U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Utah

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2024
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $5,877,973.67 $7,347,466.84
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Construction Engineering $14,355.77 $17,944.71
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Other $63.79 $92,980,079.74
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $47,627.82 $59,534.77
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way $777,582.03 $971,977.55
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Utilities $30,399.92 $37,999.90
Utah F003728 Salt Lake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,421.54 $3,670.00
Utah F003728 Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ 4R - Added Capacity $361,741.65 $388,009.92
Utah F003728 Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ Preliminary Engineering $18,559.29 $19,906.99
Utah F003728 Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ Right of Way $1,431,975.06 $1,535,959.52
Utah F006557 Utah >= 200,000 State EQUITY BONUS - CHARGED TO LIM 4R - Added Capacity $59,704.36 $64,039.86
Utah F006557 Utah >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity $4,268,705.41 $4,578,682.19
Utah F006557 Utah >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity $12,288.30 $13,180.63
Utah F006557 Utah >= 200,000 State EQUITY BONUS SP LIMITATION Environmental Only $2,659.14 $2,852.24
Utah F006557 Utah >= 200,000 State EQUITY BONUS SP LIMITATION Other $29,587.48 $31,736.01
Utah F006557 Utah >= 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $872.63 $936.00
Utah F006557 Utah >= 200,000 State EQUITY BONUS SP LIMITATION Right of Way $55,592.69 $59,629.61
Utah F006557 Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $10,129,601.27 $12,662,001.60
Utah F006557 Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Environmental Only $88,950.15 $111,187.69
Utah F006557 Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Other $379,989.34 $474,986.68
Utah F006557 Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $146,057.16 $182,571.46
Utah F006557 Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $18,446.92 $23,058.65
Utah F006557 Utah >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $273,635.41 $342,044.27
Utah F006557 Utah >= 200,000 State HIGHWAY PRIORITY PROJECTS 4R - Added Capacity $495,000.00 $495,000.00
Utah F006557 Utah >= 200,000 State MINIMUM GUARANTEE - TEA-21 4R - Added Capacity $8,337.99 $8,943.46
Utah F006557 Utah >= 200,000 State RAIL HWY CROSSING HAZ ELI 4R - Added Capacity $37,292.00 $41,435.56
Utah F006557 Utah >= 200,000 State SURFACE TRANS PRIORITIES S129 4R - Added Capacity $245,000.00 $245,000.00
Utah F006557 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $235,564.50 $252,670.28
Utah F006557 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $16,572,839.14 $17,776,294.27
Utah F006557 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only $24,108.94 $25,859.64
Utah F006557 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $42,783.29 $45,890.05
Utah F006557 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $657,059.44 $704,772.54
Utah F006557 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $466,150.00 $500,000.00
Utah F006557 Utah >= 200,000 State TRANSPORTATION IMP PROJ 4R - Added Capacity $5,438,903.95 $5,833,856.00
Utah F006557 Utah >= 200,000 State TRANSPORTATION IMP PROJ Other $29,041,850.00
Utah F007701 Utah >= 200,000 State HIGH RISK RURAL ROAD 4R - Added Capacity $282,055.27 $302,537.03
Utah F007701 Utah >= 200,000 State HIGH RISK RURAL ROAD Construction Engineering $103,485.30 $111,000.00
Utah F007701 Utah >= 200,000 State HIGH RISK RURAL ROAD Preliminary Engineering $267,069.43 $286,462.97
Utah F007701 Utah >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity $525,458.26 $563,615.00
Utah F007701 Utah >= 200,000 State HSIP LIMITING FLEXIBLE Other $256,720.87 $1,075,362.94
Utah F007701 Utah >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $150,120.87 $161,022.06
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $12,961,379.93
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $643,287.00 $690,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $9,311,742.34 $9,987,924.86
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $59,376.45 $63,688.16
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Environmental Only $9,323.00 $10,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,403,111.50 $1,505,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $689,902.00 $740,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $34,855.91 $37,387.01
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $228,434.07 $245,022.06
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $117,970.47 $126,537.03
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $419,535.00 $450,000.00
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,982,855.65 $4,272,075.14
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,506,005.51 $1,615,365.77
Utah F010782 Tooele >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $2,946,549.69 $3,140,156.00
Utah F010782 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $5,893,983.44 $6,281,254.13
Utah F010782 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $869,533.46 $932,607.90
Utah F010782 Tooele >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,128.85 $3,322.20
Utah F010782 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,815,322.91 $3,019,734.25
Utah F010782 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $43,057.84 $46,184.51
Utah F010782 Tooele >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $68,838.84 $73,837.62
Utah F010782 Tooele >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,554,144.10 $1,667,000.00
Utah F010782 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $17,157,039.79 $18,402,917.40
Utah F010782 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $584,776.88 $627,241.10
Utah F010782 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $72,213.16 $6,677,243.34
Utah F010782 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $769,671.35 $825,561.78
Utah F011271 Weber >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $143,110.68 $178,888.35
Utah F011271 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $1,829,346.00 $1,962,186.00
Utah F011271 Davis >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $463,547.56 $579,434.44
Utah F011271 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $2,038,891.10 $2,184,069.36
Utah F011271 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $7,759,085.22 $8,312,958.04
Utah F011271 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,169,023.94 $9,063,075.48
Utah F011271 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $978,356.40 $3,340,598.71
Utah F011271 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $108,080.84 $3,349,631.86
Utah F011271 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $350,087.93 $8,376,850.15
Utah F011271 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,499,822.00
Utah F011271 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,010,178.00
Utah F011271 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $24,592,244.42 $26,378,037.56
Utah F011271 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $6,588,362.28 $74,351,307.68
Utah F011271 Weber >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $1,698,885.87 $19,171,285.20
Utah F011271 Weber >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $804,947.82 $863,400.00
Utah F011271 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,991,952.18 $2,136,600.00
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $18,032,148.57 $19,341,573.07
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $49,174.17 $52,745.01
Utah F011687 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $68,200.62 $73,153.08
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $207,669.76 $222,749.91
Utah F011687 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $376,443.08 $403,778.93
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $122,309.04 $131,190.65
Utah F011687 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $221,709.66 $237,809.35
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $5,123.16 $5,495.18
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $14,468,127.40 $15,518,746.54
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,171,773.04 $1,256,862.64
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,625,126.96 $1,743,137.36
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $5,519,934.97
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $3,980,065.03
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,102,937.22 $2,255,644.35
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,160,112.78 $1,244,355.65
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,228.87 $4,535.96
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $7,665.67 $8,222.32
Utah F011826 Salt Lake >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Rail/Hwy Crossing $11,352,772.00 $18,921,286.67
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,704,905.84 $2,901,325.57
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,585,000.17 $4,917,945.06
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $190,423.96 $204,251.81
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $653,613.10 $701,075.94
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $2,634,606.54 $2,825,921.42
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Other $677,840.56 $727,062.71
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $351,222.76 $376,727.19
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Rail/Hwy Crossing $5,896,944.44 $6,325,157.61
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Right of Way $8,390,700.00 $9,000,000.00
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Utilities $2,551,880.58 $2,737,188.22
Utah F011826 Salt Lake >= 200,000 State RAIL HWY CROSSING HAZ ELI Rail/Hwy Crossing $450,000.00 $500,000.00
Utah F011826 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $15,341,788.55
Utah F011826 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $1,800,000.00 $1,930,709.00
Utah F011826 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $14,199,996.26 $15,231,144.77
Utah F012559 Utah >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way $316,257.77 $316,257.77
Utah F012559 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $746,168.07 $800,351.90
Utah F012559 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $462,979.05 $496,598.79
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only $1,288,702.44 $1,382,283.00
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New  Construction Roadway $4,838,837.85 $5,190,215.42
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $85,287,248.89
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $5,569,892.28 $5,974,356.19
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $13,460,165.55 $14,437,590.44
Utah F012559 Utah >= 200,000 State TRANSPORTATION ALTERNATIVES Right of Way $2,536,162.35 $2,720,328.60
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $6,495,606.48 $6,967,292.17
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only $236,643.84 $253,828.00
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other $18,428,090.00
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,169,917.18 $1,254,872.00
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $4,865,190.00 $5,218,481.18
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $284,842.50 $305,526.65
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $1,042,201.41 $45,799,690.60
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,796,900.00 $3,000,000.00
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $8,000.91 $8,581.90
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $5,634,307.22 $6,043,448.70
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,584,910.00 $1,700,000.00
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $697,977.93 $748,662.37
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Construction Engineering $46,615.00 $50,000.00
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Other $69,132,019.76
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Preliminary Engineering $653,731.87 $701,203.33
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Right of Way $893,143.40 $958,000.00
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Utilities $2,260,281.73 $2,424,414.60
Utah F013042 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $126,954.36 $136,173.29
Utah F013042 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $734,672.60 $788,021.67
Utah F013042 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $38,086.04 $40,851.70
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $8,447,868.17 $9,061,319.50
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,788.57 $4,063.70
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,527,467.03 $1,638,385.75
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,970,067.66 $3,185,742.41
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $260,591.18 $279,514.29
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $19,558,740.01 $20,767,402.86
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $12,772,510.00 $13,700,000.00
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,177,464.51 $5,497,414.00
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $337,355.43 $4,550,412.66
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $8,656,834.57 $9,191,797.16
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $423,810.00 $450,000.00
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $79,935,081.33 $85,739,656.05
Utah F013049 Statewide N/A Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $26,669,262.97 $28,605,881.12
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,716,161.70 $5,058,631.02
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $255,263.74 $273,800.00
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,754,836.12 $2,954,881.60
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $21,751.58 $23,331.09
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC 4R - Restoration & Rehabilitation $47,920,779.00 $67,289,071.44
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Preliminary Engineering $5,523,905.91
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Right of Way $107,801.65
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $95,789.58 $102,745.45
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $16,346,507.84 $23,314,899.17
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $5,407,340.00 $11,000,000.00
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Other $77,528.87 $2,083,159.00
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $68,048.32 $1,476,094.09
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Right of Way $1,053,108.93 $1,129,581.60
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Utilities $746,996.45 $808,465.00
Utah F015019 San Juan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $9,443,524.66 $36,341,015.94