| RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|
| South Carolina | 2366990 | US 25 NB & SB over S-119 & North Saluda River and Safety Improvements and US 25 Emergency Repairs (Hurricane Helene) | $31,649,416.36 | $60,346,110.67 |
| South Carolina | 2614820 | Intersection Improvements at US Highway 17 Bus Intersection (Garden City) and US 17 BUS and Tadlock Drive (L-8033) | $76,516,883.90 | |
| South Carolina | 2764170 | I-95 Corridor Improvement and Bridge Replacements at I-95 over SC 46 & GA State Line to US 278 | $476,607,915.98 | $826,453,176.95 |
| South Carolina | 3652370 | Rehabilitation of eastbound and westbound lanes of I-26 with bridge jackings at: S-36-32 Jalapa Road Bridge; S-36-81 Old Whitmire Highway Bridge; SC 1 | $121,577,623.28 | $135,086,248.09 |
| South Carolina | 3962240 | Closed and/or Load Restricted Bridge Replacements DB Package 2023-3 | $40,848,291.68 | $51,060,364.64 |
| South Carolina | 4069460 | Bridge Replacements at US 76 over US 601 and US 601 over Colonels Creek | $32,394,778.43 | $40,493,473.03 |
| South Carolina | 4084120 | Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive | $35,987,310.51 | $53,523,069.35 |
| South Carolina | 4368180 | Bridge Replacements at S-43-152 (Manning Ave.) over SCL RR & Street and S-43-55 over Shot Pouch Branch | $39,461,904.53 | |
| South Carolina | 4462250 | Closed and/or Load Restricted Bridge Replacements DB Package 2023-2 | $59,038,236.76 | $73,797,795.99 |
| South Carolina | 4674110 | I-77 MM 83-91 Preservation & I-77 83-91 Preservation bridge repairs | $27,754,593.13 | |
| South Carolina | 5368980 | DB Bridge Replacements S-42-197 South Tyger River; S-37-51 Snow Crk; S-37-133 Little Cane Crk; S-37-168 Trib to Choestoea Crk & Little Choestoea Crk | $29,372,813.37 | |
| South Carolina | 8888860 | I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S-57) to SC 18 | $382,438,116.88 | $691,948,333.62 |
| South Carolina | BR40004 | REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 | $27,437,679.98 | $32,055,442.78 |
| South Carolina | BR40008 | US 1 over S.C.L. Railroad | $23,818,526.61 | $25,709,039.23 |
| South Carolina | BR88044 | US 701 over Great Pee Dee River | $47,280,435.38 | $59,147,142.78 |
| South Carolina | CHMB010 | Phase III Berlin Myers Parkway | $72,169,249.12 | $154,110,359.62 |
| South Carolina | EM05025 | Port Access Road | $8,000,000.00 | $388,184,242.27 |
| South Carolina | EM13001 | Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) | $5,039,440.00 | $27,956,140.23 |
| South Carolina | ER25106 | Design Build Bridge/Culvert/Pipe Replacements Package 32 at S-9-22; S-38-39; S-38-191; S-38-634; S-38-1210; and S-5-458 (Orangeburg Flood) | $135,000.00 | $34,803,123.81 |
| South Carolina | GPAT002 | Batesville Rd (S-164) (SC 14 to Roper Mountain Road) | $22,940,058.39 | $28,616,109.90 |
| South Carolina | GRID010 | I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES | $94,463,278.01 | $118,119,611.51 |
| South Carolina | GSLA003 | CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE | $219,323,518.17 | $295,515,917.74 |
| South Carolina | IM23009 | I-85 @ I-385 (Design Build) | $243,445,286.40 | $324,404,081.50 |
| South Carolina | LSCG005 | US 301 over North Edisto River & Swamp | $28,822,107.19 | $38,241,255.96 |
| South Carolina | P026862 | US 21 over Harbor River | $57,040,905.42 | $71,852,429.01 |
| South Carolina | P027003 | I-20 Widening (US 378 to Longs Pond) - Design Build | $12,500,000.00 | $124,175,601.15 |
| South Carolina | P027077 | I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) | $52,195,591.67 | $67,242,611.08 |
| South Carolina | P027116 | I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) | $190,506,637.76 | $243,686,335.55 |
| South Carolina | P027229 | I-26/US 21 Interchange (Exit 119). Reconfigure existing I-26 @ US 21 interchange in Lexington County | $48,827,364.81 | $61,034,206.02 |
| South Carolina | P027413 | SC 85 over Southern R.R. and S-995 | $22,731,459.28 | $29,695,162.61 |
| South Carolina | P027550 | I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) | $2,389,657.30 | $92,762,969.67 |
| South Carolina | P029208 | I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) | $491,865,539.84 | $567,340,421.78 |
| South Carolina | P029263 | I-26 from near SC 27 (Exit 187) to near Jedburg Road (Exit 194) | $22,546,244.51 | $219,699,346.51 |
| South Carolina | P029270 | I-77 at SC 160 Interchange Improvement and Intersection Improvement at US-21 and Coltharp Rd (S-252) | $76,685,571.04 | $161,469,963.81 |
| South Carolina | P029450 | Design Build I-20 EB & WB over Wateree River and Wateree Swamp Overflow | $112,328,558.58 | $112,428,558.58 |
| South Carolina | P029503 | Clements Ferry Road - Phase II | $16,000,000.00 | $48,887,327.82 |
| South Carolina | P029525 | US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB | $24,641,587.90 | $35,148,152.88 |
| South Carolina | P029873 | South Main Street Streetscaping Improvements | $20,689,425.17 | $28,471,715.95 |
| South Carolina | P029938 | I-26 (Near MM 149 to near MM 172) | $51,505,837.01 | $57,531,697.35 |
| South Carolina | P030176 | Seamless City Revitalization Project | $17,666,966.50 | $39,935,597.69 |
| South Carolina | P030462 | Bridge Replacement - US 76 WB over Wateree River | $46,519,298.78 | $58,149,123.49 |
| South Carolina | P030484 | Country Club Road Corridor Project | $30,852,004.96 | $38,565,006.20 |
| South Carolina | P030487 | SC 277 NB over I-77 | $28,113,902.00 | $31,237,668.89 |
| South Carolina | P030562 | US 17 Bypass (Shetland to Backgate) | $24,658,842.62 | $30,823,553.26 |
| South Carolina | P030711 | US 1 over I-20 Bridge Replacement | $67,292,880.05 | $76,422,505.92 |
| South Carolina | P038111 | I-85 over Rocky Creek Bridge Design Build | $36,161,048.76 | $40,927,726.17 |
| South Carolina | P038652 | I-77 Panther's Interchange (MM81) Design Build | $34,597,743.00 | $65,500,000.00 |
| South Carolina | P038677 | I-26 Interchange Improvement from Exit 169 I-95 to Exit 187 Ridgeville Road | $111,243,039.84 | $236,854,885.55 |
| South Carolina | P039718 | I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction | $199,120,863.78 | $226,259,229.92 |
| South Carolina | P039719 | I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction | $120,246,226.92 | $134,933,105.35 |
| South Carolina | P040014 | I-26 Corridor Improvement from Exit 125 to Exit 136 | $36,734,960.00 | $439,308,907.73 |
| South Carolina | P041130 | Design Build Bridge Replacement I-95 NB & SB over Lake Marion | $228,665,438.29 | $359,194,655.89 |
| South Carolina | P041767 | US 17 over Waccamaw River Bridge Repair (Asset 4792) | $47,901,507.52 | $66,768,154.17 |
| South Carolina | P043325 | I-20/I-26/I-126 - Corridor Improvements - Phase 3C I-20 Improvements and Bridge Replacements | $68,128,907.40 | $181,530,000.00 |
| South Carolina | RU27001 | US 17 Widening | $49,252,583.26 | $62,426,418.87 |
| South Carolina | SB02002 | FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY | $127,898,263.87 | $159,829,602.08 |
| South Carolina | SB07001 | SC 170 - FROM ROAD S-20 TO SC ROUTE 280. | $76,020,891.00 | $95,027,499.84 |
| South Carolina | SU40013 | Hardscrabble Road (S-83) | $67,091,402.49 | $114,620,095.74 |