U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Kansas

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $33,208,681.19 $36,941,034.66
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $443,788.10 $493,097.89
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $209,167.75 $232,408.61
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $442,244.60 $491,382.89
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,651,125.74 $2,951,940.08
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $3,304,391.25 $3,692,223.43
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,177.70 $2,770.35
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $4,320.00 $12,000.00
Kansas 0702047 Gove < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $180,000.00 $200,000.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $141,747,625.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $40,973,640.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $2,089,860.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $42,247,075.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $17,029,365.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $10,000,000.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $15,000,000.00
Kansas 0705217 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $25,000,000.00
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $1,862,647.48 $2,069,863.51
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $2,795,116.36 $3,106,068.05
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $23,918,987.07 $26,584,013.89
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,332,849.51 $3,705,178.98
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $340,736.56
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $4,320.00 $12,000.00
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $450,000.00 $500,000.00
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Bridge Replacement - Added Capacity $29,805,513.53 $33,117,237.26
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $1,170,000.00 $1,300,000.00
Kansas 0706125 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $4,321,193.35 $4,840,097.27
Kansas 2351200 Sedgwick >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $2,047,255.99 $2,277,146.80
Kansas 2351200 Sedgwick >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity $6,452.88 $7,172.07
Kansas 2351200 Sedgwick >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $2,177,046.75 $2,419,695.19
Kansas 2351200 Sedgwick >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $6,807.81 $7,919.53
Kansas 2351200 Sedgwick >= 200,000 State HIGHWAY INFRA PRGM -APPOR Safety $342,566.54 $394,400.76
Kansas 2351200 Sedgwick >= 200,000 State HIGHWAY INFRA PRGM -APPOR Training $1,100.92
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $20,267,752.59 $22,543,662.38
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $63,883.31 $71,003.25
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $21,137,281.68 $23,539,491.50
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,475,179.55 $2,879,380.48
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,844,337.89 $4,315,824.84
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $6,893,294.59
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $310,082.73 $420,918.27
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $10,899.08
Kansas 2351200 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,230,046.34 $1,366,718.16
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $32,153,831.07 $40,209,000.84
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $12,291,061.77 $15,368,315.21
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,554,819.58 $5,697,215.81
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,760,000.00 $4,729,381.17
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $4,083,063.78
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $12,000.00
Kansas A100502 Cherokee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $608,000.00 $764,010.27
Kansas A100702 Reno >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY New  Construction Roadway $10,000,000.00 $12,504,557.88
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $7,985,935.42 $9,986,216.08
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,530,323.84 $3,185,817.23
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $16,773,874.69 $20,974,988.68
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,307,106.06 $2,921,959.78
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,795,395.56
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $12,000.00
Kansas A100702 Reno >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,813,600.00 $3,517,000.00
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $9,407,473.88 $11,764,089.55
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,714,264.32 $3,406,674.72
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $23,301,308.70 $29,137,888.68
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,964,727.84 $3,726,248.43
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,637,539.53
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $12,000.00
Kansas A100703 Rice >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,124,000.00 $2,655,145.49
Kansas A100802 Haskell < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $393,500.00
Kansas A100802 Haskell < 5,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,150,000.00
Kansas A100802 Haskell < 5,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $20,906,528.00 $26,133,160.00
Kansas A100802 Haskell < 5,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $1,567,992.00 $1,959,990.00
Kansas A126606 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $517,696.11 $575,523.66
Kansas A126606 Shawnee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $144,040.09 $160,106.47
Kansas A126606 Shawnee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $2,015,982.00 $2,239,980.00
Kansas A126606 Shawnee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $19,732,303.89 $21,936,436.24
Kansas A126606 Shawnee >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $90,000.00 $100,000.00
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,141.45 $1,427.91
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $13,696,261.75 $17,133,550.09
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $2,406,272.44 $3,010,208.36
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $200.54 $250.87
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $414,786.52 $518,891.14
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $101.69 $127.65
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,220,230.17 $1,531,717.51
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $268.38 $336.97
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,220,306.84 $4,043,332.60
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,531,918.09
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $127.67
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $0.21 $0.65
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,495.79 $7,799.35
Kansas A155302 Bourbon >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $393,163.01 $491,588.87
Kansas A155302 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $32.77 $40.97
Kansas A155402 Crawford >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $1,704,720.00 $1,714,315.04
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $17,512,853.33 $21,906,972.26
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $101,753.81 $127,286.67
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,765,903.05 $2,219,591.57
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,258,345.26 $2,835,642.71
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $997,513.52
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $7,200.00
Kansas A155402 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,333,670.02 $1,668,378.10
Kansas A155403 Crawford >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $1,500,000.00 $1,563,626.33
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,649,568.34 $20,827,106.03
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $877,917.15 $1,098,202.84
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $52,281.27 $65,399.59
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,319,847.40 $2,901,840.54
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $153,397.39 $159,904.13
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $958,661.71
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $7,000.00
Kansas A155403 Crawford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $902,268.74 $1,131,707.13
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $27,940,549.87 $35,080,702.78
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $243,512.21 $304,529.47
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,105,387.72 $2,653,289.93
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,362,087.05 $1,741,467.22
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,194,276.20
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $2,496.00 $7,800.00
Kansas A158601 Cherokee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,824,188.10 $3,536,891.02
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY 4R - Restoration & Rehabilitation $17,491,476.57 $21,878,344.97
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Bridge Rehabilitation - Added Capacity $773,882.90 $967,973.00
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Bridge Replacement - Added Capacity $1,725,972.14 $2,158,846.54
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Construction Engineering $1,467,482.31 $1,875,306.73
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Preliminary Engineering $1,992,028.20
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Right of Way $2,084,012.04
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Training $5,800.00
Kansas A236801 Morris >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Utilities $2,784,060.53
Kansas A236901 Geary >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $1,015,295.50 $1,269,119.38
Kansas A236901 Morris >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $804.50 $1,005.62
Kansas A236901 Morris >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $15,627.08 $19,545.51
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $19,721,800.59 $24,666,967.08
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $483,348.01 $604,535.41
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $1,272,316.81 $1,591,317.62
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,830,912.18 $2,315,990.16
Kansas A236901 Morris >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,450.77 $1,835.13
Kansas A236901 Morris >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,521.57
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,920,258.10
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,506,137.55
Kansas A236901 Morris >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,985.80
Kansas A236901 Morris >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $2.22
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $2,797.78
Kansas A236901 Geary >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,251,844.66
Kansas A236901 Morris >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $991.93
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $11,214,253.54 $35,604,315.84
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $243,884.45
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $856,420.71
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,884,745.37
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $599,446.18
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $603,291.54
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $12,000.00
Kansas A237003 Russell >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,165,748.40
Kansas A237303 Miami >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity $387,248.64 $484,175.00
Kansas A237303 Miami >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Rehabilitation - Added Capacity $19,050.36 $23,818.65
Kansas A237303 Miami >= 5,000 AND < 50,000 State REPURPOSED EARMARKS EXEMPT 4R - No Added Capacity $121,347.62 $121,376.25
Kansas A237303 Miami >= 5,000 AND < 50,000 State REPURPOSED EARMARKS EXEMPT Bridge Rehabilitation - Added Capacity $5,969.59 $5,971.02
Kansas A237303 Miami >= 5,000 AND < 50,000 State REPURPOSED SPECIAL 4R - No Added Capacity $2,877,009.16 $3,597,110.45
Kansas A237303 Miami >= 5,000 AND < 50,000 State REPURPOSED SPECIAL Bridge Rehabilitation - Added Capacity $141,532.43 $176,957.30
Kansas A237303 Miami >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $9,558,047.26 $11,950,377.80
Kansas A237303 Miami >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $470,199.86 $587,890.38
Kansas A237303 Miami >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,332,535.97 $1,666,387.85
Kansas A237303 Miami >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $915,183.50
Kansas A237303 Miami >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,544,684.45
Kansas A237303 Miami >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,342,865.52 $2,928,581.90
Kansas A238001 Anderson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $16,101,757.60 $20,148,741.01
Kansas A238001 Anderson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $896,348.51 $1,121,291.63
Kansas A238001 Anderson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,341,691.14 $1,687,050.50
Kansas A238001 Anderson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,294,505.75 $1,645,369.33
Kansas A238001 Anderson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,264,435.75
Kansas A238001 Anderson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,283,114.34 $1,603,956.39
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $26,748,925.23 $33,436,156.54
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $1,480,487.06 $1,850,608.83
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $1,526,870.34 $1,908,587.92
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,348,841.36 $2,948,510.80
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,358,672.55 $2,969,706.87
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,662,388.30
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $7,600.00
Kansas A238301 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $627,199.10 $785,826.27
Kansas A238401 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $10,682.37 $13,369.91
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $36,570,034.25 $45,770,569.06
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $1,544,586.40 $1,931,348.81
Kansas A238401 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $451.18 $564.16
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $2,077,062.19 $2,597,156.54
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $219,825.18 $274,869.48
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,206,117.83 $4,034,827.99
Kansas A238401 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $936.53 $1,178.60
Kansas A238401 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $994.06 $1,249.58
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,403,071.90 $4,277,811.04
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $8,809,844.85
Kansas A238401 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,573.42
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $9,600.00
Kansas A238401 Ford >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,875,588.87 $3,639,173.32
Kansas A238401 Gray >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $839.98 $1,063.03
Kansas A238501 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $18,937,615.46 $23,688,019.32
Kansas A238501 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,493,333.70 $1,885,149.48
Kansas A238501 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,440,000.00 $1,810,564.79
Kansas A238501 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,592,494.20
Kansas A238501 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $6,000.00
Kansas A238501 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,357,573.39 $5,447,019.24
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,899,743.17 $21,136,706.16
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $5,185,306.02 $6,485,386.12
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $301,923.23 $377,623.24
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,768,826.78 $2,217,763.46
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $989,138.10 $1,274,625.32
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $414,960.52
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $12,000.00
Kansas A238503 Seward >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,082,444.39 $5,295,977.19
Kansas A307901 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $5,101,121.93 $6,389,876.01
Kansas A307901 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $13,085,110.21 $16,367,914.17
Kansas A307901 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,453,739.76 $1,819,223.84
Kansas A307901 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,373,782.05 $1,737,485.13
Kansas A307901 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,752.14
Kansas A307901 Wyandotte >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $48,000.00 $60,000.00
Kansas A323203 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $13,910,926.08 $15,905,210.60
Kansas A323203 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,319,057.58 $5,917,186.67
Kansas A323203 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New  Construction Roadway $13,571,800.24 $15,577,377.65
Kansas A323203 Sedgwick >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,973,386.56 $4,496,823.08
Kansas A323203 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,562,121.08
Kansas A323203 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $10,285.71
Kansas A323203 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $7,553,475.39 $8,392,750.43
Kansas A323203 Sedgwick >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $2,318,487.68 $2,650,868.44
Kansas A323203 Sedgwick >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $2,261,966.70 $2,596,229.59
Kansas A323203 Sedgwick >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $1,714.29
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $7,033,228.59 $27,363,971.33
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $3,947,957.74 $15,359,037.74
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $98,856.07 $384,587.45
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $3,878,509.89 $15,088,859.77
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,714,048.93 $12,865,107.53
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $5,646.06 $27,039.72
Kansas A323222 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Special Bridge $421,752.72 $1,640,775.87
Kansas A323222 Sedgwick >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - No Added Capacity $9,599,523.61 $37,348,578.33
Kansas A323222 Sedgwick >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge New Construction $5,388,494.49 $20,963,266.44
Kansas A323222 Sedgwick >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Rehabilitation - Added Capacity $134,926.80 $524,916.22
Kansas A323222 Sedgwick >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - Added Capacity $5,293,706.41 $20,594,505.64
Kansas A323222 Sedgwick >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Safety $7,706.20 $36,906.05
Kansas A323222 Sedgwick >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Special Bridge $575,642.49 $2,239,464.61
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $40,160,130.85
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $6,067,770.39
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $930,191.69
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,766,792.53
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,626,959.83
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $322,739.74
Kansas A323601 Shawnee >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $163,807.15
Kansas A325501 Allen >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $546,308.50 $683,512.15
Kansas A325501 Neosho >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $3,807,543.53 $4,763,796.03
Kansas A325501 Neosho >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $18,139,669.69 $22,687,624.90
Kansas A325501 Allen >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $2,602,690.04 $3,255,233.22
Kansas A325501 Allen >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $458,384.70 $573,262.12
Kansas A325501 Neosho >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $516,901.90 $646,444.54
Kansas A325501 Allen >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $168,468.27 $210,800.86
Kansas A325501 Neosho >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,174,153.93 $1,469,194.49
Kansas A325501 Allen >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $228,139.49
Kansas A325501 Neosho >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,590,037.55
Kansas A325501 Allen >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $1,179.48
Kansas A325501 Neosho >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $8,220.52
Kansas A325501 Neosho >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $347,549.42 $439,602.42
Kansas A325501 Allen >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $49,866.58 $63,074.39
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $179,064,300.00
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $22,620,610.00
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $2,320,560.00
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $1,170,930.00
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $13,429,825.00
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $10,800,000.00
Kansas A363403 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $16,000,000.00
Kansas A570003 Johnson >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $5,316,676.00 $6,645,845.00
Kansas A570003 Johnson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $87,060,506.59 $525,915,484.00
Kansas A570003 Johnson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,600,000.00 $35,000,000.00
Kansas A570003 Johnson >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $7,200,000.00 $45,000,000.00
Kansas A580201 Hodgeman < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $29,420,080.98
Kansas A580201 Hodgeman < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,942,008.10
Kansas A580201 Hodgeman < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,107,500.00
Kansas A580201 Hodgeman < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $350,930.00
Kansas A605601 Kingman >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $34,008,405.10
Kansas A605601 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $51,927.10
Kansas A605601 Kingman >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $1,950,495.60
Kansas A605601 Kingman >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,515,485.91
Kansas A605601 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,840.87
Kansas A605601 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,023.70
Kansas A605601 Kingman >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $670,443.82
Kansas A605601 Kingman >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $149,014.03
Kansas A605601 Sedgwick >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $227.53
Kansas A606201 Geary >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $29,076,463.15
Kansas A606201 Geary >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,036,105.49
Kansas A606201 Geary >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $777,439.50