SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Vermont 0102016 READSBORO, VT100, BRIDGE NO. 25; SCOPING TO EVALUATE ALTERNATIVES, PENG, REPLACE BRIDGE. $31,893,797.06 $39,867,246.32
Vermont 0134013 WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY $28,651,453.41 $31,993,776.36
Vermont 0281026 NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. $81,695,446.75 $97,036,289.60
Vermont 0281031 COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, IMPROVE INTERSECTIONS, REPLACE US2 BR18A. $30,694,741.62 $35,755,184.62
Vermont 0283026 CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY $26,067,840.85 $28,768,444.88
Vermont 0891063 ROYALTON, I-89, BRIDGE NO. 26 N&S; SCOPING TO EVALUATE ALTERNATIVES. $15,288,820.37 $40,030,473.85
Vermont 0911070 WESTMINSTER, I-91, BRIDGE NO. 21 N&S; SCOPING TO EVALUATE ALTERNATIVES; PENG, REPLACE DECK & BEARINGS. $23,689,518.33 $26,321,687.04
Vermont 1444060 HARTFORD, TH6, BR7; OTHER, SCOPING TO EVALUATE ALTERNATIVES. $20,717,571.69 $26,270,288.61
Vermont 2971001 WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. $24,326,901.26 $28,306,283.85
Vermont 5000001 BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY $102,060,871.80 $128,884,331.49
Vermont 5600014 COLCHESTER, US7, AT I-89 EXIT #16; ROWA, INSTALL DOUBLE CROSSOVER ON US7, INCL. WIDENING, NEW SIGNALS, DRAINAGE. $23,243,703.91 $40,288,803.91
Vermont A004152 BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. $20,770,009.89 $27,457,771.09
Vermont PS19001 MARSHFIELD-DANVILLE, US2, BEGINNING AT MM 0.987 IN PLAINFIELD EXT. EASTERLY 16.669 MILES; PENG, RESURFACING. $24,322,685.77 $30,065,868.00
Vermont WCRS023 MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. $79,837,809.34 $93,167,850.49