U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Arkansas

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity $178,558.40 $223,198.00
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Bridge Replacement - Added Capacity $4,160.00 $5,200.00
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $17,149,535.41 $21,436,919.26
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $3,200,000.00 $4,000,000.00
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $889,338.65 $1,111,673.32
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $81,184.00 $101,480.00
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $52,460.14 $65,575.17
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $935,628.92 $1,169,536.15
Arkansas 0002031 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,305,974.80 $1,632,468.51
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $60,808.00 $67,564.44
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $49,914,925.05
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $3,544,206.00
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,765,256.80 $5,956,571.00
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $2,237,483.00
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $294,745.00
Arkansas 0002032 Ashley >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $2,000,000.00
Arkansas 0004031 Benton >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity $806,228.00 $1,007,785.00
Arkansas 0004031 Benton >= 200,000 State EQUITY BONUS EXEMPT LIM Construction Engineering $493,740.00 $617,175.00
Arkansas 0004031 Benton >= 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $630.52 $788.15
Arkansas 0004031 Benton >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity $17,661,676.00 $22,077,095.00
Arkansas 0004031 Benton >= 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering $215,644.00 $269,555.00
Arkansas 0004031 Benton >= 200,000 State EQUITY BONUS SP LIMITATION Utilities $431,762.00 $539,702.50
Arkansas 0004031 Benton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $164,490.00 $205,612.50
Arkansas 0004031 Benton >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $4,172,384.00 $5,215,480.00
Arkansas 0004031 Benton >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $756,786.00 $945,982.50
Arkansas 0004045 Benton >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $67,275.00 $84,093.75
Arkansas 0004045 Benton >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Utilities $194,708.00 $243,385.00
Arkansas 0004045 Benton >= 200,000 N/A REDISTRIBUTION OF TIFIA FUNDS Bridge New Construction $101,278.00 $126,597.50
Arkansas 0004045 Benton >= 200,000 N/A REDISTRIBUTION OF TIFIA FUNDS Construction Engineering $5,805.64 $7,257.05
Arkansas 0004045 Benton >= 200,000 N/A REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway $8,061,160.30 $10,076,450.38
Arkansas 0004045 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $4,609,446.00 $5,761,807.50
Arkansas 0004045 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $610,875.06 $763,593.82
Arkansas 0004045 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $366,565.79 $458,207.24
Arkansas 0004045 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,489.32 $3,111.66
Arkansas 0004045 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,173,511.46 $3,966,889.32
Arkansas 0004045 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $130,190.00 $162,737.50
Arkansas 0004045 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,242,843.00 $4,053,553.75
Arkansas 0004072 Benton >= 200,000 N/A HSIP LIMITING FLEXIBLE Construction Engineering $467,114.49 $519,016.10
Arkansas 0004072 Benton >= 200,000 N/A HSIP LIMITING FLEXIBLE Safety $521,658.73 $579,620.81
Arkansas 0004072 Benton >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $4,360,136.00 $5,450,170.00
Arkansas 0004072 Benton >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $254,325.34 $317,906.68
Arkansas 0004072 Benton >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $16,860,911.00 $21,076,138.75
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Bridge New Construction   $68,926,860.45
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Construction Engineering   $6,392,931.82
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 New Construction Roadway   $36,431,168.30
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Preliminary Engineering $6,971,957.46 $8,714,946.82
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Right of Way $5,475,174.54 $7,743,968.18
Arkansas 0004080 Benton >= 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Safety   $1,336,125.70
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Traffic Management/Engineering - HOV   $786,063.96
Arkansas 0004080 Benton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Utilities $16,000.00 $5,020,000.00
Arkansas 0004080 Benton >= 200,000 N/A HWY INFRA PRGM-IIJA DEMO Construction Engineering $8,000.00 $10,000.00
Arkansas 0004080 Benton >= 200,000 N/A HWY INFRA PRGM-IIJA DEMO New Construction Roadway $6,939,115.20 $8,673,894.00
Arkansas 0004080 Benton >= 200,000 N/A HWY INFRA PRGM-IIJA DEMO Preliminary Engineering $52,884.80 $66,106.00
Arkansas 0004080 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $565,872.94 $716,770.93
Arkansas 0004080 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff $200,200.00 $250,250.00
Arkansas 0004080 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $9,273,550.22 $11,591,937.78
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $26,873,085.63
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $4,550,751.00
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $344,000.00 $430,000.00
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff   $14,450.00
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Other $86,476.23 $108,095.29
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $281,797.11
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $231,622.41
Arkansas 0007025 Calhoun < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $450,000.00
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A HWY INFRA PRGM-IIJA DEMO Preliminary Engineering $938,307.20 $1,172,884.00
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A HWY INFRA PRGM-IIJA DEMO Right of Way $280,000.00 $350,000.00
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A HWY INFRA PRGM-IIJA DEMO Utilities $16,000.00 $20,000.00
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction   $9,090,201.49
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $40,135.75 $2,845,169.69
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway   $46,173,311.14
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way   $5,500,000.00
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Safety   $330,453.22
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV   $869,250.38
Arkansas 0011066 Clay >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,300,000.00
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $33,153,935.47
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $8,916,725.00
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $548,000.00 $685,000.00
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $300,000.00
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $235,000.00
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $365,543.75
Arkansas 0014028 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $249,742.54
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $3,200,000.00 $19,250,000.00
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $1,583,367.87
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $166,910.85 $208,638.56
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $3,270,088.72 $11,150,000.00
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $153,023.55 $191,279.44
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $151,018.32
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $83,000.00
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $557,305.70 $696,632.13
Arkansas 0014036 Columbia >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $24,606.40 $30,758.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY Bridge New Construction $4,322,218.99 $5,402,773.74
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY Construction Engineering $1,497,600.00 $1,872,000.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY New Construction Roadway $10,224,977.26 $12,781,221.57
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY Right of Way   $1,529,300.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY Utilities   $1,420,000.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A RAIL HWY CROSSING HAZ ELI Bridge New Construction $3,814,022.00 $4,237,802.22
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A RAIL HWY CROSSING HAZ ELI Preliminary Engineering $24,826.04 $27,584.49
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $80,000.00 $100,000.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $3,800,000.00 $4,750,000.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $677,564.91 $846,956.14
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,096,560.00 $3,870,700.00
Arkansas 0023044 Faulkner >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,342,265.30 $2,927,831.62
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   $16,473,515.64
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity   $7,695,562.47
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $40,237.57 $2,443,296.97
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $60,708.34 $75,885.42
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $81,840.00 $102,300.00
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way   $1,755,953.02
Arkansas 0028060 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $1,342,215.00
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering $1,074,808.12 $1,343,510.15
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $44,289,820.49
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $228,184.80 $2,333,720.85
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $362,257.60 $452,822.00
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $779,982.50
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $1,434,734.85
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $160,000.00 $500,000.00
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Right of Way $628,014.00 $785,017.50
Arkansas 0035049 Jefferson >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Utilities $480,000.00 $600,000.00
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF 4R - Added Capacity $2,881,851.21 $3,602,314.01
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity $26,359,133.60 $32,948,917.00
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Construction Engineering $638,150.53 $797,688.16
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $988,519.31 $1,235,649.14
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Right of Way $198,400.00 $248,000.00
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities $23,116.35 $28,895.44
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $832,427.00 $1,040,533.75
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $22,978.00 $28,722.50
Arkansas 0038045 Lawrence >= 5,000 AND < 50,000 State SAFETEA-LU MISC. 1900 & UP 4R - Added Capacity $1,553,704.00 $1,942,130.00
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $7,176,942.00 $8,971,177.50
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,092,019.39 $1,471,875.11
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $14,251,868.70 $17,814,835.87
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $1,983,269.04
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $929,006.30
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $50,724.00 $63,405.00
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $2,158,381.02
Arkansas 0043028 Lonoke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,993.00 $2,491.25
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $26,089,945.45 $32,612,431.81
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other   $74,782.50
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $553,212.23 $3,193,515.29
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $382,840.00 $478,550.00
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $77,000.00
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $20,000.00
Arkansas 0043037 Lonoke >= 50,000 AND < 200,000 N/A TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $739,000.00 $1,291,829.10
Arkansas 0047051 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $12,170,714.00
Arkansas 0047051 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $15,000,000.00 $24,000,000.00
Arkansas 0047051 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $7,811,289.00
Arkansas 0047051 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $749,894.60
Arkansas 0047051 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $649,685.00
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Bridge Replacement - Added Capacity $15,911,000.00 $19,888,750.00
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Construction Engineering $250,000.00 $312,500.00
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $20,000,000.00 $25,000,000.00
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $3,019,659.01 $3,943,041.97
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,682,039.26 $2,102,709.10
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $107,875.82 $3,858,754.78
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $470,000.00
Arkansas 0047081 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,415,000.00
Arkansas 0059016 Prairie >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $12,800,000.00 $16,000,000.00
Arkansas 0059016 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $7,484,085.39
Arkansas 0059016 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $393,086.77
Arkansas 0059016 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $50,000.00
Arkansas 0059016 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $80,625.00
Arkansas 0059016 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $1,610,902.22 $2,013,627.77
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $560,299.56 $700,374.45
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 Local REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $150,722.44 $188,403.05
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $7,030,738.98 $17,448,460.33
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,278,224.39 $6,677,277.18
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $402,645.62 $516,103.87
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,276,880.78 $1,621,687.00
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $174,115.09 $217,643.87
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $646,795.31 $808,494.13
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $639,936.00 $957,500.00
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $320,064.00 $442,500.00
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $12,606.40 $801,679.40
Arkansas 0065052 Sebastian >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,393.60 $397,320.60
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $36,588,230.03
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $1,800,000.00
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,000,000.00 $2,500,000.00
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other $166,072.80 $207,591.00
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $340,000.00
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $1,300,000.00
Arkansas 0070036 Union >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $875,000.00
Arkansas 0071030 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $26,257,102.54 $32,821,378.18
Arkansas 0071030 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $1,077,227.00 $1,346,533.75
Arkansas 0071030 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,374,043.37 $1,717,554.21
Arkansas 0071030 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $936,271.96 $1,170,339.96
Arkansas 0071030 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $92,597.00 $115,746.25
Arkansas 0071030 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,809,460.20 $2,261,825.26
Arkansas 0071031 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $36,584,705.01
Arkansas 0071031 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,472,585.33 $1,840,731.66
Arkansas 0071031 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $440,800.63
Arkansas 0071031 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $3,067,531.40
Arkansas 0071031 Van Buren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $3,019,001.36
Arkansas 0073080 Lonoke >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM 4R - Restoration & Rehabilitation $103.22 $129.03
Arkansas 0073080 White >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM 4R - Restoration & Rehabilitation $413,645.78 $517,057.22
Arkansas 0073080 Lonoke >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION 4R - Restoration & Rehabilitation $514.73 $643.41
Arkansas 0073080 White >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION 4R - Restoration & Rehabilitation $2,062,712.27 $2,578,390.34
Arkansas 0073080 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $3,632.75 $4,540.94
Arkansas 0073080 White >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $15,772,348.81 $19,715,436.02
Arkansas 0073080 White >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $1,978,456.00 $2,473,070.00
Arkansas 0073080 White >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,011,178.18 $1,263,972.72
Arkansas 0073080 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $251.76 $314.70
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $113,127.02 $141,408.77
Arkansas 0076135 Clark >= 5,000 AND < 50,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $28,281.75 $35,352.19
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $10,380,562.69 $17,505,320.88
Arkansas 0076135 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $2,595,140.66 $4,376,330.22
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity   $735,094.12
Arkansas 0076135 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $355,114.15 $443,892.69
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,420,456.59 $1,775,570.73
Arkansas 0076135 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $105,612.04 $132,015.05
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $325,798.19 $407,247.74
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way   $731,250.00
Arkansas 0076135 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way   $243,750.00
Arkansas 0076135 Hot Spring >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $2,118,283.30
Arkansas 0076135 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $711,716.70
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $3,535,666.45 $4,419,583.06
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $3,642,807.87 $4,553,509.84
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $3,535,666.45 $4,419,583.06
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $128,844.35 $161,055.44
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $132,748.73 $165,935.91
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $128,844.35 $161,055.44
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $2,499,568.48 $3,883,303.31
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $2,498,818.79 $3,882,138.56
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $2,498,818.79 $3,882,138.56
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $399,960.00 $499,950.00
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $400,080.00 $500,100.00
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $399,960.00 $499,950.00
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $399,581.63 $499,477.04
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $399,581.64 $499,477.06
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $399,701.53 $499,626.90
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $128,386.00
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $128,386.00
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $128,424.54
Arkansas 0076152 Pike >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $207,522.79
Arkansas 0076152 Howard >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $207,522.79
Arkansas 0076152 Sevier >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $207,585.05
Arkansas 0076244 Saline >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $8,625.08 $9,583.42
Arkansas 0076244 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other $8,630.27 $9,589.19
Arkansas 0076244 Saline >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Construction Engineering $8,502.49 $9,447.22
Arkansas 0076244 Pulaski >= 200,000 State INTERSTATE MAINTENANCE Construction Engineering $8,507.59 $9,452.87
Arkansas 0076244 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $15,018,101.86 $16,686,779.83
Arkansas 0076244 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $21,642,877.00 $24,047,641.12
Arkansas 0076244 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $1,077,300.00 $1,197,000.00
Arkansas 0076244 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $182,700.00 $203,000.00
Arkansas 0076244 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $123,946.20 $137,718.01
Arkansas 0076244 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $167,363.62 $185,959.58
Arkansas 0076269 Statewide N/A N/A CARBON REDUCTION PROGRAM Construction Engineering $2,121,813.00 $4,927,269.00
Arkansas 0076269 Statewide N/A N/A CARBON REDUCTION PROGRAM Preliminary Engineering $2,128,743.20 $2,824,597.00
Arkansas 0076269 Statewide N/A N/A CARBON REDUCTION PROGRAM Safety $18,094,417.82 $29,964,531.70
Arkansas 0076269 Statewide N/A N/A CARBON REDUCTION PROGRAM Traffic Management/Engineering - HOV $7,314,583.88 $9,143,229.85
Arkansas 0076269 Statewide N/A State HSIP LIMITING FLEXIBLE Other $77,598.00 $86,220.00
Arkansas 0076269 Statewide N/A N/A HSIP LIMITING FLEXIBLE Safety $13,400,000.00 $14,888,888.89
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $53,311,410.00 $66,639,262.50
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $1,267,200.00 $1,408,000.00
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $411,945.09 $100,684,526.52
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $49,271,578.17
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $23,368,114.00
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $3,390,309.86
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $4,675,000.00
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $4,659,185.00
Arkansas 0302267 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $2,468,912.00
Arkansas 0302268 Pulaski >= 200,000 State CONGESTION AIR QUALITY Bridge Replacement - Added Capacity $26,409,043.12 $33,011,303.90
Arkansas 0302268 Pulaski >= 200,000 State CONGESTION AIR QUALITY Other $8,079,841.30 $10,099,801.63
Arkansas 0302268 Pulaski >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $1,079,880.00 $1,349,850.00
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $93,341,854.10 $116,677,317.63
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $148,034,874.08 $219,563,405.48
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $5,872,036.88
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $136,425,543.56 $172,133,574.15
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $15,441,945.41
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $18,834,588.03
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $44,184.58
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Replacement - Added Capacity $8,482,540.00 $10,603,175.00
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $6,431,345.90 $8,039,182.38
Arkansas 0302268 Pulaski >= 200,000 State NATIONAL HWY FREIGHT PGM Bridge Replacement - Added Capacity $8,000,000.00 $10,000,000.00
Arkansas 0302268 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $22,200,000.00 $27,781,338.09
Arkansas 0302268 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $20,600,000.00 $25,750,000.00
Arkansas 0302273 Hot Spring >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other   $37,060.53
Arkansas 0302273 Saline >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other   $37,067.97
Arkansas 0302273 Saline >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $4,759,292.71 $14,097,358.49
Arkansas 0302273 Hot Spring >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $4,758,340.96 $14,094,539.29
Arkansas 0302273 Hot Spring >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Bridge Resurfacing $1,743,718.95 $1,937,465.50
Arkansas 0302273 Saline >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $420,694.88 $467,438.75
Arkansas 0302273 Hot Spring >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $434,305.12 $482,561.25
Arkansas 0302273 Saline >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $115,840.96 $128,712.18
Arkansas 0302273 Hot Spring >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $119,591.84 $132,879.82
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $60,936.84 $67,707.60
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $60,936.84 $67,707.60
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation $420,347.22 $467,052.47
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation $1,865,390.78 $2,072,656.42
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $5,506,214.99 $6,118,016.66
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $24,435,138.99 $27,150,154.43
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $3,337,564.25 $3,708,404.66
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $6,000,891.75 $6,667,657.56
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,016,054.95 $1,128,949.96
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $228,957.85 $254,397.61
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $163,975.33 $182,194.81
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $36,950.21 $41,055.79
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $7,902,774.45 $8,780,860.50
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $1,780,811.45 $1,978,679.39
Arkansas 0401094 Sebastian >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Restoration & Rehabilitation $174,647.99 $218,309.99
Arkansas 0401094 Crawford >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Restoration & Rehabilitation $775,042.01 $968,802.51
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - Added Capacity $374,342.52 $415,936.13
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - Added Capacity $60,939.48 $67,710.54
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $22,881.23 $25,423.59
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $22,856.08 $25,395.65
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $22,885.82 $25,428.68
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation $13,965.77 $15,517.53
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation $13,950.40 $15,500.44
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation $13,968.54 $15,520.60
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $2,873,600.79 $3,192,889.77
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $2,790,034.02 $3,100,037.79
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $3,087,696.87 $3,430,774.30
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $2,437,056.00 $2,707,840.00
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $442,944.00 $492,160.00
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $56,250.00 $62,500.00
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $168,750.00 $187,500.00
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $145,758.30 $161,953.67
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $145,918.75 $162,131.95
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $145,947.91 $162,164.34
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Restoration & Rehabilitation $611,483.73 $679,426.38
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Restoration & Rehabilitation $400,026.70 $444,474.09
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Restoration & Rehabilitation $1,126,786.50 $1,251,985.01
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $6,764,594.83 $7,516,216.48
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $17,381,303.80 $19,312,559.78
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $2,398,424.79 $2,664,916.43
Arkansas 0401266 Franklin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $429,841.97 $477,602.19
Arkansas 0401266 Crawford >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $295,141.61 $327,935.12
Arkansas 0401266 Johnson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $240,088.14 $266,764.59
Arkansas 0402083 Pope >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other   $30,127.50
Arkansas 0402083 Johnson >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other   $30,127.50
Arkansas 0402083 Pope >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing $681,771.99 $757,524.44
Arkansas 0402083 Johnson >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing $681,771.99 $757,524.43
Arkansas 0402083 Pope >= 50,000 AND < 200,000 State INTERSTATE MAINTENANCE Construction Engineering $303,821.10 $337,579.00
Arkansas 0402083 Johnson >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering $191,178.90 $212,421.00
Arkansas 0402083 Johnson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $18,748,174.37 $20,831,304.85
Arkansas 0402083 Pope >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $18,748,174.37 $20,831,304.86
Arkansas 0402083 Pope >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $435,499.35 $483,888.18
Arkansas 0402083 Johnson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $204,940.88 $227,712.08
Arkansas 0402083 Pope >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $36,428.01 $40,475.56
Arkansas 0402083 Johnson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $36,428.02 $40,475.58
Arkansas 0403138 Pope >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $85.59 $95.09
Arkansas 0403138 Conway >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $85.34 $94.83
Arkansas 0403138 Pope >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $14,288,713.14 $15,876,347.93
Arkansas 0403138 Conway >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $14,248,760.67 $15,831,956.30
Arkansas 0403138 Pope >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $900,000.00 $1,000,000.00
Arkansas 0403138 Conway >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $450,000.00 $500,000.00
Arkansas 0403138 Pope >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $250,343.88 $278,159.87
Arkansas 0403138 Conway >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $249,643.90 $277,382.11
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity $16,977.89 $18,864.32
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $11,797,037.67 $13,107,819.63
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $3,295.67 $3,295.67
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering $3,184,297.32 $3,538,108.13
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Right of Way $12,320.28 $13,689.20
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Utilities $10,259.42 $11,399.35
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $8,430,692.64 $9,367,436.27
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $82,937,303.88 $92,152,559.87
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,157,561.99 $1,286,179.98
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other $23,171.74 $25,746.38
Arkansas 0404081 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,596,783.64 $1,774,204.05
Arkansas 0404087 Lonoke >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other   $21,751.32
Arkansas 0404087 Prairie >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other   $28,248.68
Arkansas 0404087 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $14,238,777.43 $15,820,863.81
Arkansas 0404087 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $10,963,780.75 $12,181,978.61
Arkansas 0404087 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $106,555.50 $118,395.00
Arkansas 0404087 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $106,555.50 $118,395.00
Arkansas 0404087 Prairie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $80,012.40 $88,902.67
Arkansas 0404087 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $61,609.10 $68,454.55
Arkansas 0404090 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $2,700,000.00 $18,000,000.00
Arkansas 0404090 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $54,900.00 $61,000.00
Arkansas 0404090 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $90,000.00 $2,610,000.00
Arkansas 0404090 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $191,309.40 $212,566.00
Arkansas 0404090 Monroe >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - Maintenance Resurfacing $1,118,500.80 $16,739,000.00
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering $29,487.54 $29,487.54
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $109,248.58 $121,387.31
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety $705,102.79 $705,102.79
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity $22,372.00 $24,857.78
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $24,394,565.34 $27,105,072.59
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $3,210,875.07 $3,567,638.97
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $676,292.99 $751,436.67
Arkansas 0405158 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $166,776.10 $185,306.78
Arkansas 0472010 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,286,285.49 $10,547,224.10
Arkansas 0472010 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM Mitigation of Water Pollution due to Highway Runoff $480,800.00 $601,000.00
Arkansas 0472010 Statewide N/A N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway   $25,000,000.00
Arkansas 0472010 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction   $62,301,105.01
Arkansas 0472010 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,127.96 $1,409.95
Arkansas 0472010 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway   $89,651,979.24
Arkansas 0472010 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,474,904.80 $1,843,631.00
Arkansas 0472010 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way   $20,000,000.00
Arkansas 0472010 Benton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $679,880.00 $849,850.00
Arkansas 0472010 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Safety   $2,732,774.09
Arkansas 0472010 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Traffic Management/Engineering - HOV   $1,372,849.87
Arkansas 0472010 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities   $13,794,000.00
Arkansas 0491017 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $29,681,167.37
Arkansas 0491017 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity   $7,693,860.00
Arkansas 0491017 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,373,317.39 $1,757,132.93
Arkansas 0491017 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $3,318.23
Arkansas 0491017 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $2,288,487.41
Arkansas 0491021 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $32,358,431.09 $35,953,812.32
Arkansas 0491021 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $3,010,459.16 $3,344,954.62
Arkansas 0491021 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $315,000.00 $2,928,000.00
Arkansas 0551148 Mississippi >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $110,541.05 $301,459.30
Arkansas 0551148 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $35,538,247.99 $39,486,942.21
Arkansas 0551148 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $1,512,000.00 $1,680,000.00
Arkansas 0551148 Mississippi >= 5,000 AND < 50,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $288,000.00 $320,000.00
Arkansas 0551148 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,610,000.00 $2,900,000.00
Arkansas 0551151 Mississippi >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other $78,386.40 $87,096.00
Arkansas 0551151 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $72,521,508.20 $93,485,045.25
Arkansas 0551151 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $391,249.19 $434,721.32
Arkansas 0551151 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $3,577,500.00 $3,975,000.00
Arkansas 0551151 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $421,773.00
Arkansas 1656005 Craighead >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $889,824.00 $2,004,377.03
Arkansas 1656005 Poinsett >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $5,350,176.00 $12,051,562.92
Arkansas 1656005 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $761,526.95
Arkansas 1656005 Poinsett >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $4,578,774.18
Arkansas 1656005 Poinsett >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $1,681,863.47
Arkansas 1656005 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $281,438.61
Arkansas 1656005 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $344,954.42
Arkansas 1656005 Poinsett >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $2,011,307.58
Arkansas 1656005 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $224,000.00
Arkansas 1656005 Poinsett >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $1,176,000.00
Arkansas 1656005 Poinsett >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $735,504.00
Arkansas 1656005 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $140,096.00
Arkansas 1765009 Statewide N/A State HWY INFRA PRGM-IIJA DEMO Bridge New Construction $67,000,000.00 $83,750,000.00
Arkansas 1765009 Statewide N/A State HWY INFRA PRGM-IIJA DEMO New Construction Roadway $23,000,000.00 $28,750,000.00
Arkansas 1765009 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,571,914.49 $6,964,893.11
Arkansas 1765009 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway   $41,630,217.77
Arkansas 1765009 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Safety   $8,967,963.93
Arkansas 1765009 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV   $4,043,840.42
Arkansas 1765009 Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction   $115,530,285.08
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A HWY INFRA PRGM-IIJA DEMO Bridge New Construction $2,000,000.00 $2,500,000.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A HWY INFRA PRGM-IIJA DEMO New Construction Roadway $16,000,000.00 $20,000,000.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A I-69 PROJ-AR-TEA21 New Construction Roadway $8,064,432.41 $8,064,432.41
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A I-69 PROJ-AR-TEA21 Preliminary Engineering $234,812.59 $234,812.59
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A I-69 PROJ-AR-TEA21 Right of Way $558,630.00 $558,630.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NAT'L COOR INF IM PROGRAM Bridge New Construction $8,000,000.00 $10,000,000.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NAT'L COOR INF IM PROGRAM Construction Engineering $2,575,440.80 $3,219,301.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NAT'L COOR INF IM PROGRAM Mitigation of Water Pollution due to Highway Runoff $2,897,926.00 $3,622,407.50
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NAT'L COOR INF IM PROGRAM New Construction Roadway $17,066,716.52 $21,333,395.65
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NAT'L COOR INF IM PROGRAM Right of Way $560,000.00 $700,000.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $639,395.00 $799,243.75
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way   $3,603,577.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,495,000.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A REPURPOSED EARMARKS EXEMPT Preliminary Engineering $1,200,000.00 $1,200,000.00
Arkansas 2221002 Drew >= 5,000 AND < 50,000 N/A REPURPOSED EARMARKS EXEMPT Right of Way $676,423.00 $676,423.00
Arkansas 4302265 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other $10,680.00 $10,680.00
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $23,507,370.00 $26,119,300.00
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,428,261.91 $1,587,040.45
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $9,491.84 $11,864.80
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $71,319.86 $89,149.83
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $328,755.00 $365,283.33
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $211,979.00 $264,973.75
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $386,019.00 $482,523.75
Arkansas 4302265 Pulaski >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $160,015.00 $200,018.75
Arkansas 4302269 Pulaski >= 200,000 State EQUITY BONUS SP LIMITATION Traffic Management/Engineering - HOV $405,000.00 $450,000.00
Arkansas 4302269 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other $4,282.30 $4,758.11
Arkansas 4302269 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $16,424,783.58 $18,249,759.53
Arkansas 4302269 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $16,851,923.18 $18,724,359.09
Arkansas 4302269 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $556,526.96 $618,363.28
Arkansas 4401007 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $96,768.00 $107,520.00
Arkansas 4401007 Pulaski >= 200,000 State INTERSTATE MAINTENANCE Construction Engineering $59,749.00 $66,388.00
Arkansas 4401007 Pulaski >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $34,862.00 $38,735.00
Arkansas 4401007 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $30,971,977.00 $34,413,308.00
Arkansas 4401007 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $949,196.00 $1,054,662.00
Arkansas 4401007 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $350,229.00 $389,143.00
Arkansas 4928001 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $1,849,510.58 $4,464,385.88
Arkansas 4928001 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $4,975,216.00 $5,528,017.78
Arkansas 4928001 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,430,628.23 $1,589,586.93
Arkansas 4928001 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,005,715.56
Arkansas 4928001 Washington >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $21,723,526.90 $24,137,252.11
Arkansas 4928001 Washington >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $1,170,000.00 $1,300,000.00
Arkansas 4928001 Washington >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity $2,288,117.00 $2,860,146.25
Arkansas 4928001 Washington >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $3,330,000.00 $3,700,000.00
Arkansas 4928001 Washington >= 200,000 State TRANSPORTATION ALTERNATIVES Bridge New Construction $332,000.00 $415,000.00
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $35,520.40 $39,467.11
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $52,787,042.88 $61,842,944.50
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,141,820.76 $2,379,800.85
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $113,783.27 $126,425.85
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $13,116,379.00 $14,573,754.44
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $360,866.74 $400,963.04
Arkansas 5305004 Jefferson >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity $2,282,521.00 $2,853,151.25
Arkansas 5401078 Benton >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - Added Capacity $2,884,390.00 $3,605,487.50
Arkansas 5401078 Benton >= 200,000 State INTERSTATE MAINT DISC 4R - Added Capacity $74,090.00 $92,612.50
Arkansas 5401078 Benton >= 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity $138,475.40 $173,094.25
Arkansas 5401078 Benton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $1,051,938.00 $1,314,922.50
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $5,422,518.68 $6,778,148.35
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $3,445,849.00 $4,307,311.25
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,680,000.00 $2,100,000.00
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $272,895.00 $341,118.75
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,276,000.00 $6,595,000.00
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $1,292,361.00 $1,615,451.25
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $516,000.00 $2,382,000.00
Arkansas 5401078 Benton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $1,480,700.46 $1,850,875.58
Arkansas 5401078 Benton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $8,398,902.00 $10,498,627.50
Arkansas 5401078 Benton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $1,214,398.00 $1,517,997.50
Arkansas 5553001 Craighead >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $163,428.04 $181,587.27
Arkansas 5553001 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $25,189,582.55 $27,988,424.72
Arkansas 5553001 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $1,280,248.34 $1,422,498.14
Arkansas 5553001 Craighead >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing $182,892.66 $203,214.08
Arkansas 5553001 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $473,152.83 $525,725.37
Arkansas 5553001 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $4,189,549.40 $4,655,054.89
Arkansas 6043002 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other $280,636.87 $285,570.02
Arkansas 6043002 Lonoke >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $83,395.82 $84,108.52
Arkansas 6043002 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $79,876,926.57
Arkansas 6043002 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $11,540,265.93
Arkansas 6043002 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $2,500,000.00
Arkansas 6043002 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,449,004.96 $5,823,384.99
Arkansas 6043002 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $642,772.63 $841,337.00
Arkansas 6043002 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $652,418.90
Arkansas 6043002 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $94,258.60
Arkansas 6062001 Pulaski >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing $10,561,458.70 $13,601,823.38
Arkansas 6062001 Saline >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Maintenance Resurfacing $10,561,458.69 $13,601,823.36
Arkansas 6062001 Saline >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $396,431.10 $495,538.88
Arkansas 6062001 Pulaski >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Resurfacing $161,883.50 $202,354.37
Arkansas 6062001 Saline >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $400,000.00 $500,000.00
Arkansas 6062001 Pulaski >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $400,000.00 $500,000.00
Arkansas 6301001 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other $363,256.34 $403,618.15
Arkansas 6301001 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $24,000,000.00 $73,113,630.44
Arkansas 6301001 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $22,060,472.00
Arkansas 6301001 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $2,044,358.49
Arkansas 6301001 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $1,470,628.00
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A HIGHWAY INFRA PRGM -APPOR New Construction Roadway $1,228,630.00 $1,535,787.50
Arkansas 9013010 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,779,892.02 $13,830,160.69
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $2,400,000.00 $3,000,000.00
Arkansas 9013010 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction   $3,000,000.00
Arkansas 9013010 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $2,300,000.00
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $400,000.00 $500,000.00
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $8,692,749.06 $10,865,936.32
Arkansas 9013010 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway   $26,037,069.45
Arkansas 9013010 Clark >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $3,361,624.58 $4,202,030.72
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,329,702.53 $2,912,128.17
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $460,756.00 $14,575,945.00
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Safety $842,577.64 $1,053,222.05
Arkansas 9013010 Clark >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities   $1,310,000.00
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity $7,677,210.13 $9,596,512.66
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Construction Engineering $52,641.39 $65,801.74
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Preliminary Engineering $140,690.00 $175,862.50
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Right of Way $3,534,896.71 $12,800,000.00
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Safety $889,080.02 $1,111,350.02
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Utilities   $3,080,209.92
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State REDISTRIBUTION OF TIFIA FUNDS Construction Engineering $285,468.06 $356,835.08
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $8,263,627.35 $10,329,534.19
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $1,416,999.13 $1,771,248.91
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $151,487.66 $189,359.58
Arkansas 9035021 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $55,630.62 $69,538.27
Arkansas 9035025 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $21,798,807.93
Arkansas 9035025 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $2,312,000.00
Arkansas 9035025 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $799,412.80 $999,266.00
Arkansas 9035025 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $1,433,962.77
Arkansas 9035025 Saline >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,200,000.00
Arkansas 9036016 Benton >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $1,578,003.21 $26,455,695.09
Arkansas 9036016 Benton >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Right of Way $642,386.00 $802,982.50
Arkansas 9036016 Benton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $1,077,513.93 $1,346,892.41
Arkansas 9036020 Benton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $14,337,191.00 $20,188,652.00
Arkansas 9036020 Benton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Bridge New Construction $4,000,000.00 $5,000,000.00
Arkansas 9036020 Benton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Construction Engineering $1,600,000.00 $2,010,000.00
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity $497,551.34 $621,939.18
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Construction Engineering $3,000.64 $3,750.79
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Utilities $792,880.84 $991,101.05
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $19,497,710.37 $24,372,137.96
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $1,347,935.00 $1,684,918.75
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,376,000.00 $1,720,000.00
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $9,176,000.00 $11,470,000.00
Arkansas 9061006 Saline >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,674,796.00 $2,093,495.00
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity $12,856,800.62 $16,071,000.77
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Bridge New Construction $6,246,625.60 $7,808,282.00
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Bridge Replacement - Added Capacity $990,212.80 $1,237,766.00
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Construction Engineering $850,367.31 $1,062,959.14
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Right of Way $1,977,193.23 $2,471,491.54
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $252,984.12 $316,230.15
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $987,267.15 $1,234,083.94
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $213,124.29 $266,405.36
Arkansas 9065024 Lonoke >= 50,000 AND < 200,000 State TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $117,000.00 $146,250.00
Arkansas 9065038 Lonoke >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Other $67,304.25 $74,782.50
Arkansas 9065038 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $108,000,391.61
Arkansas 9065038 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $12,581,344.08
Arkansas 9065038 Lonoke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,695,660.32 $7,269,227.41
Arkansas 9142048 Washington >= 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity   $1,800,000.00
Arkansas 9142048 Washington >= 200,000 State CONGESTION AIR QUALITY Construction Engineering   $2,582,000.00
Arkansas 9142048 Washington >= 200,000 State CONGESTION AIR QUALITY Other   $3,274,695.64
Arkansas 9142048 Washington >= 200,000 State CONGESTION AIR QUALITY Right of Way $240,000.00 $6,695,500.00
Arkansas 9142048 Washington >= 200,000 State CONGESTION AIR QUALITY Utilities   $10,754,577.06
Arkansas 9142048 Washington >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $280,000.00 $350,000.00
Arkansas 9142048 Washington >= 200,000 State TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $500,000.00 $702,500.00
Arkansas 9142048 Washington >= 200,000 N/A TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $250,000.00 $312,500.00
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   $34,205,887.00
Arkansas 9142051 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   $34,205,887.00
Arkansas 9142051 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $11,189,166.59
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity   $11,189,166.60
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $37,892.09
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering   $3,535,173.33
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way   $6,250,000.00
Arkansas 9142051 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $3,911,414.91
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety   $3,911,414.90
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV   $27,799.35
Arkansas 9142051 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Traffic Management/Engineering - HOV   $27,799.34
Arkansas 9142051 Washington >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $6,089,000.00
Arkansas 9142051 Washington >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $400,000.00 $500,000.00
Arkansas 9142051 Benton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $400,000.00 $500,000.00
Arkansas 9142051 Washington >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $2,025,386.30 $2,577,485.43
Arkansas 9142051 Benton >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $2,025,386.28 $2,577,485.40
Arkansas 9142051 Washington >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,500,000.00 $1,666,666.67
Arkansas 9142051 Benton >= 200,000 State TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $125,511.27 $156,889.08
Arkansas 9142051 Washington >= 200,000 State TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $125,511.26 $156,889.08
Arkansas 9142067 Washington >= 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity   $31,250,000.00
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 State HWY INFRA PRGM-IIJA DEMO Bridge Replacement - Added Capacity $5,000,000.00 $6,250,000.00
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Bridge New Construction $413,245.41 $516,556.76
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $7,600,000.00 $12,663,298.09
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $400,000.00 $10,282,316.61
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $8,868.15 $11,085.18
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $15,667.34 $2,907,584.17
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $2,400,000.00 $29,643,006.17
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering   $1,014,850.00
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $737,615.00 $737,615.00
Arkansas 9177010 Sebastian >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $80,000.00 $6,100,000.00
Arkansas 9210035 Garland >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $1,507,467.00 $1,884,333.75
Arkansas 9210035 Garland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $14,398,312.09 $17,997,890.12
Arkansas 9210035 Garland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $864,107.92 $1,080,134.90
Arkansas 9210035 Garland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,480,000.00 $4,600,000.00
Arkansas 9210035 Garland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $240,000.00 $300,000.00
Arkansas 9210035 Garland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $816,000.00 $3,420,000.00
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A NATL INTRASTRUCTURE INVESTMENT Bridge New Construction $8,000,000.00 $10,000,000.00
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A NATL INTRASTRUCTURE INVESTMENT New Construction Roadway $12,000,000.00 $15,000,000.00
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM Bridge New Construction $1,211,083.00 $1,513,853.75
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $9,188,917.00 $11,486,146.25
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,671,576.08 $2,089,470.10
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Mitigation of Water Pollution due to Highway Runoff $1,044,800.00 $1,306,000.00
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $20,220,327.67 $50,275,409.58
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,040,000.00 $7,700,000.00
Arkansas 9210038 Garland >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $80,000.00 $4,800,000.00
Arkansas 9222014 Pulaski >= 200,000 State CONGESTION AIR QUALITY Preliminary Engineering   $2,073,494.00
Arkansas 9222014 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other   $500,000.00
Arkansas 9222014 Pulaski >= 200,000 State HWY INFRA PRGM-IIJA DEMO 4R - Added Capacity $16,000,000.00 $20,000,000.00
Arkansas 9222014 Pulaski >= 200,000 Local HWY INFRA PRGM-IIJA DEMO Bridge Replacement - Added Capacity $680,000.00 $850,000.00
Arkansas 9222014 Pulaski >= 200,000 State HWY INFRA PRGM-IIJA DEMO Bridge Replacement - Added Capacity $1,320,000.00 $1,650,000.00
Arkansas 9222014 Pulaski >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $36,000,000.00 $45,000,000.00
Arkansas 9222014 Pulaski >= 200,000 Local NAT SIG FREIGHT AND HWY PROJ Bridge Replacement - Added Capacity $1,320,000.00 $1,650,000.00
Arkansas 9222014 Pulaski >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Bridge Replacement - Added Capacity $2,680,000.00 $3,350,000.00
Arkansas 9222014 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $13,715,508.53 $57,580,710.38
Arkansas 9222014 Pulaski >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $1,320,000.00 $3,233,670.49
Arkansas 9222014 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $2,680,000.00 $6,516,391.00
Arkansas 9222014 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $304,000.00 $7,380,000.00
Arkansas 9222014 Pulaski >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity $8,000,000.00 $10,000,000.00
Arkansas 9222014 Pulaski >= 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - Added Capacity $1,340,000.00 $1,675,000.00
Arkansas 9222014 Pulaski >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - Added Capacity $660,000.00 $825,000.00
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY 4R - Added Capacity   $11,194,400.00
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local CONGESTION AIR QUALITY 4R - Added Capacity   $8,805,600.00
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY Bridge New Construction   $16,682,863.36
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 N/A CONGESTION AIR QUALITY New Construction Roadway   $23,025,340.73
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local CONGESTION AIR QUALITY Preliminary Engineering $167,766.57 $209,708.22
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Preliminary Engineering $213,278.63 $266,598.28
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Right of Way $1,000,173.63 $7,784,951.89
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local CONGESTION AIR QUALITY Right of Way $786,744.17 $6,123,702.25
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local CONGESTION AIR QUALITY Safety   $601,396.16
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Safety   $764,544.05
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State CONGESTION AIR QUALITY Utilities   $4,994,970.39
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local CONGESTION AIR QUALITY Utilities   $3,929,081.61
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $304,830.46 $381,038.07
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Construction Engineering $304,830.46 $381,038.08
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way $3,435,997.24 $4,294,996.55
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local REDISTRIBUTION OF CERTAIN AUTH Right of Way $3,435,997.25 $4,294,996.56
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway $731,340.00 $914,175.00
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 N/A REPURPOSED SPECIAL New Construction Roadway $192,562.00 $240,702.50
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $870,301.04 $1,087,876.30
Arkansas 9227074 Craighead >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $965,034.44 $1,206,293.06
Arkansas 9227080 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,116,009.23 $1,395,011.54
Arkansas 9227080 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $12,199,488.63 $15,249,360.79
Arkansas 9227080 Craighead >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   $706,218.45
Arkansas 9227080 Craighead >= 50,000 AND < 200,000 State RAIL HWY CROSSING HAZ ELI Bridge New Construction $8,699,999.00 $9,666,665.56
Arkansas 9227080 Craighead >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway $182,835.00 $228,543.75
Arkansas 9227086 Craighead >= 50,000 AND < 200,000 N/A HSIP LIMITING FLEXIBLE Other $178,748.46 $198,609.40
Arkansas 9227086 Craighead >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   $37,103,300.36
Arkansas 9227086 Craighead >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity   $2,439,975.25
Arkansas 9227086 Craighead >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Resurfacing   $143,179.84
Arkansas 9227086 Craighead >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,716,300.00 $1,907,000.00
Arkansas 9253063 Pulaski >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $3,288,806.00 $4,111,007.00
Arkansas 9253063 Pulaski >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Utilities $16,000.00 $20,000.00
Arkansas 9253063 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $28,510,019.00 $40,623,897.00
Arkansas 9253063 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $679,555.00 $849,444.00
Arkansas 9253063 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,695,638.00 $3,369,548.00
Arkansas 9253063 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,402,000.00 $3,002,500.00
Arkansas 9253063 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $3,200,000.00 $4,000,000.00
Arkansas 9253063 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $6,025,245.00 $10,223,500.00
Arkansas 9253063 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - Added Capacity $31,325,518.00 $51,407,943.00
Arkansas 9253063 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $2,016,607.00 $2,520,759.00
Arkansas 9253063 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Safety $232,214.00 $360,905.00
Arkansas 9253087 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $37,178,433.51 $43,739,333.54
Arkansas 9253087 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,540,716.36 $2,989,078.08
Arkansas 9253087 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,004,197.06 $3,534,349.48
Arkansas 9253087 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $17,230,022.80 $20,270,615.06
Arkansas 9253087 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $4,150,888.60
Arkansas 9253087 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $17,970,317.70 $21,141,550.24
Arkansas 9253087 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $17,000,000.00 $20,000,000.00
Arkansas 9253087 Pulaski >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity $2,550,000.00 $3,000,000.00
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A NATL INTRASTRUCTURE INVESTMENT Bridge New Construction $2,000,000.00 $2,500,000.00
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A NATL INTRASTRUCTURE INVESTMENT New Construction Roadway $2,000,000.00 $2,500,000.00
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $3,200,000.00 $13,098,232.77
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $643,717.65 $2,268,281.41
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $3,503,735.52 $11,815,514.58
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $292,664.25 $465,830.32
Arkansas 9293009 Drew >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities   $912,000.00
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $364,878.41 $456,098.01
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A BRIDGE PROGRAM - 85% ON/OFF Utilities $37,660.06 $47,075.07
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge New Construction $20,909,047.96 $26,136,309.95
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,501,231.32 $1,876,539.16
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $3,731,687.00 $4,664,608.75
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $194,567.53 $243,209.41
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $361,683.13 $452,103.91
Arkansas 9309002 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $423,872.00 $529,840.00
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge New Construction $783,117.00 $978,896.25
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,027,735.43 $1,284,669.29
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $11,911,289.39 $14,889,111.73
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $11,085.27 $13,856.59
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,210,168.26 $6,512,710.33
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Safety $185,752.00 $232,190.00
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities $911,225.51 $1,139,031.88
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $500,724.73 $625,905.92
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way $429,810.49 $537,263.11
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Utilities $13,459.78 $16,824.72
Arkansas 9332013 Greene >= 5,000 AND < 50,000 N/A SAFETEA-LU MISC. 1900 & UP Utilities $699,177.00 $873,971.25
Arkansas 9373019 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $7,787,953.00 $19,734,941.25
Arkansas 9373019 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,728,000.00 $2,160,000.00
Arkansas 9373019 Benton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety $1,280,000.00 $1,600,000.00
Arkansas 9373019 Benton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Utilities $65,009.00 $81,261.25
Arkansas 9373019 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $192.04 $750,240.05
Arkansas 9373019 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Landscaping and Other Scenic Beautification   $600,000.00
Arkansas 9373019 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,650,000.00 $3,312,500.00
Arkansas 9373019 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $16,000.00 $6,920,000.00
Arkansas 9373019 Benton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,052,804.00 $1,316,005.00
Arkansas 9373019 Benton >= 200,000 N/A TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $212,047.00 $265,058.75
Arkansas 9448045 Crittenden >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $4,250,000.00 $55,337,446.67
Arkansas 9448045 Crittenden >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $425,000.00 $2,750,000.00
Arkansas 9448045 Crittenden >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $5,641,661.42 $6,637,248.73
Arkansas 9448045 Crittenden >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $21,250.00 $4,525,000.00
Arkansas 9448045 Crittenden >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $310,000.00
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering $765.93 $765.93
Arkansas B300203 Miller >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering $342.87 $342.87
Arkansas B300203 Miller >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety $34,693.70 $34,693.70
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety $77,220.30 $77,220.30
Arkansas B300203 Miller >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity   $3,647,297.11
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity   $3,647,297.11
Arkansas B300203 Miller >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $658,736.29
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $1,466,197.56
Arkansas B300203 Miller >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $8,453,050.51 $9,392,278.34
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $8,561,946.49 $9,513,273.88
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $4,990,564.10 $5,545,071.22
Arkansas B300203 Miller >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $4,990,564.10 $5,545,071.22
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $757,537.83 $841,708.70
Arkansas B300203 Miller >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $340,348.17 $378,164.63
Arkansas B300203 Hempstead >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $4,075,366.75 $4,528,185.28
Arkansas B300203 Miller >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $4,023,533.79 $4,470,593.11
Arkansas B300216 Clark >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other   $18,259.09
Arkansas B300216 Hempstead >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other   $18,989.00
Arkansas B300216 Nevada >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Other   $71,353.84
Arkansas B300216 Hempstead >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing   $7,207,823.34
Arkansas B300216 Clark >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing   $6,930,759.50
Arkansas B300216 Nevada >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing   $27,084,407.28
Arkansas B300216 Nevada >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Resurfacing   $2,812,896.60
Arkansas B300216 Hempstead >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Resurfacing   $1,278,589.40
Arkansas B300216 Clark >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering   $269,005.60
Arkansas B300216 Nevada >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering   $1,051,235.04
Arkansas B300216 Hempstead >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering   $279,759.36
Arkansas B300216 Hempstead >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $1,805,527.90
Arkansas B300216 Clark >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $1,736,124.62
Arkansas B300216 Nevada >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $6,784,524.37
Arkansas B400201 Monroe >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - Maintenance Resurfacing $5,034,324.00 $5,593,693.33
Arkansas B400201 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $9,525,377.00 $10,583,752.00
Arkansas B400201 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $561,441.70 $623,823.44
Arkansas B400201 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $1,497,340.00 $1,663,711.11
Arkansas B400201 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - Maintenance Resurfacing $11,785,624.60 $13,095,138.00
Arkansas B400201 Monroe >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Debt Service $6,406,257.40 $7,118,064.00
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering $13,131.91 $13,131.91
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety $1,591,977.09 $1,591,977.09
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity   $30,623,324.44
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Rehabilitation - No Added Capacity   $469,855.56
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity   $7,805,314.44
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Construction Engineering $664,049.70 $737,833.00
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $11,669,548.89
Arkansas B400207 Crittenden >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $110,384.19 $122,649.10
Arkansas B400229 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $10,990,230.30 $12,211,367.00
Arkansas B400229 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $13,580,568.69 $15,089,520.76
Arkansas B400229 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $869,330.00 $965,922.00
Arkansas B400229 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $7,371,239.69 $8,190,266.33
Arkansas B400230 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity   $14,381,331.11
Arkansas B400230 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity   $19,359,408.89
Arkansas B400230 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $9,254,083.33
Arkansas B400230 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,250,065.40 $1,388,961.56
Arkansas B400230 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $31,296.00 $34,773.33
Arkansas B400231 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE 4R - No Added Capacity   $6,876,382.22
Arkansas B400231 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Bridge Replacement - No Added Capacity   $20,857,850.00
Arkansas B400231 St. Francis >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Debt Service   $8,320,270.00
Arkansas B400231 St. Francis >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $594,420.41 $660,467.12
Arkansas B440202 Pulaski >= 200,000 State HSIP LIMITING FLEXIBLE Other $136,033.00 $151,147.78
Arkansas B440202 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $38,952,232.01 $43,280,257.79
Arkansas B440202 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,044,913.00 $2,272,125.56
Arkansas B440202 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $11,685,606.61 $12,984,007.34
Arkansas B530201 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $22,476,983.00 $24,974,426.00
Arkansas B530201 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $380,303.00 $422,559.00
Arkansas B530201 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $6,743,094.00 $7,492,327.00
Arkansas B530201 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $289.00 $321.00
Arkansas B530202 Jefferson >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $81,001.00 $90,001.11
Arkansas B530202 Jefferson >= 50,000 AND < 200,000 State HSIP LIMITING FLEXIBLE Safety $531,259.00 $590,287.78
Arkansas B530202 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $25,381,241.20 $28,201,379.10
Arkansas B530202 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $211,686.00 $235,206.67
Arkansas B530202 Jefferson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $7,614,372.34 $8,460,413.72
Arkansas B530203 Pulaski >= 200,000 State INTERSTATE MAINTENANCE Debt Service   $3,382,239.00
Arkansas B530203 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $57,376,325.00 $63,751,473.00
Arkansas B530203 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Preservation $2,486,933.00 $2,763,258.00
Arkansas B530203 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,299,459.00 $1,443,843.00
Arkansas B530203 Pulaski >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $8,895,480.00 $9,883,867.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Construction Engineering $19,872.00 $19,872.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State HSIP LIMITING FLEXIBLE Safety $607,705.00 $607,705.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $21,597,787.00 $23,997,541.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $1,136,725.00 $1,263,028.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $244,930.00 $272,145.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $6,948,022.00 $7,720,024.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other $4,163.00 $4,626.00
Arkansas B550209 Mississippi >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Special Bridge $425,559.00 $472,844.00