U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
New Hampshire

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
New Hampshire 0931201 Rockingham >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way $317,999.80 $317,999.80
New Hampshire 0931201 Rockingham >= 200,000 Local REDISTRIBUTION OF CERTAIN AUTH Right of Way $2,310,072.20 $2,310,072.20
New Hampshire 0931201 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $266,214.67 $266,214.67
New Hampshire 0931201 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,933,785.33 $1,933,785.33
New Hampshire 0931201 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,178,484.39 $3,976,834.58
New Hampshire 0931201 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,978,814.00 $3,978,814.00
New Hampshire 0931201 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $12,008,897.25 $16,590,547.06
New Hampshire A000124 Hillsborough >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service $730,404.56 $730,404.56
New Hampshire A000124 Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service $22,402.15 $22,402.15
New Hampshire A000124 Hillsborough >= 200,000 N/A CONGESTION AIR QUALITY Debt Service $1,838,760.53 $1,838,760.53
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $64,897.38 $64,897.38
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $18,108,224.54 $24,483,469.93
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Construction Engineering $88,537.27
New Hampshire A000124 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service $1,674,255.04 $9,225,841.31
New Hampshire A000124 Hillsborough >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $13,316,429.49 $13,316,429.49
New Hampshire A000125 Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service $6,138,310.43 $6,138,310.43
New Hampshire A000125 Rockingham >= 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity $11,896.00
New Hampshire A000125 Rockingham >= 200,000 N/A INTERSTATE MAINTENANCE Debt Service $366,108.89 $366,108.89
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $22,179,629.74 $22,179,629.74
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $34,455.44
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service $5,955,256.37 $5,955,256.37
New Hampshire A000125 Rockingham >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Utilities $153,943.36
New Hampshire A000125 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $99,312.79
New Hampshire A000125 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $11,307,551.58 $11,307,551.58
New Hampshire A000128 Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service $2,534,083.87 $3,014,888.82
New Hampshire A000128 Rockingham >= 200,000 N/A HIGHWAY INFRA PRGM -APPOR Debt Service $103,864.00 $103,864.00
New Hampshire A000128 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $582,788.40
New Hampshire A000128 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $22,505,370.21 $22,505,370.21
New Hampshire A000128 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $126,260.36
New Hampshire A000128 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance  Resurfacing $35,243.85
New Hampshire A000128 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $8,066,439.00 $8,066,439.00
New Hampshire A000129 Hillsborough >= 200,000 N/A CONGESTION AIR QUALITY Debt Service $4,763,883.19 $4,763,883.19
New Hampshire A000129 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $575,746.01
New Hampshire A000129 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $14,366,895.37 $14,366,895.37
New Hampshire A000129 Hillsborough >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $16,421,279.71 $16,421,279.71
New Hampshire A000501 Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Debt Service $1,667,225.73 $9,843,464.38
New Hampshire A000501 Rockingham >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Utilities $15,099.66
New Hampshire A000501 Rockingham >= 200,000 N/A CONGESTION AIR QUALITY Debt Service $981,897.76 $981,897.76
New Hampshire A000501 Rockingham >= 200,000 N/A GRANTS SUP PLAN SECTION 117 4R - Added Capacity $2.00 $2.00
New Hampshire A000501 Rockingham >= 200,000 N/A HIGHWAY PRIORITY PROJECTS 4R - Added Capacity $1,980,000.00 $1,980,000.00
New Hampshire A000501 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $71,603.26
New Hampshire A000501 Rockingham >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $27,893,806.91 $34,508,125.40
New Hampshire A000501 Hillsborough >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service $923,941.76 $1,244,754.64
New Hampshire A000501 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service $7,302,262.92 $7,302,262.92
New Hampshire A001026 Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $161,884.34 $161,884.34
New Hampshire A001026 Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Right of Way $10,533.78 $10,533.78
New Hampshire A001026 Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $73,623,855.57 $115,962,013.57
New Hampshire A001026 Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $4,379,733.57 $4,379,733.57
New Hampshire A001026 Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Other $196,921.30 $196,921.30
New Hampshire A001026 Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $212,982.80
New Hampshire A001026 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,060,103.65 $2,060,103.65
New Hampshire A001026 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $2,440,747.20
New Hampshire A001026 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $5,895,241.21 $5,895,241.21
New Hampshire A001026 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $594,602.91 $594,602.91
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $3,864,659.86 $3,864,659.86
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $581,680.00 $1,071,280.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Right of Way $4,950.00 $49,450.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $700,040.00 $700,040.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Bridge Rehabilitation - Added Capacity $14,836,623.76 $15,205,728.88
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $1,760,650.97 $1,760,650.97
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Rehabilitation - Added Capacity $10,000,000.00 $12,719,895.88
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $13,173,728.63
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,131,000.00
New Hampshire A001154 Grafton >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,251,360.00 $1,488,960.00
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Bridge New Construction $6,174,677.00 $6,174,677.00
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH New  Construction Roadway $1,159,249.07 $1,159,249.07
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $908,678.46 $908,678.46
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $921,365.50 $921,365.50
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,059,300.00 $1,102,300.00
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only $131,399.96 $131,399.96
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Landscaping and Other Scenic Beautification $140,071.06
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $3,086,866.23 $8,275,867.08
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $4,950,000.00 $4,950,000.00
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,860,000.00 $3,499,000.00
New Hampshire A001234 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $557,649.33 $1,104,773.22
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $30,971,161.39
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $10,323,720.46
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $589,383.00
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $196,461.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $3,567,767.90
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,559,085.80 $2,599,827.08
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $13,580.43
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $1,847,163.91
New Hampshire A004115 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $7,975.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $55,000.00 $55,000.00
New Hampshire A004115 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $8,357.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $2,626,060.75 $2,626,060.75
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction $20,248,128.05 $20,248,128.05
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,124,650.00 $2,124,650.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Environmental Only $167,486.97 $167,486.97
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Other $1,133,152.06 $1,133,152.06
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $87,413.33 $87,413.33
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge New Construction $12,000,000.00 $15,000,000.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $4,331,850.77
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $8,675,229.79 $20,264,910.32
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $947,100.00 $1,887,536.31
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $249,024.27 $1,245,524.27
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,713,095.02 $3,229,115.02
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $297,000.00 $8,377,000.00
New Hampshire A004152 Cheshire >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $900,893.40
New Hampshire A004375 Rockingham >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - No Added Capacity $2,769,912.20 $2,769,912.20
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $323,367.66 $40,007,262.65
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $161,732.34 $1,854,018.14
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $1,969,577.09
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $12,914,107.24
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $674,656.00
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,238,855.83 $3,817,957.86
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $436,764.58 $694,594.38
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $203,624.14
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $101,842.61
New Hampshire A004375 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $251,653.22 $1,121,893.51
New Hampshire A004375 Rockingham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $10,731.54 $48,426.55
New Hampshire A004375 Rockingham >= 200,000 Local REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity $26,995.80 $26,995.80
New Hampshire A004375 Rockingham >= 200,000 Local REPURPOSED SPECIAL Bridge Replacement - No Added Capacity $1,009,436.29 $1,009,436.29
New Hampshire A004376 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,465,739.38
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $25,775,767.49
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $288,311.35
New Hampshire A004376 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $184,175.30
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $4,049,825.40
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,319,418.38 $2,416,022.34
New Hampshire A004376 Rockingham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $857,571.96 $857,571.96
New Hampshire A004376 Hillsborough >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $102,839.21
New Hampshire A005073 Rockingham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge New Construction $2,832.30 $2,832.30
New Hampshire A005073 Rockingham >= 200,000 Local BRIDGE PROGRAM - 85% ON/OFF Bridge New Construction $7,166.70 $7,166.70
New Hampshire A005073 Rockingham >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction $2,815,425.95 $2,815,425.95
New Hampshire A005073 Rockingham >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Bridge New Construction $7,124,060.81 $7,124,060.81
New Hampshire A005073 Rockingham >= 200,000 State NATIONAL HWY FREIGHT PGM New  Construction Roadway $3,714,710.40 $3,714,710.40
New Hampshire A005073 Rockingham >= 200,000 Local NATIONAL HWY FREIGHT PGM New  Construction Roadway $9,399,580.22 $9,399,580.22
New Hampshire A005073 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $765,165.83 $766,406.48
New Hampshire A005073 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,936,150.39 $1,939,289.74
New Hampshire A005073 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff $1,216,828.03 $1,216,828.03
New Hampshire A005073 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff $3,079,021.30 $3,079,021.30
New Hampshire A005073 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $7,647,947.39 $7,676,273.06
New Hampshire A005073 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $19,352,112.81 $19,423,787.14
New Hampshire A005073 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $617,999.91 $617,999.91
New Hampshire A005073 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Other $1,563,766.49 $1,563,766.49
New Hampshire A005073 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,199,999.99 $2,199,999.99
New Hampshire A005073 Rockingham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $449,783.50 $449,783.50
New Hampshire A005073 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,830,150.26 $2,830,150.26
New Hampshire A005207 Rockingham >= 200,000 Local PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $5,936,450.00 $5,936,450.00
New Hampshire A005207 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $7,686,993.26 $25,145,821.32
New Hampshire A005207 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $516,805.67 $516,805.67
New Hampshire A005207 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,751,048.89 $2,495,114.89
New Hampshire A005207 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Other $35,750.00 $35,750.00
New Hampshire A005207 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $4,217,661.11 $4,217,661.11
New Hampshire A005207 Rockingham >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,386,119.31 $2,565,332.56
New Hampshire A005252 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,497,429.84 $2,497,429.84
New Hampshire A005252 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff $205,772.60 $205,772.60
New Hampshire A005252 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Other $41,623,830.60 $41,623,830.60
New Hampshire A005252 Rockingham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $247,500.00 $275,000.00