U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Georgia

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Georgia 0000297 Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity $358,628.66 $448,285.82
Georgia 0000297 Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Construction Engineering $124,800.00 $156,000.00
Georgia 0000297 Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $1,102,468.32 $1,378,085.40
Georgia 0000297 Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Right of Way $122,480.40 $153,100.50
Georgia 0000297 Upson >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Utilities $65,872.80 $82,341.00
Georgia 0000297 Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $4,163,382.43 $5,204,228.04
Georgia 0000297 Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $146,400.00 $183,000.00
Georgia 0000297 Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $9,698,468.11 $12,123,085.13
Georgia 0000297 Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $335,908.81 $419,886.01
Georgia 0000297 Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering $94,400.00 $118,000.00
Georgia 0000297 Upson >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,657,960.44 $2,072,450.55
Georgia 0000297 Upson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way $611,051.49 $763,814.37
Georgia 0000297 Upson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $8,136,166.35 $10,170,207.94
Georgia 0000297 Upson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $301,261.11 $376,576.39
Georgia 0000297 Upson >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $985,995.57 $1,232,494.46
Georgia 0000566 Bibb >= 50,000 AND < 200,000 Local EQUITY BONUS SP LIMITATION 4R - Added Capacity $692,389.23 $865,486.54
Georgia 0000566 Bibb >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way $6,696,586.36 $8,371,932.95
Georgia 0000566 Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $43,772,763.68 $54,715,954.60
Georgia 0000566 Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,031,039.59 $3,135,583.49
Georgia 0000566 Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,060,000.00 $1,325,000.00
Georgia 0000566 Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $903,632.64 $1,129,540.80
Georgia 0000566 Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,396,514.99 $2,995,643.74
Georgia 0000566 Bibb >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $429,293.43 $1,189,173.44
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $38,545,178.43 $48,181,473.03
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $969,423.35 $1,211,779.19
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way $16,000,000.00 $20,000,000.00
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,307,609.67 $1,634,512.09
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $1,117,729.80 $1,844,991.31
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $943,970.77 $1,179,963.46
Georgia 0000762 Lowndes >= 50,000 AND < 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering $1,977,569.20 $2,471,961.50
Georgia 0001757 Fulton >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $719,921.00 $899,901.25
Georgia 0001757 Forsyth >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity $38,719.61 $43,021.79
Georgia 0001757 Fulton >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity $321,280.39 $356,978.21
Georgia 0001757 Fulton >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering $900,000.00 $1,000,000.00
Georgia 0001757 Forsyth >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $479,032.47 $532,258.31
Georgia 0001757 Fulton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $6,305,871.51 $7,006,523.89
Georgia 0001757 Forsyth >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $19,792,650.02 $24,740,812.52
Georgia 0001757 Fulton >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity $164,231,796.98 $205,289,746.23
Georgia 0001757 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $12,190,693.95 $3,034,059,706.52
Georgia 0001757 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $4,100,907.65 $368,944,075.73
Georgia 0001757 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $9,419,148.19 $31,545,886.92
Georgia 0001757 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $47,192,244.96 $106,936,063.97
Georgia 0001757 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $29,561,622.83 $44,012,281.55
Georgia 0001757 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $14,150,141.75 $17,687,677.19
Georgia 0001757 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,705,858.25 $2,132,322.81
Georgia 0001757 Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,327,351.41 $1,659,189.26
Georgia 0001817 Clayton >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Rail/Hwy Crossing $9,341,654.12 $11,677,067.65
Georgia 0001817 Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,237,539.32 $1,546,924.16
Georgia 0001817 Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $69,711.10 $87,138.87
Georgia 0001817 Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $28,009,484.29 $35,011,855.35
Georgia 0001817 Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $1,076,163.26 $1,345,204.08
Georgia 0001817 Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,964,000.00 $6,100,000.00
Georgia 0001817 Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $4,840,349.60 $6,408,421.00
Georgia 0002626 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $25,236,897.54 $31,546,121.92
Georgia 0002626 Bartow >= 50,000 AND < 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $993,539.21 $1,241,924.01
Georgia 0002626 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $864,272.75 $1,080,340.93
Georgia 0002626 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,642,741.54 $4,553,426.94
Georgia 0002626 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,261,844.88 $1,577,306.10
Georgia 0002626 Bartow >= 50,000 AND < 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $6,000.40 $7,500.50
Georgia 0002626 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $21,999.60 $27,499.50
Georgia 0002626 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,048,065.81 $1,310,082.26
Georgia 0002626 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $451,214.96 $564,018.70
Georgia 0002626 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $12,992,000.00 $16,240,000.00
Georgia 0002626 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,792,794.57 $2,240,993.21
Georgia 0002868 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $26,791,300.23 $33,489,125.29
Georgia 0002868 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $22,633,671.59 $28,292,089.48
Georgia 0002868 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $550,572.13 $688,215.16
Georgia 0002868 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $651,707.92 $814,634.90
Georgia 0002868 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $625,001.82 $781,252.27
Georgia 0002868 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $528,010.43 $660,013.04
Georgia 0002868 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $14,632,098.88 $18,290,123.60
Georgia 0002868 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way $17,319,901.12 $21,649,876.40
Georgia 0002868 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $363,678.82 $454,598.53
Georgia 0002868 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $430,483.78 $538,104.72
Georgia 0002868 DeKalb >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $4,784,140.80 $6,083,176.00
Georgia 0004428 Douglas >= 50,000 AND < 200,000 N/A EXTENSION OF ALLOC PROGRAMS Right of Way $4,800,000.00 $6,000,000.00
Georgia 0004428 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,555,066.40 $4,443,833.00
Georgia 0004428 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $10,400,000.00 $16,930,300.00
Georgia 0004428 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $20,000.00
Georgia 0004428 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $441,528.01 $1,003,572.21
Georgia 0004428 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $530,644.80 $2,600,000.00
Georgia 0004915 Floyd >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $2,694,486.67 $3,368,108.34
Georgia 0004915 Bartow >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $3,764,014.46 $4,705,018.07
Georgia 0004915 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $26,572,182.75 $33,215,228.44
Georgia 0004915 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $19,753,591.51 $24,691,989.39
Georgia 0004915 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,697,332.52 $2,121,665.65
Georgia 0004915 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,697,332.52 $2,121,665.65
Georgia 0004915 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $66,441.90 $83,329.59
Georgia 0004915 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,704,238.10 $3,380,297.62
Georgia 0004915 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $91,700.23 $114,998.07
Georgia 0004915 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $10,296,000.00 $12,870,000.00
Georgia 0004915 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,436,613.03 $1,795,766.29
Georgia 0004915 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,931,764.52 $2,414,705.65
Georgia 0006049 Cobb >= 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $219,601.47 $274,501.84
Georgia 0006049 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $213,557.69 $266,947.11
Georgia 0006049 Paulding >= 50,000 AND < 200,000 Other EQUITY BONUS EXEMPT LIM Preliminary Engineering $750.08 $937.60
Georgia 0006049 Cobb >= 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $5,644,699.43 $7,061,522.67
Georgia 0006049 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $5,266,857.49 $6,588,842.49
Georgia 0006049 Cobb >= 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $178,147.20 $222,684.00
Georgia 0006049 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $173,244.32 $216,555.40
Georgia 0006049 Paulding >= 50,000 AND < 200,000 Other EQUITY BONUS SP LIMITATION Preliminary Engineering $608.48 $760.60
Georgia 0006049 Cobb >= 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering $2,653,121.97 $3,316,402.46
Georgia 0006049 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way $230,075.92 $287,594.90
Georgia 0006049 Cobb >= 200,000 State EQUITY BONUS SP LIMITATION Right of Way $246,636.86 $308,296.07
Georgia 0006049 Cobb >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $11,728,673.36 $14,660,841.70
Georgia 0006049 Cobb >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $10,364,285.00 $12,955,356.25
Georgia 0006049 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $42,180,725.96 $52,725,907.46
Georgia 0006049 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,164,203.63 $1,455,254.54
Georgia 0006049 Cobb >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $655,816.02 $819,770.03
Georgia 0006049 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $760,013.72 $950,017.15
Georgia 0006049 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $814,492.15 $1,018,115.19
Georgia 0006049 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $101,251.28 $126,564.10
Georgia 0006049 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $94,479.02 $118,098.78
Georgia 0006049 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $637,333.26 $6,730,025.58
Georgia 0006857 Paulding >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $6,648,086.75 $8,310,108.44
Georgia 0006857 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $14,787,417.66 $18,484,272.08
Georgia 0006857 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $520,604.44 $650,755.55
Georgia 0006857 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,118,540.09 $2,648,175.11
Georgia 0006857 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $847.76 $1,059.70
Georgia 0006857 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $44,902.96 $56,128.70
Georgia 0006866 Cobb >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity $5,469,703.06 $6,837,128.82
Georgia 0006866 Cobb >= 200,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $837,880.45 $1,047,350.56
Georgia 0006866 Cobb >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $4,769,668.48 $5,962,085.60
Georgia 0006866 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $12,146,155.24 $15,182,694.05
Georgia 0006866 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $507,416.51 $634,270.64
Georgia 0006866 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,009,204.08 $1,411,505.10
Georgia 0006866 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $314,527.20 $3,487,291.00
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A GRANTS SUP PLAN SECTION 117 Preliminary Engineering $1,967,855.00 $1,967,855.00
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway $5,234,286.74 $6,542,858.42
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $980,735.82 $1,225,919.78
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $9,986,680.24 $12,483,350.30
Georgia 0006900 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $18,897,782.42 $23,622,228.02
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $387,687.26 $484,609.08
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $9,136,000.00 $11,435,237.79
Georgia 0006900 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,711,419.39 $4,912,299.24
Georgia 0006900 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $524,220.80 $655,276.00
Georgia 0006901 Douglas >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway $5,315,814.19 $6,644,767.74
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $880,000.00 $1,100,000.00
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way $4,879,360.00 $6,099,200.00
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $603,963.93 $754,954.91
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $472,457.37 $590,571.71
Georgia 0006901 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $15,400,199.15 $19,250,248.93
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,114,935.56 $1,393,669.45
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $12,279,840.00 $17,830,800.00
Georgia 0006901 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $173,928.11 $217,410.14
Georgia 0006934 Rockdale >= 50,000 AND < 200,000 Local HIGHWAY INFRA PRGM - COVID APP Right of Way $757,500.00 $757,500.00
Georgia 0006934 Rockdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $25,271,052.00 $33,082,366.49
Georgia 0006934 Rockdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $240,000.00 $300,000.00
Georgia 0006934 Rockdale >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $840,000.00 $1,050,000.00
Georgia 0006934 Rockdale >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $10,570,000.00 $13,212,500.00
Georgia 0006934 Rockdale >= 50,000 AND < 200,000 N/A SURFACE TRANSPORTATION PROJECT Preliminary Engineering $499,915.00 $499,915.00
Georgia 0007128 Chatham >= 200,000 N/A ARRA AMERICAN RECOV & REINV AC Preliminary Engineering $863,632.04 $863,632.04
Georgia 0007128 Chatham >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - No Added Capacity $1,894,043.11 $1,894,043.11
Georgia 0007128 Chatham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $57,504,349.43 $71,880,436.78
Georgia 0007128 Chatham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,440,104.94 $1,800,131.17
Georgia 0007128 Chatham >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities   $253,500.00
Georgia 0007128 Chatham >= 200,000 Local NATIONAL HIGHWAY SYSTEM Bridge Replacement - No Added Capacity $10,438,957.22 $13,048,696.53
Georgia 0007128 Chatham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $56,987.80 $71,234.75
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $10,600,000.00 $13,250,000.00
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $12,617.60 $15,772.00
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $5,383,447.83 $6,767,294.39
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,507.79 $1,895.38
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $22,516,576.96 $28,145,721.20
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $546,954.60 $683,693.25
Georgia 0007386 Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $288,692.00 $360,865.00
Georgia 0007526 Forsyth >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $379,412.19 $474,265.24
Georgia 0007526 Fulton >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $53,602.78 $67,003.47
Georgia 0007526 Forsyth >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $33,216.30 $41,520.37
Georgia 0007526 Fulton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $210,456.73 $263,070.92
Georgia 0007526 Forsyth >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $953,810.97 $1,192,263.71
Georgia 0007526 Fulton >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $541,004.22 $676,255.28
Georgia 0007526 Fulton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $500,317.10 $625,396.37
Georgia 0007526 Forsyth >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $123,188.00 $153,985.00
Georgia 0007526 Forsyth >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $12,679.71 $15,849.64
Georgia 0007526 Forsyth >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP New Construction Roadway $42,085.44 $42,085.44
Georgia 0007526 Fulton >= 200,000 State HIGHWAY INFRA PRGM - COVID APP New Construction Roadway $266,651.14 $266,651.14
Georgia 0007526 Fulton >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP New Construction Roadway $67,915.34 $67,915.34
Georgia 0007526 Forsyth >= 200,000 State HIGHWAY INFRA PRGM - COVID APP New Construction Roadway $480,719.69 $480,719.69
Georgia 0007526 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $494,174.36 $617,717.95
Georgia 0007526 Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $43,263.34 $54,079.18
Georgia 0007526 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $274,114.34 $342,642.92
Georgia 0007526 Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $69,816.20 $87,270.25
Georgia 0007526 Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $5,153,539.68 $6,441,924.60
Georgia 0007526 Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $14,223,967.14 $17,779,958.94
Georgia 0007526 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $18,054,936.94 $22,568,671.16
Georgia 0007526 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $13,848,088.14 $17,310,110.17
Georgia 0007526 Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way $696,867.40 $871,084.25
Georgia 0007526 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,195,528.97 $2,744,411.22
Georgia 0007526 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,932,098.65 $4,915,123.31
Georgia 0007526 Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,212,704.98 $1,515,881.22
Georgia 0007526 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,951,454.66 $3,927,359.76
Georgia 0007526 Forsyth >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $694,498.34 $998,396.08
Georgia 0007526 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,644,281.93 $2,880,756.40
Georgia 0007526 Fulton >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $1,986,658.76 $2,693,551.67
Georgia 0007526 Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,000,000.00 $9,330,000.00
Georgia 0007535 Gwinnett >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway $1,490,308.02 $1,862,885.25
Georgia 0007535 Gwinnett >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $40,000.00 $50,000.00
Georgia 0007535 Gwinnett >= 200,000 Local HIGH PRIORITY PROJECT SEC 1702 Right of Way $2,058,746.00 $4,340,995.02
Georgia 0007535 Gwinnett >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,231,203.98 $1,539,004.98
Georgia 0007535 Gwinnett >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $12,907,795.00 $16,134,743.75
Georgia 0007535 Gwinnett >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,820,000.00 $3,525,000.00
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity $175,411.77 $219,264.71
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity $39,050.38 $48,812.98
Georgia 0007691 Paulding >= 50,000 AND < 200,000 N/A EQUITY BONUS EXEMPT LIM Preliminary Engineering $2,276,181.60 $2,845,227.00
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $399,141.30 $498,926.63
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Preliminary Engineering $85,543.96 $106,929.95
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $3,064,000.35 $3,830,000.44
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State EQUITY BONUS EXEMPT LIM Right of Way $656,676.50 $820,845.63
Georgia 0007691 Paulding >= 50,000 AND < 200,000 N/A EQUITY BONUS EXEMPT LIM Right of Way $380,158.09 $475,197.62
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way $804,095.64 $1,009,730.62
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way $178,864.36 $224,606.15
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $8,901,280.98 $11,126,601.23
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $40,036,419.28 $50,045,524.10
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $32,211.52 $40,264.40
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $899,255.49 $1,124,069.36
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $501,689.60 $627,112.00
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,250,310.40 $2,812,888.00
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $511,809.98 $639,762.48
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,388,690.64 $2,985,863.29
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $29,578.64 $36,973.30
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $132,941.36 $166,176.70
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $12,957.11 $16,196.40
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $2,882.89 $3,603.60
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $167,858.66 $209,823.33
Georgia 0007691 Paulding >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $300,000.00 $375,000.00
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $783,420.47 $979,275.58
Georgia 0007691 Paulding >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $9,986,646.50 $12,483,308.11
Georgia 0007691 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,140,336.96 $2,675,421.20
Georgia 0007841 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $300,000.00 $375,000.00
Georgia 0007841 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $23,288,000.00 $29,110,000.00
Georgia 0007841 Fulton >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Other $40,000.00 $50,000.00
Georgia 0007841 Fulton >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,170,701.54 $1,463,376.93
Georgia 0007841 Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $1,000,000.00 $1,250,000.00
Georgia 0007841 Fulton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity $42,122,205.92 $52,652,757.40
Georgia 0007841 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $24,185,234.29 $30,231,542.86
Georgia 0007841 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,623,403.71 $2,029,254.64
Georgia 0007841 Fulton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,291,572.80 $1,614,466.00
Georgia 0007841 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $200,000.00 $250,000.00
Georgia 0007841 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $285,600.00 $1,145,646.25
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $960,000.00 $1,200,000.00
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,308,585.86 $4,135,732.32
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $39,846.98 $49,808.72
Georgia 0008430 Barrow >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $400,000.00 $500,000.00
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering   $755,164.68
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT New Construction Roadway $24,821,050.00 $30,360,785.53
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Utilities   $1,571,320.87
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Right of Way $101,575.04 $126,968.80
Georgia 0008430 Barrow >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Right of Way $3,797,839.10 $4,747,298.88
Georgia 0009316 Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $26,160,865.82 $32,701,082.28
Georgia 0009316 Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $540,343.37 $675,429.21
Georgia 0009316 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $144,000.00 $180,000.00
Georgia 0009316 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,545,735.05 $5,682,168.81
Georgia 0009316 Forsyth >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities   $3,420,590.00
Georgia 0009397 Fulton >= 200,000 Local CARBON REDUCTION PROGRAM Facilities for Pedestrians and Bicycles $7,077,936.50 $8,847,420.62
Georgia 0009397 Fulton >= 200,000 Local HWY INFRA PRGM-IIJA DEMO Facilities for Pedestrians and Bicycles $5,000,000.00 $6,250,000.00
Georgia 0009397 Fulton >= 200,000 Local NATL INTRASTRUCTURE INVESTMENT Facilities for Pedestrians and Bicycles $16,460,000.00 $20,575,000.00
Georgia 0009397 Fulton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,748,900.80 $2,186,126.00
Georgia 0009397 Fulton >= 200,000 N/A TRANSPORTATION ALTERNATIVES Preliminary Engineering $4,619,000.00 $5,773,750.00
Georgia 0009400 DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Construction Engineering $252,403.19 $280,447.99
Georgia 0009400 DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $2,127,816.50 $2,364,240.55
Georgia 0009400 Fulton >= 200,000 State HSIP LIMITING FLEXIBLE Right of Way $8,399,462.40 $9,332,736.00
Georgia 0009400 DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Right of Way $5,271,537.60 $5,857,264.00
Georgia 0009400 DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Safety $29,975,238.05 $35,016,904.41
Georgia 0009400 DeKalb >= 200,000 State HSIP LIMITING FLEXIBLE Utilities $20,783.70 $11,908,962.25
Georgia 0009861 Echols < 5,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity $60,863.80 $76,079.75
Georgia 0009861 Echols < 5,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $871,367.14 $1,089,208.93
Georgia 0009861 Echols < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $17,287,186.94 $21,608,983.68
Georgia 0009861 Echols < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $578,390.37 $722,987.96
Georgia 0009861 Echols < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $189,076.00 $236,345.00
Georgia 0009861 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $412,065.22 $515,081.53
Georgia 0009861 Echols < 5,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $160,000.00 $2,150,090.22
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $14,588,023.65 $37,909,629.26
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $715,922.92 $894,903.65
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $384,643.73 $480,804.66
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $453,040.87 $566,301.09
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $4,847,015.32 $6,058,769.15
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $50,309.01 $62,886.26
Georgia 0010297 Lowndes >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,241,952.00 $1,552,440.00
Georgia 0010352 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $289,952.83 $362,441.04
Georgia 0010352 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $28,062,263.16 $60,967,137.63
Georgia 0010352 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,109,299.98 $2,636,624.97
Georgia 0012700 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $44,580,952.70 $55,726,190.87
Georgia 0012700 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,229,872.11 $1,537,340.14
Georgia 0012700 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $3,419,993.21 $5,788,583.42
Georgia 0012700 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $1,533,768.07 $1,917,210.09
Georgia 0012700 Bibb >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity $487,561.19 $609,451.49
Georgia 0012700 Bibb >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity $4,820,257.81 $6,025,322.27
Georgia 0012701 Bibb >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $1,096,220.04 $1,096,220.04
Georgia 0012701 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $24,249,413.25 $30,311,766.56
Georgia 0012701 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,702,699.10 $2,128,373.88
Georgia 0012701 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $504,511.28 $1,787,425.09
Georgia 0012701 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $1,671,147.93 $2,088,934.91
Georgia 0012701 Bibb >= 50,000 AND < 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $47,621,053.00 $59,526,316.25
Georgia 0012757 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $65,154,961.00 $87,918,701.25
Georgia 0012757 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $87,512,914.00 $194,516,142.50
Georgia 0012757 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $814,034.40 $1,017,543.00
Georgia 0012757 Chatham >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $27,927,086.00 $34,908,857.50
Georgia 0012757 Chatham >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $325,039.00 $406,298.75
Georgia 0012757 Chatham >= 200,000 State REPURPOSED SPECIAL Construction Engineering $3,129,681.00 $3,912,101.25
Georgia 0012757 Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $4,250,912.00 $5,313,640.00
Georgia 0012788 Fulton >= 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Facilities for Pedestrians and Bicycles $1,615,068.82 $2,018,836.02
Georgia 0012788 Fulton >= 200,000 N/A HIGH PRIORITY PROJECTS-TEA-21 Preliminary Engineering $400,000.00 $500,000.00
Georgia 0012788 Fulton >= 200,000 State HIGH PRIORITY PROJECTS-TEA-21 Right of Way $133,322.27 $4,650,000.00
Georgia 0012788 Fulton >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Preliminary Engineering $700,000.00 $700,000.00
Georgia 0012788 Fulton >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Facilities for Pedestrians and Bicycles $1,204,329.80 $3,688,738.98
Georgia 0012788 Fulton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $30,000.00
Georgia 0012788 Fulton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $22,141,409.38 $27,676,761.73
Georgia 0012788 Fulton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $700,000.00 $875,000.00
Georgia 0013104 Gwinnett >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - No Added Capacity $8,000,000.00 $8,000,000.00
Georgia 0013104 Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $13,792,393.09 $17,240,491.36
Georgia 0013104 Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $496,816.80 $621,021.00
Georgia 0013104 Gwinnett >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $16,812.21 $60,125.26
Georgia 0013104 Gwinnett >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,447,183.29 $3,137,979.11
Georgia 0013239 Cobb >= 200,000 Local HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity $7,437,700.00 $7,437,700.00
Georgia 0013239 Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $12,000,000.00 $15,000,000.00
Georgia 0013239 Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $9,879,252.00 $15,054,600.00
Georgia 0013239 Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering   $25,337.02
Georgia 0013239 Cobb >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,824,000.00 $7,530,000.00
Georgia 0013525 Cherokee >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $19,646,711.07 $24,558,388.84
Georgia 0013525 Cherokee >= 200,000 Local HIGHWAY INFRA PRGM -APPOR Construction Engineering $353,288.93 $441,611.16
Georgia 0013525 Cherokee >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $135,564.86 $169,456.07
Georgia 0013525 Cherokee >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,440,000.00 $4,016,000.00
Georgia 0013545 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $82,481,972.53 $103,102,465.67
Georgia 0013545 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $400,000.00 $500,000.00
Georgia 0013545 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $4,771,223.42 $5,964,029.27
Georgia 0013546 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $113,159,583.06 $166,071,992.26
Georgia 0013546 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $12,051,541.51 $17,686,750.04
Georgia 0013546 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $14,239,400.91 $26,176,828.62
Georgia 0013546 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $132,837,288.74 $244,707,853.54
Georgia 0013546 DeKalb >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $16,162,844.77 $20,203,555.97
Georgia 0013546 Fulton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $151,762,728.23 $189,703,410.28
Georgia 0013546 Fulton >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $29,700,830.80 $37,126,038.50
Georgia 0013546 DeKalb >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $3,163,169.20 $3,953,961.50
Georgia 0013546 Fulton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Construction Engineering $178,548.54 $223,185.67
Georgia 0013546 DeKalb >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Construction Engineering $24,601.46 $30,751.83
Georgia 0013546 DeKalb >= 200,000 State REPURPOSED EARMARKS EXEMPT 4R - Added Capacity $48,115.75 $48,115.75
Georgia 0013546 Fulton >= 200,000 State REPURPOSED EARMARKS EXEMPT 4R - Added Capacity $451,799.25 $451,799.25
Georgia 0013546 Fulton >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $2,200,491.38 $2,200,491.38
Georgia 0013546 DeKalb >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $303,196.62 $303,196.62
Georgia 0013546 Fulton >= 200,000 State REPURPOSED SPECIAL Construction Engineering $1,626,568.75 $2,033,210.94
Georgia 0013546 DeKalb >= 200,000 State REPURPOSED SPECIAL Construction Engineering $173,231.25 $216,539.06
Georgia 0013546 DeKalb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $52,349,395.80 $65,436,744.75
Georgia 0013605 Ware >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $5,685,183.66 $8,881,979.58
Georgia 0013605 Pierce >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $2,800,165.09 $4,374,706.36
Georgia 0013605 Pierce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $18,647,091.15 $23,308,863.95
Georgia 0013605 Ware >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $7,616,417.50 $9,520,521.87
Georgia 0013605 Pierce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $637,542.53 $796,928.16
Georgia 0013605 Ware >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $260,404.69 $325,505.86
Georgia 0013605 Pierce >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $430,724.62 $574,654.58
Georgia 0013605 Ware >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $175,929.78 $234,718.09
Georgia 0013605 Ware >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,808,666.21 $2,610,832.76
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $7,807,636.58 $9,759,545.72
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $10,526,021.88 $13,157,527.35
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $426,523.39 $533,154.24
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,399,305.89 $1,749,132.36
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $829,996.71 $1,037,495.89
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,324,311.70 $1,655,389.63
Georgia 0013712 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $188,000.00 $235,000.00
Georgia 0013715 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $19,104,640.24 $23,880,800.30
Georgia 0013715 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $468,768.69 $585,960.86
Georgia 0013715 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $936,000.00 $1,170,000.00
Georgia 0013715 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $79,755.89 $99,694.86
Georgia 0013715 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $82,324.80 $987,416.00
Georgia 0013715 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $304,000.00 $380,000.00
Georgia 0013727 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $28,221,822.08 $35,277,277.60
Georgia 0013727 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $280,000.00 $350,000.00
Georgia 0013727 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $1,193,600.00 $1,492,000.00
Georgia 0013727 Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $2,330,476.00 $2,913,095.00
Georgia 0013727 Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $80,000.00 $100,000.00
Georgia 0013727 Chatham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $400,000.00 $980,494.00
Georgia 0013727 Chatham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $257,600.00 $6,977,933.83
Georgia 0013741 Chatham >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering $440,000.00 $550,000.00
Georgia 0013741 Chatham >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - No Added Capacity $12,300,000.00 $12,300,000.00
Georgia 0013741 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $52,667,100.80 $65,833,876.00
Georgia 0013741 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $560,000.00 $700,000.00
Georgia 0013741 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,040,395.18 $2,550,493.97
Georgia 0013767 Oconee >= 5,000 AND < 50,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $11,301,986.74 $39,396,027.60
Georgia 0013767 Oconee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $24,016,379.17 $109,713,897.79
Georgia 0013767 Oconee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,114,214.01 $5,142,767.51
Georgia 0013767 Oconee >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $5,362,775.44 $6,703,469.30
Georgia 0013767 Oconee >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $5,362,775.45 $6,703,469.31
Georgia 0013804 Bulloch >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $9,053,466.73 $11,316,833.41
Georgia 0013804 Effingham >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $10,027,452.24 $12,534,315.30
Georgia 0013804 Bulloch >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $296,261.75 $370,327.19
Georgia 0013804 Effingham >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $178,047.88 $222,559.85
Georgia 0013804 Bulloch >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $3,325,534.44 $4,156,918.05
Georgia 0013804 Effingham >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,998,465.56 $2,498,081.95
Georgia 0013804 Effingham >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,275.52 $5,344.40
Georgia 0013804 Bulloch >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $47,845.87 $59,807.34
Georgia 0013804 Effingham >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,384.08 $2,980.10
Georgia 0013804 Bulloch >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,966.98 $4,958.73
Georgia 0013886 Baldwin >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $2,168,880.00 $2,711,100.00
Georgia 0013886 Baldwin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $15,962,234.61 $19,952,793.26
Georgia 0013886 Baldwin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $396,743.18 $495,928.98
Georgia 0013886 Baldwin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,246,301.56 $1,557,876.95
Georgia 0013886 Baldwin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $824,000.00 $1,030,000.00
Georgia 0013886 Baldwin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,975,042.23 $3,188,802.79
Georgia 0013902 Barrow >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $201,750.00
Georgia 0013902 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $298,250.00
Georgia 0013902 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $9,156,796.58 $52,851,391.25
Georgia 0013902 Barrow >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $6,194,077.82 $35,751,108.75
Georgia 0013902 Barrow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,990,140.99 $4,987,676.24
Georgia 0013910 Oconee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $175,499.10 $219,373.87
Georgia 0013910 Barrow >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $134,548.07 $168,185.09
Georgia 0013910 Barrow >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $13,021,853.37 $28,290,844.61
Georgia 0013910 Oconee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $16,985,182.67 $36,901,441.76
Georgia 0013910 Oconee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,290,710.48 $3,712,448.10
Georgia 0013910 Barrow >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,756,195.18 $2,846,183.98
Georgia 0013910 Barrow >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Right of Way $899,894.17 $3,385,799.31
Georgia 0013910 Oconee >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,173,785.83 $4,416,300.69
Georgia 0013915 DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $12,520,000.00 $15,650,000.00
Georgia 0013915 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $43,971,206.40 $374,169,383.00
Georgia 0013915 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $65,004,843.62 $212,805,709.23
Georgia 0013915 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,000,000.00 $2,500,000.00
Georgia 0013915 DeKalb >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity $74,434,234.80 $153,612,908.50
Georgia 0013915 DeKalb >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering $227,530.00 $284,412.50
Georgia 0013915 DeKalb >= 200,000 State REPURPOSED SPECIAL Preliminary Engineering $2,567,476.99 $3,209,346.24
Georgia 0013915 DeKalb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,832,523.01 $5,806,241.26
Georgia 0013918 Fulton >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $1,442,378.78 $1,802,973.48
Georgia 0013918 Fulton >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $1,000,000.00 $1,250,000.00
Georgia 0013918 Fulton >= 200,000 N/A HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $5,040,000.00 $7,800,000.00
Georgia 0013918 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $46,636,582.80 $371,547,423.32
Georgia 0013918 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $21,055,077.36 $167,742,987.88
Georgia 0013918 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service $19,270,118.64 $78,270,977.77
Georgia 0013918 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $8,082,749.38 $10,103,436.72
Georgia 0013918 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $13,120,000.00 $16,400,000.00
Georgia 0013918 Fulton >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity   $546,318,786.60
Georgia 0013918 Cobb >= 200,000 State NATIONAL HWY FREIGHT PGM 4R - Added Capacity   $246,636,355.90
Georgia 0013918 Fulton >= 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $7,050,725.60 $8,813,407.00
Georgia 0013918 Fulton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering $589,135.00 $736,418.75
Georgia 0013918 Fulton >= 200,000 State REPURPOSED SPECIAL Preliminary Engineering $5,443,046.34 $6,803,807.93
Georgia 0013918 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $5,171,189.60 $6,463,987.00
Georgia 0013992 Dougherty >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $15,000,000.00 $18,750,000.00
Georgia 0013992 Dougherty >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $11,397,741.32 $14,247,176.65
Georgia 0013992 Dougherty >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $658,857.71 $823,572.14
Georgia 0013992 Dougherty >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $224,642.30 $280,802.88
Georgia 0013992 Dougherty >= 50,000 AND < 200,000 State PROTECT PROGRAM APPORTIONED Right of Way $136,000.00 $170,000.00
Georgia 0013992 Dougherty >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,851,849.22 $2,314,811.52
Georgia 0013995 Henry >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity   $36,250,000.00
Georgia 0013995 Henry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity   $16,950,000.00
Georgia 0013995 Henry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $840,000.00 $1,050,000.00
Georgia 0013995 Henry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,408,000.00 $1,760,000.00
Georgia 0013995 Henry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities   $134,131.00
Georgia 0015023 Fulton >= 200,000 Local CARBON REDUCTION PROGRAM Facilities for Pedestrians and Bicycles $2,775,928.00 $3,469,910.00
Georgia 0015023 Fulton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Facilities for Pedestrians and Bicycles $8,738,509.00 $11,659,746.89
Georgia 0015023 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $974,400.00 $1,218,000.00
Georgia 0015023 Fulton >= 200,000 Local TRANSPORTATION ALTERNATIVES Facilities for Pedestrians and Bicycles $6,080,320.00 $7,600,400.00
Georgia 0015023 Fulton >= 200,000 State TRANSPORTATION ALTERNATIVES Preliminary Engineering $1,296,000.00 $1,620,000.00
Georgia 0015023 Fulton >= 200,000 Local TRANSPORTATION ALTERNATIVES Right of Way $688,000.00 $860,000.00
Georgia 0015051 Cobb >= 200,000 State HIGHWAY INFRA PRGM -APPOR New Construction Roadway $6,000,000.00 $9,000,000.00
Georgia 0015051 Cobb >= 200,000 State NAT SIG FREIGHT AND HWY PROJ New Construction Roadway $4,512,000.00 $5,640,000.00
Georgia 0015051 Cobb >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Right of Way $488,000.00 $610,000.00
Georgia 0015051 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $400,000.00 $500,000.00
Georgia 0015051 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $6,628,430.93 $8,585,538.66
Georgia 0015051 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $321,781.46 $402,226.82
Georgia 0015051 Cobb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $1,878,218.54 $3,169,773.18
Georgia 0015090 Henry >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity   $39,396,701.27
Georgia 0015090 Henry >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,200,000.00 $1,500,000.00
Georgia 0015090 Henry >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $5,600,000.00 $7,171,200.00
Georgia 0015245 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $118,035,114.52 $147,543,893.14
Georgia 0015245 Banks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $3,056,348.52 $3,820,435.66
Georgia 0015245 Banks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $200,000.00 $250,000.00
Georgia 0015245 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $200,000.00 $250,000.00
Georgia 0015245 Banks >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $100,960.00 $139,072.40
Georgia 0015245 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,899,040.00 $5,370,927.60
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $5,907,166.57 $7,383,958.21
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $323,721.18 $404,651.48
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $5,416,000.00 $6,770,000.00
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $664,994.93 $831,243.66
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $7,029,091.06 $8,786,363.83
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $321,539.03 $401,923.79
Georgia 0015445 Lowndes >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $633,802.88 $792,253.60
Georgia 0016054 DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity $7,000,000.00 $31,711,200.00
Georgia 0016054 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $47,251,062.56 $67,313,828.20
Georgia 0016054 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $400,000.00 $500,000.00
Georgia 0016054 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,840,000.00 $2,300,000.00
Georgia 0016054 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $17,209,692.89 $21,512,116.11
Georgia 0016054 DeKalb >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $9,721,507.11 $12,151,883.89
Georgia 0016054 DeKalb >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $400,000.00 $500,000.00
Georgia 0016506 Bartow >= 50,000 AND < 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity $12,446.70 $15,558.38
Georgia 0016506 Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $18,633,123.68 $23,291,404.60
Georgia 0016506 Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $459,467.58 $574,334.48
Georgia 0016506 Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,554,744.84 $1,943,431.05
Georgia 0016506 Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $133,126.18 $166,407.72
Georgia 0017129 DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $27,829,792.80 $35,312,241.00
Georgia 0017129 DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - No Added Capacity $1,212,356.00 $21,973,204.00
Georgia 0017129 DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $240,000.00 $300,000.00
Georgia 0017129 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $1,023,495.01 $1,649,368.76
Georgia 0017130 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $32,128,116.63 $43,696,472.84
Georgia 0017130 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $240,000.00 $300,000.00
Georgia 0017130 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $840,000.00 $1,050,000.00
Georgia 0017130 Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $1,000,000.00 $1,250,000.00
Georgia 0017411 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity   $28,463,829.41
Georgia 0017411 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $612,000.00 $765,000.00
Georgia 0017411 Statewide N/A State NATIONAL HWY FREIGHT PGM 4R - No Added Capacity   $20,625,000.00
Georgia 0018191 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation   $104,130,702.72
Georgia 0018191 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $2,494,044.54
Georgia 0018191 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,813,341.75 $6,016,677.19
Georgia 0018192 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation   $77,552,995.37
Georgia 0018192 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $1,858,099.06
Georgia 0018192 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,366,475.06 $5,458,093.83
Georgia 0018192 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $60,000.00
Georgia 0018193 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $54,993,091.90 $68,741,364.87
Georgia 0018193 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $74,341,555.09 $92,926,943.87
Georgia 0018193 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,795,586.35 $2,244,482.94
Georgia 0018193 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,328,259.08 $1,660,323.85
Georgia 0018193 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,401,776.86 $3,045,331.07
Georgia 0018193 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,776,679.75 $2,252,739.69
Georgia 0018361 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $188,888.00 $236,110.00
Georgia 0018361 Morgan >= 5,000 AND < 50,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $211,112.00 $263,890.00
Georgia 0018361 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $31,878,571.58 $39,848,214.48
Georgia 0018361 Morgan >= 5,000 AND < 50,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $35,629,309.46 $44,536,636.82
Georgia 0018361 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $6,080,000.00 $7,600,000.00
Georgia 0018361 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $679,996.80 $849,996.00
Georgia 0018361 Morgan >= 5,000 AND < 50,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $760,003.20 $950,004.00
Georgia 0019022 Rabun >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $8,019,222.80 $57,168,376.89
Georgia 0019022 Rabun >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $281,245.88 $1,395,192.47
Georgia 0019022 Rabun >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $3,296,814.57
Georgia 0019023 Rabun >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $6,046,694.66 $7,558,368.32
Georgia 0019023 Rabun >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,804,380.06 $2,255,475.07
Georgia 0019023 Rabun >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $4,840,453.11 $6,050,566.39
Georgia 0019023 Rabun >= 5,000 AND < 50,000 State REDISTRIBUTION OF TIFIA FUNDS 4R - Added Capacity $7,404,744.00 $9,255,930.00
Georgia 0019023 Rabun >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $60,000,000.00 $75,000,000.00
Georgia 0019219 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $217,443,114.40 $271,803,893.00
Georgia 0019219 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $800,000.00 $1,000,000.00
Georgia 0019219 Chatham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $14,556,885.60 $18,196,107.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 Local EQUITY BONUS SP LIMITATION Preliminary Engineering $945,460.80 $1,181,826.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION Preliminary Engineering $494,539.20 $618,174.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 Local NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $10,505,120.00 $13,131,400.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $5,494,880.00 $6,868,600.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 State REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway $5,538,309.14 $6,922,886.43
Georgia 0019451 Bryan >= 5,000 AND < 50,000 Local REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway $10,588,147.90 $13,235,184.87
Georgia 0019451 Bryan >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $262,628.00 $328,285.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $137,372.00 $171,715.00
Georgia 0019451 Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $7,115,670.44 $16,777,188.01
Georgia 0019451 Bryan >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $13,985,939.20 $32,552,390.69
Georgia 0019451 Bryan >= 5,000 AND < 50,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,680,819.20 $3,538,890.54
Georgia 0019451 Bryan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $879,180.80 $1,851,076.32
Georgia 0019545 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $27,257,058.56 $27,257,058.56
Georgia 0019545 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Construction Engineering $664,931.66 $664,931.66
Georgia 0019545 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Utilities $55,870.11 $111,469.19
Georgia 0019546 Towns >= 5,000 AND < 50,000 State APPALACHIAN DEV HIGHWAY SYSTEM 4R - Added Capacity $78,427.24 $78,427.24
Georgia 0019546 Union >= 5,000 AND < 50,000 State APPALACHIAN DEV HIGHWAY SYSTEM 4R - Added Capacity $78,427.24 $78,427.24
Georgia 0019546 Towns >= 5,000 AND < 50,000 State APPALACHIAN DEV HWY INFRA PRGM 4R - Added Capacity $8,662,924.00 $8,662,924.00
Georgia 0019546 Union >= 5,000 AND < 50,000 State APPALACHIAN DEV HWY INFRA PRGM 4R - Added Capacity $8,662,924.00 $8,662,924.00
Georgia 0019546 Union >= 5,000 AND < 50,000 State APPALACHIAN DEV HWY INFRA-IIJA 4R - Added Capacity $16,827,402.37 $16,827,402.37
Georgia 0019546 Towns >= 5,000 AND < 50,000 State APPALACHIAN DEV HWY INFRA-IIJA 4R - Added Capacity $16,827,402.38 $16,827,402.38
Georgia 0019546 Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $8,078,228.70 $8,078,228.70
Georgia 0019546 Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $6,301,452.62 $6,301,452.62
Georgia 0019546 Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $672,895.61 $672,895.61
Georgia 0019546 Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering $929,236.79 $929,236.79
Georgia 0019546 Union >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $637,535.90 $637,535.90
Georgia 0019546 Towns >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Utilities $461,663.93 $461,663.93
Georgia 0019550 Statewide N/A State CARBON REDUCTION PROGRAM Other $12,450,187.93 $15,562,734.91
Georgia 0019550 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $400,000.00 $500,000.00
Georgia 0019550 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Other $78,090,868.07 $97,613,585.09
Georgia 0019551 Statewide N/A State CARBON REDUCTION PROGRAM Other $11,202,529.53 $14,003,161.91
Georgia 0019551 Statewide N/A State NATIONAL HIGHWAY PERF PROGRAM Other $47,386,254.07 $59,232,817.59
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State DONOR STATE BONUS 4R - Added Capacity $198,900.27 $248,625.34
Georgia 0026051 Hall >= 200,000 State DONOR STATE BONUS 4R - Added Capacity $228,760.68 $285,950.85
Georgia 0026051 Jackson >= 50,000 AND < 200,000 N/A DONOR STATE BONUS Preliminary Engineering $104,000.00 $130,000.00
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $6,431,112.03 $8,038,890.04
Georgia 0026051 Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $10,936,164.52 $13,670,205.65
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $412,546.63 $515,683.29
Georgia 0026051 Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $412,546.63 $515,683.29
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $440,329.36 $621,121.38
Georgia 0026051 Hall >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $996,870.71 $1,406,169.48
Georgia 0026051 Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $13,281,328.22 $16,601,660.28
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $6,809,616.90 $8,512,021.12
Georgia 0026051 Hall >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,005,000.00 $1,256,250.00
Georgia 0026051 Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $801,783.67 $1,002,229.60
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $359,538.06 $449,422.57
Georgia 0026051 Hall >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way $800,800.00 $1,001,000.00
Georgia 0026051 Jackson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $120,611.55 $6,550,285.02
Georgia 0026051 Hall >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $279,388.45 $15,173,289.33
Georgia 0033053 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $6,854,538.76 $8,568,173.45
Georgia 0033053 Clarke >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $316,362.85 $395,453.55
Georgia 0033053 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $918,561.24 $1,148,201.56
Georgia 0033053 Clarke >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $200,000.00 $250,000.00
Georgia 0033053 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,236,825.80 $1,546,032.25
Georgia 0033053 Fulton >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $892,176.94 $1,115,221.17
Georgia 0033053 Clarke >= 50,000 AND < 200,000 Local NATIONAL HIGHWAY SYSTEM Preliminary Engineering $426,245.06 $532,806.33
Georgia 0033053 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $44,812,085.08 $56,015,106.35
Georgia 0033053 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,258,575.69 $1,573,219.61
Georgia 0033053 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,376,000.00 $5,470,000.00
Georgia 0033053 Clarke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $10,111,379.20 $12,639,224.00
Georgia 0033053 Fulton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $3,246,216.72 $4,057,770.90
Georgia 0092092 Glynn >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $1,439,840.00 $1,799,800.00
Georgia 0092092 Glynn >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $20,036,101.90 $25,045,127.38
Georgia 0092092 Glynn >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $489,096.31 $611,370.39
Georgia 0092092 Glynn >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $268,000.00 $335,000.00
Georgia 0092092 Glynn >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,932,000.00 $4,298,698.45
Georgia 0092092 Glynn >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,008,160.00 $3,760,200.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway $851,609.18 $1,064,511.47
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering $870,800.00 $1,088,500.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way $3,160,000.00 $3,950,000.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way $970,000.00 $1,212,500.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 New Construction Roadway $303,663.82 $379,579.78
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $680,000.00 $850,000.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $886,486.90 $1,108,108.63
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $36,181,737.00 $45,227,171.24
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,283,094.05 $2,853,867.57
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,548,000.00 $4,435,000.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $310,000.00 $387,500.00
Georgia 00MS007 Gordon >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,687,927.38 $2,109,909.23
Georgia 0161092 Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way $1,563,416.57 $1,563,416.57
Georgia 0161092 Bibb >= 50,000 AND < 200,000 N/A INTERSTATE 4R Preliminary Engineering $27,000.00 $30,000.00
Georgia 0161092 Bibb >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $4,967,106.46 $5,532,896.07
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $52,388,124.28 $65,636,773.40
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,253,607.07 $1,567,008.84
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,640,000.00 $4,550,000.00
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $8,518,550.52 $10,648,188.15
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $102,476.14 $128,095.18
Georgia 0161092 Bibb >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $4,490,159.68 $5,066,965.09
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $9,240,000.00 $11,550,000.00
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity $235,654.09 $294,567.61
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity $3,370,050.91 $4,212,563.64
Georgia 0161092 Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $3,092,000.00 $3,865,000.00
Georgia 0161092 Bibb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $1,074,800.00 $1,343,516.04
Georgia 0161104 Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way $2,551,606.65 $2,551,606.65
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 4R - Added Capacity $181,914.68 $227,393.35
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $4,002,675.86 $5,003,344.83
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $75,936,795.62 $94,920,994.52
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,745,051.67 $2,181,314.59
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $546,400.00 $686,372.94
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $2,792,472.31 $3,490,590.39
Georgia 0161104 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity $1,020,188.93 $1,275,236.16
Georgia 0161104 Bibb >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $60,000.00 $75,000.00
Georgia 0161104 Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $758,314.68 $947,893.35
Georgia 0161131 Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way $722,580.52 $722,580.52
Georgia 0161131 Bibb >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Rehabilitation - Added Capacity $1,193,864.76 $1,193,864.76
Georgia 0161131 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity $117,910,000.12 $147,387,500.15
Georgia 0161131 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,876,217.59 $3,595,271.99
Georgia 0161131 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $903,403.41 $1,534,043.37
Georgia 0161131 Bibb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $660,800.00 $826,000.00
Georgia 0161131 Bibb >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $326,000.00 $407,500.00
Georgia 0181067 Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $191,128.74 $238,910.92
Georgia 0181067 Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $344,771.26 $430,964.08
Georgia 0181067 Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $14,415,682.01 $18,019,602.52
Georgia 0181067 Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $7,991,533.36 $9,989,416.70
Georgia 0181067 Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $21,969.64 $292,096.35
Georgia 0181067 Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $39,630.36 $526,903.65
Georgia 0181067 Carroll >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $298,085.93 $1,030,022.05
Georgia 0181067 Carroll >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $537,708.08 $1,858,025.20
Georgia 0202117 Richmond >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Replacement - Added Capacity $2,296,128.00 $2,296,128.00
Georgia 0202117 Richmond >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Replacement - Added Capacity $142,181.41 $177,726.76
Georgia 0202117 Richmond >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering $314,729.91 $349,699.90
Georgia 0202117 Richmond >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $1,870,922.02 $2,078,802.25
Georgia 0202117 Haralson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $26,093,609.78 $31,521,226.54
Georgia 0202117 Richmond >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - Added Capacity $49,550,738.17 $54,978,354.94
Georgia 0202117 Haralson >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,676,171.25 $2,095,214.06
Georgia 0202117 Richmond >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $4,460,178.43 $4,879,221.24
Georgia 0202117 Richmond >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - Added Capacity $325,039.00 $406,298.75
Georgia 0202117 Richmond >= 200,000 State REPURPOSED SPECIAL Preliminary Engineering $2,879,681.00 $3,599,601.25
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Right of Way $3,161,235.00 $3,951,543.75
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State HWY INFRA PRGM-IIJA DEMO New Construction Roadway $2,303,084.46 $2,878,855.58
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State HWY INFRA PRGM-IIJA DEMO Utilities $408,915.54 $511,144.42
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $745,456.76 $931,820.95
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway $6,080,223.06 $35,283,568.82
Georgia 0263056 Liberty >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $388,000.00 $485,000.00
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State TRANSPORTATION IMP PROJ New Construction Roadway $155,576.00 $194,470.00
Georgia 0263056 Liberty >= 50,000 AND < 200,000 State TRANSPORTATION IMP PROJ Right of Way $846,765.00 $1,058,456.25
Georgia 0351033 Rockdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $7,874,230.40 $80,254,314.62
Georgia 0351033 Rockdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $1,967,977.08
Georgia 0351033 Rockdale >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $800,000.00 $1,000,000.00
Georgia 0351033 Rockdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $3,572,295.86 $4,465,369.82
Georgia 0351033 Rockdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $20,544,000.00 $25,680,000.00
Georgia 0351033 Rockdale >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $5,362,243.30
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $15,104,823.00 $18,881,028.75
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $2,480,000.00 $3,100,000.00
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $363,600.00 $363,600.00
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,257,724.44 $4,072,155.55
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $410,349.61 $512,937.01
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $718,352.96 $1,643,075.49
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $6,000,000.00 $7,500,000.00
Georgia 0511023 Clarke >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,467,849.44 $2,899,135.81
Georgia 0562029 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEV HWY INFRA-IIJA Right of Way $12,200,000.00 $12,200,000.00
Georgia 0562029 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity $112,965,898.41 $112,965,898.41
Georgia 0562029 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Construction Engineering $2,774,424.40 $2,774,424.40
Georgia 0562029 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Preliminary Engineering $6,255,270.78 $17,495,341.47
Georgia 0562029 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Right of Way $45,910,776.23 $45,912,910.54
Georgia 0562029 Walker >= 50,000 AND < 200,000 State APPALACHIAN DEVEL HWY Utilities $1,240,586.22 $1,240,586.22
Georgia 0752177 Bibb >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC Right of Way $16,096.04 $16,096.04
Georgia 0752177 Bibb >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $2,988,720.00 $3,735,900.00
Georgia 0752177 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $135,214,794.97
Georgia 0752177 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $3,363,769.62
Georgia 0752177 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $80,000.00 $100,000.00
Georgia 0752177 Bibb >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities   $1,801,692.83
Georgia 0752177 Bibb >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,175,530.32 $1,469,412.91
Georgia 0752177 Bibb >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,884.37 $6,105.46
Georgia 1551023 Twiggs >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $960,000.00 $1,200,000.00
Georgia 1551023 Twiggs >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way $3,136,000.00 $3,920,000.00
Georgia 1551023 Twiggs >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity $22,000,000.00 $70,526,110.35
Georgia 1551023 Twiggs >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Construction Engineering   $1,618,858.86
Georgia 1551023 Twiggs >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Utilities   $1,316,316.65
Georgia 1551023 Twiggs >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,473,262.58 $1,841,578.23
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $1,984,000.00 $2,480,000.00
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $27,644,890.70 $34,556,113.38
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $691,938.32 $864,922.90
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,707,930.77 $2,134,913.46
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $191,578.07 $239,472.59
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $11,108,000.00 $13,885,000.00
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $100,000.00 $125,000.00
Georgia 1801006 Catoosa >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,781,196.58 $2,226,495.72
Georgia 1861011 Douglas >= 50,000 AND < 200,000 Local GRANTS SUP PLAN SECTION 117 Preliminary Engineering $406,952.62 $406,952.62
Georgia 1861011 Douglas >= 50,000 AND < 200,000 State GRANTS SUP PLAN SECTION 117 Preliminary Engineering $576,975.38 $576,975.38
Georgia 1861011 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $492,135.31 $615,169.14
Georgia 1861011 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $347,113.17 $433,891.46
Georgia 1861011 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $8,410,651.19 $10,513,313.97
Georgia 1861011 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $13,079,847.58 $16,349,809.49
Georgia 1861011 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $323,762.43 $404,703.04
Georgia 1861011 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $400,000.00 $500,000.00
Georgia 1861011 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $504,952.71 $631,190.89
Georgia 1861011 Douglas >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $6,184,000.00 $7,734,256.58
Georgia 1861011 Douglas >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $69,579.56 $86,974.45
Georgia 1861011 Douglas >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $98,649.56 $123,311.95
Georgia 2851346 Clayton >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering $2,667,512.32 $2,963,902.58
Georgia 2851346 Clayton >= 200,000 State INTERSTATE MAINTENANCE Preliminary Engineering $294,835.00 $327,594.44
Georgia 2851346 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity $50,144,608.35 $62,680,760.44
Georgia 2851346 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $1,528,264.63 $1,910,330.79
Georgia 2851346 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $199,988.22 $222,209.13
Georgia 2851346 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $3,361,920.00 $4,202,400.00
Georgia 2851346 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $104,002.28 $130,002.85
Georgia 2851346 Clayton >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - No Added Capacity $1,911,103.43 $2,388,879.29
Georgia 2851346 Clayton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - No Added Capacity $121,891.00 $152,363.75
Georgia 2851346 Clayton >= 200,000 State REPURPOSED SPECIAL 4R - No Added Capacity $5,836,736.74 $7,295,920.92
Georgia 2851346 Clayton >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity $5,600,000.00 $7,000,000.00
Georgia 2851352 DeKalb >= 200,000 Local HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $3,965,355.69 $4,956,694.61
Georgia 2851352 DeKalb >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $3,965,355.68 $4,956,694.60
Georgia 2851352 DeKalb >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering $3,718,800.00 $4,132,000.00
Georgia 2851352 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $47,331,882.73 $59,164,853.42
Georgia 2851352 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity $30,502,526.72 $38,128,158.39
Georgia 2851352 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $168,415.21 $210,519.01
Georgia 2851352 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $261,336.03 $326,670.04
Georgia 2851352 DeKalb >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $90,000.00 $100,000.00
Georgia 2851352 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,120,000.00 $3,650,000.00
Georgia 2851352 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $18,184,000.00 $22,730,000.00
Georgia 2851352 DeKalb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $177,677.66 $222,097.07
Georgia 2851352 DeKalb >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $275,708.90 $344,636.13
Georgia 2851352 DeKalb >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $3,000,000.00 $3,750,000.00
Georgia 2851352 DeKalb >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way $560,000.00 $700,000.00
Georgia 2946001 Bartow >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering $298,274.90 $372,843.63
Georgia 2946001 Bartow >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way $1,253,180.69 $1,566,475.87
Georgia 2946001 Bartow >= 50,000 AND < 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering $1,251,431.58 $1,564,289.47
Georgia 2946001 Bartow >= 50,000 AND < 200,000 State MINIMUM GUARANTEE - TEA-21 Right of Way $2,028,215.66 $2,535,269.57
Georgia 2946001 Bartow >= 50,000 AND < 200,000 Local REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity $13,723,334.19 $17,154,167.74
Georgia 2946001 Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $50,510,163.46 $63,137,704.33
Georgia 2946001 Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,437,186.44 $1,796,483.05
Georgia 2946001 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,826,484.20 $2,283,105.26
Georgia 2946001 Bartow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $179,668.52 $224,585.65
Georgia 2946001 Bartow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $9,150,603.65 $11,438,254.57
Georgia 2946001 Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,880,000.00 $3,600,000.00
Georgia 2946001 Bartow >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,964,302.72 $3,705,378.40
Georgia 3711009 Floyd >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity $9,080,498.00 $11,350,622.50
Georgia 3711009 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $8,492,431.75 $10,615,539.69
Georgia 3711009 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $428,370.00 $535,462.50
Georgia 3711009 Floyd >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $260,000.00 $325,000.00
Georgia 3711009 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $948,800.00 $1,396,401.35
Georgia 3711009 Floyd >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $6,870,916.00 $8,588,645.00
Georgia 3711009 Floyd >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,469,241.50 $2,762,883.95
Georgia 7063001 Columbia >= 50,000 AND < 200,000 Local EQUITY BONUS SP LIMITATION 4R - Added Capacity $5,438,139.58 $6,797,674.47
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering $633,240.99 $791,551.25
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $3,779,580.96 $4,724,476.20
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A MIN ALLOC 90%-SUB TO LIM-STEA Right of Way $88,000.00 $110,000.00
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $1,105,684.02 $1,382,105.03
Georgia 7063001 Columbia >= 50,000 AND < 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $251,343.39 $23,307,662.24
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,367,334.10 $1,709,167.62
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,011,791.20 $2,514,739.00
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way $17,072,077.38 $21,340,096.74
Georgia 7063001 Columbia >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities $2,478,877.19 $3,098,596.49
Georgia 9108004 Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $15,545,739.20 $21,991,590.80
Georgia 9108004 Clayton >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $5,800,888.80 $7,251,111.00
Georgia 9108004 Clayton >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $108,000.00 $135,000.00
Georgia M006062 Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $15,493,414.10 $17,214,904.56
Georgia M006062 Gordon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $7,230,865.90 $8,034,295.44
Georgia M006062 Gordon >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $72,308.66 $80,342.96
Georgia M006062 Bartow >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $154,934.14 $172,149.04
Georgia M006167 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $18,875,128.13 $20,972,364.59
Georgia M006167 Cherokee >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $31,794,996.52 $35,327,773.91
Georgia M006167 Cherokee >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $317,905.28 $353,228.09
Georgia M006167 Cobb >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $188,724.75 $209,694.17
Georgia M006448 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $6,787,573.41 $7,541,748.23
Georgia M006448 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Resurfacing $32,042,938.07 $35,603,264.52
Georgia M006448 Fulton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $322,311.20 $358,123.56
Georgia M006448 Clayton >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $68,274.36 $75,860.40
Georgia M006448 Fulton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Maintenance Resurfacing $209,091.46 $209,091.46
Georgia M006448 Clayton >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Maintenance Resurfacing $44,291.31 $44,291.31