| RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|
| Florida | 0041228 | I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB | $1,068,950,180.00 | $4,535,494,704.00 |
| Florida | 0105152 | I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $111,131,774.00 | $155,141,008.00 |
| Florida | 0755096 | I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER; DESIGN/BUILD | $59,300,619.00 | $75,391,870.00 |
| Florida | 0757443 | I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION | $44,493,400.00 | $51,055,863.00 |
| Florida | 0951671 | SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB | $80,220,048.00 | $214,223,643.00 |
| Florida | 0951685 | SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB | $37,450,520.00 | $43,158,886.00 |
| Florida | 0951695 | SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $35,223,146.00 | $55,509,116.00 |
| Florida | 0953133 | I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY;INTERCHANGE (NEW);CONSTRUCTION | $46,211,315.00 | $52,201,689.00 |
| Florida | 0955313 | I-95 (SR 9) AT NORTH I-295 INTERCHANGE ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB | $100,250,019.00 | $259,120,033.00 |
| Florida | 0955314 | I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $4,835,206.00 | $163,458,432.00 |
| Florida | 1002062 | SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION | $49,880,990.00 | $120,379,938.00 |
| Florida | 1316003 | GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB | $269,630,229.00 | $2,629,275,395.00 |
| Florida | 1852019 | US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,809,252.00 | $148,207,548.00 |
| Florida | 2757410 | I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB | $140,971,475.00 | $247,215,965.00 |
| Florida | 2955314 | I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $152,866,021.00 | $228,001,808.00 |
| Florida | 3115028 | SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION | $69,656,933.00 | $77,051,059.00 |
| Florida | 3141036 | SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $30,502,118.00 | $292,692,595.00 |
| Florida | 3141042 | SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION | $58,617,431.00 | $252,917,209.00 |
| Florida | 3951501 | SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB | $245,611,035.00 | $821,933,448.00 |
| Florida | 4002027 | SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. | $30,609,456.00 | $36,307,450.00 |
| Florida | 4047203 | CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $23,500,849.00 | $29,668,030.00 |
| Florida | 4221091 | SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $25,948,763.00 | $502,641,915.00 |
| Florida | 4881064 | SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $59,061,008.00 | $81,521,599.00 |
| Florida | 5951553 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $665,712,369.00 | $2,585,688,574.00 |
| Florida | 5951556 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $80,952,434.00 | |
| Florida | 5951557 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $124,950,849.00 | |
| Florida | 5951560 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA | $160,390,282.00 | $160,390,282.00 |
| Florida | 7079006 | SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $11,856,714.00 | $38,859,333.00 |
| Florida | 7810035 | SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $35,142,093.00 | $54,613,078.00 |
| Florida | 8886496 | CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP | $44,196,413.00 | $50,338,620.00 |
| Florida | D117027 | I-75 FROM S OF N JONES LOOP TO N OF US 17 ;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,984,493.00 | $36,132,731.00 |
| Florida | D117115 | I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $90,233,392.00 | $119,209,248.00 |
| Florida | D118021 | US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $14,727,984.00 | $26,703,402.00 |
| Florida | D118039 | US 41 (SR 45) FROM WINKLER AVENUE TO SR 82 ;RESURFACING;CONSTRUCTION | $6,945,064.00 | $30,796,464.00 |
| Florida | D118043 | I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB | $83,358,947.00 | $91,941,709.00 |
| Florida | D118127 | I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $153,359,135.00 | $179,175,024.00 |
| Florida | D119037 | US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION | $50,290,675.00 | $57,473,829.00 |
| Florida | D119075 | SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION | $43,950,816.00 | $53,156,572.00 |
| Florida | D120030 | I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $62,239,503.00 | $296,963,441.00 |
| Florida | D120059 | I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION | $21,439,036.00 | $46,574,870.00 |
| Florida | D121032 | SR 70 FROM PEACE RIVER TO SE BAKER STREET;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $30,285,705.00 | $36,676,092.00 |
| Florida | D122022 | BIG CARLOS BRIDGE REPLACEMENT ;BRIDGE REPLACEMENT;ADMINISTRATION;LAP | $1,151,597.00 | $48,180,793.00 |
| Florida | D122025 | SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION | $23,333,559.00 | $27,833,155.00 |
| Florida | D122041 | SR 25 (US 27) FROM N OF SR 540 TO N OF KOKOMO RD;RESURFACING;CONSTRUCTION;DB | $22,651,489.00 | $27,670,231.00 |
| Florida | D122060 | I-75 (SR 93) FROM BONITA BEACH RD TO ALICO RD;RESURFACING;CONSTRUCTION | $17,384,644.00 | $28,137,379.00 |
| Florida | D122068 | SR 70 FROM LORRAINE ROAD TO BOURNSIDE BLVD ;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $18,235,250.00 | $42,963,765.00 |
| Florida | D123035 | SR 33 (LAKELAND HILLS BLVD) FROM PARKVIEW PLACE TO GRANADA ST;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $16,947,168.00 | $33,668,683.00 |
| Florida | D123041 | SR 25 (US 27) FROM SHORELINE DR TO DAVIS & GAINES RD;RESURFACING;CONSTRUCTION | $19,024,124.00 | $27,854,254.00 |
| Florida | D124033 | SR 82 FROM HENDRY COUNTY LINE TO GATOR SLOUGH LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $9,461,303.00 | $53,435,067.00 |
| Florida | D124056 | I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION;INTERCHANGE - ADD LANES;CONSTRUCTION | $4,000,000.00 | $107,139,760.00 |
| Florida | D125036 | I-75 (SR 93) AT CR 876 / DANIELS PARKWAY ;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $41,316,468.00 | $49,082,404.00 |
| Florida | D217011 | FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION | $104,034,888.00 | $934,852,873.00 |
| Florida | D217069 | SR200(US301) FROM: BRADFORD C/L TO: NORTH OF CR218;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION; CONCRETE PROJECT WITH STATE MATERIALS | $31,073,206.00 | $38,591,154.00 |
| Florida | D217103 | I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION | $17,139,305.00 | $29,553,502.00 |
| Florida | D217128 | I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB | $178,533,124.00 | $296,597,859.00 |
| Florida | D218017 | SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION | $116,834,688.00 | $286,651,944.00 |
| Florida | D218123 | SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $250,774,681.00 | $716,112,264.00 |
| Florida | D218124 | SR23(FIRST COAST XWAY) FROM EAST OF CR2209 TO EAST OF CR16A SPUR; NEW ROAD CONSTRUCTION; CONSTRUCTION | $311,643,918.00 | |
| Florida | D219120 | URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP | $12,636,580.00 | $51,182,261.00 |
| Florida | D219130 | I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION | $23,629,070.00 | $29,691,682.00 |
| Florida | D219140 | SR5(US1) FROM: SR207 TO: CITY GATES;RESURFACING;CONSTRUCTION | $10,769,127.00 | $26,139,338.00 |
| Florida | D220122 | I-95(SR9) FROM SOUTH OF SR126(EMERSON ST) TO ATLANTIC BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $97,869,751.00 | $294,532,491.00 |
| Florida | D221010 | SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION | $28,466,490.00 | $42,160,323.00 |
| Florida | D221018 | I-295(SR9A) @ US17 TO SOUTH OF WELLS ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION | $25,405,128.00 | $30,742,425.00 |
| Florida | D221033 | SR5(US1/PHILIPS HWY) FROM: SR152(BAYMEADOWS RD) TO: SR109(UNIV BLVD);RESURFACING;CONSTRUCTION | $16,597,357.00 | $25,409,705.00 |
| Florida | D221062 | SR115 FROM SOUTHSIDE BLVD TO MATHEWS BRIDGE;RESURFACING;CONSTRUCTION | $17,005,325.00 | $31,821,028.00 |
| Florida | D222030 | I-95(SR9) @ SR115(US1)/ML KING/20TH STREET ;INTERCHANGE - ADD LANES;CONSTRUCTION | $56,885,631.00 | $100,144,652.00 |
| Florida | D222084 | I-295(SR9A) FROM MORSE AVE TO US90 ;RESURFACING;CONSTRUCTION | $23,578,729.00 | $32,897,840.00 |
| Florida | D223050 | I-10(SR8) FROM CHAFFEE ROAD TO I-295(SR9A) ;RESURFACING;CONSTRUCTION | $27,973,733.00 | $32,252,592.00 |
| Florida | D224068 | SR23(FIRST COAST XWAY) FROM I-95(SR9) TO EAST OF CR2209;NEW ROAD CONSTRUCTION;CONSTRUCTION | $370,556,283.00 | |
| Florida | D225023 | I-10(SR8) FROM SR10(US90) TO SR51(US129) ;RESURFACING;CONSTRUCTION | $29,837,103.00 | |
| Florida | D225101 | SR5A(A1A) FROM: BRIDGE OF LIONS TO: CHARLOTTE ST;DRAINAGE IMPROVEMENTS;CONSTRUCTION | $9,600,000.00 | $33,176,338.00 |
| Florida | D317016 | SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $27,132,843.00 | $42,064,015.00 |
| Florida | D318058 | SR 30 (US 98) GREGORY ST & BAYFRONT PKWY @ 17TH AVE INTERCHANGE;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION;DB | $20,267,791.00 | $28,204,771.00 |
| Florida | D319003 | SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $43,185,101.00 | $58,246,953.00 |
| Florida | D319075 | SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION | $38,024,248.00 | $59,655,283.00 |
| Florida | D319079 | SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $76,061,862.00 | $93,478,739.00 |
| Florida | D319080 | SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION | $31,140,350.00 | $35,046,607.00 |
| Florida | D320013 | SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB | $10,533,347.00 | $96,589,110.00 |
| Florida | D320016 | SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $30,994,461.00 | $82,393,575.00 |
| Florida | D320021 | SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION | $8,898,658.00 | $30,222,741.00 |
| Florida | D320028 | SR 30A (US 98) PCB PARKWAY FROM WALTON COUNTY LINE TO HEATHER DRIVE;RESURFACING;CONSTRUCTION | $6,955,715.00 | $27,922,805.00 |
| Florida | D322007 | SR 77 FROM NORTH OF ROGERS ROAD TO SOUTH OF CANE MILL ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,319,532.00 | $66,733,978.00 |
| Florida | D322015 | SR 8 (I-10) @ SR 95 (US 29) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $71,014,706.00 | $284,035,795.00 |
| Florida | D322082 | SR 30A (US 98) PC BEACH PKWY FROM MANDY LANE TO EAST OF NAUTILUS ST;ADD LANES & RECONSTRUCT;CONSTRUCTION | $6,943,438.00 | $60,341,035.00 |
| Florida | D322083 | SR 30A (US98) PC BCH PKWY FROM E OF NAUTILUS ST TO E OF R JACKSON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $563,603.00 | $69,741,485.00 |
| Florida | D323043 | SR 30 (US 98B) GARDEN ST FROM N STREET TO SR 8A (I-110) RAMP;RESURFACING;CONSTRUCTION | $16,679,238.00 | $25,082,565.00 |
| Florida | D323054 | SR 30 (US 98) OVER ST ANDREWS BAY ICWW BRIDGE NO. 460019;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $50,691,337.00 | $404,453,127.00 |
| Florida | D323055 | SR 8 (I-10) OVER SR 10 (US 90A) NINE MILE RD BR NO. 480061 & 480066;BRIDGE REPLACEMENT;CONSTRUCTION | $57,129,196.00 | $67,971,086.00 |
| Florida | D417080 | SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $34,090,507.00 | $47,272,238.00 |
| Florida | D418011 | SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $27,803,383.00 | $29,503,439.00 |
| Florida | D419098 | SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION | $28,643,575.00 | $30,386,847.00 |
| Florida | D420011 | LOXAHATCHEE RD. FROM ARTHUR MARSHALL LOXAHATCHEE REFUGE TO SR-7/US-441;ROAD RECONSTRUCTION - 2 LANE;CONSTRUCTION | $23,725,964.00 | $41,810,520.00 |
| Florida | D420092 | SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION | $14,717,908.00 | $138,709,473.00 |
| Florida | D421056 | SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT | $22,906,026.00 | $43,959,301.00 |
| Florida | D421077 | SR-710/BEELINE HWY FROM NORTHLAKE BLVD TO SR-708/BLUE HERON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,548,739.00 | $216,880,352.00 |
| Florida | D421085 | SR-25/US-27 FROM HENDRY/PALM BEACH COUNTYLINE TO SR-80;RESURFACING;CONSTRUCTION | $1,586,426.00 | $27,243,271.00 |
| Florida | D422005 | SR-869/SW 10TH STREET CONNECTOR TSM&O SMART WORK ZONE;ITS COMMUNICATION SYSTEM;CONSTRUCTION;DB | $2,974,482.00 | $32,770,235.00 |
| Florida | D422059 | SR-9/I-95 @ 6TH AVENUE SOUTH;INTERCHANGE - ADD LANES;CONSTRUCTION | $10,675,736.00 | $28,269,300.00 |
| Florida | D422068 | SR-869/SW 10TH ST FROM FL TURNPIKE/SAWGRASS EXPRESSWAY TO W OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $10,016,704.00 | $103,276,023.00 |
| Florida | D422077 | SR-9/I-95 FROM SOUTH OF SW 10TH STREET TO NORTH OF HILLSBORO BLVD.;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $1,980,038.00 | $918,683,997.00 |
| Florida | D422093 | SR-9/I-95 @ OSLO ROAD INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $6,462,665.00 | $41,405,312.00 |
| Florida | D423002 | OSLO ROAD FROM SW 82ND AVE TO 58TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT | $4,125,819.00 | $51,310,820.00 |
| Florida | D423057 | SR-93/I-75/ALLIGATOR ALLEY FR MP 31.261 TO BROWARD/COLLIER COUNTY LINE;RESURFACING;CONSTRUCTION | $5,261,545.00 | $35,488,325.00 |
| Florida | D424005 | SR-93/I-75 INTRCHNG @ROYAL PALM BLVD FR GRIFFIN RD TO ROYAL PALM BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $11,902.00 | $31,748,146.00 |
| Florida | D424041 | SR-9/I-95 @ SR-804/BOYNTON BEACH BLVD INTERCHANGE;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION | $3,242,295.00 | $77,854,140.00 |
| Florida | D424062 | SR-9/I-95 @ SUNRISE BLVD. INTERCHANGE IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION | $2,120,418.00 | $53,936,958.00 |
| Florida | D424088 | CR-510/85TH ST FROM CR-512 TO 87TH ST ;ADD LANES & RECONSTRUCT;CONSTRUCTION | $26,251,291.00 | $28,495,054.00 |
| Florida | D424099 | SR-838/SUNRISE BLVD OVER INTRACOASTAL WATERWAY BRIDGE #860466 & 860467;BRIDGE-REPAIR/REHABILITATION;CONSTRUCTION | $6,699,530.00 | $32,532,933.00 |
| Florida | D424104 | SR-A1A OVER SEBASTIAN INLET- BRIDGE REPLACEMENT;BRIDGE REPLACEMENT;CONSTRUCTION | $13,019,827.00 | $122,621,577.00 |
| Florida | D425014 | SR-9/I-95 FR S OF SR-76/KANNER HWY TO MARTIN/ST. LUCIE COUNTY LINE;RESURFACING;CONSTRUCTION | $39,706,870.00 | |
| Florida | D425023 | SR-817/UNIVERSITY DR FR N. OF SR-824/PEMBROKE RD TO N. OF JOHNSON ST;BIKE LANE/SIDEWALK;CONSTRUCTION | $20,345,232.00 | $30,086,688.00 |
| Florida | D425025 | PORT ST.LUCIE BLVD FR SOUTH OF PAAR DR TO SOUTH OF ALCANTARRA BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $7,764,758.00 | $29,827,604.00 |
| Florida | D517015 | SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $135,346,874.00 | $343,044,561.00 |
| Florida | D519013 | SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION | $47,382,393.00 | $54,440,969.00 |
| Florida | D520035 | I-4 (SR 400) AT DARYL CARTER PARKWAY INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $81,550,157.00 | $94,771,902.00 |
| Florida | D520075 | SR 93 (I-75) FROM SUMTER COUNTY TO SR 200; RESURFACING; CONSTRUCTION | $30,982,949.00 | $36,705,849.00 |
| Florida | D520104 | SR 426/CR 419 FROM PINE AVENUE TO AVENUE B; ADD LANES & RECONSTRUCT; CONSTRUCTION | $9,407,041.00 | $26,632,440.00 |
| Florida | D521023 | I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $209,846,857.00 | $243,039,925.00 |
| Florida | D521049 | SR 464 FROM SR 500 (US 27/301) TO SR 35; RESURFACING; CONSTRUCTION | $22,036,104.00 | $31,636,419.00 |
| Florida | D521092 | SPACE COMMERCE WAY;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $13,230,386.00 | $26,961,481.00 |
| Florida | D521100 | SR 400 FROM WEST OF CENTRAL FL PKWY TO WEST OF SR 528;ADD MANAGED LANES;CONSTRUCTION;DB | $18,033,532.00 | $28,111,647.00 |
| Florida | D522081 | FORTUNE ROAD AND SIMPSON ROAD INTERSECTION IMPROVEMENT PROJECT; SAFETY PROJECT; CONSTRUCTION; LAP | $10,188,485.00 | $29,550,696.00 |
| Florida | D522091 | NEPTUNE ROAD FROM SOUTH OF KINGS CREST RD TO SR 500 / US 192;WIDEN/RESURFACE EXIST LANES;CONSTRUCTION;LAP | $2,899,190.00 | $61,199,733.00 |
| Florida | D523009 | I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S OF SR 200;REST AREA;CONSTRUCTION | $8,950,796.00 | $39,254,923.00 |
| Florida | D523021 | I-95 INTERCHANGE AT PIONEER TRAIL; INTERCHANGE (NEW); CONSTRUCTION | $88,734,302.00 | |
| Florida | D523040 | I-75(SR 93) AT NW 49TH ST FROM END OF NW 49TH ST TO END OF NW 35TH ST;INTERCHANGE (NEW);CONSTRUCTION | $7,003,036.00 | $78,710,136.00 |
| Florida | D524029 | US-192/VINE ST FROM BAMBOO LN TO MAIN ST; RESURFACING; CONSTRUCTION | $29,126,962.00 | |
| Florida | D524037 | I-95 NB FROM SR514 (MALABAR RD) TO CONCRETE JOINT N OF SR519 (FISKE);RESURFACING;CONSTRUCTION | $12,913,322.00 | $78,087,528.00 |
| Florida | D524044 | SR 500 FROM SR 50 TO SR 414 RAMPS; RESURFACING; CONSTRUCTION. | $22,530,681.00 | $42,251,536.00 |
| Florida | D525006 | I-95/SR9 FROM SOUTH OF SR50 TO SR 46; RESURFACING; CONSTRUCTION | $33,328,947.00 | |
| Florida | D525017 | I-75/SR-93 FROM SR-44 TO THE MARION COUNTY LINE; RESURFACING; CONSTRUCTION; DB | $25,793,361.00 | |
| Florida | D619048 | SR 826/PALMETTO EXPY - SR 826 EASTBOUND RAMP TO SR 9A/I-95 NORTHBOUND;INTERCHANGE RAMP (NEW);CONSTRUCTION | $16,536,966.00 | $25,668,470.00 |
| Florida | D620056 | SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $64,721,037.00 | $131,875,924.00 |
| Florida | D622032 | SR 25/OKEECHOBEE RD. & SR 826/PALMETTO EXPRESSWAY INTERCHANGE;INTERCHANGE RAMP (NEW);CONSTRUCTION | $24,383,984.00 | $162,770,752.00 |
| Florida | D622074 | SR 7 AND SR 9/GOLDEN GLADES INTERCHANGE VARIOUS RAMP IMPROVEMENTS;INTERCHANGE RAMP (NEW);CONSTRUCTION | $47,223,181.00 | $48,045,643.00 |
| Florida | D622075 | SR 826 CONNECTOR AT GOLDEN GLADES INTERCHG AND VARIOUS RAMPS;ADD LANES & RECONSTRUCT;CONSTRUCTION | $85,211,580.00 | $85,211,580.00 |
| Florida | D624006 | SR 25/OKEECHOBEE RD FROM EAST OF NW 87 AVE TO NW 79 AVE (CONCRETE);ADD LANES & RECONSTRUCT;CONSTRUCTION | $30,529,937.00 | $76,769,468.00 |
| Florida | D717065 | I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION | $42,253,865.00 | $49,395,195.00 |
| Florida | D718036 | SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION | $39,373,763.00 | $67,289,693.00 |
| Florida | D718055 | I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $232,589,874.00 | $955,573,320.00 |
| Florida | D718056 | I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $33,631,374.00 | $50,599,052.00 |
| Florida | D718067 | SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $37,200,631.00 | $43,345,079.00 |
| Florida | D720029 | US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION | $25,332,133.00 | $32,447,934.00 |
| Florida | D720031 | I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $98,770,197.00 | $110,704,652.00 |
| Florida | D721012 | I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $44,461,205.00 | $50,529,158.00 |
| Florida | D721013 | I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION | $59,894,747.00 | $66,104,938.00 |
| Florida | D721023 | US 19 (SR 55) FROM N OF SR 580 (MAIN ST) TO NORTHSIDE DR;ADD LANES & RECONSTRUCT;CONSTRUCTION | $104,678,125.00 | $129,306,847.00 |
| Florida | D721027 | I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION | $11,787,760.00 | $28,541,556.00 |
| Florida | D721035 | US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $130,117,188.00 | $156,010,131.00 |
| Florida | D722039 | US 19/SR55/34TH ST FROM SR 682/54TH AVE S TO 22ND AVE N;RESURFACING;CONSTRUCTION | $19,808,934.00 | $30,052,294.00 |
| Florida | D722050 | US 41 (SR 45) FROM SR 44 TO S OF WITHLACOOCHEE TRAIL BRIDGE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $9,572,020.00 | $25,464,744.00 |
| Florida | D722064 | I-4/SR 400 FROM E OF MCINTOSH RD TO E OF COUNTY LINE RD;RESURFACING;CONSTRUCTION SUPPORT | $40,204,464.00 | $47,655,542.00 |
| Florida | D723003 | I-275/SR 93 FROM 54TH AVE S TO 5TH AVE S ;RIGID PAVEMENT REHABILITATION;CONSTRUCTION | $23,386,462.00 | $28,828,821.00 |
| Florida | D723023 | I-75/SR 93A FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD;RIGID PAVEMENT REHABILITATION;CONSTRUCTION | $25,563,923.00 | $29,733,695.00 |
| Florida | D723029 | I-75/SR 93A FROM N CSX R/R/BROADWAY AVE TO S OF SR 582/FOWLER AVE;RIGID PAVEMENT REHABILITATION;CONSTRUCTION | $8,532,418.00 | $32,296,480.00 |
| Florida | D723030 | I-75/SR 93A NB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $6,087,269.00 | $63,676,910.00 |
| Florida | D723031 | I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $12,710,939.00 | $59,194,125.00 |
| Florida | D723070 | I-4 TRUCK PARKING FACILITY; PARKING FACILITY; CONSTRUCTION; DB | $15,000,000.00 | $34,038,454.00 |
| Florida | D723078 | SR 60 FROM W OF SR 39 TO W OF CLARENCE GORDON JR RD.;RESURFACING;CONSTRUCTION;DB | $12,461,896.00 | $25,165,439.00 |
| Florida | D723079 | US 301/US 41/SR 43 FROM S OF WHITT RD TO N OF RIVERCREST DR;RESURFACING;CONSTRUCTION;DB | $19,694,610.00 | $26,504,175.00 |
| Florida | E221002 | HURRICANE IAN SANIBEL ISLAND ACCESS - EMERGENCY ROAD REPAIRS; EMERGENCY OPERATIONS; SANIBEL CSWY/SEXTANT - DB - IN12002E | $134,465,296.00 | $142,562,605.00 |
| Florida | E221003 | HURRICANE IAN SANIBEL ISLAND ACCESS PERMANENT REPAIRS; EMERGENCY OPERATIONS; DB CONSTRUCTION - IN12004P | $149,093,260.00 | $187,047,574.00 |
| Florida | E221006 | HURRICANE IAN PINE ISLAND ROADWAY PERMANENT REPAIRS; EMERGENCY OPERATIONS; PINE ISLAND BRIDGE APPROACH - IN12006P | $45,647,646.00 | $55,715,432.00 |
| Florida | E221014 | HURRICANE IAN SANIBEL ISLAND ACCESS - PERMANENT REPAIRS;EMERGENCY OPERATIONS;CONSTRUCTION;CAUSEWAY FROM SEXTANT;DB IN12003P | $21,600,163.00 | $26,364,172.00 |
| Florida | E231005 | SR A1A ROAD/SLOPE PROTECTION PROJECT;ROAD/SLOPE PROTECTION;CONSTRUCTION;PERMANENT REPAIR FLAGLER CO - NI73002P | $20,365,646.00 | $26,258,990.00 |
| Florida | E231006 | SR A1A; SR 5 TO FLAGLER ROAD/SLOPE PROTECTION PERMANENT REPAIR PROJECT;VOLUSIA CO - NI79001P | $69,495,425.00 | $86,785,204.00 |
| Florida | NASA002 | NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION | $90,257,614.00 | $152,038,003.00 |
| Florida | PMT1001 | PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $214,269,613.00 | $2,356,448,216.00 |
| Florida | SR20001 | SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $59,593,644.00 | $72,562,230.00 |
| Florida | TAMI002 | SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S-334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB | $65,772,857.00 | $85,845,853.00 |
| Florida | TGER002 | FIU UNIVERSITY CITY PROSPERITY PROJ. ALONG SW 109 AVE & SR 90/SW 8 ST; PEDESTRIAN OVERPASS; DESIGN & CONSTRUCTION MANAGED BY FDOT | $41,253,181.94 | $51,855,997.94 |
| Florida | TGER004 | BIG BEND ROAD/CR 672 @ I-75/SR93A FROM W OF COVINGTON TO E OF SIMMONS;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $25,000,000.00 | $108,992,758.00 |
| Florida | TPEX275 | I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $625,008,913.00 | $1,736,521,331.00 |