18,048,733.90 | $22,560,917.38 |
Arkansas | 7007001 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,950,169.49 | $2,437,711.86 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | ||
Arkansas | 7007001 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $8,519,813.84 | $10,649,767.30 |
Arkansas | 7007001 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $21,376.96 | $26,721.20 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
Arkansas | 7007001 | Calhoun | < 5,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $34,865.68 | $43,582.10 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $16,093.83 | $20,117.29 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $1,228,630.00 | $1,535,787.50 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,779,892.02 | $13,830,160.69 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $2,400,000.00 | $3,000,000.00 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,000,000.00 | |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $400,000.00 | $500,000.00 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,300,000.00 | |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,692,749.06 | $10,865,936.32 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $26,037,069.45 | |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,266,084.13 | $2,832,605.17 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $460,756.00 | $14,575,945.00 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $842,577.64 | $1,053,222.05 |
Arkansas | 9013010 | Clark | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,310,000.00 | |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $6,497,612.48 | $8,122,015.60 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $1,232,239.04 | $1,540,298.80 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $140,690.00 | $175,862.50 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $3,534,896.71 | $12,800,000.00 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Safety | $889,080.02 | $1,111,350.02 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Utilities | $2,805,000.00 | |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Construction Engineering | $285,468.06 | $356,835.08 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,263,627.35 | $10,329,534.19 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,416,999.13 | $1,771,248.91 |
Arkansas | 9035021 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $148,263.55 | $185,329.44 |
Arkansas | 9036020 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $14,337,191.00 | $20,188,652.00 |
Arkansas | 9036020 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $4,000,000.00 | $5,000,000.00 |
Arkansas | 9036020 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,600,000.00 | $2,010,000.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $497,551.34 | $621,939.18 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $3,000.64 | $3,750.79 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $792,880.84 | $991,101.05 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,479,445.98 | $23,099,307.48 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,347,935.00 | $1,684,918.75 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,376,000.00 | $1,720,000.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,176,000.00 | $11,470,000.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,674,796.00 | $2,093,495.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $13,350,475.80 | $16,688,094.75 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Bridge New Construction | $6,246,625.60 | $7,808,282.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $990,212.80 | $1,237,766.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $1,544,048.80 | $1,930,061.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $59,385.60 | $74,232.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $256,263.20 | $820,000.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,400,000.00 | |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $500,000.00 | |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $117,000.00 | $146,250.00 |
Arkansas | 9065038 | Lonoke | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $67,304.25 | $74,782.50 |
Arkansas | 9065038 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $106,113,536.03 | |
Arkansas | 9065038 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,879,504.10 | |
Arkansas | 9065038 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $361,798.52 | $6,201,900.17 |
Arkansas | 9142048 | Washington | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $41,620,483.23 | |
Arkansas | 9142048 | Washington | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $3,322,500.00 | |
Arkansas | 9142048 | Washington | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $240,000.00 | $6,695,500.00 |
Arkansas | 9142048 | Washington | >= 200,000 | State | CONGESTION AIR QUALITY | Utilities | $615,000.00 | |
Arkansas | 9142048 | Washington | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $280,000.00 | $350,000.00 |
Arkansas | 9142048 | Washington | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $100,892.28 | $312,500.00 |
Arkansas | 9142048 | Washington | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $222,554.74 | $625,000.00 |
Arkansas | 9142051 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $34,205,887.00 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $34,205,887.00 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $11,189,166.60 | |
Arkansas | 9142051 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $11,189,166.59 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,535,173.33 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,250,000.00 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $3,911,414.90 | |
Arkansas | 9142051 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $3,911,414.91 | |
Arkansas | 9142051 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $27,799.34 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $27,799.35 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $6,089,000.00 | |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $400,000.00 | $500,000.00 |
Arkansas | 9142051 | Benton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $400,000.00 | $500,000.00 |
Arkansas | 9142051 | Benton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,999,646.27 | $2,499,557.84 |
Arkansas | 9142051 | Washington | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,999,646.28 | $2,499,557.85 |
Arkansas | 9142051 | Washington | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,500,000.00 | $1,666,666.67 |
Arkansas | 9142051 | Benton | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $125,511.27 | $156,889.08 |
Arkansas | 9142051 | Washington | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $125,511.26 | $156,889.08 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Replacement - Added Capacity | $5,000,000.00 | $6,250,000.00 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Bridge New Construction | $413,245.41 | $516,556.76 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $7,600,000.00 | $21,663,298.09 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $400,000.00 | $10,282,316.61 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,667.34 | $2,902,584.17 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $2,400,000.00 | $29,349,248.37 |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,014,850.00 | |
Arkansas | 9177010 | Sebastian | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $80,000.00 | $6,100,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,507,467.00 | $1,884,333.75 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,398,312.09 | $17,997,890.12 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $864,107.92 | $1,080,134.90 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,480,000.00 | $4,600,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $240,000.00 | $300,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $816,000.00 | $3,420,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $8,000,000.00 | $10,000,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $12,000,000.00 | $15,000,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Bridge New Construction | $1,211,083.00 | $1,513,853.75 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $9,188,917.00 | $11,486,146.25 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,671,576.08 | $2,089,470.10 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $1,044,800.00 | $1,306,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $17,770,843.95 | $47,213,554.93 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,040,000.00 | $7,700,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $80,000.00 | $4,800,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $2,073,494.00 | |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $500,000.00 | |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $16,000,000.00 | $20,000,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Replacement - Added Capacity | $1,320,000.00 | $1,650,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Bridge Replacement - Added Capacity | $680,000.00 | $850,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $36,000,000.00 | $45,000,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - Added Capacity | $2,680,000.00 | $3,350,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - Added Capacity | $1,320,000.00 | $1,650,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,851,000.00 | $53,257,993.22 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,680,000.00 | $6,509,180.47 |
Arkansas | 9222014 | Pulaski | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,320,000.00 | $3,206,014.28 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $80,000.00 | $7,380,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $8,000,000.00 | $10,000,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $1,340,000.00 | $1,675,000.00 |
Arkansas | 9222014 | Pulaski | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $660,000.00 | $825,000.00 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $11,194,400.00 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $8,805,600.00 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Bridge New Construction | $16,682,863.36 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $21,971,034.69 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $213,278.63 | $266,598.28 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | Preliminary Engineering | $167,766.57 | $209,708.22 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $1,000,173.63 | $7,784,951.89 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | Right of Way | $786,744.17 | $6,123,702.25 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Safety | $764,544.05 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | Safety | $601,396.16 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Utilities | $4,994,970.39 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | Utilities | $3,929,081.61 | |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $304,830.46 | $381,038.08 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $304,830.46 | $381,038.07 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $3,435,997.24 | $4,294,996.55 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $3,435,997.25 | $4,294,996.56 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $731,340.00 | $914,175.00 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | N/A | REPURPOSED SPECIAL | New Construction Roadway | $192,562.00 | $240,702.50 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $965,034.44 | $1,206,293.06 |
Arkansas | 9227074 | Craighead | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $870,301.04 | $1,087,876.30 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,107,980.28 | $1,384,975.35 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $12,191,906.64 | $15,239,883.30 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $706,218.45 | |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $8,699,999.00 | $9,666,665.56 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $182,835.00 | $228,543.75 |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | HSIP LIMITING FLEXIBLE | Other | $178,748.46 | $198,609.40 |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $37,103,300.36 | |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,439,975.25 | |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $143,179.84 | |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,716,300.00 | $1,907,000.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $3,288,806.00 | $4,111,007.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $16,000.00 | $20,000.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $28,510,019.00 | $40,623,897.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $679,555.00 | $849,444.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,695,638.00 | $3,369,548.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,402,000.00 | $3,002,500.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,200,000.00 | $4,000,000.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,025,245.00 | $10,223,500.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $31,325,518.00 | $51,407,943.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,016,607.00 | $2,520,759.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $232,214.00 | $360,905.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,998,577.38 | $44,704,208.69 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,601,729.90 | $4,237,329.30 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,245,370.58 | $3,818,083.03 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $17,000,000.00 | $30,000,000.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,150,888.60 | |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,970,317.70 | $21,141,550.24 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $17,000,000.00 | $20,000,000.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $2,550,000.00 | $3,000,000.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,641,920.00 | $20,802,400.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,103,717.20 | $1,379,646.50 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,213,040.00 | $1,516,300.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $37,372.00 | $46,715.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $141,600.00 | $177,000.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $555,466.00 | $694,332.50 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $376,492.80 | $470,616.00 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $2,000,000.00 | $2,500,000.00 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $2,000,000.00 | $2,500,000.00 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,200,000.00 | $13,098,232.77 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $638,446.89 | $2,261,692.96 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,413,585.37 | $12,103,303.78 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $292,664.25 | $465,830.32 |
Arkansas | 9293009 | Drew | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $912,000.00 | |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $364,878.41 | $456,098.01 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $37,660.06 | $47,075.07 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $20,884,105.17 | $26,105,131.46 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,499,517.70 | $1,874,397.13 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,731,687.00 | $4,664,608.75 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $192,000.00 | $240,000.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $361,683.13 | $452,103.91 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $423,872.00 | $529,840.00 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $783,117.00 | $978,896.25 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,027,735.43 | $1,284,669.29 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $11,911,289.39 | $14,889,111.73 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $11,085.27 | $13,856.59 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,210,168.26 | $6,512,710.33 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Safety | $185,752.00 | $232,190.00 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $911,225.51 | $1,139,031.88 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $500,724.73 | $625,905.92 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $429,810.49 | $537,263.11 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $13,459.78 | $16,824.72 |
Arkansas | 9332013 | Greene | >= 5,000 AND < 50,000 | N/A | SAFETEA-LU MISC. 1900 & UP | Utilities | $699,177.00 | $873,971.25 |
Arkansas | 9373019 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,787,953.00 | $19,734,941.25 |
Arkansas | 9373019 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,728,000.00 | $2,160,000.00 |
Arkansas | 9373019 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,280,000.00 | $1,600,000.00 |
Arkansas | 9373019 | Benton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Utilities | $65,009.00 | $81,261.25 |
Arkansas | 9373019 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $192.04 | $750,240.05 |
Arkansas | 9373019 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $600,000.00 | |
Arkansas | 9373019 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,650,000.00 | $3,312,500.00 |
Arkansas | 9373019 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $16,000.00 | $6,920,000.00 |
Arkansas | 9373019 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,052,804.00 | $1,316,005.00 |
Arkansas | 9373019 | Benton | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $212,047.00 | $265,058.75 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $342.87 | $342.87 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $765.93 | $765.93 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $77,220.30 | $77,220.30 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $34,693.70 | $34,693.70 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $4,732,395.15 | |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $2,126,180.36 | |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $9,192,368.50 | |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $9,192,368.50 | |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $5,181,564.93 | |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $2,327,984.29 | |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,455,834.81 | $6,062,038.68 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,386,444.23 | $5,984,938.03 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $340,348.17 | $378,164.63 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $757,537.83 | $841,708.70 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,636,782.14 | $1,818,646.82 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,615,964.56 | $1,795,516.18 |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $71,353.84 | |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $18,989.00 | |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | $18,259.09 | |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $27,084,407.28 | |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $7,207,823.34 | |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $6,930,759.50 | |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Resurfacing | $1,278,589.40 | |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Resurfacing | $2,812,896.60 | |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $1,051,235.04 | |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $269,005.60 | |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $279,759.36 | |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $1,805,527.90 | |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $1,736,124.62 | |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $6,784,524.37 | |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | $5,034,324.00 | $5,593,693.33 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $9,525,377.00 | $10,583,752.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $561,441.70 | $623,823.44 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,497,340.00 | $1,663,711.11 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | $11,785,624.60 | $13,095,138.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $6,406,257.40 | $7,118,064.00 |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $13,131.91 | $13,131.91 |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,591,977.09 | $1,591,977.09 |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $30,623,324.44 | |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $469,855.56 | |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $7,805,314.44 | |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $664,049.70 | $737,833.00 |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $11,669,548.89 | |
Arkansas | B400207 | Crittenden | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $110,384.19 | $122,649.10 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,990,230.30 | $12,211,367.00 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $13,580,568.69 | $15,089,520.76 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $869,330.00 | $965,922.00 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,371,239.69 | $8,190,266.33 |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $14,381,331.11 | |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $19,359,408.89 | |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $9,254,083.33 | |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,250,065.40 | $1,388,961.56 |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $31,296.00 | $34,773.33 |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $6,876,382.22 | |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $20,857,850.00 | |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $8,320,270.00 | |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $594,420.41 | $660,467.12 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $136,033.00 | $151,147.78 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $38,952,232.01 | $43,280,257.79 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,044,913.00 | $2,272,125.56 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $11,685,606.61 | $12,984,007.34 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,476,983.00 | $24,974,426.00 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $380,303.00 | $422,559.00 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,743,094.00 | $7,492,327.00 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $289.00 | $321.00 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $81,001.00 | $90,001.11 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $531,259.00 | $590,287.78 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,381,241.20 | $28,201,379.10 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $211,686.00 | $235,206.67 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,614,372.34 | $8,460,413.72 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $3,382,239.00 | |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $57,376,325.00 | $63,751,473.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $2,486,933.00 | $2,763,258.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,299,459.00 | $1,443,843.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,895,480.00 | $9,883,867.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,094,977.00 | $28,994,419.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $519,216.00 | $576,907.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $203,118.00 | $225,686.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,984,258.00 | $8,871,398.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $19,872.00 | $19,872.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $607,705.00 | $607,705.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,597,787.00 | $23,997,541.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,136,725.00 | $1,263,028.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $244,930.00 | $272,145.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,948,022.00 | $7,720,024.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,163.00 | $4,626.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $425,559.00 | $472,844.00 |