Report: FMISF71A-3
North Dakota

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
North Dakota 1094208 Morton >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $14,246,499.51 $15,829,443.90
North Dakota 1094208 Morton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $10,542,226.60
North Dakota 1094208 Morton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,637,167.06
North Dakota 1094208 Morton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $805,715.28 $895,239.20
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $26,389,730.29 $29,535,207.34
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,638,973.04 $2,953,520.74
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $857,433.95 $952,704.39
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,730,010.83 $1,922,234.26
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $2,106,855.95 $2,603,306.50
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $11,480.00
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $13,813,273.98 $15,348,082.20
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,381,327.40 $1,534,808.22
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $210,685.60 $261,478.66
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $1,800.00 $2,000.00
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $360,000.00 $400,000.00
North Dakota 1094212 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $697,572.00 $775,080.00
North Dakota 1094214 Burleigh >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - No Added Capacity $1,953,150.24 $1,953,150.24
North Dakota 1094214 Burleigh >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $969,989.31 $1,077,765.90
North Dakota 1094214 Burleigh >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,600,000.00
North Dakota 1094214 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $16,853,322.09 $28,300,903.20
North Dakota 1094214 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $314,815.00
North Dakota 1094214 Burleigh >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,164,663.43
North Dakota 1094223 Morton >= 5,000 AND < 50,000 State CONGESTION AIR QUALITY Right of Way $1,052,090.00 $1,300,000.00
North Dakota 1094223 Morton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $20,310,410.74 $25,096,269.30
North Dakota 1094223 Morton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $3,515,607.11 $10,386,948.00
North Dakota 1094223 Morton >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $623,004.81 $1,441,445.50
North Dakota 1094223 Morton >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,787,793.14 $3,548,321.73
North Dakota 1094223 Morton >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $62,300.48 $144,144.55
North Dakota 1A94078 Burleigh >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - Added Capacity $16,490,933.00 $18,323,258.88
North Dakota 1A94078 Morton >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECT SEC 1702 Bridge Replacement - Added Capacity $7,544,468.00 $8,712,182.62
North Dakota 5094143 Golden Valley < 5,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $1,908,301.28 $2,120,334.75
North Dakota 5094143 Golden Valley < 5,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $190,830.13 $212,033.48
North Dakota 5094143 Golden Valley < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $23,833,112.27 $26,481,235.86
North Dakota 5094143 Golden Valley < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,243,967.73 $3,604,408.59
North Dakota 5094143 Golden Valley < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $540,000.00 $600,000.00
North Dakota 5094143 Golden Valley < 5,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $8,606,565.00 $9,562,850.00
North Dakota 5094143 Golden Valley < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $2,197,274.21 $2,441,415.79
North Dakota 5094143 Golden Valley < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $219,727.42 $244,141.58
North Dakota 5094150 Golden Valley < 5,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $1,014,301.19 $1,127,001.32
North Dakota 5094150 Golden Valley < 5,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $1,362,090.16 $1,513,433.51
North Dakota 5094150 Golden Valley < 5,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $237,639.14 $264,043.49
North Dakota 5094150 Golden Valley < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $16,769,422.90 $18,632,692.11
North Dakota 5094150 Golden Valley < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,989,827.15 $3,322,030.17
North Dakota 5094150 Golden Valley < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,700,000.00
North Dakota 5094150 Golden Valley < 5,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $8,778,696.00 $9,754,106.67
North Dakota 5094150 Golden Valley < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $4,350,152.66 $4,833,502.96
North Dakota 5094152 Billings < 5,000 State CONGESTION AIR QUALITY 4R - Added Capacity $3,079,970.98 $3,805,722.21
North Dakota 5094152 Billings < 5,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $312,284.56 $385,869.96
North Dakota 5094152 Billings < 5,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $1,208,669.77 $1,493,475.56
North Dakota 5094152 Billings < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $6,138,844.75 $7,585,375.94
North Dakota 5094152 Billings < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $160,000.00
North Dakota 5094152 Billings < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $8,764,705.27 $10,829,983.04
North Dakota 5094152 Billings < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,950,447.53 $2,426,042.67
North Dakota 5094152 Billings < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $4,851,401.39 $5,994,564.92
North Dakota 5094152 Billings < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $97,116.00 $120,000.00
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,800,000.00
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $74,225,470.56
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $1,482,850.90
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $7,722,950.33
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $1,521,181.75
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,400,000.00
North Dakota 7085116 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,404,924.19 $4,207,246.00
North Dakota 8029173 Statewide N/A State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $439,962.93 $488,847.70
North Dakota 8029173 Traill >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $1,600,399.35 $1,778,221.50
North Dakota 8029173 Traill >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $160,039.94 $177,822.15
North Dakota 8029173 Statewide N/A State HIGHWAY INFRA PRGM -APPOR Construction Engineering $43,996.29 $48,884.77
North Dakota 8029173 Traill >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $9,246,462.39 $10,273,847.10
North Dakota 8029173 Cass >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $3,815,357.63 $4,239,286.26
North Dakota 8029173 Traill >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,521,958.67 $1,691,065.19
North Dakota 8029173 Cass >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $628,004.13 $697,782.37
North Dakota 8029173 Traill >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $219,240.64 $243,600.71
North Dakota 8029173 Cass >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $90,465.03 $100,516.70
North Dakota 8029173 Cass >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $2,464,683.71 $2,738,537.45
North Dakota 8029173 Traill >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $5,973,124.29 $6,636,804.77
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - Added Capacity $350,903.78 $389,893.08
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $35,090.38 $38,989.30
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $83.97 $93.30
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $818,316.00 $909,240.00
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $20,770,320.39 $23,078,133.77
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,077,032.04 $2,307,813.38
North Dakota 8094098 Cass >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $19,716.03 $21,906.70
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Bridge Rehabilitation - Added Capacity $430,353.37 $887,692.60
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $43,035.34 $88,769.26
North Dakota 9052056 Wells < 5,000 State HSIP LIMITING FLEXIBLE Construction Engineering $1,005,082.88
North Dakota 9052056 Sheridan < 5,000 State HSIP LIMITING FLEXIBLE Construction Engineering $233,298.85
North Dakota 9052056 McHenry >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering $590,819.27
North Dakota 9052056 Pierce < 5,000 State HSIP LIMITING FLEXIBLE Construction Engineering $87,798.58
North Dakota 9052056 Pierce < 5,000 State HSIP LIMITING FLEXIBLE Safety $366,395.80 $793,097.63
North Dakota 9052056 McHenry >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety $5,427,130.60 $8,298,517.14
North Dakota 9052056 Sheridan < 5,000 State HSIP LIMITING FLEXIBLE Safety $973,588.85 $2,107,423.19
North Dakota 9052056 Wells < 5,000 State HSIP LIMITING FLEXIBLE Safety $4,194,351.98 $9,079,063.09
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety $750,598.14 $750,598.14
North Dakota 9052056 Renville < 5,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $705,664.80 $1,106,715.47
North Dakota 9052056 Foster < 5,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $1,544,584.54 $1,930,730.68
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $5,431,949.19 $8,519,090.35
North Dakota 9052056 Wells < 5,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $8,103,039.10 $10,128,798.87
North Dakota 9052056 Statewide N/A N/A NAT SIG FREIGHT AND HWY PROJ Bridge Rehabilitation - Added Capacity $2,310,489.00
North Dakota 9052056 Statewide N/A N/A NAT SIG FREIGHT AND HWY PROJ Construction Engineering $231,048.90
North Dakota 9052056 Wells < 5,000 State NAT SIG FREIGHT AND HWY PROJ Construction Engineering $810,303.91 $1,012,879.89
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Construction Engineering $851,883.81
North Dakota 9052056 Foster < 5,000 State NAT SIG FREIGHT AND HWY PROJ Construction Engineering $154,458.46 $193,073.07
North Dakota 9052056 Renville < 5,000 State NAT SIG FREIGHT AND HWY PROJ Construction Engineering $110,696.77
North Dakota 9052056 McHenry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $4,103,217.63 $11,610,999.87
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,039,948.11 $2,942,772.84
North Dakota 9052056 Ward >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $179,054.62 $369,337.09
North Dakota 9052056 McHenry >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $706,477.65 $1,457,255.88
North Dakota 9052056 McHenry >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $462,300.00 $571,234.40
North Dakota 9052056 Sheridan < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $182,550.00 $225,565.30
North Dakota 9052056 Pierce < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $68,700.00 $84,888.17
North Dakota 9052056 Wells < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $786,450.00 $971,765.73
North Dakota 9999500 Eddy < 5,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $1,186,328.12 $2,731,586.73
North Dakota 9999500 Kidder < 5,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $1,638,633.12 $3,773,044.26
North Dakota 9999500 Wells < 5,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $2,149,747.46 $4,949,913.57
North Dakota 9999500 McHenry >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $3,363,765.30 $7,745,257.43
North Dakota 9999500 Mountrail >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $710,283.16 $1,635,466.64
North Dakota 9999500 LaMoure < 5,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $2,225,879.40 $5,125,211.60
North Dakota 9999500 Sheridan < 5,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $3,358,826.88 $7,733,886.44
North Dakota 9999500 Stutsman >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $3,860,498.84 $8,889,014.13
North Dakota 9999500 Ward >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation $1,299,966.20 $2,993,244.76
North Dakota 9999500 Ward >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $129,996.62 $299,324.48
North Dakota 9999500 Stutsman >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $564,582.01 $1,299,981.61
North Dakota 9999500 Sheridan < 5,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $335,882.69 $773,388.64
North Dakota 9999500 LaMoure < 5,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $222,587.94 $512,521.16
North Dakota 9999500 Mountrail >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $71,028.31 $163,546.66
North Dakota 9999500 McHenry >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $336,376.53 $774,525.74
North Dakota 9999500 Wells < 5,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $214,974.75 $494,991.36
North Dakota 9999500 Kidder < 5,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $212,009.86 $488,164.54
North Dakota 9999500 Eddy < 5,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $118,632.81 $273,158.67
North Dakota 9999500 Stutsman >= 5,000 AND < 50,000 State PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $3,288,641.55 $3,288,641.55
North Dakota 9999500 Kidder < 5,000 State PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $886,880.99 $886,880.99
North Dakota 9999500 Kidder < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $199,548.22 $221,720.25
North Dakota 9999500 Stutsman >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $739,944.35 $822,160.39
North Dakota 9999509 Statewide N/A State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $7,075,335.60 $8,742,537.50
North Dakota 9999509 Statewide N/A State HIGHWAY INFRA PRGM -APPOR Construction Engineering $707,533.56 $874,253.75
North Dakota 9999509 Sioux < 5,000 State HSIP LIMITING FLEXIBLE Construction Engineering $216,036.70 $216,036.70
North Dakota 9999509 Sioux < 5,000 State HSIP LIMITING FLEXIBLE Safety $2,160,367.04 $2,160,367.04
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - No Added Capacity $13,616,379.93 $27,232,759.86
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $136,124.08 $272,248.15
North Dakota 9999509 Mountrail >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering $398,750.48 $797,500.95
North Dakota 9999509 Mountrail >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Safety $3,987,504.76 $7,975,009.50
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Safety $1,361,240.75 $2,722,481.50
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $1,152,202.55 $1,423,702.64
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,319,167.51 $2,865,646.25
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $8,093.00 $10,000.00
North Dakota 9999509 McKenzie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $57,642.39 $71,225.00
North Dakota SB97001 Statewide N/A N/A ST INFR BANK PILOT - ADV CAP Other $23,968,184.00
North Dakota SB97001 Statewide N/A N/A STATE INFRASTRUCTURE BANK - GF Other $2,540,000.00 $3,138,516.00