U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
District Of Columbia

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
District Of Columbia 1104013 District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity $169,393.06 $203,719.86
District Of Columbia 1104013 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $15,742,271.31 $19,788,288.72
District Of Columbia 1104013 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,016,939.95 $6,563,624.43
District Of Columbia 1104013 District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity $38,344.71 $46,115.11
District Of Columbia 1104013 District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $828,346.98 $1,097,460.23
District Of Columbia 1104013 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $2,446,843.87 $2,942,686.55
District Of Columbia 1104013 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $301,986.02 $363,182.22
District Of Columbia 1116033 District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $113,975.04 $142,468.80
District Of Columbia 1116033 District of Columbia >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - No Added Capacity $20,000,000.00 $25,000,000.00
District Of Columbia 1116033 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $713,037.19 $8,618,187.52
District Of Columbia 2016006 District of Columbia >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Restoration & Rehabilitation $214,897.00 $258,444.98
District Of Columbia 2016006 District of Columbia >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Restoration & Rehabilitation $276,495.03 $332,525.59
District Of Columbia 2016006 District of Columbia >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Restoration & Rehabilitation $18,096,928.06 $22,263,396.80
District Of Columbia 2016006 District of Columbia >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $29,211.71 $32,457.46
District Of Columbia 2016006 District of Columbia >= 200,000 State RAIL HWY CROSSING HAZ ELI 4R - Restoration & Rehabilitation $47,707.14 $89,501.41
District Of Columbia 2016006 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $905,260.58 $1,088,707.85
District Of Columbia 2016006 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,577,047.66 $1,896,629.78
District Of Columbia 2016010 District of Columbia >= 200,000 State HSIP LIMITING FLEXIBLE Traffic Management/Engineering - HOV $1,464,750.00 $1,627,500.00
District Of Columbia 2016010 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $4,760,796.79 $5,745,240.98
District Of Columbia 2016010 District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $1,179,763.38 $1,418,837.50
District Of Columbia 2016010 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $14,101,378.35 $16,993,505.15
District Of Columbia 2016010 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $330,625.43 $397,625.29
District Of Columbia 2016016 District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $12,906,601.84 $15,202,524.47
District Of Columbia 2016016 District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Construction Engineering $3,693,774.00 $4,617,217.50
District Of Columbia 2016016 District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Debt Service $3,098,143.00 $3,725,968.73
District Of Columbia 2016016 District of Columbia >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $252,940.22 $165,785,900.28
District Of Columbia 2016016 District of Columbia >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Debt Service $49,756,697.50 $60,788,808.16
District Of Columbia 2016016 District of Columbia >= 200,000 Other PUBLIC LANDS - BEGINNING FY 83 Bridge Rehabilitation - Added Capacity $497,101.34 $497,101.34
District Of Columbia 2016016 District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $651,576.78 $783,616.09
District Of Columbia 2016016 District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Debt Service $18,312,559.50 $281,898,958.73
District Of Columbia 2016016 District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $14,222,614.30 $17,713,606.25
District Of Columbia 2016049 District of Columbia >= 200,000 Local HIGH RISK RURAL ROAD Safety $2,348,476.46 $4,614,858.78
District Of Columbia 2016049 District of Columbia >= 200,000 Local HSIP LIMITING FLEXIBLE Safety $4,496,641.90 $22,211,366.51
District Of Columbia 2016049 District of Columbia >= 200,000 Local RAIL HWY CROSSING HAZ ELI Safety $2,591,381.63 $2,879,312.93
District Of Columbia 2016049 Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Safety $162,208.00 $1,895,078.77
District Of Columbia 2016049 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $5,161,952.00 $11,726,000.00
District Of Columbia 2016049 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Safety $5,575,142.00 $16,938,639.06
District Of Columbia 2016051 District of Columbia >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Tunnel Preventive Maintenance $27,351,521.41 $32,999,677.92
District Of Columbia 2016051 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Tunnel Preventive Maintenance $19,777,559.26 $23,836,011.57
District Of Columbia 2016051 District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Tunnel Preventive Maintenance $1,605,812.92 $1,931,224.20
District Of Columbia 2016059 District of Columbia >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $6,730,989.51 $7,747,231.14
District Of Columbia 2016059 District of Columbia >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $37,706,225.14 $66,706,502.41
District Of Columbia 2018005 Statewide N/A N/A FRA TRANSFER DEVELOPMENT 4R - No Added Capacity $117,683,979.70 $117,683,979.70
District Of Columbia 2018005 Statewide N/A N/A FRA TRANSFER DEVELOPMENT Construction Engineering $19,297,472.38 $20,749,153.38
District Of Columbia 2018006 Statewide N/A N/A NAT SIG FREIGHT AND HWY PROJ 4R - Restoration & Rehabilitation $90,000,000.00 $90,000,000.00
District Of Columbia 2018017 District of Columbia >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $3,057,670.18 $3,822,087.72
District Of Columbia 2018017 District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Maintenance  Resurfacing $2,512,900.60 $3,141,125.75
District Of Columbia 2018017 District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $26,190,532.97 $40,720,435.03
District Of Columbia 2018017 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $47,502,240.49 $57,917,329.30
District Of Columbia 2018017 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,366,000.00 $1,707,500.00
District Of Columbia 2018022 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $23,288,297.43 $34,733,164.83
District Of Columbia 2018023 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $12,285,399.88 $26,076,177.26
District Of Columbia 2018031 District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $9,419,723.40 $11,328,590.99
District Of Columbia 2018031 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $21,842,272.16 $26,281,537.31
District Of Columbia 2018045 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,130,128.32 $1,359,144.11
District Of Columbia 2018045 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $10,505,156.60 $12,633,982.68
District Of Columbia 2018045 District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Traffic Management/Engineering - HOV $26,310.40 $31,642.09
District Of Columbia 2018045 District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Traffic Management/Engineering - HOV $645,006.31 $775,714.15
District Of Columbia 2018045 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,268,878.32 $2,728,657.02
District Of Columbia 2018045 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $19,193,730.33 $23,083,259.57
District Of Columbia 2019026 District of Columbia >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $6,069,950.00 $7,344,048.50
District Of Columbia 2019026 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $483,026.82 $603,783.53
District Of Columbia 2019026 District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $19,883,885.12 $23,913,271.33
District Of Columbia 2020037 District of Columbia >= 200,000 State FRA TRANSFER DEVELOPMENT 4R - Restoration & Rehabilitation $31,301.75 $31,301.75
District Of Columbia 2020037 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $55,238,711.94 $69,048,389.93
District Of Columbia 2020037 District of Columbia >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $3,753,768.84 $4,692,212.61
District Of Columbia 2020037 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $4,306,310.07 $5,382,887.59
District Of Columbia 2021023 District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $7,977,944.14 $27,908,046.73
District Of Columbia 2021023 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $571,433.43 $714,291.79
District Of Columbia 2021023 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,342,853.26 $5,428,566.57
District Of Columbia 2022022 District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $2,400,000.00 $26,414,101.47
District Of Columbia 2022022 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $2,000,000.00 $2,500,000.00
District Of Columbia 2022035 District of Columbia >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP 4R - Restoration & Rehabilitation $12,978,686.11 $12,978,686.11
District Of Columbia 2022035 District of Columbia >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $1,595,451.11 $1,994,313.89
District Of Columbia 2022035 District of Columbia >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $7,237,955.06 $11,261,562.15
District Of Columbia 2023011 District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM - COVID APP Bridge Rehabilitation - No Added Capacity $6,617,951.89 $6,617,951.89
District Of Columbia 2023011 District of Columbia >= 200,000 Other HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $20,124,815.20 $22,360,905.78
District Of Columbia 2023011 District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $31,838,039.10 $35,375,599.00
District Of Columbia 2023020 District of Columbia >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $18,476,360.00 $21,470,450.00
District Of Columbia 2023020 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $11,700,000.00 $13,000,000.00
District Of Columbia 2952185 District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity $27,351,438.70 $34,189,298.37
District Of Columbia 2952185 District of Columbia >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $34,925,243.91 $43,656,554.89
District Of Columbia 2952185 District of Columbia >= 200,000 N/A BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity $342,834.46 $428,543.08
District Of Columbia 2952185 District of Columbia >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity $1,743,995.78 $2,179,994.73
District Of Columbia 2952185 District of Columbia >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Rehabilitation - No Added Capacity $2,096,045.89 $2,620,057.37
District Of Columbia 2952185 District of Columbia >= 200,000 State EQUITY BONUS EXEMPT LIM Bridge Rehabilitation - No Added Capacity $235,795.08 $261,994.54
District Of Columbia 2952185 District of Columbia >= 200,000 State EQUITY BONUS SP LIMITATION Bridge Rehabilitation - No Added Capacity $404,872.09 $449,857.88
District Of Columbia 2952185 District of Columbia >= 200,000 State EXTENSION OF ALLOC PROGRAMS Bridge Rehabilitation - No Added Capacity $284,753.30 $342,457.37
District Of Columbia 2952185 District of Columbia >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $15,838,242.00 $19,797,802.50
District Of Columbia 2952185 District of Columbia >= 200,000 State HIGHWAY BRIDGE PROGRAM Bridge Rehabilitation - No Added Capacity $57,496.17 $71,870.21
District Of Columbia 2952185 District of Columbia >= 200,000 State HIGHWAY INFRASTRUCTURE Bridge Rehabilitation - No Added Capacity $2,790,907.00 $3,488,633.75
District Of Columbia 2952185 District of Columbia >= 200,000 N/A INTERSTATE MAINTENANCE Bridge Rehabilitation - No Added Capacity $890,003.46 $988,892.73
District Of Columbia 2952185 District of Columbia >= 200,000 State INTERSTATE MAINTENANCE Bridge Rehabilitation - No Added Capacity $9,642,994.35 $10,714,438.16
District Of Columbia 2952185 District of Columbia >= 200,000 State MINIMUM GUARANTEE - TEA-21 Bridge Rehabilitation - No Added Capacity $35,151.41 $43,939.26
District Of Columbia 2952185 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $19,543,486.83 $23,503,892.76
District Of Columbia 2952185 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $97,543,079.54 $137,012,770.88
District Of Columbia 2952185 District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity $15,261,148.77 $16,956,831.96
District Of Columbia 2952185 District of Columbia >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $200,797.92 $223,108.80
District Of Columbia 2952185 District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $9,413,670.94 $11,149,138.39
District Of Columbia 2952185 District of Columbia >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Bridge Rehabilitation - No Added Capacity $659,586.00 $793,248.34
District Of Columbia 2952185 District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Bridge Rehabilitation - No Added Capacity $586,466.87 $719,709.47
District Of Columbia 2952185 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $3,479,728.95 $7,857,079.48
District Of Columbia 2952185 District of Columbia >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $344,957.57 $414,861.78
District Of Columbia 2952185 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Debt Service $61,631,949.96 $72,216,635.72
District Of Columbia 2952185 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $5,635,590.10 $7,393,416.23
District Of Columbia 2952185 District of Columbia >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $348,182.39 $418,740.10
District Of Columbia 2952185 District of Columbia >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,500,000.00 $40,104,148.14
District Of Columbia 8888468 Statewide N/A State CONGESTION AIR QUALITY 4R - Restoration & Rehabilitation $8,078,808.69 $10,098,510.87
District Of Columbia 8888468 District of Columbia >= 200,000 State EXTENSION OF ALLOC PROGRAMS 4R - Restoration & Rehabilitation $44,074.96 $53,006.57
District Of Columbia 8888468 District of Columbia >= 200,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation $3,827.27 $4,602.85
District Of Columbia 8888468 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $39,679,349.60 $50,996,922.51
District Of Columbia 8888468 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $7,638,375.21 $9,432,690.01
District Of Columbia 8888468 District of Columbia >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Restoration & Rehabilitation $20,497.13 $24,650.79
District Of Columbia 8888468 District of Columbia >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $1,401,226.69 $1,685,179.42
District Of Columbia 8888468 District of Columbia >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $124,725.00 $150,000.00
District Of Columbia 8888468 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $7,786,676.96 $9,364,614.50
District Of Columbia 8888468 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,838,297.70 $2,210,821.05
District Of Columbia 8888468 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,151,260.49 $2,587,204.44
District Of Columbia 8888468 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,615,078.71 $1,942,367.66
District Of Columbia 8888468 Statewide N/A State TECHNOLOGY DEPLOYMENT GRANTS T Research $50,000.00 $55,000.00
District Of Columbia 8888468 Statewide N/A State TRANSPORTATION ALTERNATIVES 4R - Restoration & Rehabilitation $3,924,845.53 $4,906,056.91
District Of Columbia 8888483 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,224,367.73 $1,592,766.01
District Of Columbia 8888483 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,715,291.97 $7,403,007.84
District Of Columbia 8888483 District of Columbia >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $7,931,624.74 $22,929,700.33
District Of Columbia 8888483 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,155,388.88 $5,522,461.07
District Of Columbia 8888483 District of Columbia >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV $11,121,181.88 $13,383,553.35