SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Minnesota 0010338 US 10: FROM ANOKA/RAMSEY CITY LIMITS (0.48 MI E OF CSAH 57) TO W OF GREEN HAVEN RD (0.28 MI W OF MN 47)- R/W ACQUISITION FOR CONST OF NEW INTERCHANGE $34,031,500.00 $55,256,523.13
Minnesota 0010340 RAMSEY GATEWAY PROJECT (US HIGHWAY 10/169) $63,200,000.00 $99,848,562.81
Minnesota 0010342 US 10: 700’ E OF CSAH 9 TO 700’ W OF CREEK MEADOW DR IN COON RAPIDS- EXPAND FROM 2 TO 3 LANES, BIT MILL & OVLY, ULTA-THIN BONDED WEARING COURSE (CONT) $26,326,403.64 $42,105,451.75
Minnesota 0010343 US 10: FROM 1100’ W OF 620TH AVE TO 2520’ E OF OINK JOINT RD IN WADENA CO- RECONSTRUCTION, 4 LANE EXPANSION, ROUNDABOUTS, LANE RECONFIGURATION (CONT) $6,490,258.37 $55,643,406.06
Minnesota 0012300 TH 12: CR 6 to Wayzata Blvd; Reconstruction, New Bridges, Replace Br 90650 w/Br27274, Signals, and Signs $45,822,305.53 $58,197,503.65
Minnesota 0014344 US 14: FROM 1.25 MI NW OF CSAH 37 TO 0.5 MI E OF 481ST AVE IN NICOLLET CO- RECONSTRUCT FROM 2 LN TO 4 LN DIVIDED, CONCRETE & BIT SURFACING, ADA (CONT) $22,250,696.08 $83,539,141.56
Minnesota 0015310 MN 15/MN 60: 0.57 MI E OF CR 117 TO 0.1 MI S OF CSAH 58 & MN 15 FROM 0.2 MI S OF CSAH 26 TO 120' N OF CSAH 26 IN WATONWAN CO- BIT MILL & OVLY, (CONT) $22,017,635.65 $27,936,299.91
Minnesota 0019306 HIGHWAY 19 RECONSTRUCTION PROJECT $16,259,074.18 $25,796,387.18
Minnesota 0022306 MN 22: 500’ N OF CSAH 26 IN BLUE EARTH CO TO 0.25 MI N OF CSAH 45 IN LE SUEUR CO- RECONSTRUCTION INCLUDING ROUNDABOUT, MILL & OVLY, LIGHTING, (CONT) $28,038,313.38 $39,378,794.56
Minnesota 0023325 MN 23: 0.1 MI W OF LINCOLN AV TO CSAH 1 & ON US 10, FROM 0.2 MI N OF GERMAIN ST TO 650' N OF 15TH AVE SE IN ST. CLOUD- RECONST MN23/US10 INTCHG (CONT) $28,726,661.72 $47,435,660.12
Minnesota 0052315 TH 52: Oronoco ''Design Build' - New Interchange at CR 112 & New Overpass at CSAH 12, Repl brs 9234 & 9235 $25,028,944.00 $40,294,392.00
Minnesota 0052347 US 52: 0.4 MI S OF CSAH 86 IN HAMPTON TO 0.2 MI N OF 140TH ST IN ROSEMOUNT- CONCRETE SURFACING, UNBONDED CONC OVERLAY, BIT MILL & OVERLAY, TMS (CONT) $46,693,224.81 $58,375,608.35
Minnesota 0055316 MN 55/MN 62: BLOOMINGTON RD IN MPLS TO US 52 IN INVER GROVE HEIGHTS- REHAB BRIDGES 4190, 19819 & 19827, BIT MILL & OVERLAY, CONCRETE PVMT REHAB (CONT) $23,184,806.42 $28,834,282.31
Minnesota 0065210 MN 65 (CENTRAL AVE): CSAH 10 IN SPRING LAKE PARK TO 237TH AVE IN EAST BETHEL- MILL & OVLY, ULTRATHIN BONDED WEARING COURSE, TMS, ADA, SIGNALS, (CONT) $32,858,130.40 $40,830,270.95
Minnesota 0122152 MN 210: 0.19 MI E OF CSAH 1 (RIPPLE RVR) TO N JCT US 169 & US 169, FROM N JCT OF MN 210 TO 0.28 MI S OF CSAH 21 (MISSISSIPPI RVR) IN AITKIN CO. (CONT) $4,100,000.00 $36,214,110.00
Minnesota 0169359 US 169/CSAH 4 RURAL SAFETY AND MOBILITY INTERCHANGE PROJECT $43,349,396.00 $54,966,486.00
Minnesota 0212308 TH 212: CARVER CR 147 IN CHASKA TO CSAH 4 IN EDEN PRAIRIE, DESIGN BUILD, GR, SURF, BRS. $124,041,073.12 $253,585,892.17
Minnesota 0212326 US 212: FROM 0.30 MI E OF CSAH 36 TO CSAH 11 IN DAHLGREN TWP- RECONSTRUCT & EXPAND FROM A 2-LANE TO A 4-LANE DIVIDED HWY, REDUCED CONFLICT INT. (CONT) $22,301,129.28 $27,868,911.60
Minnesota 0222054 US 10 RUM RIVER BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENTS $15,000,000.00 $44,883,760.20
Minnesota 0610309 TH 610:CR 81 TO I-94 & CONST OF 105TH AV FR MAPLE GROVE PKWY TO 0.5 MI W OF I-94, 4 LN FREEWAY CONST, 9 NEW BRIDGES $4,346,171.64 $81,001,000.00
Minnesota 1024127 US 212 FREIGHT MOBILITY AND SAFETY PROJECT IN CARVER COUNTY $32,314,726.44 $58,790,116.04
Minnesota 1025262 HIGHWAY 5 MOBILITY AND IMPROVEMENT PROJECT $7,000,000.00 $98,600,000.00
Minnesota 1424070 DOWNTOWN MOORHEAD- SAFETY, MOBILITY AND LIVABILITY RAIL GRADE SEPARATION PROJECT (11TH STREET UNDERPASS) $34,018,213.29 $125,399,278.31
Minnesota 2719258 HISTORIC STONE ARCH BRIDGE: OVER THE MISSISSIPPI RVR AT ST. ANTHONY FALLS IN MINNEAPOLIS FROM PORTLAND AVE TO SE 6TH AVE (BTWN I-35W & MN 65)- $36,752,916.22 $43,312,552.32
Minnesota 2720177 MN 65 (3RD AVE S): FROM 1ST ST S TO 180' S OF 2ND ST SE IN MINNEAPOLIS- REHAB BRIDGE 2440 OVER THE MISSISSIPPI RIVER *CMGC* $104,650,397.29 $150,596,329.40
Minnesota 2723111 MSAS 143 (RUSH CREEK BLVD): CSAH 30 TO MN 610 IN MAPLE GROVE- CONSTRUCT NEW 4-LANE DIVIDED HWY, NEW BR'S 27R09 & 27W13 OVER I-94, SIGNALS, ADA (CONT) $21,949,399.94 $42,954,444.40
Minnesota 2723196 MSAS 425 (HENNEPIN AV): DOUGLAS AV TO LAKE ST IN MPLS- RECONSTRUCT RDWY INCLUDING SIDEWALKS, SIGNALS, REHAB BR 27599, BRT STATIONS & STREETSCAPING $7,577,000.00 $34,290,804.75
Minnesota 2726045 NICOLLET AVENUE BRIDGE OVER MINNEHAHA CREEK REHABILITATION $34,303,583.00 $49,479,479.00
Minnesota 4944254 I-494: TH5 TO 0.1 MI S OF TH55 - RECONST, GR, SURF, REPL BRS, & ADD 3RD LN EACH DIRECTION $80,156,404.35 $143,797,249.42
Minnesota 6222177 **PROTECT** MSAS 158 (KELLOGG BLVD/3RD ST): FROM BROADWAY ST TO .04 W OF MARIE REPLACE BRIDGES 62080&62080A W/NEW BRIDGE 62666 INCLUDES ROADWAY & $7,054,000.00 $53,625,124.03
Minnesota 6225003 RICE STREET RECONSTRUCTION $8,031,500.00 $35,673,498.10
Minnesota 6225007 MN 5 AND US 61 IMPROVEMENTS PROJECT $17,965,232.93 $34,514,045.38
Minnesota 6225089 MN 3 (ROBERT ST): FROM KELLOGG BLVD TO I-94 IN ST. PAUL- RECONSTRUCT RDWY, ADA, DRAINAGE, INSTALL SIGNALS, LIGHTING & ENHANCED TRANSIT STOPS $6,525,000.00 $30,400,000.00
Minnesota 6920250 MNDOT D1/ST. LOUIS COUNTY: BRIDGE BUNDLE PARTNERSHIP TO REPLACE BRIDGES & BOX CULVERTS, INCLUDES PE & MNDOT BR'S 6290, 6292, 6293 & 6294 ALONG MN210 $15,755,224.38 $25,392,593.69
Minnesota 7022096 MN 13: 800' W OF LOUISANA AVE TO QUENTIN AVE IN SAVAGE-CONSTRUCT INTERCHANGE & FRONTAGE ROADS, CONSTRUCT NEW BRIDGE 70053 & REMOVE BRIDGE 5831 $20,555,616.16 $34,361,778.33
Minnesota 7025045 US 169 & MN 282 INTERCHANGE PROJECT $28,468,100.00 $66,282,842.09
Minnesota 7224009 MN 93: 220’ N OF US 169 TO 0.25 MI S OF MN 19 IN SIBLEY COUNTY- RECONSTRUCT & RAISE RDWY, ADA, REPLC BR 72005 W/72016 & NEW BR'S 72017, 72J88 & 72X06 $11,662,387.85 $32,661,833.65
Minnesota 8606002 TH 101:PRELIM ENG & 147 TH AV TO MISSIPPI RIVER, GR, SURF, WALLS, LIGHTS, SIG, BRS. - "BAP" PROJECT $36,733,284.00 $63,262,521.00
Minnesota I350129 DULUTH TWIN PORTS INTERCHANGE ON I-35, I-535 & US 53 (CMGC WORK PACKAGES 1 & 2) $217,638,190.12 $275,839,504.55
Minnesota I350134 I-35: 0.58 MI S OF CSAH 48 TO 0.54 MI N OF MN 21 IN CITY OF FARIBAULT- BIT MILL & OVLY, UNBONDED CONCRETE OVLY, SIGNAL, HTCG, REHAB BR'S 66808 & 66811 $26,944,480.41 $30,241,392.67
Minnesota I350138 I-35: FROM 1 MI S OF MN 48 TO 2.2 MI N OF MN 48 IN PINE COUNTY- MILL & OVERLAY, UNBONDED CONCRETE OVERLAY, HIGH TENSION CABLE GUARDRAIL, TMS (CONT) $26,403,286.74 $30,347,432.83
Minnesota I35W005 I-35W:72' S OF E 43RD ST TO 520' E OF CHICAGO AV S & I-94:NICOLLET AV S TO 70' E OF PARK AV S & TH 65:168' N OF 24TH ST TO 550' S OF E 15TH ST, (cont) $155,940,976.14 $248,245,632.44
Minnesota I35W012 I-35W:CR B2 IN ROSEVILLE TO 0.1 MI N OF SUNSET AV (CR 53) IN LINO LAKES,CONST MnPASS LN FROM CR C TO LEXINGTON AV (CSAH 17),CONC OVLY FR CR C (cont.) $177,694,078.92 $209,946,170.50
Minnesota I35W014 I-35W (NB): FROM E 42ND ST TO E 40TH ST IN MINNEAPOLIS- CONSTRUCT STORMWATER HOLDING CAVERN SYSTEM, INCLUDES LIGHTING, NOISE & RETAINING WALLS $55,194,284.99 $68,334,348.45
Minnesota I35W019 I-35W: SOUTHCROSS DR TO 0.51 MI N OF CLIFF ROAD IN BURNSVILLE: MILL BIT PAVEMENT, CONCRETE OVERLAY, RECONSTRUCT CONCRETE & BIT PAVEMENT (CONT) $3,052,722.59 $77,323,161.93
Minnesota I394003 I-394: FROM MN 100 TO 11TH ST N & ON I-94, FROM DUNWOODY BLVD TO MN 55 IN MPLS- CONCRETE PAVEMENT REHAB, ADA, TMS, NOISE WALLS, LIGHTING, SIGNS (CONT) $61,877,597.83 $72,202,772.01
Minnesota I494008 I-494: PILOT KNOB RD IN EAGAN TO 24TH AVE IN BLOOMINGTON- REHAB BR'S 19825, 27765, 27767, 9217E & 9217W, CONCRETE PVMT REHAB, BIT MILL & OVLY (CONT) $57,716,754.33 $62,167,893.70
Minnesota I494009 I-494 (EB & WB): 1000’ W OF EAST BUSH LAKE RD (CSAH 28) TO 1000’ E OF 12TH AVE S IN HENNEPIN CO- CONST EB/WB EZPASS LANES FROM CSAH 28 TO I-35W (CONT) $110,709,074.27 $377,412,915.00
Minnesota I535004 TWIN PORTS INTERCHANGE (TPI) IN DULUTH - CMGC WORK PACKAGES #3 & #4 $141,908,901.36 $158,787,768.54
Minnesota I900140 I-90: 2 MI W OF US 169 TO MN 22 IN FARIBAULT CO- UNBONDED CONC OVLY, RAMPS, LIGHTING, ADA, REHAB BR'S 22803, 22804, 22815, 22816, 22825 & 22826 AND PE $86,358,513.56 $90,903,698.49
Minnesota I900144 I-90: INTERCHANGE RECONSTRUCTION AT US 52 IN OLMSTED COUNTY $21,819,586.88 $30,930,728.21
Minnesota I900145 I-90 AUSTIN BRIDGES IMPROVEMENT PROJECT $27,943,486.90 $49,858,377.76
Minnesota I940037 I-94: FROM MN 24 IN CLEARWATER TO 0.3 MI E OF BR #86802 (CSAH 39) NEAR MONTICELLO (EBL & WBL)- RECONSTRUCTION, REHAB 5 BR'S & REPLC 1 BR W/NEW CULVERT $81,930,432.70 $105,166,235.48
Minnesota I940044 I-94: 0.3 MI E OF MN 120 (CENTURY AVE) IN OAKDALE TO 0.27 MI E OF THE E JCT OF MN 95 (W OF THE ST CROIX RIVER) IN LAKELAND- BIT & CONCRETE OVLY (CONT) $95,724,906.73 $111,264,619.66
Minnesota I940052 I-94 EXPANSION PROJECT $8,785,879.34 $77,468,508.43
Minnesota I940054 I-94 (WB): 0.4 MI W OF MN 29 TO 0.08 MI E OF DOUGLAS CO. LINE- UNBONDED CONCRETE OVERLAY, RWIS, REHAB BR’S 21819, 21820, 21821 & REPLACE BR'S (CONT) $30,671,386.08 $34,304,605.98
Minnesota I940058 I-94 EB: 1 MI W OF CSAH 11 TO 1.35 MI S OF CSAH 88 IN OTTER TAIL CO & WILKIN CO- BIT MILL & OVERLAY, UNBONDED CONCRETE OVERLAY, RWIS & REHAB BR 56805 $23,658,020.18 $26,434,874.09