RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Utah | F003728 | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $5,877,973.67 | $7,347,466.84 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $14,355.77 | $17,944.71 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Other | $63.79 | $92,980,079.74 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $47,627.82 | $59,534.77 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $777,582.03 | $971,977.55 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $30,399.92 | $37,999.90 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,421.54 | $3,670.00 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | 4R - Added Capacity | $361,741.65 | $388,009.92 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Preliminary Engineering | $18,559.29 | $19,906.99 |
Utah | F003728 | Salt Lake | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | $1,431,975.06 | $1,535,959.52 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS - CHARGED TO LIM | 4R - Added Capacity | $59,704.36 | $64,039.86 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $4,268,705.41 | $4,578,682.19 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $12,288.30 | $13,180.63 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Environmental Only | $2,659.14 | $2,852.24 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Other | $29,587.48 | $31,736.01 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $872.63 | $936.00 |
Utah | F006557 | Utah | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $55,592.69 | $59,629.61 |
Utah | F006557 | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $10,129,601.27 | $12,662,001.60 |
Utah | F006557 | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Environmental Only | $88,950.15 | $111,187.69 |
Utah | F006557 | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Other | $379,989.34 | $474,986.68 |
Utah | F006557 | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $146,057.16 | $182,571.46 |
Utah | F006557 | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $18,446.92 | $23,058.65 |
Utah | F006557 | Utah | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $273,635.41 | $342,044.27 |
Utah | F006557 | Utah | >= 200,000 | State | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | $495,000.00 | $495,000.00 |
Utah | F006557 | Utah | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $8,337.99 | $8,943.46 |
Utah | F006557 | Utah | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | 4R - Added Capacity | $37,292.00 | $41,435.56 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Added Capacity | $245,000.00 | $245,000.00 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $235,564.50 | $252,670.28 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,572,839.14 | $17,776,294.27 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $24,108.94 | $25,859.64 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $42,783.29 | $45,890.05 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $657,059.44 | $704,772.54 |
Utah | F006557 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $466,150.00 | $500,000.00 |
Utah | F006557 | Utah | >= 200,000 | State | TRANSPORTATION IMP PROJ | 4R - Added Capacity | $5,438,903.95 | $5,833,856.00 |
Utah | F006557 | Utah | >= 200,000 | State | TRANSPORTATION IMP PROJ | Other | $29,041,850.00 | |
Utah | F007701 | Utah | >= 200,000 | State | HIGH RISK RURAL ROAD | 4R - Added Capacity | $282,055.27 | $302,537.03 |
Utah | F007701 | Utah | >= 200,000 | State | HIGH RISK RURAL ROAD | Construction Engineering | $103,485.30 | $111,000.00 |
Utah | F007701 | Utah | >= 200,000 | State | HIGH RISK RURAL ROAD | Preliminary Engineering | $267,069.43 | $286,462.97 |
Utah | F007701 | Utah | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $525,458.26 | $563,615.00 |
Utah | F007701 | Utah | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | $256,720.87 | $1,075,362.94 |
Utah | F007701 | Utah | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $150,120.87 | $161,022.06 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $12,961,379.93 | |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $643,287.00 | $690,000.00 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,311,742.34 | $9,987,924.86 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $59,376.45 | $63,688.16 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Environmental Only | $9,323.00 | $10,000.00 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,403,111.50 | $1,505,000.00 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $689,902.00 | $740,000.00 |
Utah | F007701 | Utah | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $34,855.91 | $37,387.01 |
Utah | F007701 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $228,434.07 | $245,022.06 |
Utah | F007701 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $117,970.47 | $126,537.03 |
Utah | F007701 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $419,535.00 | $450,000.00 |
Utah | F007701 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,982,855.65 | $4,272,075.14 |
Utah | F007701 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,506,005.51 | $1,615,365.77 |
Utah | F010782 | Tooele | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,946,549.69 | $3,140,156.00 |
Utah | F010782 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,893,983.44 | $6,281,254.13 |
Utah | F010782 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $869,533.46 | $932,607.90 |
Utah | F010782 | Tooele | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,128.85 | $3,322.20 |
Utah | F010782 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,815,322.91 | $3,019,734.25 |
Utah | F010782 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $43,057.84 | $46,184.51 |
Utah | F010782 | Tooele | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $68,838.84 | $73,837.62 |
Utah | F010782 | Tooele | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,554,144.10 | $1,667,000.00 |
Utah | F010782 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $17,157,039.79 | $18,402,917.40 |
Utah | F010782 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $584,776.88 | $627,241.10 |
Utah | F010782 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $72,213.16 | $6,677,243.34 |
Utah | F010782 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $769,671.35 | $825,561.78 |
Utah | F011271 | Weber | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $143,110.68 | $178,888.35 |
Utah | F011271 | Cache | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,829,346.00 | $1,962,186.00 |
Utah | F011271 | Davis | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $463,547.56 | $579,434.44 |
Utah | F011271 | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,038,891.10 | $2,184,069.36 |
Utah | F011271 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,759,085.22 | $8,312,958.04 |
Utah | F011271 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,169,023.94 | $9,063,075.48 |
Utah | F011271 | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $978,356.40 | $3,340,598.71 |
Utah | F011271 | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $108,080.84 | $3,349,631.86 |
Utah | F011271 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $350,087.93 | $8,376,850.15 |
Utah | F011271 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,499,822.00 | |
Utah | F011271 | Weber | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,010,178.00 | |
Utah | F011271 | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $24,592,244.42 | $26,378,037.56 |
Utah | F011271 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,588,362.28 | $74,351,307.68 |
Utah | F011271 | Weber | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,698,885.87 | $19,171,285.20 |
Utah | F011271 | Weber | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $804,947.82 | $863,400.00 |
Utah | F011271 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,991,952.18 | $2,136,600.00 |
Utah | F011687 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,032,148.57 | $19,341,573.07 |
Utah | F011687 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $49,174.17 | $52,745.01 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $68,200.62 | $73,153.08 |
Utah | F011687 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $207,669.76 | $222,749.91 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $376,443.08 | $403,778.93 |
Utah | F011687 | Davis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $122,309.04 | $131,190.65 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $221,709.66 | $237,809.35 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $5,123.16 | $5,495.18 |
Utah | F011687 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $14,468,127.40 | $15,518,746.54 |
Utah | F011687 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,171,773.04 | $1,256,862.64 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,625,126.96 | $1,743,137.36 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5,519,934.97 | |
Utah | F011687 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,980,065.03 | |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,102,937.22 | $2,255,644.35 |
Utah | F011687 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,160,112.78 | $1,244,355.65 |
Utah | F011687 | Davis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,228.87 | $4,535.96 |
Utah | F011687 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $7,665.67 | $8,222.32 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Rail/Hwy Crossing | $11,352,772.00 | $18,921,286.67 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,704,905.84 | $2,901,325.57 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,585,000.17 | $4,917,945.06 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $190,423.96 | $204,251.81 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $653,613.10 | $701,075.94 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,634,606.54 | $2,825,921.42 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $677,840.56 | $727,062.71 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $351,222.76 | $376,727.19 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Rail/Hwy Crossing | $5,896,944.44 | $6,325,157.61 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Right of Way | $8,390,700.00 | $9,000,000.00 |
Utah | F011826 | Salt Lake | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $2,551,880.58 | $2,737,188.22 |
Utah | F011826 | Salt Lake | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $450,000.00 | $500,000.00 |
Utah | F011826 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $15,341,788.55 | |
Utah | F011826 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $1,800,000.00 | $1,930,709.00 |
Utah | F011826 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $14,199,996.26 | $15,231,144.77 |
Utah | F012559 | Utah | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Right of Way | $316,257.77 | $316,257.77 |
Utah | F012559 | Utah | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $746,168.07 | $800,351.90 |
Utah | F012559 | Utah | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $462,979.05 | $496,598.79 |
Utah | F012559 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $1,288,702.44 | $1,382,283.00 |
Utah | F012559 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,838,837.85 | $5,190,215.42 |
Utah | F012559 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $85,287,248.89 | |
Utah | F012559 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,569,892.28 | $5,974,356.19 |
Utah | F012559 | Utah | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $13,460,165.55 | $14,437,590.44 |
Utah | F012559 | Utah | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Right of Way | $2,536,162.35 | $2,720,328.60 |
Utah | F012730 | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $6,495,606.48 | $6,967,292.17 |
Utah | F012730 | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $236,643.84 | $253,828.00 |
Utah | F012730 | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $18,428,090.00 | |
Utah | F012730 | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,169,917.18 | $1,254,872.00 |
Utah | F012730 | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,865,190.00 | $5,218,481.18 |
Utah | F012730 | Grand | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $284,842.50 | $305,526.65 |
Utah | F013038 | Box Elder | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,042,201.41 | $45,799,690.60 |
Utah | F013038 | Box Elder | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,796,900.00 | $3,000,000.00 |
Utah | F013038 | Box Elder | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $8,000.91 | $8,581.90 |
Utah | F013038 | Box Elder | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,634,307.22 | $6,043,448.70 |
Utah | F013038 | Box Elder | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,584,910.00 | $1,700,000.00 |
Utah | F013038 | Box Elder | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $697,977.93 | $748,662.37 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $46,615.00 | $50,000.00 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Other | $69,132,019.76 | |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Preliminary Engineering | $653,731.87 | $701,203.33 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Right of Way | $893,143.40 | $958,000.00 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Utilities | $2,260,281.73 | $2,424,414.60 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $126,954.36 | $136,173.29 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $734,672.60 | $788,021.67 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $38,086.04 | $40,851.70 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $8,447,868.17 | $9,061,319.50 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,788.57 | $4,063.70 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,527,467.03 | $1,638,385.75 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,970,067.66 | $3,185,742.41 |
Utah | F013042 | Cache | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $260,591.18 | $279,514.29 |
Utah | F013049 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $19,558,740.01 | $20,767,402.86 |
Utah | F013049 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $12,772,510.00 | $13,700,000.00 |
Utah | F013049 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,177,464.51 | $5,497,414.00 |
Utah | F013049 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $337,355.43 | $4,550,412.66 |
Utah | F013049 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,656,834.57 | $9,191,797.16 |
Utah | F013049 | Salt Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $423,810.00 | $450,000.00 |
Utah | F013049 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $79,935,081.33 | $85,739,656.05 |
Utah | F013049 | Statewide | N/A | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $26,669,262.97 | $28,605,881.12 |
Utah | F013049 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,716,161.70 | $5,058,631.02 |
Utah | F013049 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $255,263.74 | $273,800.00 |
Utah | F013049 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,754,836.12 | $2,954,881.60 |
Utah | F013049 | Salt Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $21,751.58 | $23,331.09 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | 4R - Restoration & Rehabilitation | $47,920,779.00 | $67,289,071.44 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $5,523,905.91 | |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Right of Way | $107,801.65 | |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $95,789.58 | $102,745.45 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $16,346,507.84 | $23,314,899.17 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $5,407,340.00 | $11,000,000.00 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Other | $77,528.87 | $2,083,159.00 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $68,048.32 | $1,476,094.09 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Right of Way | $1,053,108.93 | $1,129,581.60 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $746,996.45 | $808,465.00 |
Utah | F015019 | San Juan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $9,443,524.66 | $36,341,015.94 |