RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | New Construction Roadway | $4,368,980.00 | $4,828,136.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $987,351.00 | $1,091,116.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $9,955,563.00 | $11,001,838.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,302,894.00 | $2,544,915.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Historic Preservation | $18,098.00 | $20,000.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,810,244.00 | $8,631,058.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $27,814.00 | $30,737.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,560,292.00 | $1,724,270.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $477,265.04 | $527,423.04 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,055,645.96 | $1,166,588.96 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,620,912.00 | $5,106,546.00 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $18,337.72 | $20,264.72 |
Wyoming | 0261020 | Albany | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,160,747.28 | $1,282,735.28 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $25,781,053.00 | $41,167,686.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,809,266.00 | $4,116,769.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $111,495.00 | $123,213.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $19,980.00 | $19,980.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,804,325.00 | $3,099,045.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,850,886.00 | $3,150,500.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $5,000.00 | $5,000.00 |
Wyoming | 2000058 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $6,027.00 | $6,660.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $14,665,632.00 | $14,665,632.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $2,168,500.00 | $2,168,500.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $2,552,686.00 | $2,552,686.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Bridge New Construction | $4,039,102.00 | $4,039,102.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Environmental Only | $440,306.00 | $440,306.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | $68,654.00 | $68,654.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,036,653.00 | $1,145,599.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $103,278.00 | $114,132.00 |
Wyoming | 2000062 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $7,846.00 | $7,846.00 |
Wyoming | HPP0418 | Park | >= 5,000 AND < 50,000 | Other | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $9,303,000.00 | $10,336,679.00 |
Wyoming | HPP0418 | Park | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $14,353,974.21 | $14,353,974.21 |
Wyoming | HPP0418 | Park | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,630,000.00 | $1,630,000.00 |
Wyoming | HPP0418 | Park | >= 5,000 AND < 50,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $616,025.79 | $616,025.79 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $9,726,215.00 | $10,485,355.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $18,216,005.00 | $19,637,779.50 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,245,000.00 | $4,574,432.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,414,116.00 | $1,524,490.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $250,000.00 | $269,513.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,543.00 | $14,600.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,811,129.37 | $3,030,540.50 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,853,345.00 | $1,998,000.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $5,000.00 | $5,000.00 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $720,674.02 | $776,923.02 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $201,749.00 | $242,020.69 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $2,278.98 | $2,456.98 |
Wyoming | I254160 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $1,047,065.00 | $1,128,789.50 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $6,275,492.00 | $6,418,411.00 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,628,931.35 | $26,167,781.00 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,200,000.00 | $3,257,510.00 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $40,127.00 | $40,127.00 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,862,419.29 | $3,085,833.65 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $199,400.00 | $214,963.00 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $5,000.00 | $5,000.00 |
Wyoming | I254161 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $23,448.00 | $25,278.00 |
Wyoming | I254168 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $22,395,693.00 | $24,143,697.25 |
Wyoming | I254168 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $651,578.00 | $702,434.25 |
Wyoming | I254168 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000,000.00 | $2,467,672.50 |
Wyoming | I254168 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $200,990.57 | $216,678.06 |
Wyoming | I254168 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,451.00 | $48,451.00 |
Wyoming | I254169 | Natrona | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $21,175,000.00 | $22,827,727.00 |
Wyoming | I254169 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $205,000.00 | $221,001.00 |
Wyoming | I254169 | Natrona | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,902,958.00 | |
Wyoming | I254169 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,851,959.00 | |
Wyoming | I802209 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,708,731.00 | $23,403,116.00 |
Wyoming | I802209 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,169,638.00 | $2,338,980.00 |
Wyoming | I802209 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $146,147.29 | $157,554.22 |
Wyoming | I802209 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $70,959.00 | $70,959.00 |
Wyoming | I803153 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,977,698.00 | $21,459,537.00 |
Wyoming | I803153 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $627,744.00 | $2,606,160.00 |
Wyoming | I803153 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $525,000.00 | $985,195.00 |
Wyoming | I803153 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $21,219.00 | |
Wyoming | I803153 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $3,723,077.00 | $4,013,666.00 |
Wyoming | I803153 | Sweetwater | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Preservation | $554,367.00 | $597,636.00 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $1,145,250.00 | $1,432,457.86 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $3,854,750.00 | $4,821,451.14 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $553,287.45 | $692,041.82 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,862,287.55 | $2,329,315.18 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $229,739.24 | $287,353.88 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $68,255.76 | $85,373.12 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $19,580.34 | $24,490.71 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $65,904.66 | $82,432.29 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $30,201.97 | $37,776.55 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,973.03 | $11,223.45 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $3,402,373.29 | $4,255,626.34 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $11,451,908.71 | $14,323,838.16 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | $1,815,105.00 | $2,270,300.00 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $366,250.95 | $458,100.00 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,232,749.05 | $1,541,900.00 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,147,649.82 | $1,435,459.33 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $340,967.89 | $426,476.38 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $22,905.00 | $28,649.12 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $77,095.00 | $96,428.88 |
Wyoming | I804271 | Albany | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $32,753.07 | $40,967.15 |
Wyoming | I804271 | Carbon | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $110,242.22 | $137,889.64 |
Wyoming | I901117 | Sheridan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,169,309.00 | $1,260,575.00 |
Wyoming | I901117 | Sheridan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $46,334.00 | $49,950.00 |
Wyoming | I901117 | Sheridan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $35,592.00 | |
Wyoming | I901117 | Sheridan | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $44,423,948.00 | |
Wyoming | I904143 | Crook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $23,100,394.61 | $24,903,400.61 |
Wyoming | I904143 | Crook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $4,641,100.00 | $5,003,342.00 |
Wyoming | I904143 | Crook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,193,542.00 | $2,990,691.00 |
Wyoming | I904143 | Crook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $466,808.19 | $503,242.98 |
Wyoming | I904143 | Crook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $80,303.00 | $80,303.00 |
Wyoming | I904143 | Crook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | $13,661.39 | $14,727.39 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $2,000,000.00 | $2,210,189.00 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,905,631.00 | $19,787,414.00 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,982,837.00 | $2,191,222.00 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $324,665.00 | $358,785.00 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,044,844.72 | $1,154,653.02 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,699,753.00 | $6,298,766.00 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,196,135.00 | $3,532,032.00 |
Wyoming | N103103 | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,678,192.28 | $1,854,560.98 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $10,618,152.78 | $10,618,152.78 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $47,502,070.00 | $52,494,275.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,787,466.00 | $1,975,319.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $11,591,443.00 | $12,809,640.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,558,017.00 | $7,247,229.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $200,888.00 | $222,000.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,808,213.89 | $1,998,246.42 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,193,265.00 | $2,423,764.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $44,591.00 | $44,591.00 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $67,784.10 | $74,907.83 |
Wyoming | N104066 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $162,882.00 | $180,000.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $8,382,565.02 | $8,661,936.02 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,335,504.73 | $10,316,612.98 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,389,595.00 | $1,535,634.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $11,052,322.00 | $12,213,860.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,606,112.00 | $2,880,000.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $407,145.98 | $449,934.78 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $676,804.77 | $748,396.75 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $839,739.00 | $927,991.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $317,116.00 | $350,443.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $135,735.00 | $150,000.00 |
Wyoming | N104083 | Teton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,273,534.08 | $1,407,375.49 |
Wyoming | ND32401 | Teton | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Other | $1,333,000.00 | $1,333,000.00 |
Wyoming | ND32401 | Teton | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $2,469,799.00 | $2,729,362.00 |
Wyoming | ND32401 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,200,000.00 | |
Wyoming | ND32401 | Teton | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $42,135,760.00 | |
Wyoming | WL32304 | Uinta | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $667,807.15 | $3,125,723.10 |
Wyoming | WL32304 | Lincoln | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $327,582.85 | $1,533,276.90 |
Wyoming | WL32304 | Lincoln | >= 5,000 AND < 50,000 | State | WILDLIFE CROSSING PRGM IIJA | Construction Engineering | $734,551.20 | $979,401.60 |
Wyoming | WL32304 | Uinta | >= 5,000 AND < 50,000 | State | WILDLIFE CROSSING PRGM IIJA | Construction Engineering | $1,497,448.80 | $1,996,598.40 |
Wyoming | WL32304 | Uinta | >= 5,000 AND < 50,000 | State | WILDLIFE CROSSING PRGM IIJA | Environmental Only | $14,844,333.40 | $19,964,642.20 |
Wyoming | WL32304 | Lincoln | >= 5,000 AND < 50,000 | State | WILDLIFE CROSSING PRGM IIJA | Environmental Only | $7,281,666.60 | $9,793,357.80 |