New Hampshire | 0931201 | Rockingham | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $317,999.80 | $317,999.80 |
New Hampshire | 0931201 | Rockingham | >= 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $2,310,072.20 | $2,310,072.20 |
New Hampshire | 0931201 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $266,214.67 | $266,214.67 |
New Hampshire | 0931201 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,933,785.33 | $1,933,785.33 |
New Hampshire | 0931201 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,178,484.39 | $3,976,834.58 |
New Hampshire | 0931201 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,978,814.00 | $3,978,814.00 |
New Hampshire | 0931201 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $12,008,897.25 | $16,590,547.06 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $730,404.56 | $730,404.56 |
New Hampshire | A000124 | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $22,402.15 | $22,402.15 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $1,838,760.53 | $1,838,760.53 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $64,897.38 | $64,897.38 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $18,108,224.54 | $24,483,469.93 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $88,537.27 | |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $1,674,255.04 | $9,225,841.31 |
New Hampshire | A000124 | Hillsborough | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $13,316,429.49 | $13,316,429.49 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $6,138,310.43 | $6,138,310.43 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $11,896.00 | |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $366,108.89 | $366,108.89 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $22,179,629.74 | $22,179,629.74 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $34,455.44 | |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $5,955,256.37 | $5,955,256.37 |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $153,943.36 | |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $99,312.79 | |
New Hampshire | A000125 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $11,307,551.58 | $11,307,551.58 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $2,534,083.87 | $3,014,888.82 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Debt Service | $103,864.00 | $103,864.00 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $582,788.40 | |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $22,505,370.21 | $22,505,370.21 |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $126,260.36 | |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $35,243.85 | |
New Hampshire | A000128 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $8,066,439.00 | $8,066,439.00 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $4,763,883.19 | $4,763,883.19 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $575,746.01 | |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $14,366,895.37 | $14,366,895.37 |
New Hampshire | A000129 | Hillsborough | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $16,421,279.71 | $16,421,279.71 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $1,667,225.73 | $9,843,464.38 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $15,099.66 | |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $981,897.76 | $981,897.76 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | 4R - Added Capacity | $2.00 | $2.00 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | $1,980,000.00 | $1,980,000.00 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $71,603.26 | |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $27,893,806.91 | $34,508,125.40 |
New Hampshire | A000501 | Hillsborough | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $923,941.76 | $1,244,754.64 |
New Hampshire | A000501 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,302,262.92 | $7,302,262.92 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $161,884.34 | $161,884.34 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $10,533.78 | $10,533.78 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $73,623,855.57 | $115,962,013.57 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,379,733.57 | $4,379,733.57 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $196,921.30 | $196,921.30 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $212,982.80 | |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,060,103.65 | $2,060,103.65 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $2,440,747.20 | |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,895,241.21 | $5,895,241.21 |
New Hampshire | A001026 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $594,602.91 | $594,602.91 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $3,864,659.86 | $3,864,659.86 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $581,680.00 | $1,071,280.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $4,950.00 | $49,450.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $700,040.00 | $700,040.00 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - Added Capacity | $14,836,623.76 | $15,205,728.88 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,760,650.97 | $1,760,650.97 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | $10,000,000.00 | $12,719,895.88 |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $13,173,728.63 | |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,131,000.00 | |
New Hampshire | A001154 | Grafton | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,251,360.00 | $1,488,960.00 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Bridge New Construction | $6,174,677.00 | $6,174,677.00 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $1,159,249.07 | $1,159,249.07 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $908,678.46 | $908,678.46 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $921,365.50 | $921,365.50 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,059,300.00 | $1,102,300.00 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $131,399.96 | $131,399.96 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $140,071.06 | |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,086,866.23 | $8,275,867.08 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,950,000.00 | $4,950,000.00 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,860,000.00 | $3,499,000.00 |
New Hampshire | A001234 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $557,649.33 | $1,104,773.22 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,971,161.39 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,323,720.46 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $589,383.00 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $196,461.00 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,567,767.90 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,559,085.80 | $2,599,827.08 |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,580.43 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $1,847,163.91 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $7,975.00 | |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $55,000.00 | $55,000.00 |
New Hampshire | A004115 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,357.00 | |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,626,060.75 | $2,626,060.75 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $20,248,128.05 | $20,248,128.05 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,124,650.00 | $2,124,650.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Environmental Only | $167,486.97 | $167,486.97 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $1,133,152.06 | $1,133,152.06 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $87,413.33 | $87,413.33 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $12,000,000.00 | $15,000,000.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,331,850.77 | |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $8,675,229.79 | $20,264,910.32 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $947,100.00 | $1,887,536.31 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $249,024.27 | $1,245,524.27 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,713,095.02 | $3,229,115.02 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $297,000.00 | $8,377,000.00 |
New Hampshire | A004152 | Cheshire | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $900,893.40 | |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | $2,769,912.20 | $2,769,912.20 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $323,367.66 | $40,007,262.65 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $161,732.34 | $1,854,018.14 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,969,577.09 | |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $12,914,107.24 | |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $674,656.00 | |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,238,855.83 | $3,817,957.86 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $436,764.58 | $694,594.38 |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $203,624.14 | |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $101,842.61 | |
New Hampshire | A004375 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $251,653.22 | $1,121,893.51 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $10,731.54 | $48,426.55 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $26,995.80 | $26,995.80 |
New Hampshire | A004375 | Rockingham | >= 200,000 | Local | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $1,009,436.29 | $1,009,436.29 |
New Hampshire | A004376 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,465,739.38 | |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $25,775,767.49 | |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $288,311.35 | |
New Hampshire | A004376 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $184,175.30 | |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $4,049,825.40 | |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,319,418.38 | $2,416,022.34 |
New Hampshire | A004376 | Rockingham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $857,571.96 | $857,571.96 |
New Hampshire | A004376 | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | $102,839.21 | |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge New Construction | $2,832.30 | $2,832.30 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | BRIDGE PROGRAM - 85% ON/OFF | Bridge New Construction | $7,166.70 | $7,166.70 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $2,815,425.95 | $2,815,425.95 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $7,124,060.81 | $7,124,060.81 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | New Construction Roadway | $3,714,710.40 | $3,714,710.40 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | NATIONAL HWY FREIGHT PGM | New Construction Roadway | $9,399,580.22 | $9,399,580.22 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $765,165.83 | $766,406.48 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,936,150.39 | $1,939,289.74 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $1,216,828.03 | $1,216,828.03 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $3,079,021.30 | $3,079,021.30 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,647,947.39 | $7,676,273.06 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $19,352,112.81 | $19,423,787.14 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $617,999.91 | $617,999.91 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,563,766.49 | $1,563,766.49 |
New Hampshire | A005073 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,199,999.99 | $2,199,999.99 |
New Hampshire | A005073 | Rockingham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $449,783.50 | $449,783.50 |
New Hampshire | A005073 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,830,150.26 | $2,830,150.26 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $5,936,450.00 | $5,936,450.00 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,686,993.26 | $25,145,821.32 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $516,805.67 | $516,805.67 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,751,048.89 | $2,495,114.89 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $35,750.00 | $35,750.00 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,217,661.11 | $4,217,661.11 |
New Hampshire | A005207 | Rockingham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,386,119.31 | $2,565,332.56 |
New Hampshire | A005252 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,497,429.84 | $2,497,429.84 |
New Hampshire | A005252 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | $205,772.60 | $205,772.60 |
New Hampshire | A005252 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $41,623,830.60 | $41,623,830.60 |
New Hampshire | A005252 | Rockingham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $247,500.00 | $275,000.00 |