| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $400,000.00 | $45,560,688.33 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $136,826.93 | $3,821,033.66 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $26,531.20 | $33,164.00 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $97,925.58 | $122,406.97 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $330,709.50 | |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,290,000.00 | |
| Delaware | 2014005 | Sussex | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,440,000.00 | $1,800,000.00 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,091,200.00 | $1,364,000.00 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $23,164.00 | $28,955.00 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $34,712,330.00 | $43,090,412.50 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,142,424.97 | |
| Delaware | 2014005 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $889,000.00 | |
| Delaware | 2014005 | Sussex | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $1,680,002.00 | $2,100,002.50 |
| Delaware | 2014005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,775,668.00 | $4,719,585.00 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Construction Engineering | $4,975.49 | $4,975.49 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $12,499.99 | $12,499.99 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $192,770.18 | $192,770.18 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $955,333.00 | $955,333.00 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $491,456.54 | $491,456.54 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,559,577.71 | $5,559,577.71 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,490,457.64 | $2,490,457.64 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,065,358.32 | $1,065,358.32 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $579,915.04 | $579,915.04 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $562,360.00 | $562,360.00 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $540,051.62 | $675,064.52 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $555,960.15 | $555,960.15 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $187,520.00 | |
| Delaware | 2015019 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $1,974.72 | $1,975.72 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,693,330.82 | $9,693,330.82 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,415,845.33 | $3,415,845.33 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $982,524.52 | $982,524.52 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,147,743.48 | $3,147,743.48 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,107,504.96 | $1,107,504.96 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,251,865.91 | $2,251,865.91 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,279,999.99 | $4,100,000.00 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $58,757.05 | $58,757.05 |
| Delaware | 2015019 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,515,108.47 | $1,515,108.47 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $145,185.99 | $145,185.99 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $5,200,587.70 | $5,200,587.70 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | CONGESTION AIR QUALITY | Preliminary Engineering | $3,929,814.01 | $3,929,814.01 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | CONGESTION AIR QUALITY | Rail/Hwy Crossing | $1,592,570.60 | $1,592,570.60 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | CONGESTION AIR QUALITY | Right of Way | $200,000.00 | $200,000.00 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,202,000.00 | $2,202,000.00 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $13,600,000.00 | $13,600,000.00 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Rail/Hwy Crossing | $5,007,429.40 | $5,007,429.40 |
| Delaware | 2022026 | Sussex | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Traffic Management/Engineering - HOV | $190,570.60 | $190,570.60 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,833,201.84 | $5,833,201.84 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,513,206.00 | $2,777,376.65 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,162,799.60 | $24,178,499.60 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $622,568.88 | $622,568.88 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,809,618.62 | $5,809,618.62 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,976.00 | |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $382,246.37 | $6,767,073.13 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $320,523.03 | $405,923.03 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,501,721.92 | $1,501,721.92 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $345,190.54 | $345,190.54 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,057,600.00 | $5,772,865.90 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $9,541,058.06 | $12,616,303.42 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $2,207,752.68 | $2,207,752.68 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | N/A | REPURPOSED SPECIAL | 4R - No Added Capacity | $1,878,688.00 | $1,878,688.00 |
| Delaware | K008006 | Kent | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $8,472,666.44 | $8,472,666.44 |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,251,000.00 | $3,201,062.42 |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $19,299,963.00 | $22,262,051.15 |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,798,578.25 | |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,881,696.36 | $3,957,224.27 |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $374,168.80 | $467,711.00 |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $7,941,724.45 | |
| Delaware | K029007 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $336,224.60 | |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $2,806,601.00 | $3,508,251.25 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,858,665.75 | $16,123,332.19 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,952,268.68 | $2,440,335.85 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,435,480.00 | $1,794,350.00 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,362,163.96 | $2,952,704.95 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $720,000.00 | $900,000.00 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $262,832.31 | $328,540.38 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,751,623.88 | $3,439,529.83 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $792,091.60 | $990,114.50 |
| Delaware | K104003 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $505,302.43 | $631,628.04 |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $2,605,272.00 | $2,605,272.00 |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | New Construction Roadway | $949,559.87 | $949,559.87 |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,093,284.37 | $3,380,153.80 |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $10,645,291.07 | $20,624,036.33 |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $200,000.00 | $13,125,210.84 |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,161,267.47 | |
| Delaware | K356015 | Kent | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $200,000.00 | $200,000.00 |
| Delaware | N011031 | New Castle | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $8,000,000.00 | $8,000,000.00 |
| Delaware | N011031 | New Castle | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $104,000.00 | $130,000.00 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,480,620.00 | $2,480,620.00 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,782,746.78 | $16,022,048.37 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $102,980.39 | $112,761.61 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,425,000.00 | |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $995,527.04 | $995,598.46 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $12,090.00 | $15,112.50 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,412,253.74 | $1,412,253.74 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $176,000.00 | $220,000.00 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,295,819.46 | $1,303,819.46 |
| Delaware | N011031 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $193,222.75 | $193,222.75 |
| Delaware | N011031 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $6,512,722.30 | $6,512,722.30 |
| Delaware | N011031 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,909,184.09 | $2,909,184.09 |
| Delaware | N011031 | New Castle | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $500,000.00 | $500,000.00 |
| Delaware | N011031 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,259,472.96 | $1,259,472.96 |
| Delaware | N011031 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $18,137.60 | $22,672.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,567,949.49 | $1,959,936.87 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Other | $8,979,137.07 | |
| Delaware | N029003 | New Castle | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,300,000.00 | $1,300,000.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,890,355.93 | $2,890,355.93 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $26,629.00 | $26,629.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,000,000.00 | $4,000,000.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $753,547.00 | $941,933.75 |
| Delaware | N029003 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $53,600.00 | $53,600.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $21,137.60 | $26,422.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $986,851.03 | $1,233,563.79 |
| Delaware | N029003 | New Castle | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Other | $46,500.00 | |
| Delaware | N029003 | New Castle | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $2,368,876.02 | $2,368,876.02 |
| Delaware | N029003 | New Castle | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $742,952.98 | $928,691.25 |
| Delaware | N029003 | New Castle | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $3,060,357.45 | $3,825,446.82 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,158,400.12 | $6,448,000.14 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $10,899,996.90 | $13,624,996.13 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,240,648.12 | $5,300,810.15 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $1,425,516.73 | |
| Delaware | N029003 | New Castle | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $900,000.00 | $900,000.00 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $543,749.77 | $543,749.77 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,037,279.71 | $2,037,279.71 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $550,773.73 | $688,467.16 |
| Delaware | N029003 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,066,980.83 | $1,333,726.04 |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,000,990.42 | |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,959,375.76 | |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,534,544.64 | |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $380,000.00 | $475,000.00 |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,899,343.17 | $2,374,178.96 |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $2,596,097.35 | |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $50,000.00 | |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $7,544,881.03 | $7,544,881.03 |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,436,990.07 | $2,436,990.07 |
| Delaware | N032019 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $981,183.09 | $1,181,183.09 |
| Delaware | N056041 | New Castle | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Safety | $4,260.80 | $5,326.00 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,081,840.88 | $1,352,301.10 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,788,125.84 | $4,932,944.20 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,469,185.37 | |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $905,061.07 | $1,131,326.33 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $564,494.48 | $705,618.10 |
| Delaware | N056041 | New Castle | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $800,000.00 | $1,000,000.00 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $27,676,119.89 | $34,595,149.86 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $26,537,950.44 | $33,172,438.05 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,461,325.98 | $1,826,657.48 |
| Delaware | N056041 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $893,579.20 | $1,116,974.00 |
| Delaware | N056041 | New Castle | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Safety | $312,746.62 | $390,933.28 |
| Delaware | N056041 | New Castle | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Safety | $446,930.00 | $558,662.50 |
| Delaware | N056041 | New Castle | >= 200,000 | State | REPURPOSED SPECIAL | Safety | $486,899.63 | $608,624.54 |
| Delaware | N056041 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $10,160.00 | |
| Delaware | N056041 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $97,461.92 | $121,827.41 |
| Delaware | N056041 | New Castle | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,853,266.42 | $3,566,583.02 |
| Delaware | N056041 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $669,545.00 | $836,931.25 |
| Delaware | N056041 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $4,066,169.37 | $5,082,711.71 |
| Delaware | N056046 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,800,000.00 | $24,032,791.45 |
| Delaware | N056046 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $500,000.00 | $500,000.00 |
| Delaware | N056046 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,500,000.00 | $4,251,000.00 |
| Delaware | N056046 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $200,000.00 | $601,801.32 |
| Delaware | N059045 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $1,045,707.14 | $22,751,251.98 |
| Delaware | N059045 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,300,000.00 | |
| Delaware | N059045 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $1,012,000.00 | |
| Delaware | N059045 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $15,250.40 | $15,250.40 |
| Delaware | N059047 | New Castle | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | $454.80 | $454.80 |
| Delaware | N059047 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $6,944,245.44 | $14,270,635.38 |
| Delaware | N059047 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,000,000.00 | $3,000,000.00 |
| Delaware | N059047 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $55,754.56 | $55,754.56 |
| Delaware | N059047 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $32,837,687.06 | |
| Delaware | N059047 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,426,250.00 | |
| Delaware | N060044 | New Castle | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $467.25 | $467.25 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $56,807,160.00 | $113,614,320.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,924,528.00 | $39,089,043.78 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $65,034,058.07 | $96,514,768.88 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,816,000.00 | $20,816,000.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,219,000.00 | $4,219,000.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $104,000.00 | $104,000.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,988,212.09 | |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,760,423.46 | $2,200,529.32 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $13,224,988.00 | $16,531,235.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $600,000.00 | $600,000.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $3,426,565.45 | |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $150,000.00 | $150,000.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $294,098.00 | $294,098.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $17,644.45 | $17,644.45 |
| Delaware | N060044 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,050,777.98 | $18,050,777.98 |
| Delaware | N060044 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $664,340.34 | $664,340.34 |
| Delaware | N060044 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,940,000.00 | $1,940,000.00 |
| Delaware | N060044 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,003,920.55 | $1,003,920.55 |
| Delaware | N060044 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,135,000.00 | $1,135,000.00 |
| Delaware | N159002 | New Castle | >= 200,000 | N/A | BRIDGE PROGRAM - 15% OFF SYST | Preliminary Engineering | $1,248,954.88 | $1,561,193.60 |
| Delaware | N159002 | New Castle | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $10,400.00 | $13,000.00 |
| Delaware | N159002 | New Castle | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $73,442.72 | $91,803.40 |
| Delaware | N159002 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $4,611,000.00 | $5,763,750.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $3,389,000.00 | $4,236,250.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $5,656,535.78 | $6,235,231.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $1,946,558.28 | $1,946,558.28 |
| Delaware | N159002 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $859,732.91 | $859,732.91 |
| Delaware | N159002 | New Castle | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $799,307.28 | $799,307.28 |
| Delaware | N159002 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $6,513.00 | |
| Delaware | N159002 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $9,040.00 | $11,300.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,606,826.06 | $4,508,532.58 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,618,423.00 | $2,023,028.75 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,732,371.09 | $1,732,371.09 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,758,850.00 | $2,758,850.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $305,600.00 | $382,000.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $521,600.00 | $652,000.00 |
| Delaware | N159002 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $182,400.00 | $228,000.00 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,000.00 | $135,000.00 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $9,071,760.77 | $11,339,700.97 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $3,008,977.54 | $3,761,221.92 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,524,442.56 | $1,905,553.20 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Other | $44,880.00 | $56,100.00 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Traffic Management/Engineering - HOV | $393,742.09 | $492,177.61 |
| Delaware | N356007 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Traffic Management/Engineering - HOV | $321,614.17 | $402,017.71 |
| Delaware | N356007 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,600,000.00 | $4,500,000.00 |
| Delaware | N356007 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,400,000.00 | $1,750,000.00 |
| Delaware | N356007 | New Castle | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | $89,650.00 | |
| Delaware | N356007 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $350,000.00 | |
| Delaware | N356007 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,488,000.29 | $1,860,000.36 |
| Delaware | N356007 | New Castle | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $200,000.00 | $250,000.00 |
| Delaware | N356007 | New Castle | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,910,270.00 | $2,910,270.00 |
| Delaware | N356007 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $754,000.00 | $754,000.00 |
| Delaware | N356007 | New Castle | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $545,000.00 | $545,000.00 |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $694,144.00 | $867,680.00 |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $188,375,044.05 | |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $80,000.00 | $100,000.00 |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,222,080.01 | $9,027,599.99 |
| Delaware | N748001 | New Castle | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,491,200.00 | $6,864,000.00 |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $34,094.66 | $42,618.29 |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,444,911.56 | $1,806,139.45 |
| Delaware | N748001 | New Castle | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $2,400,000.00 | $3,000,000.00 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,252,335.61 | $2,252,335.61 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,757,164.72 | $11,757,164.72 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $603,741.83 | $603,741.83 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,125,000.00 | $5,125,000.00 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $9,175,000.00 | |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $682,026.34 | $682,026.34 |
| Delaware | S014014 | Sussex | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,400,000.00 | $2,400,000.00 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $247,642.45 | $247,642.45 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $112.43 | $112.43 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $729,204.00 | $729,204.00 |
| Delaware | S014014 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $141,279.24 | $141,279.24 |
| Delaware | S014014 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,000,000.00 | $2,000,000.00 |
| Delaware | S014014 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $11,040,552.57 | $11,040,552.57 |
| Delaware | S014014 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,536.28 | $3,536.28 |
| Delaware | S014014 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $323,916.87 | $323,916.87 |
| Delaware | S014014 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $14,000.00 | $14,000.00 |
| Delaware | S036003 | Sussex | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $34,086,881.80 | |
| Delaware | S036003 | Sussex | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,148,900.00 | |
| Delaware | S036003 | Sussex | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $169,200.00 | $211,500.00 |
| Delaware | S036003 | Sussex | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $92,463.80 | |
| Delaware | S050023 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,948,000.00 | $6,199,063.19 |
| Delaware | S050023 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $9,000,000.00 | $26,347,831.80 |
| Delaware | S050023 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $219,752.00 | |
| Delaware | S050023 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,372,000.00 | $6,715,000.00 |
| Delaware | S050023 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $98,400.00 | $133,000.00 |
| Delaware | S050023 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $600,717.06 | |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000,000.00 | $1,000,000.00 |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $11,810,000.00 | $11,810,000.00 |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $360,000.00 | |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $962,377.96 | $962,377.96 |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $478,029.48 | $478,029.48 |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,500,000.00 | $1,946,631.25 |
| Delaware | S050023 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $340,000.00 | $340,000.00 |
| Delaware | S113026 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,730,071.94 | $2,730,071.94 |
| Delaware | S113026 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,631,956.65 | $46,635,923.21 |
| Delaware | S113026 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $50,000.00 | $50,000.00 |
| Delaware | S113026 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $575,000.00 | $605,000.00 |
| Delaware | S113026 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $525,053.87 | $525,053.87 |
| Delaware | S113026 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,109,623.50 | $5,109,623.50 |
| Delaware | S113026 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $319,978.10 | $319,978.10 |
| Delaware | S113026 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $44,019,615.00 | $44,019,615.00 |
| Delaware | S113026 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $150,000.00 | $150,000.00 |
| Delaware | S113026 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $250,000.00 | $250,000.00 |
| Delaware | S113027 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,484,402.24 | $3,484,402.24 |
| Delaware | S113027 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $34,625,796.83 | $34,625,796.83 |
| Delaware | S113027 | Sussex | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,264,682.38 | $1,264,682.38 |
| Delaware | S269001 | Sussex | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - No Added Capacity | $799,913.00 | $799,913.00 |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,874,087.00 | $11,184,070.70 |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,275,241.01 | $2,880,354.07 |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $424,967.60 | |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,031,000.00 | $3,031,000.00 |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,534,089.64 | |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $600,000.00 | $6,600,000.00 |
| Delaware | S269001 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $762,018.89 | |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,331,144.68 | $2,913,930.85 |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $180,273.60 | $225,342.00 |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $13,859,708.37 | $17,324,635.46 |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $5,390,000.00 | |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $1,680,000.00 | $2,100,000.00 |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $289,964.43 | $362,455.54 |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $29,177.11 | $36,471.39 |
| Delaware | S318005 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $103,360.00 | $129,200.00 |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000,000.00 | $3,222,557.11 |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,236,336.28 | |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $2,500,000.00 | $18,572,785.53 |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $586,200.00 | |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $4,149,800.00 | |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $2,000,000.00 | |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,599,440.00 | $4,499,300.00 |
| Delaware | S321002 | Sussex | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $491,447.26 |