| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $169,393.06 | $203,719.86 |
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $15,742,271.31 | $19,788,288.72 |
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,016,939.95 | $6,563,624.43 |
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $38,344.71 | $46,115.11 |
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $828,346.98 | $1,097,460.23 |
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $2,446,843.87 | $2,942,686.55 |
| District Of Columbia | 1104013 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $301,986.02 | $363,182.22 |
| District Of Columbia | 1116033 | District of Columbia | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $113,975.04 | $142,468.80 |
| District Of Columbia | 1116033 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $20,000,000.00 | $25,000,000.00 |
| District Of Columbia | 1116033 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $713,037.19 | $8,618,187.52 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Restoration & Rehabilitation | $214,897.00 | $258,444.98 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | $276,495.03 | $332,525.59 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Restoration & Rehabilitation | $18,096,928.06 | $22,263,396.80 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $29,211.71 | $32,457.46 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | RAIL HWY CROSSING HAZ ELI | 4R - Restoration & Rehabilitation | $47,707.14 | $89,501.41 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $905,260.58 | $1,088,707.85 |
| District Of Columbia | 2016006 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,577,047.66 | $1,896,629.78 |
| District Of Columbia | 2016010 | District of Columbia | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Traffic Management/Engineering - HOV | $1,451,888.45 | $1,611,596.18 |
| District Of Columbia | 2016010 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $4,760,796.79 | $5,745,240.98 |
| District Of Columbia | 2016010 | District of Columbia | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,179,763.38 | $1,418,837.50 |
| District Of Columbia | 2016010 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $14,099,935.48 | $16,991,601.75 |
| District Of Columbia | 2016010 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $330,625.43 | $397,625.29 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $12,906,601.84 | $15,202,524.47 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,693,774.00 | $4,617,217.50 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Debt Service | $3,098,143.00 | $3,725,968.73 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $252,940.22 | $161,755,119.03 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $49,756,697.50 | $60,788,808.16 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | PUBLIC LANDS - BEGINNING FY 83 | Bridge Rehabilitation - Added Capacity | $497,101.34 | $497,101.34 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $651,576.78 | $783,616.09 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $47,292,809.50 | $302,001,146.23 |
| District Of Columbia | 2016016 | District of Columbia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,365,489.30 | $1,642,200.00 |
| District Of Columbia | 2016049 | District of Columbia | >= 200,000 | Local | HIGH RISK RURAL ROAD | Safety | $2,348,476.46 | $4,614,858.78 |
| District Of Columbia | 2016049 | District of Columbia | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $4,496,641.90 | $22,211,366.51 |
| District Of Columbia | 2016049 | District of Columbia | >= 200,000 | Local | RAIL HWY CROSSING HAZ ELI | Safety | $2,591,381.63 | $2,879,312.93 |
| District Of Columbia | 2016049 | Statewide | N/A | State | REDISTRIBUTION OF CERTAIN AUTH | Safety | $162,208.00 | $1,895,078.77 |
| District Of Columbia | 2016049 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $5,575,142.00 | $16,938,639.06 |
| District Of Columbia | 2016049 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $5,161,952.00 | $11,726,000.00 |
| District Of Columbia | 2016051 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Tunnel Preventive Maintenance | $18,275,321.27 | $22,029,107.42 |
| District Of Columbia | 2016051 | District of Columbia | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Tunnel Preventive Maintenance | $26,872,736.10 | $32,422,943.23 |
| District Of Columbia | 2016051 | District of Columbia | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Tunnel Preventive Maintenance | $533,524.00 | $641,615.96 |
| District Of Columbia | 2016059 | District of Columbia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,575,469.76 | $9,796,653.64 |
| District Of Columbia | 2016059 | District of Columbia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $38,022,595.07 | $66,748,425.26 |
| District Of Columbia | 2016059 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $15,101,654.00 | $18,877,067.50 |
| District Of Columbia | 2018005 | Statewide | N/A | N/A | FRA TRANSFER DEVELOPMENT | 4R - No Added Capacity | $109,383,331.12 | $109,383,331.12 |
| District Of Columbia | 2018005 | Statewide | N/A | N/A | FRA TRANSFER DEVELOPMENT | Construction Engineering | $13,840,090.11 | $15,291,771.11 |
| District Of Columbia | 2018006 | Statewide | N/A | N/A | NAT SIG FREIGHT AND HWY PROJ | 4R - Restoration & Rehabilitation | $90,000,000.00 | $90,000,000.00 |
| District Of Columbia | 2018017 | District of Columbia | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $3,057,670.18 | $3,822,087.72 |
| District Of Columbia | 2018017 | District of Columbia | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Maintenance Resurfacing | $2,512,900.60 | $3,141,125.75 |
| District Of Columbia | 2018017 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $47,502,240.49 | $57,917,329.30 |
| District Of Columbia | 2018017 | District of Columbia | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $26,190,532.97 | $40,720,435.03 |
| District Of Columbia | 2018017 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,366,000.00 | $1,707,500.00 |
| District Of Columbia | 2018022 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $23,288,297.43 | $34,733,164.83 |
| District Of Columbia | 2018023 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $11,644,921.35 | $25,308,407.98 |
| District Of Columbia | 2018031 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $2,294,091.09 | $2,758,979.06 |
| District Of Columbia | 2018031 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $19,535,590.76 | $23,494,396.59 |
| District Of Columbia | 2018045 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,130,128.32 | $1,359,144.11 |
| District Of Columbia | 2018045 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $10,505,156.60 | $12,633,982.68 |
| District Of Columbia | 2018045 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Traffic Management/Engineering - HOV | $26,310.40 | $31,642.09 |
| District Of Columbia | 2018045 | District of Columbia | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Traffic Management/Engineering - HOV | $645,006.31 | $775,714.15 |
| District Of Columbia | 2018045 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,268,878.32 | $2,728,657.02 |
| District Of Columbia | 2018045 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $19,193,730.33 | $23,083,259.57 |
| District Of Columbia | 2019026 | District of Columbia | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $6,069,950.00 | $7,344,048.50 |
| District Of Columbia | 2019026 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $507,359.16 | $633,046.71 |
| District Of Columbia | 2019026 | District of Columbia | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $19,859,552.78 | $23,884,008.15 |
| District Of Columbia | 2020035 | District of Columbia | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,440,000.00 | $1,600,000.00 |
| District Of Columbia | 2020035 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $21,171,877.17 | $26,841,846.46 |
| District Of Columbia | 2020037 | District of Columbia | >= 200,000 | State | FRA TRANSFER DEVELOPMENT | 4R - Restoration & Rehabilitation | $31,301.75 | $31,301.75 |
| District Of Columbia | 2020037 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $63,238,711.94 | $79,048,389.93 |
| District Of Columbia | 2020037 | District of Columbia | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $3,753,768.84 | $4,692,212.61 |
| District Of Columbia | 2020037 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,306,310.07 | $5,382,887.59 |
| District Of Columbia | 2021023 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $7,977,944.14 | $27,908,046.73 |
| District Of Columbia | 2021023 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $571,433.43 | $714,291.79 |
| District Of Columbia | 2021023 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,342,853.26 | $5,428,566.57 |
| District Of Columbia | 2022019 | District of Columbia | >= 200,000 | State | CARBON REDUCTION PROGRAM | Safety | $3,920,000.00 | $4,900,000.00 |
| District Of Columbia | 2022019 | District of Columbia | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Safety | $1,468,544.00 | $1,835,680.00 |
| District Of Columbia | 2022019 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $14,615,088.00 | $18,550,960.00 |
| District Of Columbia | 2022022 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $2,400,000.00 | $26,414,101.47 |
| District Of Columbia | 2022022 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,000,000.00 | $2,500,000.00 |
| District Of Columbia | 2022035 | District of Columbia | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $12,978,686.11 | $12,978,686.11 |
| District Of Columbia | 2022035 | District of Columbia | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $1,595,451.11 | $1,994,313.89 |
| District Of Columbia | 2022035 | District of Columbia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $10,040,235.06 | $14,764,412.15 |
| District Of Columbia | 2023009 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $7,463,390.16 | $9,329,237.70 |
| District Of Columbia | 2023009 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $2,395,825.95 | $2,994,782.44 |
| District Of Columbia | 2023009 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $6,950,720.78 | $8,105,878.31 |
| District Of Columbia | 2023009 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $195,300.00 | $244,125.00 |
| District Of Columbia | 2023009 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Preservation | $7,219,275.33 | $9,024,094.16 |
| District Of Columbia | 2023009 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,153,382.27 | $1,441,727.84 |
| District Of Columbia | 2023011 | District of Columbia | >= 200,000 | Other | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - No Added Capacity | $6,617,951.89 | $6,617,951.89 |
| District Of Columbia | 2023011 | District of Columbia | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $66,798,205.85 | $80,702,644.10 |
| District Of Columbia | 2023011 | District of Columbia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $9,877,318.95 | $12,346,648.69 |
| District Of Columbia | 2023011 | District of Columbia | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $81,195.98 | $101,494.98 |
| District Of Columbia | 2023011 | District of Columbia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $68,144,674.32 | $80,758,893.04 |
| District Of Columbia | 2023020 | District of Columbia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $18,476,360.00 | $21,470,450.00 |
| District Of Columbia | 2023020 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $11,700,000.00 | $13,000,000.00 |
| District Of Columbia | 2025035 | District of Columbia | >= 200,000 | Other | HIGHWAY INFRA PRGM -ALLOC | Bridge Rehabilitation - Added Capacity | $72,000,000.00 | $80,000,000.00 |
| District Of Columbia | 2025035 | District of Columbia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $4,636,012.00 | $5,151,124.44 |
| District Of Columbia | 2025035 | District of Columbia | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,903,020.00 | $21,003,355.56 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $27,351,438.70 | $34,189,298.37 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $34,925,243.91 | $43,656,554.89 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $342,834.46 | $428,543.08 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $1,743,995.78 | $2,179,994.73 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $2,096,045.89 | $2,620,057.37 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Bridge Rehabilitation - No Added Capacity | $235,795.08 | $261,994.54 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $404,872.09 | $449,857.88 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Bridge Rehabilitation - No Added Capacity | $284,753.30 | $342,457.37 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $15,838,242.00 | $19,797,802.50 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Rehabilitation - No Added Capacity | $57,496.17 | $71,870.21 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | HIGHWAY INFRASTRUCTURE | Bridge Rehabilitation - No Added Capacity | $2,790,907.00 | $3,488,633.75 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $9,642,994.35 | $10,714,438.16 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $890,003.46 | $988,892.73 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Bridge Rehabilitation - No Added Capacity | $35,151.41 | $43,939.26 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $19,543,486.83 | $23,503,892.76 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $97,543,079.54 | $125,246,045.88 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $15,261,148.77 | $16,956,831.96 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $9,413,670.94 | $11,149,138.39 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $200,797.92 | $223,108.80 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Bridge Rehabilitation - No Added Capacity | $659,586.00 | $793,248.34 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Rehabilitation - No Added Capacity | $586,466.87 | $719,709.47 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,479,728.95 | $7,857,079.48 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $344,957.57 | $414,861.78 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $73,398,674.96 | $86,925,041.97 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,635,590.10 | $7,393,416.23 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $348,182.39 | $418,740.10 |
| District Of Columbia | 2952185 | District of Columbia | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,500,000.00 | $37,162,466.89 |
| District Of Columbia | 8888468 | Statewide | N/A | State | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $7,925,673.99 | $9,907,092.49 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | 4R - Restoration & Rehabilitation | $44,074.96 | $53,006.57 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | $3,827.27 | $4,602.85 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $39,657,305.83 | $50,969,367.80 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,638,375.21 | $9,432,690.01 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | $20,497.13 | $24,650.79 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $780,077.31 | $938,156.72 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $124,725.00 | $150,000.00 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,838,297.70 | $2,210,821.05 |
| District Of Columbia | 8888468 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,786,676.96 | $9,364,614.50 |
| District Of Columbia | 8888468 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,151,260.49 | $2,587,204.44 |
| District Of Columbia | 8888468 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,615,078.71 | $1,942,367.66 |
| District Of Columbia | 8888468 | Statewide | N/A | State | TECHNOLOGY DEPLOYMENT GRANTS T | Research | $10,441.52 | $15,441.52 |
| District Of Columbia | 8888468 | Statewide | N/A | State | TRANSPORTATION ALTERNATIVES | 4R - Restoration & Rehabilitation | $3,399,321.47 | $4,249,151.83 |
| District Of Columbia | 8888483 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,044,164.61 | $6,595,879.33 |
| District Of Columbia | 8888483 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $939,003.25 | $1,249,573.61 |
| District Of Columbia | 8888483 | District of Columbia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $6,920,883.46 | $21,714,136.55 |
| District Of Columbia | 8888483 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,594,580.49 | $4,848,007.20 |
| District Of Columbia | 8888483 | District of Columbia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $7,680,584.24 | $9,245,732.98 |