RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,106.30 | $1,229.22 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $7,374,223.70 | $8,193,582.78 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $297.95 | $331.06 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,979,702.05 | $2,199,668.94 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $35,296,458.06 | $39,278,868.28 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $5,295.27 | $5,892.72 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $17.55 | $19.50 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $116,982.45 | $129,980.50 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | OP MOT VEH/INTOX-TEA21 | Safety | $1,471,874.18 | $1,635,416.65 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | OP MOT VEH/INTOX-TEA21 | Safety | $220.82 | $245.35 |
Mississippi | 0008005 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $48,267.76 | $53,630.96 |
Mississippi | 0008005 | Stone | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $7.24 | $8.04 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $3,220,685.00 | $4,025,857.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Other | $3,238,400.00 | $4,048,000.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | GRANTS SUP PLAN SECTION 117 | Debt Service | $1,721,874.00 | $1,721,874.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Debt Service | $180,613.00 | $225,767.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Debt Service | $2,487,900.00 | $3,109,875.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,583,012.00 | $17,067,142.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $1,153,520.00 | $1,441,900.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $32,336,000.00 | $43,955,000.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,565,669.00 | $4,457,086.00 |
Mississippi | 0029103 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $6,149,241.00 | $7,686,552.00 |
Mississippi | 0064020 | Simpson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $20,132,092.00 | $25,165,116.00 |
Mississippi | 0064020 | Simpson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,026,418.00 | $5,033,023.00 |
Mississippi | 0064020 | Simpson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $53,357.00 | $66,697.00 |
Mississippi | 0081047 | Yalobusha | >= 5,000 AND < 50,000 | Local | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $21,122,195.00 | $26,402,744.00 |
Mississippi | 0081047 | Yalobusha | >= 5,000 AND < 50,000 | Local | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $910,768.00 | $1,138,460.00 |
Mississippi | 0081047 | Yalobusha | >= 5,000 AND < 50,000 | Local | EMERGENCY RELIEF | Construction Engineering | $1,060,415.00 | $1,325,519.00 |
Mississippi | 0081047 | Yalobusha | >= 5,000 AND < 50,000 | Local | EMERGENCY RELIEF | Other | $489,333.00 | $611,667.00 |
Mississippi | 0081047 | Yalobusha | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $8,000.00 | |
Mississippi | 0081154 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $44,950,690.00 | |
Mississippi | 0081154 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $8,990,138.00 | |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,899,372.00 | $4,874,216.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $6,205,599.00 | $7,757,000.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $984,939.00 | $1,231,174.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,666,020.00 | $5,832,525.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $16,621,458.00 | $20,776,823.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $613,980.00 | $767,475.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $4,537,483.00 | $5,671,854.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $93,872.00 | $117,340.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $53,383,370.00 | $72,053,028.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,090,979.00 | $28,616,077.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $552,534.00 | $690,668.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,661,216.00 | $2,076,521.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,952,482.00 | $3,690,603.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1.00 | $2.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $100,000.00 | $125,000.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,765,118.00 | $2,206,398.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $3,782,683.00 | $4,728,354.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $139,968,062.45 | $174,960,078.45 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,671,659.00 | $8,339,575.00 |
Mississippi | 0083029 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,296,055.00 | $2,870,068.00 |
Mississippi | 0084066 | Yazoo | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $480,000.00 | $600,000.00 |
Mississippi | 0084066 | Yazoo | >= 5,000 AND < 50,000 | State | RURAL SURFAC TRANS GRT PG IIJA | 4R - Restoration & Rehabilitation | $28,249,060.00 | $35,311,325.00 |
Mississippi | 0084066 | Yazoo | >= 5,000 AND < 50,000 | State | RURAL SURFAC TRANS GRT PG IIJA | Construction Engineering | $6,750,940.00 | $8,438,675.00 |
Mississippi | 0084066 | Yazoo | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $389,157.00 | |
Mississippi | 0101179 | Harrison | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $490,161.00 | $857,383.00 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $300,966.00 | $574,856.00 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $519,797.00 | $649,747.00 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Safety | $1,504,830.00 | $2,874,282.00 |
Mississippi | 0101179 | Harrison | >= 200,000 | State | CARBON REDUCTION PROGRAM | Safety | $2,586,048.00 | $4,286,914.00 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $20,000,000.00 | $25,000,000.00 |
Mississippi | 0101179 | Harrison | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $40,000,000.00 | $50,000,000.00 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $11,000,000.00 | $19,782,747.00 |
Mississippi | 0101179 | Harrison | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $10,702,502.00 | $49,170,029.00 |
Mississippi | 0101179 | Harrison | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $19,834,006.00 | |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $8,956,549.00 | |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $747,864.00 | $934,830.00 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $3,219,521.00 | $4,024,402.00 |
Mississippi | 0101179 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $619,938.00 | $812,418.74 |
Mississippi | 0101179 | Hancock | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $600,062.00 | $787,581.26 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $432,898.00 | $541,123.00 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | New Construction Roadway | $2,164,491.00 | $2,705,614.00 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $726,911.00 | $908,639.00 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $71,460,000.00 | $89,325,000.00 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $21,916,592.00 | $42,740,037.00 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $81,266,203.00 | $123,466,543.00 |
Mississippi | 0111056 | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,270,000.00 | $1,587,500.00 |
Mississippi | 0142070 | Marion | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $670,000.00 | $837,500.00 |
Mississippi | 0142070 | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $18,000,000.00 | $49,679,361.00 |
Mississippi | 0142070 | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $9,935,872.00 | |
Mississippi | 0142070 | Marion | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $249,232.00 | $311,540.00 |
Mississippi | 0181026 | Washington | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $23,557,816.00 | |
Mississippi | 0181026 | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,711,563.00 | |
Mississippi | 0181026 | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $266,033.00 | $332,542.00 |
Mississippi | 0181026 | Humphreys | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $530,400.00 | $663,000.00 |
Mississippi | 0181026 | Washington | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $120,000.00 | $150,000.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $900,000.00 | $9,141,517.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $80,000.00 | $8,403,332.00 |
Mississippi | 0201216 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $43,162.00 | $53,953.00 |
Mississippi | 0201216 | Rankin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $215,811.00 | $269,764.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,280,000.00 | $2,850,000.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $400,000.00 | $500,000.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - Added Capacity | $11,825,524.00 | $14,781,905.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | $465,483.00 | $563,212.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | $47,667.00 | $59,584.00 |
Mississippi | 0201216 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $13,576,354.32 | $16,970,444.00 |
Mississippi | 0201234 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,298,012.00 | $33,624,384.00 |
Mississippi | 0201234 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,379,900.00 | $6,724,876.00 |
Mississippi | 0202102 | Scott | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,583,780.00 | $9,537,534.00 |
Mississippi | 0202102 | Scott | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,070,014.00 | $5,633,349.00 |
Mississippi | 0202102 | Scott | >= 5,000 AND < 50,000 | N/A | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $16,766,292.00 | $18,629,214.00 |
Mississippi | 0224070 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $140,932,062.00 | |
Mississippi | 0224070 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $28,186,412.00 | |
Mississippi | 0224071 | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $46,998,747.00 | $58,748,434.00 |
Mississippi | 0224071 | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $741,253.00 | $11,749,687.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | HIGH PRIORITY PROJECTS-TEA-21 | Other | $2,187,203.00 | $2,734,004.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $13,130,803.00 | $19,572,374.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $4,390,681.00 | |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Other | $5,282,373.00 | $9,087,589.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,086,824.00 | $1,358,530.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,928,048.00 | $3,660,060.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Other | $818,566.00 | $1,093,295.00 |
Mississippi | 0250047 | Hinds | >= 200,000 | Local | SURFACE TRANSPORTATION PROJECT | Rail/Hwy Crossing | $264,885.00 | $264,885.00 |
Mississippi | 0261080 | Neshoba | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Maintenance Resurfacing | $25,000,000.00 | $25,000,000.00 |
Mississippi | 0261080 | Neshoba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,468,938.00 | $22,301,314.00 |
Mississippi | 0261080 | Neshoba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,693,788.00 | $8,874,506.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $8,000,000.00 | $10,000,000.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Debt Service | $333,084.00 | $416,355.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Debt Service | $6,212,620.00 | $7,765,776.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | $10,489,176.00 | $13,111,471.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $9,462,876.00 | $11,828,596.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $886,385.00 | $1,107,982.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Debt Service | $1,158,251.00 | $1,499,155.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $153,019.00 | $10,423,596.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Debt Service | $5,066,973.00 | $6,333,717.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | NAT'L COOR INF IM PROGRAM | Debt Service | $1,342,862.00 | $1,678,578.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $37,472,130.00 | $111,611,970.45 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $33,526,383.00 | $53,723,679.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $21,432,000.00 | $104,920,000.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $25,152,100.00 | $31,440,125.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $47,273,481.00 | $279,836,852.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $10,923,043.00 | $13,653,805.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,733,610.00 | $17,167,013.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $5,602,505.00 | $7,003,132.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $48,329,706.00 | $60,412,134.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,178,531.00 | $1,473,164.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $26,548,482.00 | $33,185,603.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $22,630,510.00 | $28,288,138.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $14,696,738.00 | $18,370,923.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,608,000.00 | $5,760,000.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Debt Service | $552,757.00 | $690,947.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Debt Service | $2,317,983.00 | $2,897,479.00 |
Mississippi | 0290100 | DeSoto | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $3,566,497.00 | $4,458,122.00 |
Mississippi | 0290100 | Marshall | >= 5,000 AND < 50,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $3,599,629.00 | $4,499,537.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $408,662.00 | $510,828.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | CONGESTION AIR QUALITY | Right of Way | $42,371.00 | $52,964.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | $964,847.00 | $1,206,059.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $2,800,000.00 | $3,500,000.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $12,457,487.00 | $15,571,859.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,081,087.00 | $2,601,359.00 |
Mississippi | 0401021 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,600,000.00 | $5,750,000.00 |
Mississippi | 0461016 | Franklin | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $6,583,379.00 | $8,229,224.00 |
Mississippi | 0461016 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $14,000,011.00 | $17,500,014.00 |
Mississippi | 0461016 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,116,678.00 | $5,145,848.00 |
Mississippi | 0461016 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $150,880.00 | $188,600.00 |
Mississippi | 0501034 | Calhoun | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $2,708,781.00 | $3,385,977.00 |
Mississippi | 0501034 | Calhoun | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $3,868,555.00 | $4,835,694.00 |
Mississippi | 0501034 | Calhoun | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $9,633,996.00 | $12,042,495.00 |
Mississippi | 0501034 | Calhoun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $7,000,000.00 | $8,750,000.00 |
Mississippi | 0501034 | Calhoun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $313,280.00 | $391,600.00 |
Mississippi | 0501034 | Calhoun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $109,200.00 | $136,500.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | Other | CARBON REDUCTION PROGRAM | Construction Engineering | $493,968.00 | $617,461.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | Other | CARBON REDUCTION PROGRAM | Safety | $2,469,846.00 | $3,087,307.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $3,517,146.00 | $3,907,940.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,410,948.00 | $20,456,611.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Restoration & Rehabilitation | $1,899,675.00 | $1,899,675.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,548,930.00 | $43,574,173.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $13,967,680.00 | |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $613,340.00 | |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,620,000.00 | $1,800,000.00 |
Mississippi | 0551123 | Pike | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $3,066,701.00 | |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $5,845,618.00 | $7,307,023.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $2,981,425.00 | $3,726,782.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $4,529,506.00 | $5,661,883.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $18,411,518.00 | $20,457,243.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | $9,583,848.00 | $32,138,720.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $10,185,410.00 | $12,731,763.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $15,460,413.00 | $18,063,209.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $12,840,702.00 | $14,267,447.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $45,069,497.00 | $51,454,787.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $2,453,015.00 | $4,154,021.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $1,857,565.00 | $2,321,956.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Debt Service | $4,158,731.00 | $4,620,813.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,570,884.00 | $16,963,606.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,733,446.00 | $9,458,387.00 |
Mississippi | 0552202 | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $29,180,665.00 | $35,230,207.00 |
Mississippi | 0552208 | Madison | >= 50,000 AND < 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $3,000,000.00 | $3,750,000.00 |
Mississippi | 0552208 | Madison | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,112,357.00 | |
Mississippi | 0552208 | Madison | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $28,211,800.00 | |
Mississippi | 0552257 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $6,300.00 | $7,000.00 |
Mississippi | 0552257 | Holmes | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $20,993,700.00 | $23,326,334.00 |
Mississippi | 0552257 | Holmes | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $11,862,684.12 | $13,180,760.58 |
Mississippi | 0552257 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $3,559.88 | $3,955.42 |
Mississippi | 0552257 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,105.98 | $2,339.98 |
Mississippi | 0552257 | Holmes | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $7,017,857.02 | $7,797,619.02 |
Mississippi | 0552257 | Holmes | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,232,897.92 | $2,480,998.46 |
Mississippi | 0552257 | Carroll | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $670.08 | $744.54 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $15,000,000.00 | $18,750,000.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,065,298.00 | $1,331,623.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $26,966,727.00 | $33,708,410.00 |
Mississippi | 0554102 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $8,393,345.00 | $10,491,682.00 |
Mississippi | 0554111 | Panola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,543,663.00 | $18,381,848.00 |
Mississippi | 0554111 | Panola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,108,733.00 | $5,676,370.00 |
Mississippi | 0554111 | Panola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $90,000.00 | $100,000.00 |
Mississippi | 0554111 | Panola | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,000,000.00 | $10,000,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,080,000.00 | $1,200,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $809,148.00 | $899,054.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,234,500.00 | $4,705,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,250,000.00 | $2,500,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,126,538.00 | $5,158,173.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $5,553,000.00 | $6,170,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | $273,944.00 | $342,430.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Safety | $4,063.00 | $5,079.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Safety | $35,996.00 | $44,995.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,871,500.00 | $4,839,376.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,230,000.00 | $4,700,000.00 |
Mississippi | 0591075 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $14,916,962.00 | $18,646,203.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $5,359,197.00 | $5,954,665.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,055,637.00 | $4,506,264.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,342,328.00 | $7,047,031.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $9,000,000.00 | $10,000,000.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $121,890.00 | $152,363.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $260,032.00 | $325,040.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $176,280.00 | $220,350.00 |
Mississippi | 0591121 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $12,961,360.00 | $14,401,512.00 |
Mississippi | 0591127 | Pearl River | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $4,344,881.00 | $4,827,646.00 |
Mississippi | 0591127 | Pearl River | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $12,077,871.00 | $13,419,858.00 |
Mississippi | 0591127 | Pearl River | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,933,459.00 | $6,592,732.00 |
Mississippi | 0591127 | Pearl River | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARKS EXEMPT | Construction Engineering | $950,000.00 | $950,000.00 |
Mississippi | 0591127 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $17,519,538.89 | $19,466,155.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $4,935,000.00 | |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $5,360,437.00 | $6,205,916.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,220,195.00 | $9,133,550.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,200,795.00 | $4,667,550.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Debt Service | $1,226,744.00 | $1,363,049.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,849,576.00 | $10,943,975.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,951,227.00 | $6,612,475.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $3,038,462.00 | $3,376,069.00 |
Mississippi | 0592091 | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $5,643,544.00 | $6,270,604.00 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $18,627,904.40 | $20,697,671.89 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,794.60 | $3,105.11 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $205.40 | $228.22 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,369,095.60 | $1,521,217.78 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $8,881,167.13 | $9,867,964.14 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $1,331.87 | $1,479.86 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $731,228.30 | $914,035.87 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $109.70 | $137.13 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $4.38 | $4.85 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $29,196.62 | $32,352.15 |
Mississippi | 0592110 | Jones | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,303,067.44 | $4,781,186.71 |
Mississippi | 0592110 | Forrest | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $645.56 | $717.29 |
Mississippi | 0593099 | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,915,434.00 | $2,128,260.00 |
Mississippi | 0593099 | Lauderdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,387,500.00 | $4,875,000.00 |
Mississippi | 0593099 | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $20,022,064.40 | $22,246,739.00 |
Mississippi | 0593099 | Lauderdale | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $337,935.60 | $375,484.00 |
Mississippi | 0661008 | Jackson | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Other | $487,560.00 | $609,450.00 |
Mississippi | 0661008 | Jackson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $2,103,673.00 | $2,103,673.00 |
Mississippi | 0661008 | Jackson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $22,644,302.00 | $22,644,302.00 |
Mississippi | 0661008 | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $42,525,234.00 | |
Mississippi | 0661008 | Jackson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $94,937,541.28 | $187,268,744.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | $10,251,779.00 | $12,814,725.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Bridge Replacement - Added Capacity | $3,629,299.00 | $3,629,299.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Right of Way | $710,500.00 | $710,500.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | GRANTS SUP PLAN SECTION 117 | Utilities | $248,500.00 | $248,500.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $19,336.00 | $24,170.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $216,599.00 | $270,749.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | $3,538,253.00 | $4,422,817.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | $142,205.00 | $177,757.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - Added Capacity | $207,182.00 | $258,978.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $6,773,488.00 | $8,466,863.00 |
Mississippi | 0702015 | Quitman | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,763,270.00 | $5,954,088.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $4,398,159.00 | $5,497,700.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $16,487,500.00 | $20,609,376.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,084,174.00 | $5,105,218.00 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $187,520.00 | $234,400.00 |
Mississippi | 0725011 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $187,520.00 | $234,400.00 |
Mississippi | 0725011 | Tunica | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,139.00 | $51,423.50 |
Mississippi | 0725011 | Tate | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,139.00 | $51,423.50 |
Mississippi | 0734059 | Yazoo | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $16,115,000.00 | $18,485,512.00 |
Mississippi | 0734059 | Yazoo | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $5,572,102.00 | |
Mississippi | 0734059 | Yazoo | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $7,500,000.00 | $9,375,000.00 |
Mississippi | 0734059 | Yazoo | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $760,000.00 | $950,000.00 |
Mississippi | 0734059 | Yazoo | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $57,200.00 | $71,500.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA PRGM | New Construction Roadway | $2,431,663.00 | $2,799,402.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA-IIJA | New Construction Roadway | $3,666,715.00 | $3,784,755.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $52,400,000.00 | $65,500,000.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $18,000,000.00 | $22,500,000.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $288,414.00 | $2,563,434.00 |
Mississippi | 0781011 | Itawamba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $800,000.00 | $1,000,000.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | GRANTS SUP PLAN SECTION 117 | 4R - No Added Capacity | $43,065.00 | $43,065.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $13,000,000.00 | $29,899,722.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,217,656.00 | |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $575,356.00 | $762,260.00 |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,102,965.00 | |
Mississippi | 1920007 | DeSoto | >= 50,000 AND < 200,000 | Local | SURFACE TRANSPORTATION PROJECT | 4R - No Added Capacity | $1,499,744.00 | $1,499,744.00 |
Mississippi | 2104011 | Jackson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $4,700,000.00 | |
Mississippi | 2104011 | Jackson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $24,144,762.00 | |
Mississippi | 2104011 | Jackson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $910,400.00 | |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,628,263.00 | $15,785,329.00 |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,171,736.00 | $2,714,671.00 |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,504,752.00 | $6,880,940.00 |
Mississippi | 2170022 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,760,000.00 | $2,200,000.00 |
Mississippi | 2911001 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $54,024,645.00 | |
Mississippi | 2911001 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,804,929.00 | |
Mississippi | 2911001 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $790,846.00 | $988,558.00 |
Mississippi | 2911001 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,825,023.00 | $2,281,279.00 |
Mississippi | 2911001 | Tippah | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $503,200.00 | $629,000.00 |
Mississippi | 7113004 | Oktibbeha | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,129,317.00 | $2,661,646.00 |
Mississippi | 7113004 | Oktibbeha | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $7,950,503.00 | $9,938,129.00 |
Mississippi | 7113004 | Oktibbeha | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,259,110.00 | $1,573,888.00 |
Mississippi | 7113004 | Oktibbeha | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $1,316,910.00 | $1,646,138.00 |
Mississippi | 7113004 | Oktibbeha | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,081,280.00 | |
Mississippi | 7113004 | Oktibbeha | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $22,812,477.00 | |
Mississippi | 7281006 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $18,460,355.00 | $23,075,444.00 |
Mississippi | 7281006 | Hinds | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,539,645.00 | $1,924,556.00 |
Mississippi | 7281006 | Hinds | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,690,533.00 | |
Mississippi | 7281006 | Hinds | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,644,460.00 | |
Mississippi | 7281006 | Hinds | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $45,638.00 | |
Mississippi | 7334013 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,481,287.00 | $11,890,847.00 |
Mississippi | 7334013 | Rankin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $16,737,122.00 | $59,454,237.00 |
Mississippi | 8769001 | Forrest | >= 50,000 AND < 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Safety | $3,000,000.00 | $3,750,000.00 |
Mississippi | 8769001 | Forrest | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $229,497.00 | $1,329,497.00 |
Mississippi | 8769001 | Forrest | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $920,315.00 | $920,315.00 |
Mississippi | 8769001 | Forrest | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety | $12,074,088.00 | $12,249,960.00 |
Mississippi | 8769001 | Forrest | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $10,664,914.00 | |
Mississippi | 9159001 | Harrison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $4,883,003.00 | $6,103,753.00 |
Mississippi | 9159001 | Harrison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $13,498,949.00 | $16,873,687.00 |
Mississippi | 9159001 | Harrison | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $2,078,048.00 | $2,597,560.00 |
Mississippi | 9159001 | Harrison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $23,818,004.00 | |
Mississippi | 9371101 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Inspection and Bridge Related Training | $400,000.00 | $400,000.00 |
Mississippi | 9371101 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $17,997,210.00 | $22,496,513.00 |
Mississippi | 9371101 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,599,442.00 | $4,499,303.00 |
Mississippi | 9371101 | Harrison | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $900,000.00 | $900,000.00 |
Mississippi | 9376009 | Harrison | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $1,065,878.00 | $1,332,348.00 |
Mississippi | 9376009 | Harrison | >= 200,000 | Local | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $5,418,718.00 | $7,733,808.00 |
Mississippi | 9376009 | Harrison | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $1,946,124.00 | $2,432,655.00 |
Mississippi | 9376009 | Harrison | >= 200,000 | N/A | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $216,876.00 | $271,096.00 |
Mississippi | 9376009 | Harrison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,861,500.00 | |
Mississippi | 9376009 | Harrison | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,331,185.00 | $16,182,345.00 |
Mississippi | 9602002 | Pearl River | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $500,000.00 | $500,000.00 |
Mississippi | 9602002 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $6,000,000.00 | $21,968,747.00 |
Mississippi | 9602002 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $188,960.00 | $4,393,749.00 |
Mississippi | 9602002 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $760,000.00 | $950,000.00 |
Mississippi | 9602002 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,331,162.00 | $7,913,954.00 |
Mississippi | 9602002 | Pearl River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,793,334.00 | $2,241,668.00 |
Mississippi | FY03001 | Lafayette | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $880,140.00 | $1,127,511.00 |
Mississippi | FY03001 | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Relocation | $370,513.00 | $480,456.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,110,012.00 | $1,387,516.00 |
Mississippi | FY03001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,204,602.00 | $2,755,753.00 |
Mississippi | FY03001 | Lafayette | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,268,932.00 | $2,228,215.00 |
Mississippi | FY03001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $378,171.00 | $472,714.00 |
Mississippi | FY03001 | Clay | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,584,008.00 | $1,990,604.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $135,578.00 | $169,473.00 |
Mississippi | FY03001 | DeSoto | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,072,182.00 | $1,340,228.00 |
Mississippi | FY03001 | Alcorn | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $712,059.00 | $890,074.00 |
Mississippi | FY03001 | Chickasaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,036,102.00 | $1,298,403.00 |
Mississippi | FY03001 | Choctaw | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $667,008.00 | $837,017.00 |
Mississippi | FY03001 | Attala | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $119,542.00 | $149,428.00 |
Mississippi | FY03001 | Carroll | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,420,037.00 | $1,777,481.00 |
Mississippi | FY03001 | Quitman | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $682,869.00 | $856,461.00 |
Mississippi | FY03001 | Kemper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,590,784.00 | $1,992,128.00 |
Mississippi | FY03001 | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,638,822.00 | $2,052,694.00 |
Mississippi | FY03001 | Itawamba | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $399,996.00 | $499,996.00 |
Mississippi | FY03001 | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,598,979.00 | $3,255,492.00 |
Mississippi | FY03001 | Holmes | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $438,457.00 | $550,930.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $180,942.00 | $229,385.00 |
Mississippi | FY03001 | Pearl River | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $837,695.00 | $1,050,955.00 |
Mississippi | FY03001 | Perry | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,559,256.00 | $1,951,654.00 |
Mississippi | FY03001 | Monroe | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $80,112.00 | $100,140.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,176,541.00 | $2,727,498.00 |
Mississippi | FY03001 | Tallahatchie | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $865,620.00 | $1,093,493.00 |
Mississippi | FY03001 | Prentiss | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $318,011.00 | $397,515.00 |
Mississippi | FY03001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $255,825.00 | $319,782.00 |
Mississippi | FY03001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $315,546.00 | $406,137.00 |
Mississippi | FY03001 | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,088,157.00 | $1,385,555.00 |
Mississippi | FY03001 | Yazoo | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,017,032.00 | $2,603,031.00 |
Mississippi | FY03001 | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Acquisition of Scenic Easements and Scenic or Historic Sites | $120,675.00 | $153,428.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $1,971,919.00 | $2,464,899.00 |
Mississippi | FY03001 | Harrison | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $2,910,511.00 | $3,638,139.00 |
Mississippi | FY03001 | Lowndes | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $1,282,127.00 | $1,602,659.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $3,042,200.00 | $3,802,750.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,509,100.00 | $1,886,375.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $233,276.00 | $342,202.00 |
Mississippi | FY03001 | Forrest | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $60,286.00 | $77,151.00 |
Mississippi | FY03001 | Hancock | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $35,781.00 | $44,727.00 |
Mississippi | FY03001 | Jackson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $56,064.00 | $71,158.00 |
Mississippi | FY03001 | Jasper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $14,030.00 | $18,859.00 |
Mississippi | FY03001 | Lafayette | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,302,235.00 | $3,089,905.00 |
Mississippi | FY03001 | Lafayette | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $720,000.00 | $905,546.00 |
Mississippi | FY03001 | Lee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,362.00 | $5,933.00 |
Mississippi | FY03001 | Leflore | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $180,197.00 | $225,658.00 |
Mississippi | FY03001 | Pontotoc | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $37,248.00 | $50,223.00 |
Mississippi | FY03001 | Tippah | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $263,406.00 | $352,899.00 |
Mississippi | FY03001 | Warren | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,689.00 | $7,112.00 |
Mississippi | FY03001 | Washington | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $329,672.00 | $419,907.00 |
Mississippi | FY03001 | Webster | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,559.00 | $3,199.00 |
Mississippi | FY03001 | Sunflower | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,835.00 | $3,544.00 |
Mississippi | FY03001 | Stone | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $46,449.00 | $58,088.00 |
Mississippi | FY03001 | Rankin | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $7,981.00 | $7,981.00 |
Mississippi | FY03001 | Simpson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $6,150.00 | $7,688.00 |
Mississippi | FY03001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $563,188.00 | $756,185.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $52,800.00 | $56,390.00 |
Mississippi | FY03001 | Amite | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $322,593.00 | $487,780.00 |
Mississippi | FY03001 | Bolivar | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $18,982.00 | $23,728.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $79,148.00 | $98,934.00 |
Mississippi | FY03001 | Hinds | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rehabilitation and Operation of Historic Transportation Buildings, Structures, or Facilities | $281,129.00 | $351,411.00 |
Mississippi | FY03001 | Kemper | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,297,513.00 | $1,756,219.00 |
Mississippi | FY03001 | Union | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $304,751.00 | $399,408.00 |
Mississippi | FY03001 | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $396,386.00 | $522,809.00 |
Mississippi | FY03001 | Marion | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $238,753.00 | $332,987.00 |
Mississippi | FY03001 | Marshall | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $432,710.00 | $560,079.00 |
Mississippi | FY03001 | Warren | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $366,896.00 | $366,898.00 |
Mississippi | FY03001 | Tishomingo | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $125,342.00 | $159,180.00 |
Mississippi | FY03001 | Jackson | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $525,948.00 | $668,123.00 |
Mississippi | FY03001 | Harrison | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $421,388.00 | $421,388.00 |
Mississippi | FY03001 | Lamar | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $351,296.00 | $440,935.00 |
Mississippi | FY03001 | Greene | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $516,067.00 | $648,121.00 |
Mississippi | FY03001 | Statewide | N/A | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $353,539.00 | $448,319.00 |
Mississippi | FY03001 | Benton | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $123,646.00 | $154,558.00 |
Mississippi | FY03001 | Clay | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $221,878.00 | $277,348.00 |
Mississippi | FY03001 | Carroll | >= 5,000 AND < 50,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $246,664.00 | $321,753.00 |
Mississippi | FY03001 | Madison | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $901,173.00 | $935,844.00 |
Mississippi | FY03001 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Youth Conservation Service | $274,642.00 | $343,307.00 |