U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Alaska

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local CONGESTION AIR QUALITY 4R - Added Capacity $458,669.63 $504,198.78
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM -APPOR Bridge New Construction $3,638,800.00 $4,000,000.00
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $10,347,425.62 $11,374,547.24
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $422,015.69 $463,906.44
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,251.76 $4,673.81
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $6,591,457.09 $7,245,748.14
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Training $1,209.33 $1,329.37
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Training $1,209.34 $1,329.38
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $17,498,094.33 $20,585,016.31
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $1,850,931.95 $2,034,661.92
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,151,056.77 $3,463,841.68
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,060,085.25 $3,363,840.00
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,748,085.54 $3,171,870.00
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,334,408.46 $2,566,130.00
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,132,687.40 $2,344,385.40
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,219,735.86 $2,440,074.60
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Training $2,176.80 $2,392.87
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Training $2,176.80 $2,392.88
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,759,095.09 $3,032,972.50
Alaska 0001417 Matanuska-Susitna >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,759,095.08 $3,032,972.50
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $13,021,305.77 $14,313,846.07
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,521,804.84 $2,772,128.00
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $454,850.00 $500,000.00
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $5,334,829.30 $5,334,829.30
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Other $1,213,273.55 $1,333,707.33
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $6,689,240.30 $7,353,237.66
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $435,709.89 $478,959.97
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,046,155.00 $1,150,000.00
Alaska 0001569 Yukon-Koyukuk >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $6,218.75 $6,836.04
Alaska 0001579 Anchorage >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $33,694,139.32 $36,075,095.63
Alaska 0001579 Anchorage >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $5,054,120.98 $5,411,264.44
Alaska 0001579 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $3,951,908.50 $4,231,165.41
Alaska 0001579 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $37,505,120.83 $40,155,375.62
Alaska 0001579 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $13,283,831.76 $14,222,517.93
Alaska 0001579 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $202,945.38 $217,286.28
Alaska 0001579 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,376,243.30 $5,756,149.14
Alaska 0001579 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $38,152.43 $40,848.43
Alaska 0001579 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV $362,089.90 $387,676.57
Alaska 0001579 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $279.71 $299.48
Alaska 0001579 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,655.38 $2,843.02
Alaska 0001579 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,805,759.50 $1,933,361.34
Alaska 0001579 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $190,211.58 $203,652.66
Alaska 0001685 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preservation $20,696,747.92 $22,159,259.00
Alaska 0001685 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,105,257.19 $3,324,686.50
Alaska 0001685 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $650,435.50 $720,000.00
Alaska 0001685 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $4,966.54 $5,317.50
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $3,036,663.83 $3,338,093.83
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local HIGH PRIORITY PROJECT SEC 1702 Right of Way $796,768.02 $875,858.00
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local HIGH PRIORITY PROJECT SEC 1702 Utilities $136,455.00 $150,000.00
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local HIGH PRIORITY PROJECTS-TEA-21 Preliminary Engineering $22.14 $24.34
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local HWY INFRA PRGM-IIJA DEMO New Construction Roadway $27,662,000.00 $30,407,826.76
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local NAT COR PL DV/COOR BDR INF-TEA Preliminary Engineering $1,710,000.00 $1,917,715.86
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway $7,622,860.96 $8,379,532.77
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering $217,320.69 $238,892.70
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local REPURPOSED SPECIAL Preliminary Engineering $163,056.96 $179,242.56
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $1,278,591.91 $8,437,146.60
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $7,942,815.00
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $347,774.13 $24,978,691.08
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $818,730.00 $900,000.00
Alaska 0002204 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Training $448.04 $4,214.79
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Construction Engineering $888,530.53 $905,264.37
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $2,665,591.58 $2,715,793.10
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $3,225,000.00 $3,228,782.25
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Preliminary Engineering $1,075,000.00 $1,076,260.75
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Safety $5,534,140.05 $5,698,560.53
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety $16,602,420.15 $17,095,681.60
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Training $827.55 $827.55
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Training $275.85 $275.85
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Utilities $552,940.03 $552,940.03
Alaska 0002385 Fairbanks North Star >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Utilities $174,985.97 $174,985.97
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local CONGESTION AIR QUALITY New Construction Roadway $2,577,895.86 $2,833,786.81
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $901,033.02 $990,472.71
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local HIGH PRIORITY PROJECTS-TEA-21 New Construction Roadway $29,211.06 $36,513.83
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway $9,217,824.41 $10,132,817.85
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway $3,545,949.78 $3,897,933.15
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,888,598.58 $2,076,067.47
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $23,495,493.20 $25,827,737.93
Alaska 0002469 Northwest Arctic >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Training $1,429.37 $1,571.25
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State BRIDGE REPLAC & REHAB - DISC Construction Engineering $4,343,656.34 $4,774,822.85
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State BRIDGE REPLAC & REHAB - DISC Other $15,733,383.30 $17,295,133.89
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 Local FERRY BOATS & TERMINAL Preliminary Engineering $1,141,140.24 $1,426,425.33
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Other $10,350,736.64 $11,378,186.92
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $1,893,471.53 $2,081,424.12
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $4,548,500.00 $5,000,000.00
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Training $19,584.02 $21,528.00
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities $64,019.23 $70,374.00
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,229,753.26 $2,451,086.36
Alaska 0003209 Ketchikan Gateway >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other $823,625.87 $905,381.85
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $598,673.57 $658,100.00
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $30,403,594.30 $33,421,561.29
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,071,057.35 $6,673,691.71
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,927,910.39 $3,321,880.00
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,135,487.53 $1,493,200.00
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $9,097.00 $10,000.00
Alaska 0221019 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $5,458,200.00 $6,000,000.00
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -ALLOC Bridge Rehabilitation - Added Capacity $5,299,015.49 $5,825,014.28
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -ALLOC Bridge Replacement - Added Capacity $6,266,835.72 $6,888,903.73
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $3,398,193.50 $3,735,510.06
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State HIGHWAY INFRASTRUCTURE Preliminary Engineering $1,214,097.43 $1,551,781.51
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $18,739,820.00 $20,600,000.00
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,247,266.67 $3,569,601.71
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $513,945.32 $564,961.32
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $114,114.98 $125,442.43
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $35,505,692.11 $39,030,111.17
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $308,749.01 $339,396.51
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $1,285,848.87 $1,413,486.72
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $6,626,068.12 $7,283,794.79
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $334,377.62 $367,569.11
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $4,759.55 $5,232.00
Alaska 0311032 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,134,929.52 $2,346,850.08
Alaska 0311034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $18,729,046.09 $20,052,511.87
Alaska 0311034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preservation $2,202,595.06 $2,358,238.82
Alaska 0311034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,103,547.96 $3,322,856.49
Alaska 0311034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $876,958.75 $938,928.00
Alaska 0311034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $10.01 $10.72
Alaska 0311034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,239,856.22 $2,398,133.00
Alaska 0311037 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $11,822,969.10 $12,996,558.32
Alaska 0311037 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $11,822,969.09 $12,996,558.30
Alaska 0311037 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,439,053.65 $3,780,426.13
Alaska 0311037 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,729,100.00 $3,000,000.00
Alaska 0311037 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $107,836.98 $118,541.25
Alaska 0311037 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,377,994.46 $1,514,779.00
Alaska 0496019 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Tunnel Preventive Maintenance $11,484,165.81 $22,478,641.30
Alaska 0496019 Chugach >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Tunnel Preventive Maintenance $1,628,248.39 $3,187,067.49
Alaska 0512005 Anchorage >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $909,700.00 $1,000,000.00
Alaska 0512005 Anchorage >= 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $90,970.00 $100,000.00
Alaska 0512005 Anchorage >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $14,637.00 $16,089.92
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $23,456,513.98 $25,784,889.50
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,728,649.18 $4,098,767.92
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $566,038.08 $622,225.00
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,104,964.00 $2,314,922.37
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $889,131.13 $977,389.20
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,078,960.49 $1,186,061.87
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $1,520.34 $1,671.25
Alaska 0512005 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $11,981,184.84 $13,170,479.10
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $24,612,146.29 $27,055,233.91
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $1,947,798.40 $2,141,143.68
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $7,722,487.92 $8,489,049.06
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $3,331.69 $3,662.40
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,538,342.29 $4,988,834.00
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $14,856,672.88 $31,748,434.95
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $430,529.17 $473,265.00
Alaska 0525019 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $4,988,834.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way $2,174,075.66 $2,389,882.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way   $5,981,890.16
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $822,037.65 $903,635.98
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $86,493.63 $95,079.29
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $32,435.11 $35,654.73
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM -APPOR Right of Way $26,096.97 $28,687.45
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $248,026.28 $272,646.23
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other HIGHWAY INFRA PRGM -APPOR Right of Way $9,786.36 $10,757.79
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $5,862,843.84 $6,554,690.34
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $617,494.70 $690,362.35
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $231,560.51 $258,885.88
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $45,215.85
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $120,575.61
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $2,235,104.82
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles   $717,079.26
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles   $28,321.96
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles   $75,525.23
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $7,192,476.56 $7,621,571.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $23,592.50 $25,000.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $47,185.00 $50,000.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $10,644,577.83 $11,701,195.81
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way $179,501.27 $197,319.19
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training   $585.14
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Training   $23.11
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Training   $61.63
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $93,608.13 $509,203.72
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Utilities   $31,190.37
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $7,657,263.29 $13,595,583.57
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $123,304.45 $135,544.08
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $12,973.92 $14,261.76
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $4,865.22 $5,348.16
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Other REDISTRIBUTION OF CERTAIN AUTH Right of Way $13,731.65 $15,094.70
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 Local REDISTRIBUTION OF CERTAIN AUTH Right of Way $36,617.74 $40,252.54
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way $348,016.00 $382,561.29
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State RURAL SECONDARY Preliminary Engineering $471,850.00 $520,000.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $849,327.80 $900,000.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,230,051.00 $9,922,053.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $60,897.19
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,535,846.51 $1,688,300.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSPORTATION PROJECT Preliminary Engineering $999,829.00 $999,829.00
Alaska 0617003 Fairbanks North Star >= 50,000 AND < 200,000 State URBAN SYSTEM NON ATTRIBUTABLE Preliminary Engineering $1,628,494.00 $1,725,647.00
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $5,731,110.02 $6,300,000.00
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $10,669,645.51 $11,728,751.80
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $1,522,003.52 $1,673,082.91
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Facilities for Pedestrians and Bicycles $911,920.22 $1,002,440.61
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $10,894.59 $11,976.03
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $771,828.68 $848,443.09
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $8,460,620.12 $9,300,450.83
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $6,023,223.35 $6,621,109.54
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,534,107.94 $1,686,388.86
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles $2,392,236.50 $2,629,698.26
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles $235,000.90 $258,327.91
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,994.28 $3,291.50
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $286,644.88 $315,098.25
Alaska 0617013 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,385,008.18 $4,820,279.41
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $13,134,643.57 $14,438,434.17
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $3,275,665.30 $3,600,819.28
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,135,208.23 $4,545,683.44
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,219,674.90 $1,340,744.09
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $1,950.03 $2,143.60
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $90,970.00 $100,000.00
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $349,557.60 $384,255.91
Alaska 0651032 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $13,124,945.56 $14,427,773.51
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State EQUITY BONUS - CHARGED TO LIM Preliminary Engineering $197,485.24 $217,088.31
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $771,662.69 $848,260.62
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $262,523.75 $288,582.77
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $34,409,869.84 $59,741,669.60
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $8,875,956.29
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $10,000.00 $968,846.44
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,356,359.24 $2,590,259.67
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training   $9,646.20
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $773,886.97 $850,705.69
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $28,639,955.04 $31,482,857.04
Alaska 0652017 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $6,524,523.44 $7,193,465.43
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $46,737,159.59 $51,376,453.32
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $10,540,414.37 $11,586,692.72
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other $3,192,954.75 $3,509,898.59
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,098,050.42 $1,207,046.95
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $1,905.82 $2,095.00
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $14,039,594.37 $14,039,594.37
Alaska 0656005 North Slope >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,091,640.00 $1,200,967.66
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local EQUITY BONUS SP LIMITATION 4R - Added Capacity $803.18 $882.91
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity $12,695.62 $13,955.83
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $199,800.44 $219,633.33
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $3,158,190.21 $3,471,683.20
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $1,046,767.96 $1,109,216.87
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $3,802,402.18 $4,179,841.90
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,222,122.80 $1,343,434.98
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Facilities for Pedestrians and Bicycles $990,179.06 $1,088,467.70
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $714.69 $785.63
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,713,047.80 $1,883,090.90
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $6,174,955.88 $6,787,903.58
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $292,934.46 $322,012.16
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $90,153.80 $99,102.78
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,425,035.93 $1,566,489.98
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $1,122,980.44 $1,234,451.41
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $64,026.68 $70,382.19
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $7,368,635.73 $7,808,240.13
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,296,582.24 $10,623,076.00
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $740.61 $814.12
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Training $46.85 $51.50
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $106,277.36 $116,826.82
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,779,723.97 $3,055,649.08
Alaska 0670001 Fairbanks North Star >= 50,000 AND < 200,000 State URBAN SYSTEM NON ATTRIBUTABLE Preliminary Engineering $235,925.00 $255,000.00
Alaska 0713010 Copper River < 5,000 State CONSOLIDATED PRIMARY Preliminary Engineering $1,219,528.00 $1,405,857.16
Alaska 0713010 Copper River < 5,000 State CONSOLIDATED PRIMARY Right of Way $150,046.00 $288,011.15
Alaska 0713010 Copper River < 5,000 State CONSOLIDATED PRIMARY Utilities $17,814.00 $19,500.82
Alaska 0713010 Copper River < 5,000 State INTERSTATE MAINTENANCE Preliminary Engineering $2,127,100.00 $2,254,000.00
Alaska 0713010 Copper River < 5,000 State INTERSTATE MAINTENANCE Right of Way $230,947.00 $252,816.00
Alaska 0713010 Copper River < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $32,925,576.05 $36,193,883.76
Alaska 0713010 Copper River < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,268,552.25 $5,791,527.14
Alaska 0713010 Copper River < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,652,572.72 $2,810,822.00
Alaska 0713010 Copper River < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $376,046.84 $411,655.00
Alaska 0713010 Copper River < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,875.65 $3,161.10
Alaska 0713010 Copper River < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $769,306.77 $842,153.00
Alaska 0713010 Copper River < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $174,789.00 $185,217.00
Alaska 0714024 Southeast Fairbanks >= 5,000 AND < 50,000 State EMERGENCY RELIEF 4R - No Added Capacity $21,000,189.86 $23,084,742.06
Alaska 0714024 Southeast Fairbanks >= 5,000 AND < 50,000 State EMERGENCY RELIEF Bridge Replacement - No Added Capacity $7,460,092.31 $8,200,607.15
Alaska 0714024 Southeast Fairbanks >= 5,000 AND < 50,000 State EMERGENCY RELIEF Construction Engineering $3,166,538.15 $3,480,859.79
Alaska 0714024 Southeast Fairbanks >= 5,000 AND < 50,000 State EMERGENCY RELIEF Training $3,869.86 $4,254.00
Alaska 0714024 Southeast Fairbanks >= 5,000 AND < 50,000 State EMERGENCY RELIEF Utilities $416,860.93 $458,240.00
Alaska 0714024 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,713,135.67 $2,982,451.00
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $17,340,595.06 $19,061,883.12
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,602,293.17 $3,959,869.36
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $985,852.11 $1,083,711.23
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,148,090.63 $1,970,068.86
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,534,331.86 $1,686,635.00
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $14,625.25 $16,077.00
Alaska 0955016 Juneau >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $772,293.38 $848,953.92
Alaska 0956028 Haines < 5,000 State AK HWY/AK MARINE HWY-EXEMPT Preliminary Engineering $2,748,262.36 $2,749,134.59
Alaska 0956028 Hoonah-Angoon < 5,000 State AK HWY/AK MARINE HWY-EXEMPT Preliminary Engineering $253,104.27 $253,232.04
Alaska 0956028 Haines < 5,000 State CONGESTION AIR QUALITY Preliminary Engineering $267,018.96 $293,524.20
Alaska 0956028 Hoonah-Angoon < 5,000 State CONGESTION AIR QUALITY Preliminary Engineering $24,591.41 $27,032.44
Alaska 0956028 Haines < 5,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $418,142.43 $459,648.71
Alaska 0956028 Hoonah-Angoon < 5,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $38,509.29 $42,331.86
Alaska 0956028 Haines < 5,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $21,954,016.09 $24,133,248.42
Alaska 0956028 Haines < 5,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,651,724.10 $2,914,943.49
Alaska 0956028 Haines < 5,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $170,113.90 $187,000.00
Alaska 0956028 Haines < 5,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $247,591.81 $272,168.64
Alaska 0956028 Haines < 5,000 State HIGHWAY INFRA PRGM -APPOR Training $5,836.06 $6,415.37
Alaska 0956028 Haines < 5,000 State HIGHWAY INFRA PRGM -APPOR Utilities $1,161,241.66 $1,276,510.55
Alaska 0956028 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $3,791,030.68 $4,167,341.64
Alaska 0956028 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $25,879,192.78 $28,448,051.86
Alaska 0956028 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,489,761.42 $4,935,430.83
Alaska 0956028 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $657,703.02 $722,988.92
Alaska 0956028 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $443,249.29 $487,247.77
Alaska 0956028 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,751,039.61 $5,222,644.39
Alaska 0956028 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,064,827.89 $1,222,860.10
Alaska 0956028 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $98,066.51 $115,467.26
Alaska 0956028 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,966,154.00 $2,161,321.32
Alaska 0956028 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $288,020.96 $316,610.93
Alaska 0956028 Haines < 5,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $2,261,444.20 $2,485,922.82
Alaska 0956028 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $208,270.21 $228,943.82
Alaska 0956028 Haines < 5,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $164,643.21 $180,986.27
Alaska 0956028 Hoonah-Angoon < 5,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $15,163.00 $16,668.13
Alaska 0956028 Hoonah-Angoon < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $23,090.28 $146,790.95
Alaska 0956028 Haines < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $250,719.41 $1,104,393.94
Alaska 0956036 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $12,255,051.99 $13,471,531.26
Alaska 0956036 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $36,487,979.01 $40,109,903.27
Alaska 0956036 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,077,531.44 $2,285,011.58
Alaska 0956036 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,185,606.02 $6,803,353.76
Alaska 0956036 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Training $10,972.32 $12,061.47
Alaska 0956036 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Training $3,685.22 $4,051.03
Alaska 0956036 Hoonah-Angoon < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $896,489.09 $985,477.73
Alaska 0956036 Haines < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,669,191.05 $2,934,144.27
Alaska 0972018 Skagway < 5,000 Local COORD BORDER INFRA PROGRAM Preliminary Engineering $349.36 $384.04
Alaska 0972018 Skagway < 5,000 State COORD BORDER INFRA PROGRAM Preliminary Engineering $75,517.55 $83,013.68
Alaska 0972018 Skagway < 5,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $117,056.71 $128,676.17
Alaska 0972018 Skagway < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $25,303,265.92 $27,814,956.49
Alaska 0972018 Skagway < 5,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $16,723.06 $18,383.05
Alaska 0972018 Skagway < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,614,898.70 $3,973,726.17
Alaska 0972018 Skagway < 5,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $10,348.36 $11,375.58
Alaska 0972018 Skagway < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,236,928.39 $2,458,973.72
Alaska 0972018 Skagway < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Training $28,890.32 $31,758.07
Alaska 0972018 Skagway < 5,000 Local NATIONAL HIGHWAY PERF PROGRAM Training $133.66 $146.93
Alaska 0972018 Skagway < 5,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $42.36 $46.56
Alaska 0972018 Skagway < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $9,155.62 $10,064.44
Alaska 0972018 Skagway < 5,000 Local NATIONAL HIGHWAY SYSTEM Preliminary Engineering $539.67 $593.24
Alaska 0972018 Skagway < 5,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $116,656.97 $128,236.75
Alaska 0972018 Skagway < 5,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,788.46 $1,965.99
Alaska 0972018 Skagway < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $386,598.26 $424,973.35
Alaska 0972018 Skagway < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $617,709.00 $679,024.87
Alaska 0972018 Skagway < 5,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,857.61 $3,141.27
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $29,649,650.50 $31,744,807.82
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preservation $1,978,592.85 $2,118,407.76
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,182,981.72 $6,619,894.77
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,100,367.41 $4,390,115.00
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,455.72 $2,629.25
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $206,990.28 $221,617.00
Alaska 0A11014 Southeast Fairbanks >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,257,501.55 $1,346,361.40
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $20,194,947.42 $21,621,999.38
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $176,963.51 $189,468.43
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,000,000.00 $1,070,663.81
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $1,466.01 $1,569.60
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $1,140,802.53 $1,221,415.98
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity $199,849.00 $213,971.09
Alaska 0A11016 Southeast Fairbanks >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $3,054,822.32 $3,270,687.71
Alaska 0A15037 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $16,304,942.72 $35,319,991.16
Alaska 0A15037 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,201,816.10 $4,498,732.44
Alaska 0A15037 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,702.86 $2,893.86
Alaska 0A15037 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $12,316,703.02 $13,187,048.20
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM 4R - Added Capacity $6,274,072.26 $6,717,422.12
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State CARBON REDUCTION PROGRAM 4R - Added Capacity $3,827,075.68 $4,097,511.43
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State CARBON REDUCTION PROGRAM Construction Engineering $97,927.03 $104,846.93
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Construction Engineering $160,540.66 $171,885.07
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State CARBON REDUCTION PROGRAM Training $1,881.70 $2,014.67
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Training $3,084.85 $3,302.83
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $708,935.53 $9,616,596.98
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $1,162,222.32 $15,765,359.61
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,102,376.58 $3,321,602.33
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,892,396.11 $2,026,120.03
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,535,170.07 $2,714,314.85
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,546,409.93 $1,655,685.15
Alaska 0A23021 Southeast Fairbanks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $586,833.55 $628,301.45
Alaska 0A23021 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $962,049.47 $1,030,031.55
Alaska 0A24033 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $13,416,218.13 $14,364,259.24
Alaska 0A24033 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $10,372,105.21 $11,105,037.70
Alaska 0A24033 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,463,608.67 $3,708,360.46
Alaska 0A24033 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,305,112.00 $2,468,000.00
Alaska 0A24033 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $2,002.12 $2,143.60
Alaska 0A24033 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,195,866.69 $2,351,035.00
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Bridge New Construction $5,409,216.24 $5,409,216.24
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 Local HSIP LIMITING FLEXIBLE Construction Engineering $162,566.89 $162,566.89
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $4,340,670.84 $4,340,670.84
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 Local HSIP LIMITING FLEXIBLE Preliminary Engineering $51,933.63 $56,839.62
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $1,386,671.22 $1,517,665.23
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $196,895.15 $215,495.15
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 Local HSIP LIMITING FLEXIBLE Right of Way $20,031.09 $20,031.09
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Right of Way $534,846.91 $534,846.91
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety $19,033,049.18 $19,033,049.18
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 Local HSIP LIMITING FLEXIBLE Safety $712,826.10 $712,826.10
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Training $2,562.78 $2,562.78
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 Local HSIP LIMITING FLEXIBLE Training $95.97 $95.97
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 Local HSIP LIMITING FLEXIBLE Utilities $25,270.00 $25,270.00
Alaska 0A24034 Fairbanks North Star >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Utilities $674,730.00 $674,730.00
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $61,900,966.89 $66,275,125.14
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $6,750,075.37 $7,227,061.43
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Training $68,760.15 $73,619.01
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   $24,109,030.52
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $7,227,061.41
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $396,620.76 $424,647.50
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $934.00 $2,100,000.00
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training   $73,618.99
Alaska 0A24035 Fairbanks North Star >= 50,000 AND < 200,000 State PROTECT PROGRAM APPORTIONED Resilience Improvement - Highway Project $1,698,590.00 $1,698,590.00
Alaska 0A31035 Anchorage >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering $149,360.00 $186,700.00
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-20% ON/OFF Preliminary Engineering $10,640.00 $13,300.00
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering $95,771.86 $119,714.83
Alaska 0A31035 Anchorage >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering $1,344,406.59 $1,680,508.23
Alaska 0A31035 Anchorage >= 200,000 State HIGH RISK RURAL ROAD Construction Engineering $1,142,194.80 $1,269,105.33
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State HIGH RISK RURAL ROAD Construction Engineering $120,013.07 $133,347.86
Alaska 0A31035 Anchorage >= 200,000 State HIGH RISK RURAL ROAD Safety $6,784,713.15 $8,418,673.62
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State HIGH RISK RURAL ROAD Safety $712,885.64 $884,569.68
Alaska 0A31035 Anchorage >= 200,000 State HIGH RISK RURAL ROAD Training   $4,849.46
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State HIGH RISK RURAL ROAD Training   $509.54
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $93,277.78 $103,641.98
Alaska 0A31035 Anchorage >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $887,748.32 $986,387.02
Alaska 0A31035 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,793,662.71 $2,991,074.18
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $293,536.66 $314,279.14
Alaska 0A31035 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $11,176,137.26 $13,295,823.62
Alaska 0A31035 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,012,471.41 $1,633,500.00
Alaska 0A31035 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $199,068.55 $213,135.49
Alaska 0A31035 Anchorage >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,894,585.83 $2,028,464.51
Alaska 0A31057 Anchorage >= 200,000 State EMERGENCY RELIEF 4R - Restoration & Rehabilitation $13,331.87 $13,331.87
Alaska 0A31057 Anchorage >= 200,000 Other EMERGENCY RELIEF 4R - Restoration & Rehabilitation $1,500.94 $1,500.94
Alaska 0A31057 Anchorage >= 200,000 State EMERGENCY RELIEF Construction Engineering $1,999.76 $1,999.76
Alaska 0A31057 Anchorage >= 200,000 Other EMERGENCY RELIEF Construction Engineering $225.14 $225.14
Alaska 0A31057 Anchorage >= 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity $168,172.12 $180,055.80
Alaska 0A31057 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $50,261,884.64 $53,813,580.98
Alaska 0A31057 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $2,545,816.88 $2,725,714.00
Alaska 0A31057 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,327,630.00 $6,775,611.15
Alaska 0A31057 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,420,863.48 $4,733,258.55
Alaska 0A31057 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $4,933.39 $5,282.00
Alaska 0A31057 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,702,758.76 $2,893,746.00
Alaska 0A31057 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $6,611,542.43 $7,078,739.22
Alaska 0A31065 Anchorage >= 200,000 State CONGESTION AIR QUALITY 4R - Maintenance Resurfacing $2,435,102.41 $2,607,176.02
Alaska 0A31065 Anchorage >= 200,000 Other CONGESTION AIR QUALITY 4R - Maintenance Resurfacing $865,836.19 $927,019.48
Alaska 0A31065 Anchorage >= 200,000 State CONGESTION AIR QUALITY Bridge Replacement - No Added Capacity $4,295,984.50 $4,599,555.14
Alaska 0A31065 Anchorage >= 200,000 Other CONGESTION AIR QUALITY Utilities $57,519.55 $61,584.10
Alaska 0A31065 Anchorage >= 200,000 State CONGESTION AIR QUALITY Utilities $282,545.95 $302,511.72
Alaska 0A31065 Anchorage >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $294,686.34 $315,510.00
Alaska 0A31065 Anchorage >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $1,640,705.66 $1,756,644.18
Alaska 0A31065 Anchorage >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $6,219,117.51 $6,659,508.67
Alaska 0A31065 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $17,490,823.42 $18,729,392.08
Alaska 0A31065 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,007,920.96 $4,291,135.93
Alaska 0A31065 Anchorage >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $971,858.12 $1,040,533.32
Alaska 0A31065 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $24.43 $26.16
Alaska 0A31065 Anchorage >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $241,154.13 $258,195.00
Alaska 0A31065 Anchorage >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Utilities $85,745.87 $91,805.00
Alaska 0A31065 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing $4,275,983.46 $4,578,140.76
Alaska 0A31065 Anchorage >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $2,732,307.37 $2,925,382.63
Alaska 0A33029 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $17,448,012.15 $97,793,285.36
Alaska 0A33029 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,875,814.71 $5,220,358.36
Alaska 0A33029 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,443,247.04 $3,686,560.00
Alaska 0A33029 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $157,464.93 $168,592.00
Alaska 0A33029 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,097,786.00
Alaska 0A33029 Kenai Peninsula >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $8,667,559.64 $9,280,042.44
Alaska 0A33030 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $7,204,222.85 $7,713,300.70
Alaska 0A33030 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,191,798.21 $1,276,015.21
Alaska 0A33030 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $13,048,082.55 $13,970,109.80
Alaska 0A33030 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,965,469.36 $2,104,356.92
Alaska 0A33030 Kenai Peninsula >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $7,337.74 $7,856.25
Alaska 0A33032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $9,383,297.01 $10,046,356.54
Alaska 0A33032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $13,257,282.72 $14,194,092.85
Alaska 0A33032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $38,508,019.84 $103,479,645.61
Alaska 0A33032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training   $267,950.00
Alaska 0A33032 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $129,849.07 $139,024.70
Alaska 0A33034 Kenai Peninsula >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge New Construction $40,504,724.01 $43,366,942.20
Alaska 0A33034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction   $116,437,426.50
Alaska 0A33034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $9,755,018.92
Alaska 0A33034 Kenai Peninsula >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training   $148,890.00
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $1,332,192.02 $1,456,272.32
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $781,682.65 $868,536.28
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety $9,708,482.16 $9,708,482.16
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $38,190,184.37 $40,888,848.36
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $2,674,191.91 $2,863,160.50
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,132,672.51 $6,566,030.52
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $22,368,299.46 $24,689,730.70
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Training $20,107.15 $21,528.00
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $9,151,807.36 $9,805,302.10
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $6,280,568.80 $6,905,000.00
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Right of Way $679,590.42 $834,176.82
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Utilities $516,626.56 $569,227.90
Alaska 0A41029 Matanuska-Susitna >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Right of Way $3,130,710.80 $3,475,823.18
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $14,405,118.93 $15,423,039.54
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity $1,805,200.94 $1,932,763.32
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Construction Engineering $90,345.82 $96,730.00
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $10,576,060.14 $11,323,404.86
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $494,004.18 $528,912.40
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,138,686.17 $1,219,149.94
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,422,173.87 $1,719,830.10
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $28,543.04 $30,560.00
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,033,594.15 $4,318,623.28
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Training $1,466.01 $1,569.60
Alaska 0A41034 Matanuska-Susitna >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $465,982.87 $498,911.00
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $19,633,577.30 $21,020,960.70
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $4,078,108.38 $4,366,283.06
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,977,164.41 $2,316,878.38
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,755,300.00 $2,950,000.00
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $25,127.46 $26,903.06
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Training $1,284.12 $1,374.86
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $186,800.00 $200,000.00
Alaska 0A44020 Denali < 5,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $51,370.00 $55,000.00
Alaska 0A44020 Denali < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $462,330.00 $496,000.00
Alaska 0A44020 Denali < 5,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $92,986.18 $99,556.94
Alaska 0A45034 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $52,151,571.82 $55,836,800.66
Alaska 0A45034 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $6,310,875.20 $6,756,825.69
Alaska 0A45034 Yukon-Koyukuk >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Training $4,420.30 $4,732.65
Alaska 9500151 Statewide N/A State FERRY BOATS & TERMINAL Preliminary Engineering $293,300.00 $366,625.00
Alaska 9500151 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $1,061,187.04
Alaska 9500151 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Ferry Boats   $36,312,584.00
Alaska 9500158 Statewide N/A State AK HWY/AK MARINE HWY-EXEMPT Construction Engineering $683,581.07 $683,581.07
Alaska 9500158 Statewide N/A State AK HWY/AK MARINE HWY-EXEMPT Ferry Boats $223,421.32 $223,421.32
Alaska 9500158 Statewide N/A State FERRY BOATS & TERMINAL Construction Engineering $2,217,321.23 $2,771,651.54
Alaska 9500158 Statewide N/A State FERRY BOATS & TERMINAL Ferry Boats $20,586,324.92 $25,732,906.15
Alaska 9500158 Statewide N/A State FERRY BOATS & TERMINAL Preliminary Engineering $640,000.00 $800,000.00