| RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|
| Vermont | 0102016 | READSBORO, VT100, BRIDGE NO. 25; SCOPING TO EVALUATE ALTERNATIVES, PENG, REPLACE BRIDGE. | $31,893,797.06 | $39,867,246.32 |
| Vermont | 0134013 | WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY | $28,651,453.41 | $31,993,776.36 |
| Vermont | 0281026 | NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. | $81,695,446.75 | $97,036,289.60 |
| Vermont | 0281031 | COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, IMPROVE INTERSECTIONS, REPLACE US2 BR18A. | $30,694,741.62 | $35,755,184.62 |
| Vermont | 0283026 | CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY | $26,067,840.85 | $28,768,444.88 |
| Vermont | 0891063 | ROYALTON, I-89, BRIDGE NO. 26 N&S; SCOPING TO EVALUATE ALTERNATIVES. | $15,288,820.37 | $40,030,473.85 |
| Vermont | 0911070 | WESTMINSTER, I-91, BRIDGE NO. 21 N&S; SCOPING TO EVALUATE ALTERNATIVES; PENG, REPLACE DECK & BEARINGS. | $23,689,518.33 | $26,321,687.04 |
| Vermont | 1444060 | HARTFORD, TH6, BR7; OTHER, SCOPING TO EVALUATE ALTERNATIVES. | $20,717,571.69 | $26,270,288.61 |
| Vermont | 2971001 | WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. | $24,326,901.26 | $28,306,283.85 |
| Vermont | 5000001 | BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY | $102,060,871.80 | $128,884,331.49 |
| Vermont | 5600014 | COLCHESTER, US7, AT I-89 EXIT #16; ROWA, INSTALL DOUBLE CROSSOVER ON US7, INCL. WIDENING, NEW SIGNALS, DRAINAGE. | $23,243,703.91 | $40,288,803.91 |
| Vermont | A004152 | BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. | $20,770,009.89 | $27,457,771.09 |
| Vermont | PS19001 | MARSHFIELD-DANVILLE, US2, BEGINNING AT MM 0.987 IN PLAINFIELD EXT. EASTERLY 16.669 MILES; PENG, RESURFACING. | $24,322,685.77 | $30,065,868.00 |
| Vermont | WCRS023 | MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. | $79,837,809.34 | $93,167,850.49 |