U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Florida

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Florida 0041228 I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB $1,068,950,180.00 $4,535,494,704.00
Florida 0105152 I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION $111,131,774.00 $155,141,008.00
Florida 0755096 I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER; DESIGN/BUILD $59,300,619.00 $75,391,870.00
Florida 0757443 I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION $44,493,400.00 $51,055,863.00
Florida 0951671 SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB $80,220,048.00 $214,223,643.00
Florida 0951685 SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB $37,450,520.00 $43,158,886.00
Florida 0951695 SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB $35,223,146.00 $55,509,116.00
Florida 0953133 I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY;INTERCHANGE (NEW);CONSTRUCTION $46,211,315.00 $52,201,689.00
Florida 0955313 I-95 (SR 9) AT NORTH I-295 INTERCHANGE ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB $100,250,019.00 $259,120,033.00
Florida 0955314 I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $4,835,206.00 $163,458,432.00
Florida 1002062 SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION $49,880,990.00 $120,379,938.00
Florida 1316003 GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB $269,630,229.00 $2,629,275,395.00
Florida 1852019 US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION $29,809,252.00 $148,207,548.00
Florida 2757410 I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB $140,971,475.00 $247,215,965.00
Florida 2955314 I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $152,866,021.00 $228,001,808.00
Florida 3115028 SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION $69,656,933.00 $77,051,059.00
Florida 3141036 SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $30,502,118.00 $292,692,595.00
Florida 3141042 SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION $58,617,431.00 $252,917,209.00
Florida 3951501 SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB $245,611,035.00 $821,933,448.00
Florida 4002027 SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. $30,609,456.00 $36,307,450.00
Florida 4047203 CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION $23,500,849.00 $29,668,030.00
Florida 4221091 SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB $25,948,763.00 $502,641,915.00
Florida 4881064 SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION $59,061,008.00 $81,521,599.00
Florida 5951553 I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION $665,712,369.00 $2,585,688,574.00
Florida 5951556 I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING   $80,952,434.00
Florida 5951557 I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING   $124,950,849.00
Florida 5951560 I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA $160,390,282.00 $160,390,282.00
Florida 7079006 SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION $11,856,714.00 $38,859,333.00
Florida 7810035 SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $35,142,093.00 $54,613,078.00
Florida 8886496 CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP $44,196,413.00 $50,338,620.00
Florida D117027 I-75 FROM S OF N JONES LOOP TO N OF US 17 ;ADD LANES & RECONSTRUCT;CONSTRUCTION $29,984,493.00 $36,132,731.00
Florida D117115 I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION $90,233,392.00 $119,209,248.00
Florida D118021 US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION $14,727,984.00 $26,703,402.00
Florida D118039 US 41 (SR 45) FROM WINKLER AVENUE TO SR 82 ;RESURFACING;CONSTRUCTION $6,945,064.00 $30,796,464.00
Florida D118043 I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB $83,358,947.00 $91,941,709.00
Florida D118127 I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $153,359,135.00 $179,175,024.00
Florida D119037 US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION $50,290,675.00 $57,473,829.00
Florida D119075 SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION $43,950,816.00 $53,156,572.00
Florida D120030 I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION $62,239,503.00 $296,963,441.00
Florida D120059 I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION $21,439,036.00 $46,574,870.00
Florida D121032 SR 70 FROM PEACE RIVER TO SE BAKER STREET;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION $30,285,705.00 $36,676,092.00
Florida D122022 BIG CARLOS BRIDGE REPLACEMENT ;BRIDGE REPLACEMENT;ADMINISTRATION;LAP $1,151,597.00 $48,180,793.00
Florida D122025 SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION $23,333,559.00 $27,833,155.00
Florida D122041 SR 25 (US 27) FROM N OF SR 540 TO N OF KOKOMO RD;RESURFACING;CONSTRUCTION;DB $22,651,489.00 $27,670,231.00
Florida D122060 I-75 (SR 93) FROM BONITA BEACH RD TO ALICO RD;RESURFACING;CONSTRUCTION $17,384,644.00 $28,137,379.00
Florida D122068 SR 70 FROM LORRAINE ROAD TO BOURNSIDE BLVD ;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $18,235,250.00 $42,963,765.00
Florida D123035 SR 33 (LAKELAND HILLS BLVD) FROM PARKVIEW PLACE TO GRANADA ST;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION $16,947,168.00 $33,668,683.00
Florida D123041 SR 25 (US 27) FROM SHORELINE DR TO DAVIS & GAINES RD;RESURFACING;CONSTRUCTION $19,024,124.00 $27,854,254.00
Florida D124033 SR 82 FROM HENDRY COUNTY LINE TO GATOR SLOUGH LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION $9,461,303.00 $53,435,067.00
Florida D124056 I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION;INTERCHANGE - ADD LANES;CONSTRUCTION $4,000,000.00 $107,139,760.00
Florida D125036 I-75 (SR 93) AT CR 876 / DANIELS PARKWAY ;INTERCHANGE IMPROVEMENT;CONSTRUCTION $41,316,468.00 $49,082,404.00
Florida D217011 FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION $104,034,888.00 $934,852,873.00
Florida D217069 SR200(US301) FROM: BRADFORD C/L TO: NORTH OF CR218;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION; CONCRETE PROJECT WITH STATE MATERIALS $31,073,206.00 $38,591,154.00
Florida D217103 I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION $17,139,305.00 $29,553,502.00
Florida D217128 I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB $178,533,124.00 $296,597,859.00
Florida D218017 SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION $116,834,688.00 $286,651,944.00
Florida D218123 SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $250,774,681.00 $716,112,264.00
Florida D218124 SR23(FIRST COAST XWAY) FROM EAST OF CR2209 TO EAST OF CR16A SPUR; NEW ROAD CONSTRUCTION; CONSTRUCTION   $311,643,918.00
Florida D219120 URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP $12,636,580.00 $51,182,261.00
Florida D219130 I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION $23,629,070.00 $29,691,682.00
Florida D219140 SR5(US1) FROM: SR207 TO: CITY GATES;RESURFACING;CONSTRUCTION $10,769,127.00 $26,139,338.00
Florida D220122 I-95(SR9) FROM SOUTH OF SR126(EMERSON ST) TO ATLANTIC BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $97,869,751.00 $294,532,491.00
Florida D221010 SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION $28,466,490.00 $42,160,323.00
Florida D221018 I-295(SR9A) @ US17 TO SOUTH OF WELLS ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION $25,405,128.00 $30,742,425.00
Florida D221033 SR5(US1/PHILIPS HWY) FROM: SR152(BAYMEADOWS RD) TO: SR109(UNIV BLVD);RESURFACING;CONSTRUCTION $16,597,357.00 $25,409,705.00
Florida D221062 SR115 FROM SOUTHSIDE BLVD TO MATHEWS BRIDGE;RESURFACING;CONSTRUCTION $17,005,325.00 $31,821,028.00
Florida D222030 I-95(SR9) @ SR115(US1)/ML KING/20TH STREET ;INTERCHANGE - ADD LANES;CONSTRUCTION $56,885,631.00 $100,144,652.00
Florida D222084 I-295(SR9A) FROM MORSE AVE TO US90 ;RESURFACING;CONSTRUCTION $23,578,729.00 $32,897,840.00
Florida D223050 I-10(SR8) FROM CHAFFEE ROAD TO I-295(SR9A) ;RESURFACING;CONSTRUCTION $27,973,733.00 $32,252,592.00
Florida D224068 SR23(FIRST COAST XWAY) FROM I-95(SR9) TO EAST OF CR2209;NEW ROAD CONSTRUCTION;CONSTRUCTION   $370,556,283.00
Florida D225023 I-10(SR8) FROM SR10(US90) TO SR51(US129) ;RESURFACING;CONSTRUCTION   $29,837,103.00
Florida D225101 SR5A(A1A) FROM: BRIDGE OF LIONS TO: CHARLOTTE ST;DRAINAGE IMPROVEMENTS;CONSTRUCTION $9,600,000.00 $33,176,338.00
Florida D317016 SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $27,132,843.00 $42,064,015.00
Florida D318058 SR 30 (US 98) GREGORY ST & BAYFRONT PKWY @ 17TH AVE INTERCHANGE;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION;DB $20,267,791.00 $28,204,771.00
Florida D319003 SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION $43,185,101.00 $58,246,953.00
Florida D319075 SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION $38,024,248.00 $59,655,283.00
Florida D319079 SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB $76,061,862.00 $93,478,739.00
Florida D319080 SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION $31,140,350.00 $35,046,607.00
Florida D320013 SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB $10,533,347.00 $96,589,110.00
Florida D320016 SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION $30,994,461.00 $82,393,575.00
Florida D320021 SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION $8,898,658.00 $30,222,741.00
Florida D320028 SR 30A (US 98) PCB PARKWAY FROM WALTON COUNTY LINE TO HEATHER DRIVE;RESURFACING;CONSTRUCTION $6,955,715.00 $27,922,805.00
Florida D322007 SR 77 FROM NORTH OF ROGERS ROAD TO SOUTH OF CANE MILL ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION $29,319,532.00 $66,733,978.00
Florida D322015 SR 8 (I-10) @ SR 95 (US 29) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION $71,014,706.00 $284,035,795.00
Florida D322082 SR 30A (US 98) PC BEACH PKWY FROM MANDY LANE TO EAST OF NAUTILUS ST;ADD LANES & RECONSTRUCT;CONSTRUCTION $6,943,438.00 $60,341,035.00
Florida D322083 SR 30A (US98) PC BCH PKWY FROM E OF NAUTILUS ST TO E OF R JACKSON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION $563,603.00 $69,741,485.00
Florida D323043 SR 30 (US 98B) GARDEN ST FROM N STREET TO SR 8A (I-110) RAMP;RESURFACING;CONSTRUCTION $16,679,238.00 $25,082,565.00
Florida D323054 SR 30 (US 98) OVER ST ANDREWS BAY ICWW BRIDGE NO. 460019;BRIDGE REPLACEMENT;CONSTRUCTION;DB $50,691,337.00 $404,453,127.00
Florida D323055 SR 8 (I-10) OVER SR 10 (US 90A) NINE MILE RD BR NO. 480061 & 480066;BRIDGE REPLACEMENT;CONSTRUCTION $57,129,196.00 $67,971,086.00
Florida D417080 SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $34,090,507.00 $47,272,238.00
Florida D418011 SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $27,803,383.00 $29,503,439.00
Florida D419098 SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION $28,643,575.00 $30,386,847.00
Florida D420011 LOXAHATCHEE RD. FROM ARTHUR MARSHALL LOXAHATCHEE REFUGE TO SR-7/US-441;ROAD RECONSTRUCTION - 2 LANE;CONSTRUCTION $23,725,964.00 $41,810,520.00
Florida D420092 SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION $14,717,908.00 $138,709,473.00
Florida D421056 SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT $22,906,026.00 $43,959,301.00
Florida D421077 SR-710/BEELINE HWY FROM NORTHLAKE BLVD TO SR-708/BLUE HERON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION $42,548,739.00 $216,880,352.00
Florida D421085 SR-25/US-27 FROM HENDRY/PALM BEACH COUNTYLINE TO SR-80;RESURFACING;CONSTRUCTION $1,586,426.00 $27,243,271.00
Florida D422005 SR-869/SW 10TH STREET CONNECTOR TSM&O SMART WORK ZONE;ITS COMMUNICATION SYSTEM;CONSTRUCTION;DB $2,974,482.00 $32,770,235.00
Florida D422059 SR-9/I-95 @ 6TH AVENUE SOUTH;INTERCHANGE - ADD LANES;CONSTRUCTION $10,675,736.00 $28,269,300.00
Florida D422068 SR-869/SW 10TH ST FROM FL TURNPIKE/SAWGRASS EXPRESSWAY TO W OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB $10,016,704.00 $103,276,023.00
Florida D422077 SR-9/I-95 FROM SOUTH OF SW 10TH STREET TO NORTH OF HILLSBORO BLVD.;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $1,980,038.00 $918,683,997.00
Florida D422093 SR-9/I-95 @ OSLO ROAD INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION $6,462,665.00 $41,405,312.00
Florida D423002 OSLO ROAD FROM SW 82ND AVE TO 58TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT $4,125,819.00 $51,310,820.00
Florida D423057 SR-93/I-75/ALLIGATOR ALLEY FR MP 31.261 TO BROWARD/COLLIER COUNTY LINE;RESURFACING;CONSTRUCTION $5,261,545.00 $35,488,325.00
Florida D424005 SR-93/I-75 INTRCHNG @ROYAL PALM BLVD FR GRIFFIN RD TO ROYAL PALM BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION $11,902.00 $31,748,146.00
Florida D424041 SR-9/I-95 @ SR-804/BOYNTON BEACH BLVD INTERCHANGE;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION $3,242,295.00 $77,854,140.00
Florida D424062 SR-9/I-95 @ SUNRISE BLVD. INTERCHANGE IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION $2,120,418.00 $53,936,958.00
Florida D424088 CR-510/85TH ST FROM CR-512 TO 87TH ST ;ADD LANES & RECONSTRUCT;CONSTRUCTION $26,251,291.00 $28,495,054.00
Florida D424099 SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY BRIDGE #860466 & 860467;BRIDGE-REPAIR/REHABILITATION;CONSTRUCTION $6,699,530.00 $32,532,933.00
Florida D424104 SR-A1A OVER SEBASTIAN INLET- BRIDGE REPLACEMENT;BRIDGE REPLACEMENT;CONSTRUCTION $13,019,827.00 $122,621,577.00
Florida D425014 SR-9/I-95 FR S OF SR-76/KANNER HWY TO MARTIN/ST. LUCIE COUNTY LINE;RESURFACING;CONSTRUCTION   $39,706,870.00
Florida D425023 SR-817/UNIVERSITY DR FR N. OF SR-824/PEMBROKE RD TO N. OF JOHNSON ST;BIKE LANE/SIDEWALK;CONSTRUCTION $20,345,232.00 $30,086,688.00
Florida D425025 PORT ST.LUCIE BLVD FR SOUTH OF PAAR DR TO SOUTH OF ALCANTARRA BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION $7,764,758.00 $29,827,604.00
Florida D517015 SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $135,346,874.00 $343,044,561.00
Florida D519013 SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION $47,382,393.00 $54,440,969.00
Florida D520035 I-4 (SR 400) AT DARYL CARTER PARKWAY INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION $81,550,157.00 $94,771,902.00
Florida D520075 SR 93 (I-75) FROM SUMTER COUNTY TO SR 200; RESURFACING; CONSTRUCTION $30,982,949.00 $36,705,849.00
Florida D520104 SR 426/CR 419 FROM PINE AVENUE TO AVENUE B; ADD LANES & RECONSTRUCT; CONSTRUCTION $9,407,041.00 $26,632,440.00
Florida D521023 I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION $209,846,857.00 $243,039,925.00
Florida D521049 SR 464 FROM SR 500 (US 27/301) TO SR 35; RESURFACING; CONSTRUCTION $22,036,104.00 $31,636,419.00
Florida D521092 SPACE COMMERCE WAY;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $13,230,386.00 $26,961,481.00
Florida D521100 SR 400 FROM WEST OF CENTRAL FL PKWY TO WEST OF SR 528;ADD MANAGED LANES;CONSTRUCTION;DB $18,033,532.00 $28,111,647.00
Florida D522081 FORTUNE ROAD AND SIMPSON ROAD INTERSECTION IMPROVEMENT PROJECT; SAFETY PROJECT; CONSTRUCTION; LAP $10,188,485.00 $29,550,696.00
Florida D522091 NEPTUNE ROAD FROM SOUTH OF KINGS CREST RD TO SR 500 / US 192;WIDEN/RESURFACE EXIST LANES;CONSTRUCTION;LAP $2,899,190.00 $61,199,733.00
Florida D523009 I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S OF SR 200;REST AREA;CONSTRUCTION $8,950,796.00 $39,254,923.00
Florida D523021 I-95 INTERCHANGE AT PIONEER TRAIL; INTERCHANGE (NEW); CONSTRUCTION   $88,734,302.00
Florida D523040 I-75(SR 93) AT NW 49TH ST FROM END OF NW 49TH ST TO END OF NW 35TH ST;INTERCHANGE (NEW);CONSTRUCTION $7,003,036.00 $78,710,136.00
Florida D524029 US-192/VINE ST FROM BAMBOO LN TO MAIN ST; RESURFACING; CONSTRUCTION   $29,126,962.00
Florida D524037 I-95 NB FROM SR514 (MALABAR RD) TO CONCRETE JOINT N OF SR519 (FISKE);RESURFACING;CONSTRUCTION $12,913,322.00 $78,087,528.00
Florida D524044 SR 500 FROM SR 50 TO SR 414 RAMPS; RESURFACING; CONSTRUCTION. $22,530,681.00 $42,251,536.00
Florida D525006 I-95/SR9 FROM SOUTH OF SR50 TO SR 46; RESURFACING; CONSTRUCTION   $33,328,947.00
Florida D525017 I-75/SR-93 FROM SR-44 TO THE MARION COUNTY LINE; RESURFACING; CONSTRUCTION; DB   $25,793,361.00
Florida D619048 SR 826/PALMETTO EXPY - SR 826 EASTBOUND RAMP TO SR 9A/I-95 NORTHBOUND;INTERCHANGE RAMP (NEW);CONSTRUCTION $16,536,966.00 $25,668,470.00
Florida D620056 SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $64,721,037.00 $131,875,924.00
Florida D622032 SR 25/OKEECHOBEE RD. & SR 826/PALMETTO EXPRESSWAY INTERCHANGE;INTERCHANGE RAMP (NEW);CONSTRUCTION $24,383,984.00 $162,770,752.00
Florida D622074 SR 7 AND SR 9/GOLDEN GLADES INTERCHANGE VARIOUS RAMP IMPROVEMENTS;INTERCHANGE RAMP (NEW);CONSTRUCTION $47,223,181.00 $48,045,643.00
Florida D622075 SR 826 CONNECTOR AT GOLDEN GLADES INTERCHG AND VARIOUS RAMPS;ADD LANES & RECONSTRUCT;CONSTRUCTION $85,211,580.00 $85,211,580.00
Florida D624006 SR 25/OKEECHOBEE RD FROM EAST OF NW 87 AVE TO NW 79 AVE (CONCRETE);ADD LANES & RECONSTRUCT;CONSTRUCTION $30,529,937.00 $76,769,468.00
Florida D717065 I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION $42,253,865.00 $49,395,195.00
Florida D718036 SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION $39,373,763.00 $67,289,693.00
Florida D718055 I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB $232,589,874.00 $955,573,320.00
Florida D718056 I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB $33,631,374.00 $50,599,052.00
Florida D718067 SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION $37,200,631.00 $43,345,079.00
Florida D720029 US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION $25,332,133.00 $32,447,934.00
Florida D720031 I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $98,770,197.00 $110,704,652.00
Florida D721012 I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION $44,461,205.00 $50,529,158.00
Florida D721013 I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION $59,894,747.00 $66,104,938.00
Florida D721023 US 19 (SR 55) FROM N OF SR 580 (MAIN ST) TO NORTHSIDE DR;ADD LANES & RECONSTRUCT;CONSTRUCTION $104,678,125.00 $129,306,847.00
Florida D721027 I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION $11,787,760.00 $28,541,556.00
Florida D721035 US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION $130,117,188.00 $156,010,131.00
Florida D722039 US 19/SR55/34TH ST FROM SR 682/54TH AVE S TO 22ND AVE N;RESURFACING;CONSTRUCTION $19,808,934.00 $30,052,294.00
Florida D722050 US 41 (SR 45) FROM SR 44 TO S OF WITHLACOOCHEE TRAIL BRIDGE;ADD LANES & RECONSTRUCT;CONSTRUCTION $9,572,020.00 $25,464,744.00
Florida D722064 I-4/SR 400 FROM E OF MCINTOSH RD TO E OF COUNTY LINE RD;RESURFACING;CONSTRUCTION SUPPORT $40,204,464.00 $47,655,542.00
Florida D723003 I-275/SR 93 FROM 54TH AVE S TO 5TH AVE S ;RIGID PAVEMENT REHABILITATION;CONSTRUCTION $23,386,462.00 $28,828,821.00
Florida D723023 I-75/SR 93A FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD;RIGID PAVEMENT REHABILITATION;CONSTRUCTION $25,563,923.00 $29,733,695.00
Florida D723029 I-75/SR 93A FROM N CSX R/R/BROADWAY AVE TO S OF SR 582/FOWLER AVE;RIGID PAVEMENT REHABILITATION;CONSTRUCTION $8,532,418.00 $32,296,480.00
Florida D723030 I-75/SR 93A NB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION $6,087,269.00 $63,676,910.00
Florida D723031 I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION $12,710,939.00 $59,194,125.00
Florida D723070 I-4 TRUCK PARKING FACILITY; PARKING FACILITY; CONSTRUCTION; DB $15,000,000.00 $34,038,454.00
Florida D723078 SR 60 FROM W OF SR 39 TO W OF CLARENCE GORDON JR RD.;RESURFACING;CONSTRUCTION;DB $12,461,896.00 $25,165,439.00
Florida D723079 US 301/US 41/SR 43 FROM S OF WHITT RD TO N OF RIVERCREST DR;RESURFACING;CONSTRUCTION;DB $19,694,610.00 $26,504,175.00
Florida E221002 HURRICANE IAN SANIBEL ISLAND ACCESS - EMERGENCY ROAD REPAIRS; EMERGENCY OPERATIONS; SANIBEL CSWY/SEXTANT - DB - IN12002E $134,465,296.00 $142,562,605.00
Florida E221003 HURRICANE IAN SANIBEL ISLAND ACCESS PERMANENT REPAIRS; EMERGENCY OPERATIONS; DB CONSTRUCTION - IN12004P $149,093,260.00 $187,047,574.00
Florida E221006 HURRICANE IAN PINE ISLAND ROADWAY PERMANENT REPAIRS; EMERGENCY OPERATIONS; PINE ISLAND BRIDGE APPROACH - IN12006P $45,647,646.00 $55,715,432.00
Florida E221014 HURRICANE IAN SANIBEL ISLAND ACCESS - PERMANENT REPAIRS;EMERGENCY OPERATIONS;CONSTRUCTION;CAUSEWAY FROM SEXTANT;DB IN12003P $21,600,163.00 $26,364,172.00
Florida E231005 SR A1A ROAD/SLOPE PROTECTION PROJECT;ROAD/SLOPE PROTECTION;CONSTRUCTION;PERMANENT REPAIR FLAGLER CO - NI73002P $20,365,646.00 $26,258,990.00
Florida E231006 SR A1A; SR 5 TO FLAGLER ROAD/SLOPE PROTECTION PERMANENT REPAIR PROJECT;VOLUSIA CO - NI79001P $69,495,425.00 $86,785,204.00
Florida NASA002 NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION $90,257,614.00 $152,038,003.00
Florida PMT1001 PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB $214,269,613.00 $2,356,448,216.00
Florida SR20001 SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION $59,593,644.00 $72,562,230.00
Florida TAMI002 SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S-334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB $65,772,857.00 $85,845,853.00
Florida TGER002 FIU UNIVERSITY CITY PROSPERITY PROJ. ALONG SW 109 AVE & SR 90/SW 8 ST; PEDESTRIAN OVERPASS; DESIGN & CONSTRUCTION MANAGED BY FDOT $41,253,181.94 $51,855,997.94
Florida TGER004 BIG BEND ROAD/CR 672 @ I-75/SR93A FROM W OF COVINGTON TO E OF SIMMONS;INTERCHANGE - ADD LANES;CONSTRUCTION;DB $25,000,000.00 $108,992,758.00
Florida TPEX275 I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB $625,008,913.00 $1,736,521,331.00