| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| Colorado | 0131057 | Garfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,737,757.00 | $2,965,871.00 |
| Colorado | 0131057 | Garfield | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $590,995.00 | $31,951,074.00 |
| Colorado | 021A008 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $6,000,000.00 | $50,671,222.14 |
| Colorado | 021A008 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,186,439.96 | $6,186,439.96 |
| Colorado | 021A008 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,094,148.04 | $3,094,148.04 |
| Colorado | 021A008 | El Paso | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $201,707.00 | $1,066,880.00 |
| Colorado | 021A008 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $403,293.00 | $2,133,120.00 |
| Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $2,545,000.00 | $2,545,000.00 |
| Colorado | 0251357 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $17,266,328.05 | $17,266,328.05 |
| Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $7,730,448.95 | $7,730,448.95 |
| Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $5,000.00 | $607,255.00 |
| Colorado | 0251357 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $61,505.76 | $66,671.82 |
| Colorado | 0251357 | Huerfano | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,537.24 | $29,850.18 |
| Colorado | 0251364 | Las Animas | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $1,830,001.00 | |
| Colorado | 0251364 | Las Animas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $26,894,062.00 | $26,894,062.00 |
| Colorado | 0251364 | Las Animas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $103,303.00 | $105,655.00 |
| Colorado | 0252457 | Denver | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $5,560,789.00 | |
| Colorado | 0252457 | Denver | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge Replacement - Added Capacity | $500,000.00 | $555,555.56 |
| Colorado | 0252457 | Denver | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $22,240,000.00 | $24,884,444.44 |
| Colorado | 0252457 | Denver | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,760,000.00 | $2,200,000.00 |
| Colorado | 0252457 | Denver | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $11,303.00 | $27,745.00 |
| Colorado | 0252477 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,916,651.00 | $152,957,475.00 |
| Colorado | 0252477 | Douglas | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $650,000.00 | $33,045,249.00 |
| Colorado | 0252484 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $7,889,891.00 | $9,862,363.75 |
| Colorado | 0252484 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $14,168,184.00 | $54,880,391.25 |
| Colorado | 0252516 | Denver | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $3,733,163.00 | |
| Colorado | 0252516 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $11,590,982.00 | $26,229,074.00 |
| Colorado | 0252516 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $547,619.00 | $560,088.00 |
| Colorado | 0252516 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,000,000.00 | $1,000,001.00 |
| Colorado | 0252516 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,464.00 | |
| Colorado | 0252518 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,931,000.00 | $75,235,333.00 |
| Colorado | 0253255 | Larimer | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | 4R - Added Capacity | $150,000.00 | $187,500.00 |
| Colorado | 0253255 | Larimer | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $5,425,988.00 | $341,979,675.44 |
| Colorado | 0253255 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $137,465,948.45 | $171,832,435.56 |
| Colorado | 0253255 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,567,601.00 | $5,843,207.00 |
| Colorado | 0253255 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $21,970,000.00 | $49,472,775.00 |
| Colorado | 0253300 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.18 | $7,141,256.85 |
| Colorado | 0253300 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.82 | $31,742,730.15 |
| Colorado | 0253301 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.18 | $22,703,080.21 |
| Colorado | 0253301 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.82 | $100,914,693.79 |
| Colorado | 0253302 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $68,028,680.61 | |
| Colorado | 0253302 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $44,406,075.39 | |
| Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $31,550,000.00 | |
| Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,321,780.00 | $38,740,590.00 |
| Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $16,533,321.00 | |
| Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,721,078.00 | $11,001,400.00 |
| Colorado | 025A049 | Pueblo | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Maintenance Resurfacing | $8,500,000.00 | $8,500,000.00 |
| Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $4,855,357.78 | $5,394,841.97 |
| Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $18,694,246.22 | $20,771,384.70 |
| Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $9,023,796.91 | $10,026,441.02 |
| Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $2,343,703.09 | $2,604,114.54 |
| Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $3,826,346.29 | $3,880,181.07 |
| Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $993,796.71 | $1,007,778.93 |
| Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $4,766,960.95 | $7,944,934.92 |
| Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $18,353,898.05 | $30,589,830.08 |
| Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $1,323,620.42 | $4,164,128.07 |
| Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $5,096,243.58 | $16,032,852.52 |
| Colorado | 0702417 | Eagle | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $10,796,009.50 | $42,500,083.95 |
| Colorado | 0702417 | Summit | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $2,803,990.50 | $11,038,322.23 |
| Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $23,103,837.00 | $87,555,049.22 |
| Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $359,415.00 | $1,057,102.94 |
| Colorado | 0703445 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,829,625.00 | $6,142,459.05 |
| Colorado | 0703496 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,484,136.89 | $7,929,659.18 |
| Colorado | 0703496 | Denver | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,153,144.11 | $19,641,564.82 |
| Colorado | 0703514 | Clear Creek | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $3,537,613.54 | $64,394,887.87 |
| Colorado | 0703514 | Jefferson | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $825,457.46 | $15,025,734.13 |
| Colorado | 0703515 | Clear Creek | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,707,000.00 | $2,967,876.33 |
| Colorado | 0703515 | Clear Creek | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $28,725,199.00 | $117,509,249.67 |
| Colorado | 0703516 | Jefferson | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $1,901,541.40 | $6,694,838.83 |
| Colorado | 0703516 | Clear Creek | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $15,018,458.60 | $52,876,135.07 |
| Colorado | 0703516 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.89 | $0.98 |
| Colorado | 0703516 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $0.11 | $0.12 |
| Colorado | 0703517 | Jefferson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $140,490.01 | $175,612.52 |
| Colorado | 0703517 | Clear Creek | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $2,359,509.99 | $2,949,387.48 |
| Colorado | 0703517 | Jefferson | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $625,000.00 | $781,250.00 |
| Colorado | 0703517 | Clear Creek | >= 5,000 AND < 50,000 | Local | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,875,000.00 | $2,343,750.00 |
| Colorado | 0703517 | Jefferson | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $10,385,000.00 | $58,477,997.94 |
| Colorado | 0703517 | Clear Creek | >= 5,000 AND < 50,000 | Local | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $31,155,000.00 | $175,433,993.82 |
| Colorado | 0703517 | Jefferson | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $2,334,382.07 | $13,144,919.59 |
| Colorado | 0703517 | Clear Creek | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $39,205,617.93 | $220,767,072.15 |
| Colorado | 0703517 | Clear Creek | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,225,645.93 | |
| Colorado | 0703517 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,590,395.36 | |
| Colorado | 0703517 | Clear Creek | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,710,465.90 | |
| Colorado | 0703517 | Jefferson | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,075,215.31 | |
| Colorado | 0704241 | Denver | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $35,796,730.51 | $659,936,093.42 |
| Colorado | 0704241 | Adams | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $14,203,269.49 | $261,846,544.16 |
| Colorado | 0704251 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $8,677,548.30 | $31,933,377.76 |
| Colorado | 0704251 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $16,322,451.70 | $60,066,622.24 |
| Colorado | 0704251 | Adams | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.65 | |
| Colorado | 0704251 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.35 | |
| Colorado | 0704251 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $0.35 | |
| Colorado | 0704251 | Adams | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $0.65 | |
| Colorado | 0705089 | Kit Carson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $36,930,686.00 | $61,630,686.00 |
| Colorado | 0705089 | Kit Carson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $281,976.00 | $290,813.00 |
| Colorado | 070A039 | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $695,000.00 | $10,102,489.36 |
| Colorado | 070A039 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $32,172,648.00 | $35,273,158.64 |
| Colorado | 070A039 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $37,077.00 | $50,000.00 |
| Colorado | 0762060 | Logan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $13,812,645.00 | $30,160,591.00 |
| Colorado | 0762060 | Logan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $630,158.00 | $642,024.00 |
| Colorado | 0852106 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,708,540.00 | $18,973,958.20 |
| Colorado | 0852106 | Douglas | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $6,100,000.00 | $7,864,064.80 |
| Colorado | 0852118 | Douglas | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,828,876.63 | $3,536,095.78 |
| Colorado | 0852118 | Arapahoe | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $757,123.37 | $946,404.22 |
| Colorado | 0852118 | Douglas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $394,433.44 | $394,433.44 |
| Colorado | 0852118 | Arapahoe | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $105,566.56 | $105,566.56 |
| Colorado | 0852118 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $22,687,000.00 | $28,358,750.00 |
| Colorado | 0852118 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $118,330.03 | $44,397,773.81 |
| Colorado | 0852118 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $31,669.97 | $11,882,664.69 |
| Colorado | 0852118 | Arapahoe | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $633,399.37 | $633,399.37 |
| Colorado | 0852118 | Douglas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,366,600.63 | $2,366,600.63 |
| Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,683,836.00 | $5,297,467.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $21,229,869.00 | $21,229,869.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $1,963,334.00 | $1,963,334.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Rail/Hwy Crossing | $667,134.00 | $667,134.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Right of Way | $255,762.00 | $264,909.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $16,770.00 | $232,980.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $90,499.00 | $90,499.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $295,948.00 | $496,835.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $12,236,718.00 | $12,236,718.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Right of Way | $349,578.00 | $349,578.00 |
| Colorado | 0853107 | Weld | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | Utilities | $2,228,935.00 | $2,228,935.00 |
| Colorado | 1151038 | El Paso | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $1,749,980.00 | $43,021,411.71 |
| Colorado | 1151038 | El Paso | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $5,960,428.00 | $7,199,454.04 |
| Colorado | 1151038 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $3,196,513.00 | $3,860,989.25 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,759,824.00 | $2,199,780.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $3,520,176.00 | $4,400,220.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $3,360,000.00 | $3,360,000.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $1,333,200.00 | $1,666,500.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $2,666,800.00 | $3,333,500.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,342,790.00 | $25,588,487.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $1,142,145.00 | $1,427,681.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,560,000.00 | $5,700,000.00 |
| Colorado | 1211086 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $8,515,065.00 | $15,000,000.00 |
| Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,892,793.00 | $31,759,704.26 |
| Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $170,394.80 | $205,815.68 |
| Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Other | $386,812.20 | $483,515.25 |
| Colorado | 1602165 | Archuleta | >= 5,000 AND < 50,000 | State | TRANSPORTATION ALTERNATIVES | Other | $222,512.25 | $278,140.31 |
| Colorado | 4701124 | Jefferson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,557,037.36 | $1,946,296.68 |
| Colorado | 4701124 | Arapahoe | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $334,063.80 | $417,579.74 |
| Colorado | 4701124 | Douglas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $4,408,898.84 | $5,511,123.58 |
| Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $534,922.20 | $668,652.75 |
| Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,493,217.93 | $3,116,522.41 |
| Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,059,782.87 | $8,824,728.59 |
| Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,349,428.93 | $70,567,419.57 |
| Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $289,521.21 | $15,140,304.75 |
| Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,821,035.86 | $199,818,335.93 |
| Colorado | 4701124 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $88,902.28 | $546,619.45 |
| Colorado | 4701124 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $31,396.56 | $193,043.00 |
| Colorado | 4701124 | Arapahoe | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,736.16 | $41,417.55 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $274,000.00 | $342,500.00 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $60,973.00 | $76,216.25 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,184,783.00 | $3,184,783.00 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $10,644,616.00 | $13,305,770.01 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Maintenance Relocation | $12,312,886.50 | $20,521,477.50 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $4,851,290.00 | $6,064,112.50 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,039,027.00 | $59,635,801.24 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $249,000.00 | $311,250.00 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $738,198.00 | $1,194,575.00 |
| Colorado | 5501029 | La Plata | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $9,855,384.00 | $12,319,230.00 |
| Colorado | 5502097 | Montrose | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $9,307,848.15 | $9,307,848.15 |
| Colorado | 5502097 | Ouray | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $262,851.85 | $262,851.85 |
| Colorado | 5502097 | Montrose | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $430,713.73 | $470,265.79 |
| Colorado | 5502097 | Ouray | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $12,163.27 | $13,280.21 |
| Colorado | 5502097 | Ouray | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $89,644.74 | $421,945.51 |
| Colorado | 5502097 | Montrose | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $3,174,410.26 | $14,941,514.49 |
| Colorado | C010136 | Denver | >= 200,000 | Local | CONGESTION AIR QUALITY | Safety | $26,217,700.00 | |
| Colorado | C470044 | Arapahoe | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $200,000.00 | |
| Colorado | C470044 | Douglas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $30,922,905.00 | |
| Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $92,448.83 | $111,630.84 |
| Colorado | GBLD001 | Douglas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,089,039.48 | $1,315,002.02 |
| Colorado | GBLD001 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,613,283.15 | $1,948,019.91 |
| Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,024,897.00 | $1,237,550.73 |
| Colorado | GBLD001 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $148,635.00 | $179,474.97 |
| Colorado | GBLD001 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,334,106.64 | $1,610,917.68 |
| Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,344,570.60 | $1,623,552.76 |
| Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,632,666.58 | $1,971,425.18 |
| Colorado | GBLD001 | Denver | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $518,378.76 | $625,936.09 |
| Colorado | GBLD001 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $479,216.31 | $578,647.91 |
| Colorado | GBLD001 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $994,017.65 | $1,200,264.30 |
| Colorado | GBLD001 | Douglas | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $787,990.38 | $830,037.62 |
| Colorado | GBLD001 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $965,312.34 | $1,016,821.49 |
| Colorado | GBLD001 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $719,235.98 | $757,614.49 |
| Colorado | GBLD001 | Arapahoe | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $107,547.02 | $113,285.74 |
| Colorado | GBLD001 | Pueblo | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,181,339.73 | $1,244,376.13 |
| Colorado | GBLD001 | Broomfield | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $66,892.71 | $70,462.12 |
| Colorado | GBLD001 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,167,314.54 | $1,229,602.57 |
| Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $972,883.67 | $1,024,796.83 |
| Colorado | GBLD001 | Adams | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $346,743.96 | $365,246.25 |
| Colorado | GBLD001 | Denver | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $375,080.51 | $395,094.84 |
| Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $741,579.16 | $781,149.92 |
| Colorado | GBLD001 | Washington | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.18 | $984,434.85 |
| Colorado | GBLD001 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.80 | $3,267,772.40 |
| Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.78 | $5,090,707.36 |
| Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.22 | $1,417,059.83 |
| Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.25 | $1,411,467.48 |
| Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $0.77 | $3,849,256.27 |
| Colorado | GBLD001 | Morgan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.77 | $285,709.30 |
| Colorado | GBLD001 | Washington | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.18 | $91,819.10 |
| Colorado | GBLD001 | Las Animas | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $7,583.92 | $28,447.66 |
| Colorado | GBLD001 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.80 | $6,027.80 |
| Colorado | GBLD001 | Huerfano | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,111.08 | $7,918.76 |
| Colorado | GBLD001 | Logan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $0.25 | $131,648.80 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Other | $1,690.51 | $190,182.79 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Other | $309.49 | $34,817.21 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Preliminary Engineering | $125,098.02 | $30,994,141.62 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Preliminary Engineering | $22,901.98 | $5,674,169.28 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $102,618.77 | $6,584,034.04 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $973,293.23 | $5,535,628.22 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $5,517,092.46 | $5,517,092.46 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $982,907.54 | $982,907.54 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,802,727.14 | $45,696,668.17 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,753,471.86 | $21,435,499.92 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $960,179.53 | $36,271,171.30 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $274,460.47 | $10,367,855.70 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $50,275.88 | $520,389.33 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $282,200.19 | $2,920,962.48 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $14,843,259.41 | $67,469,360.96 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $5,156,740.59 | $23,439,729.95 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $727,387.18 | $797,486.22 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,999,996.00 | $9,151,128.21 |
| Colorado | GBLD002 | Larimer | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $123,955.82 | $135,901.57 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1.00 | $2,515,792.00 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1.00 | $1.10 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1.00 | $16,505,000.00 |
| Colorado | GBLD002 | Weld | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1.00 | $5,451,308.00 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,609,000.00 | $1,787,777.78 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $41,600,720.00 | $76,897,000.45 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1.00 | $24,527,474.75 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1.00 | $200,536.78 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $257,264.00 | $310,742.85 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $8,074,845.00 | $10,093,556.25 |
| Colorado | GBLD003 | El Paso | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety | $5,374,298.00 | $6,946,006.76 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety | $4,900,857.00 | $6,242,021.78 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1.00 | $3,824,193.00 |
| Colorado | GBLD003 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,237,539.00 | $64,763,378.94 |
| Colorado | GBLD003 | El Paso | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $5,730,536.67 | $6,659,435.24 |
| Colorado | GBLD003 | El Paso | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $1,084,027.33 | $1,309,369.89 |
| Colorado | GBLD004 | Mesa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1.00 | $1,500,000.00 |
| Colorado | GBLD004 | Garfield | >= 50,000 AND < 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $6,020,468.00 | $7,525,585.00 |
| Colorado | GBLD004 | Mesa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,255,480.00 | $26,365,368.00 |
| Colorado | GBLD004 | Garfield | >= 50,000 AND < 200,000 | Local | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $1,000,000.00 | $6,321,456.00 |
| Colorado | GBLD005 | Boulder | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $8,577,243.00 | $10,360,240.37 |
| Colorado | GBLD005 | Boulder | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $4,913,496.00 | $17,517,522.65 |
| Colorado | GBLD005 | Boulder | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,694,322.00 | |
| Colorado | GBLD005 | Boulder | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $10,000,000.00 | $59,118,671.44 |
| Colorado | GBLD005 | Boulder | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $4,001,391.00 | $4,833,181.54 |
| Colorado | GBLD005 | Boulder | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $1,679,217.00 | $2,028,284.82 |
| Colorado | M320144 | Denver | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $720,000.00 | $14,226,839.12 |
| Colorado | M320144 | Denver | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $720,000.00 | $14,226,839.13 |
| Colorado | M320144 | Denver | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $919,369.00 | $1,149,211.25 |
| Colorado | M320144 | Denver | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,951,346.00 | $23,689,182.50 |
| Colorado | M420001 | Park | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,174,448.00 | $24,226,406.00 |
| Colorado | M420001 | Park | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $350,000.00 | $1,969,311.32 |
| Colorado | R200266 | Park | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $3,176,912.40 | $13,344,352.51 |
| Colorado | R200266 | Otero | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $7,412,795.60 | $31,136,822.64 |
| Colorado | R200266 | Las Animas | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $242,576.32 | $310,053.11 |
| Colorado | R200266 | Chaffee | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $5,328.76 | $6,811.05 |
| Colorado | R200266 | Otero | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $228,746.68 | $292,376.50 |
| Colorado | R200266 | Teller | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $72,856.03 | $93,122.19 |
| Colorado | R200266 | Park | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $1,098,395.69 | $1,403,933.36 |
| Colorado | R200266 | Fremont | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $237,388.52 | $303,422.23 |
| Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $217,525.35 | $10,057,324.71 |
| Colorado | SW01498 | Boulder | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,425,686.65 | $112,152,069.43 |
| Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Utilities | $584,200.72 | $750,170.85 |
| Colorado | SW01498 | Boulder | >= 200,000 | State | CONGESTION AIR QUALITY | Utilities | $6,514,587.28 | $8,365,367.15 |
| Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $3,828.07 | $4,785.09 |
| Colorado | SW01498 | Boulder | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $42,687.93 | $53,359.91 |
| Colorado | SW01498 | Broomfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,990.00 | $37,487.50 |
| Colorado | SW01498 | Boulder | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $334,427.00 | $418,033.75 |
| Colorado | SW01498 | Boulder | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,251,013.00 | $5,313,766.25 |
| Colorado | SW03103 | Statewide | N/A | State | HIGHWAY INFRA PRGM -APPOR | Electric Vehicle & Charging Infrastructure | $44,494,590.00 | $53,743,918.58 |