| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $358,628.66 | $448,285.82 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | $124,800.00 | $156,000.00 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,102,468.32 | $1,378,085.40 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $122,480.40 | $153,100.50 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $65,872.80 | $82,341.00 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,163,382.43 | $5,204,228.04 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $146,400.00 | $183,000.00 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,698,468.11 | $12,123,085.13 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $335,908.81 | $419,886.01 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $94,400.00 | $118,000.00 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,657,960.44 | $2,072,450.55 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $611,051.49 | $763,814.37 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,136,166.35 | $10,170,207.94 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $301,261.11 | $376,576.39 |
| Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $985,995.57 | $1,232,494.46 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $692,389.23 | $865,486.54 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $6,696,586.36 | $8,371,932.95 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $43,772,763.68 | $54,715,954.60 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,031,039.59 | $3,135,583.49 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,060,000.00 | $1,325,000.00 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $903,632.64 | $1,129,540.80 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,396,514.99 | $2,995,643.74 |
| Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $429,293.43 | $1,189,173.44 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $38,545,178.43 | $48,181,473.03 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $969,423.35 | $1,211,779.19 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,000,000.00 | $20,000,000.00 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,307,609.67 | $1,634,512.09 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,117,729.80 | $1,844,991.31 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $943,970.77 | $1,179,963.46 |
| Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $1,977,569.20 | $2,471,961.50 |
| Georgia | 0001757 | Fulton | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $719,921.00 | $899,901.25 |
| Georgia | 0001757 | Forsyth | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $38,719.61 | $43,021.79 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $321,280.39 | $356,978.21 |
| Georgia | 0001757 | Fulton | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $900,000.00 | $1,000,000.00 |
| Georgia | 0001757 | Forsyth | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $479,032.47 | $532,258.31 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $6,305,871.51 | $7,006,523.89 |
| Georgia | 0001757 | Forsyth | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $19,792,650.02 | $24,740,812.52 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $164,231,796.98 | $205,289,746.23 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,190,693.95 | $3,034,059,706.52 |
| Georgia | 0001757 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,100,907.65 | $368,944,075.73 |
| Georgia | 0001757 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $9,419,148.19 | $31,545,886.92 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $47,192,244.96 | $106,936,063.97 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $29,561,622.83 | $44,012,281.55 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $14,150,141.75 | $17,687,677.19 |
| Georgia | 0001757 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,705,858.25 | $2,132,322.81 |
| Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,327,351.41 | $1,659,189.26 |
| Georgia | 0001817 | Clayton | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Rail/Hwy Crossing | $9,341,654.12 | $11,677,067.65 |
| Georgia | 0001817 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,237,539.32 | $1,546,924.16 |
| Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $69,711.10 | $87,138.87 |
| Georgia | 0001817 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $28,009,484.29 | $35,011,855.35 |
| Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $1,076,163.26 | $1,345,204.08 |
| Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,964,000.00 | $6,100,000.00 |
| Georgia | 0001817 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,840,349.60 | $6,408,421.00 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $25,236,897.54 | $31,546,121.92 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $993,539.21 | $1,241,924.01 |
| Georgia | 0002626 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $864,272.75 | $1,080,340.93 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,642,741.54 | $4,553,426.94 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,261,844.88 | $1,577,306.10 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,000.40 | $7,500.50 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $21,999.60 | $27,499.50 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,048,065.81 | $1,310,082.26 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $451,214.96 | $564,018.70 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $12,992,000.00 | $16,240,000.00 |
| Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,792,794.57 | $2,240,993.21 |
| Georgia | 0002868 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,791,300.23 | $33,489,125.29 |
| Georgia | 0002868 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,633,671.59 | $28,292,089.48 |
| Georgia | 0002868 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $550,572.13 | $688,215.16 |
| Georgia | 0002868 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $651,707.92 | $814,634.90 |
| Georgia | 0002868 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $625,001.82 | $781,252.27 |
| Georgia | 0002868 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $528,010.43 | $660,013.04 |
| Georgia | 0002868 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $14,632,098.88 | $18,290,123.60 |
| Georgia | 0002868 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $17,319,901.12 | $21,649,876.40 |
| Georgia | 0002868 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $363,678.82 | $454,598.53 |
| Georgia | 0002868 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $430,483.78 | $538,104.72 |
| Georgia | 0002868 | DeKalb | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,784,140.80 | $6,083,176.00 |
| Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | Right of Way | $4,800,000.00 | $6,000,000.00 |
| Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,555,066.40 | $4,443,833.00 |
| Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,400,000.00 | $16,930,300.00 |
| Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $20,000.00 | |
| Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $441,528.01 | $1,003,572.21 |
| Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $530,644.80 | $2,600,000.00 |
| Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $2,694,486.67 | $3,368,108.34 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $3,764,014.46 | $4,705,018.07 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $26,572,182.75 | $33,215,228.44 |
| Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $19,753,591.51 | $24,691,989.39 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,697,332.52 | $2,121,665.65 |
| Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,697,332.52 | $2,121,665.65 |
| Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $66,441.90 | $83,329.59 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,704,238.10 | $3,380,297.62 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $91,700.23 | $114,998.07 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,296,000.00 | $12,870,000.00 |
| Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,436,613.03 | $1,795,766.29 |
| Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,931,764.52 | $2,414,705.65 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $219,601.47 | $274,501.84 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $213,557.69 | $266,947.11 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | Other | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $750.08 | $937.60 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $5,644,699.43 | $7,061,522.67 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $5,266,857.49 | $6,588,842.49 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $178,147.20 | $222,684.00 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $173,244.32 | $216,555.40 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | Other | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $608.48 | $760.60 |
| Georgia | 0006049 | Cobb | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $2,653,121.97 | $3,316,402.46 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $230,075.92 | $287,594.90 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $246,636.86 | $308,296.07 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $11,728,673.36 | $14,660,841.70 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $10,364,285.00 | $12,955,356.25 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $42,180,725.96 | $52,725,907.46 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,164,203.63 | $1,455,254.54 |
| Georgia | 0006049 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $655,816.02 | $819,770.03 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $760,013.72 | $950,017.15 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $814,492.15 | $1,018,115.19 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $101,251.28 | $126,564.10 |
| Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $94,479.02 | $118,098.78 |
| Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $637,333.26 | $6,730,025.58 |
| Georgia | 0006857 | Paulding | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $6,648,086.75 | $8,310,108.44 |
| Georgia | 0006857 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,787,417.66 | $18,484,272.08 |
| Georgia | 0006857 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $520,604.44 | $650,755.55 |
| Georgia | 0006857 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,118,540.09 | $2,648,175.11 |
| Georgia | 0006857 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $847.76 | $1,059.70 |
| Georgia | 0006857 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $44,902.96 | $56,128.70 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $5,469,703.06 | $6,837,128.82 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $837,880.45 | $1,047,350.56 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $4,769,668.48 | $5,962,085.60 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,146,155.24 | $15,182,694.05 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $507,416.51 | $634,270.64 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,009,204.08 | $1,411,505.10 |
| Georgia | 0006866 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $314,527.20 | $3,487,291.00 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $1,967,855.00 | $1,967,855.00 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $5,234,286.74 | $6,542,858.42 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $980,735.82 | $1,225,919.78 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $9,986,680.24 | $12,483,350.30 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $18,897,782.42 | $23,622,228.02 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $387,687.26 | $484,609.08 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,136,000.00 | $11,435,237.79 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,711,419.39 | $4,912,299.24 |
| Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $524,220.80 | $655,276.00 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | $5,315,814.19 | $6,644,767.74 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $880,000.00 | $1,100,000.00 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $4,879,360.00 | $6,099,200.00 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $603,963.93 | $754,954.91 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $472,457.37 | $590,571.71 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $15,400,199.15 | $19,250,248.93 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,114,935.56 | $1,393,669.45 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $12,279,840.00 | $17,830,800.00 |
| Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $173,928.11 | $217,410.14 |
| Georgia | 0006934 | Rockdale | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | Right of Way | $757,500.00 | $757,500.00 |
| Georgia | 0006934 | Rockdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $25,271,052.00 | $33,082,366.49 |
| Georgia | 0006934 | Rockdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $240,000.00 | $300,000.00 |
| Georgia | 0006934 | Rockdale | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $840,000.00 | $1,050,000.00 |
| Georgia | 0006934 | Rockdale | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,570,000.00 | $13,212,500.00 |
| Georgia | 0006934 | Rockdale | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Preliminary Engineering | $499,915.00 | $499,915.00 |
| Georgia | 0007128 | Chatham | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Preliminary Engineering | $863,632.04 | $863,632.04 |
| Georgia | 0007128 | Chatham | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $1,894,043.11 | $1,894,043.11 |
| Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $57,504,349.43 | $71,880,436.78 |
| Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,440,104.94 | $1,800,131.17 |
| Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $253,500.00 | |
| Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $10,438,957.22 | $13,048,696.53 |
| Georgia | 0007128 | Chatham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $56,987.80 | $71,234.75 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $10,600,000.00 | $13,250,000.00 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $12,617.60 | $15,772.00 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $5,383,447.83 | $6,767,294.39 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,507.79 | $1,895.38 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,516,576.96 | $28,145,721.20 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $546,954.60 | $683,693.25 |
| Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $288,692.00 | $360,865.00 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $379,412.19 | $474,265.24 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $53,602.78 | $67,003.47 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $33,216.30 | $41,520.37 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $210,456.73 | $263,070.92 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $953,810.97 | $1,192,263.71 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $541,004.22 | $676,255.28 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $500,317.10 | $625,396.37 |
| Georgia | 0007526 | Forsyth | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $123,188.00 | $153,985.00 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $12,679.71 | $15,849.64 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $42,085.44 | $42,085.44 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $266,651.14 | $266,651.14 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $67,915.34 | $67,915.34 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $480,719.69 | $480,719.69 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $494,174.36 | $617,717.95 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $43,263.34 | $54,079.18 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $274,114.34 | $342,642.92 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $69,816.20 | $87,270.25 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,153,539.68 | $6,441,924.60 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $14,223,967.14 | $17,779,958.94 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $18,054,936.94 | $22,568,671.16 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $13,848,088.14 | $17,310,110.17 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $696,867.40 | $871,084.25 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,195,528.97 | $2,744,411.22 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,932,098.65 | $4,915,123.31 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,212,704.98 | $1,515,881.22 |
| Georgia | 0007526 | Forsyth | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,951,454.66 | $3,927,359.76 |
| Georgia | 0007526 | Forsyth | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $694,498.34 | $998,396.08 |
| Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,644,281.93 | $2,880,756.40 |
| Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,986,658.76 | $2,693,551.67 |
| Georgia | 0007526 | Forsyth | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,000,000.00 | $9,330,000.00 |
| Georgia | 0007535 | Gwinnett | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,490,308.02 | $1,862,885.25 |
| Georgia | 0007535 | Gwinnett | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $40,000.00 | $50,000.00 |
| Georgia | 0007535 | Gwinnett | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,058,746.00 | $4,340,995.02 |
| Georgia | 0007535 | Gwinnett | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,231,203.98 | $1,539,004.98 |
| Georgia | 0007535 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $12,907,795.00 | $16,134,743.75 |
| Georgia | 0007535 | Gwinnett | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,820,000.00 | $3,525,000.00 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $175,411.77 | $219,264.71 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $39,050.38 | $48,812.98 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $2,276,181.60 | $2,845,227.00 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $399,141.30 | $498,926.63 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $85,543.96 | $106,929.95 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $3,064,000.35 | $3,830,000.44 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | $656,676.50 | $820,845.63 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | $380,158.09 | $475,197.62 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $804,095.64 | $1,009,730.62 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $178,864.36 | $224,606.15 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,901,280.98 | $11,126,601.23 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $40,036,419.28 | $50,045,524.10 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $32,211.52 | $40,264.40 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $899,255.49 | $1,124,069.36 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $501,689.60 | $627,112.00 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,250,310.40 | $2,812,888.00 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $511,809.98 | $639,762.48 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,388,690.64 | $2,985,863.29 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $29,578.64 | $36,973.30 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $132,941.36 | $166,176.70 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $12,957.11 | $16,196.40 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $2,882.89 | $3,603.60 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $167,858.66 | $209,823.33 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $300,000.00 | $375,000.00 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $783,420.47 | $979,275.58 |
| Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,986,646.50 | $12,483,308.11 |
| Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,140,336.96 | $2,675,421.20 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $300,000.00 | $375,000.00 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $23,288,000.00 | $29,110,000.00 |
| Georgia | 0007841 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Other | $40,000.00 | $50,000.00 |
| Georgia | 0007841 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,170,701.54 | $1,463,376.93 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $1,000,000.00 | $1,250,000.00 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $42,122,205.92 | $52,652,757.40 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $24,185,234.29 | $30,231,542.86 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,623,403.71 | $2,029,254.64 |
| Georgia | 0007841 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,291,572.80 | $1,614,466.00 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $200,000.00 | $250,000.00 |
| Georgia | 0007841 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $285,600.00 | $1,145,646.25 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $960,000.00 | $1,200,000.00 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,308,585.86 | $4,135,732.32 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $39,846.98 | $49,808.72 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $755,164.68 | |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $24,821,050.00 | $30,360,785.53 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $1,571,320.87 | |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Right of Way | $101,575.04 | $126,968.80 |
| Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Right of Way | $3,797,839.10 | $4,747,298.88 |
| Georgia | 0009316 | Forsyth | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $26,160,865.82 | $32,701,082.28 |
| Georgia | 0009316 | Forsyth | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $540,343.37 | $675,429.21 |
| Georgia | 0009316 | Forsyth | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $144,000.00 | $180,000.00 |
| Georgia | 0009316 | Forsyth | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,545,735.05 | $5,682,168.81 |
| Georgia | 0009316 | Forsyth | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,420,590.00 | |
| Georgia | 0009397 | Fulton | >= 200,000 | Local | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $7,077,936.50 | $8,847,420.62 |
| Georgia | 0009397 | Fulton | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Facilities for Pedestrians and Bicycles | $5,000,000.00 | $6,250,000.00 |
| Georgia | 0009397 | Fulton | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $16,460,000.00 | $20,575,000.00 |
| Georgia | 0009397 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,748,900.80 | $2,186,126.00 |
| Georgia | 0009397 | Fulton | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Preliminary Engineering | $4,619,000.00 | $5,773,750.00 |
| Georgia | 0009400 | DeKalb | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $252,403.19 | $280,447.99 |
| Georgia | 0009400 | DeKalb | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $2,127,816.50 | $2,364,240.55 |
| Georgia | 0009400 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $8,399,462.40 | $9,332,736.00 |
| Georgia | 0009400 | DeKalb | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $5,271,537.60 | $5,857,264.00 |
| Georgia | 0009400 | DeKalb | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $29,975,238.05 | $35,016,904.41 |
| Georgia | 0009400 | DeKalb | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $20,783.70 | $11,908,962.25 |
| Georgia | 0009861 | Echols | < 5,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $60,863.80 | $76,079.75 |
| Georgia | 0009861 | Echols | < 5,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $871,367.14 | $1,089,208.93 |
| Georgia | 0009861 | Echols | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $17,287,186.94 | $21,608,983.68 |
| Georgia | 0009861 | Echols | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $578,390.37 | $722,987.96 |
| Georgia | 0009861 | Echols | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $189,076.00 | $236,345.00 |
| Georgia | 0009861 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $412,065.22 | $515,081.53 |
| Georgia | 0009861 | Echols | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $160,000.00 | $2,150,090.22 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,588,023.65 | $37,909,629.26 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $715,922.92 | $894,903.65 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $384,643.73 | $480,804.66 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $453,040.87 | $566,301.09 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,847,015.32 | $6,058,769.15 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $50,309.01 | $62,886.26 |
| Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,241,952.00 | $1,552,440.00 |
| Georgia | 0010352 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $289,952.83 | $362,441.04 |
| Georgia | 0010352 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $28,062,263.16 | $60,967,137.63 |
| Georgia | 0010352 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,109,299.98 | $2,636,624.97 |
| Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $44,580,952.70 | $55,726,190.87 |
| Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,229,872.11 | $1,537,340.14 |
| Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,419,993.21 | $5,788,583.42 |
| Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $1,533,768.07 | $1,917,210.09 |
| Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $487,561.19 | $609,451.49 |
| Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $4,820,257.81 | $6,025,322.27 |
| Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $1,096,220.04 | $1,096,220.04 |
| Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,249,413.25 | $30,311,766.56 |
| Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,702,699.10 | $2,128,373.88 |
| Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $504,511.28 | $1,787,425.09 |
| Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,671,147.93 | $2,088,934.91 |
| Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $47,621,053.00 | $59,526,316.25 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $65,154,961.00 | $87,918,701.25 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $87,512,914.00 | $194,516,142.50 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $814,034.40 | $1,017,543.00 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $27,927,086.00 | $34,908,857.50 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $325,039.00 | $406,298.75 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $3,129,681.00 | $3,912,101.25 |
| Georgia | 0012757 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,250,912.00 | $5,313,640.00 |
| Georgia | 0012788 | Fulton | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Facilities for Pedestrians and Bicycles | $1,615,068.82 | $2,018,836.02 |
| Georgia | 0012788 | Fulton | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0012788 | Fulton | >= 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $133,322.27 | $4,650,000.00 |
| Georgia | 0012788 | Fulton | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Preliminary Engineering | $700,000.00 | $700,000.00 |
| Georgia | 0012788 | Fulton | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Facilities for Pedestrians and Bicycles | $1,204,329.80 | $3,688,738.98 |
| Georgia | 0012788 | Fulton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $30,000.00 | |
| Georgia | 0012788 | Fulton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $22,141,409.38 | $27,676,761.73 |
| Georgia | 0012788 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $700,000.00 | $875,000.00 |
| Georgia | 0013104 | Gwinnett | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $8,000,000.00 | $8,000,000.00 |
| Georgia | 0013104 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,792,393.09 | $17,240,491.36 |
| Georgia | 0013104 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $496,816.80 | $621,021.00 |
| Georgia | 0013104 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $16,812.21 | $60,125.26 |
| Georgia | 0013104 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,447,183.29 | $3,137,979.11 |
| Georgia | 0013239 | Cobb | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $7,437,700.00 | $7,437,700.00 |
| Georgia | 0013239 | Cobb | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,000,000.00 | $15,000,000.00 |
| Georgia | 0013239 | Cobb | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,879,252.00 | $15,054,600.00 |
| Georgia | 0013239 | Cobb | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $25,337.02 | |
| Georgia | 0013239 | Cobb | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,824,000.00 | $7,530,000.00 |
| Georgia | 0013525 | Cherokee | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $19,646,711.07 | $24,558,388.84 |
| Georgia | 0013525 | Cherokee | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $353,288.93 | $441,611.16 |
| Georgia | 0013525 | Cherokee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $135,564.86 | $169,456.07 |
| Georgia | 0013525 | Cherokee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,440,000.00 | $4,016,000.00 |
| Georgia | 0013545 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $82,481,972.53 | $103,102,465.67 |
| Georgia | 0013545 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0013545 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $4,771,223.42 | $5,964,029.27 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $113,159,583.06 | $166,071,992.26 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,051,541.51 | $17,686,750.04 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,239,400.91 | $26,176,828.62 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $132,837,288.74 | $244,707,853.54 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $16,162,844.77 | $20,203,555.97 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $151,762,728.23 | $189,703,410.28 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $29,700,830.80 | $37,126,038.50 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $3,163,169.20 | $3,953,961.50 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $178,548.54 | $223,185.67 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $24,601.46 | $30,751.83 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $48,115.75 | $48,115.75 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $451,799.25 | $451,799.25 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $2,200,491.38 | $2,200,491.38 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $303,196.62 | $303,196.62 |
| Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $1,626,568.75 | $2,033,210.94 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $173,231.25 | $216,539.06 |
| Georgia | 0013546 | DeKalb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $52,349,395.80 | $65,436,744.75 |
| Georgia | 0013605 | Ware | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $5,685,183.66 | $8,881,979.58 |
| Georgia | 0013605 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $2,800,165.09 | $4,374,706.36 |
| Georgia | 0013605 | Pierce | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,647,091.15 | $23,308,863.95 |
| Georgia | 0013605 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,616,417.50 | $9,520,521.87 |
| Georgia | 0013605 | Pierce | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $637,542.53 | $796,928.16 |
| Georgia | 0013605 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $260,404.69 | $325,505.86 |
| Georgia | 0013605 | Pierce | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $430,724.62 | $574,654.58 |
| Georgia | 0013605 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $175,929.78 | $234,718.09 |
| Georgia | 0013605 | Ware | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,808,666.21 | $2,610,832.76 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $7,807,636.58 | $9,759,545.72 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $10,526,021.88 | $13,157,527.35 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $426,523.39 | $533,154.24 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,399,305.89 | $1,749,132.36 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $829,996.71 | $1,037,495.89 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,324,311.70 | $1,655,389.63 |
| Georgia | 0013712 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $188,000.00 | $235,000.00 |
| Georgia | 0013715 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $19,104,640.24 | $23,880,800.30 |
| Georgia | 0013715 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $468,768.69 | $585,960.86 |
| Georgia | 0013715 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $936,000.00 | $1,170,000.00 |
| Georgia | 0013715 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $79,755.89 | $99,694.86 |
| Georgia | 0013715 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $82,324.80 | $987,416.00 |
| Georgia | 0013715 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $304,000.00 | $380,000.00 |
| Georgia | 0013727 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,221,822.08 | $35,277,277.60 |
| Georgia | 0013727 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $280,000.00 | $350,000.00 |
| Georgia | 0013727 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,193,600.00 | $1,492,000.00 |
| Georgia | 0013727 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,330,476.00 | $2,913,095.00 |
| Georgia | 0013727 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $80,000.00 | $100,000.00 |
| Georgia | 0013727 | Chatham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $400,000.00 | $980,494.00 |
| Georgia | 0013727 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $257,600.00 | $6,977,933.83 |
| Georgia | 0013741 | Chatham | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $440,000.00 | $550,000.00 |
| Georgia | 0013741 | Chatham | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $12,300,000.00 | $12,300,000.00 |
| Georgia | 0013741 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $52,667,100.80 | $65,833,876.00 |
| Georgia | 0013741 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $560,000.00 | $700,000.00 |
| Georgia | 0013741 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,040,395.18 | $2,550,493.97 |
| Georgia | 0013767 | Oconee | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,301,986.74 | $39,396,027.60 |
| Georgia | 0013767 | Oconee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,016,379.17 | $109,713,897.79 |
| Georgia | 0013767 | Oconee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,114,214.01 | $5,142,767.51 |
| Georgia | 0013767 | Oconee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,362,775.44 | $6,703,469.30 |
| Georgia | 0013767 | Oconee | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,362,775.45 | $6,703,469.31 |
| Georgia | 0013804 | Bulloch | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $9,053,466.73 | $11,316,833.41 |
| Georgia | 0013804 | Effingham | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $10,027,452.24 | $12,534,315.30 |
| Georgia | 0013804 | Bulloch | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $296,261.75 | $370,327.19 |
| Georgia | 0013804 | Effingham | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $178,047.88 | $222,559.85 |
| Georgia | 0013804 | Bulloch | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,325,534.44 | $4,156,918.05 |
| Georgia | 0013804 | Effingham | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,998,465.56 | $2,498,081.95 |
| Georgia | 0013804 | Effingham | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,275.52 | $5,344.40 |
| Georgia | 0013804 | Bulloch | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $47,845.87 | $59,807.34 |
| Georgia | 0013804 | Effingham | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,384.08 | $2,980.10 |
| Georgia | 0013804 | Bulloch | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,966.98 | $4,958.73 |
| Georgia | 0013886 | Baldwin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,168,880.00 | $2,711,100.00 |
| Georgia | 0013886 | Baldwin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $15,962,234.61 | $19,952,793.26 |
| Georgia | 0013886 | Baldwin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $396,743.18 | $495,928.98 |
| Georgia | 0013886 | Baldwin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,246,301.56 | $1,557,876.95 |
| Georgia | 0013886 | Baldwin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $824,000.00 | $1,030,000.00 |
| Georgia | 0013886 | Baldwin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,975,042.23 | $3,188,802.79 |
| Georgia | 0013902 | Barrow | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $201,750.00 | |
| Georgia | 0013902 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $298,250.00 | |
| Georgia | 0013902 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $9,156,796.58 | $52,851,391.25 |
| Georgia | 0013902 | Barrow | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $6,194,077.82 | $35,751,108.75 |
| Georgia | 0013902 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,990,140.99 | $4,987,676.24 |
| Georgia | 0013910 | Oconee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $175,499.10 | $219,373.87 |
| Georgia | 0013910 | Barrow | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $134,548.07 | $168,185.09 |
| Georgia | 0013910 | Barrow | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $13,021,853.37 | $28,290,844.61 |
| Georgia | 0013910 | Oconee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $16,985,182.67 | $36,901,441.76 |
| Georgia | 0013910 | Oconee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,290,710.48 | $3,712,448.10 |
| Georgia | 0013910 | Barrow | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,756,195.18 | $2,846,183.98 |
| Georgia | 0013910 | Barrow | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $899,894.17 | $3,385,799.31 |
| Georgia | 0013910 | Oconee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,173,785.83 | $4,416,300.69 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $12,520,000.00 | $15,650,000.00 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,971,206.40 | $374,169,383.00 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $65,004,843.62 | $212,805,709.23 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,000,000.00 | $2,500,000.00 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $74,434,234.80 | $153,612,908.50 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $227,530.00 | $284,412.50 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | REPURPOSED SPECIAL | Preliminary Engineering | $2,567,476.99 | $3,209,346.24 |
| Georgia | 0013915 | DeKalb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,832,523.01 | $5,806,241.26 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,442,378.78 | $1,802,973.48 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $1,000,000.00 | $1,250,000.00 |
| Georgia | 0013918 | Fulton | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $5,040,000.00 | $7,800,000.00 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $46,636,582.80 | $371,547,423.32 |
| Georgia | 0013918 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,055,077.36 | $167,742,987.88 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $19,270,118.64 | $78,270,977.77 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,082,749.38 | $10,103,436.72 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $13,120,000.00 | $16,400,000.00 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $546,318,786.60 | |
| Georgia | 0013918 | Cobb | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $246,636,355.90 | |
| Georgia | 0013918 | Fulton | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $7,050,725.60 | $8,813,407.00 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $589,135.00 | $736,418.75 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | REPURPOSED SPECIAL | Preliminary Engineering | $5,443,046.34 | $6,803,807.93 |
| Georgia | 0013918 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,171,189.60 | $6,463,987.00 |
| Georgia | 0013992 | Dougherty | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $15,000,000.00 | $18,750,000.00 |
| Georgia | 0013992 | Dougherty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $11,397,741.32 | $14,247,176.65 |
| Georgia | 0013992 | Dougherty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $658,857.71 | $823,572.14 |
| Georgia | 0013992 | Dougherty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $224,642.30 | $280,802.88 |
| Georgia | 0013992 | Dougherty | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Right of Way | $136,000.00 | $170,000.00 |
| Georgia | 0013992 | Dougherty | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,851,849.22 | $2,314,811.52 |
| Georgia | 0013995 | Henry | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $36,250,000.00 | |
| Georgia | 0013995 | Henry | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $16,950,000.00 | |
| Georgia | 0013995 | Henry | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $840,000.00 | $1,050,000.00 |
| Georgia | 0013995 | Henry | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,408,000.00 | $1,760,000.00 |
| Georgia | 0013995 | Henry | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $134,131.00 | |
| Georgia | 0015023 | Fulton | >= 200,000 | Local | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $2,775,928.00 | $3,469,910.00 |
| Georgia | 0015023 | Fulton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $8,738,509.00 | $11,659,746.89 |
| Georgia | 0015023 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $974,400.00 | $1,218,000.00 |
| Georgia | 0015023 | Fulton | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $6,080,320.00 | $7,600,400.00 |
| Georgia | 0015023 | Fulton | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Preliminary Engineering | $1,296,000.00 | $1,620,000.00 |
| Georgia | 0015023 | Fulton | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | Right of Way | $688,000.00 | $860,000.00 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $6,000,000.00 | $9,000,000.00 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | New Construction Roadway | $4,512,000.00 | $5,640,000.00 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Right of Way | $488,000.00 | $610,000.00 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $6,628,430.93 | $8,585,538.66 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $321,781.46 | $402,226.82 |
| Georgia | 0015051 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,878,218.54 | $3,169,773.18 |
| Georgia | 0015090 | Henry | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $39,396,701.27 | |
| Georgia | 0015090 | Henry | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,200,000.00 | $1,500,000.00 |
| Georgia | 0015090 | Henry | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,600,000.00 | $7,171,200.00 |
| Georgia | 0015245 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $118,035,114.52 | $147,543,893.14 |
| Georgia | 0015245 | Banks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,056,348.52 | $3,820,435.66 |
| Georgia | 0015245 | Banks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $200,000.00 | $250,000.00 |
| Georgia | 0015245 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $200,000.00 | $250,000.00 |
| Georgia | 0015245 | Banks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $100,960.00 | $139,072.40 |
| Georgia | 0015245 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,899,040.00 | $5,370,927.60 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,907,166.57 | $7,383,958.21 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $323,721.18 | $404,651.48 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,416,000.00 | $6,770,000.00 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $664,994.93 | $831,243.66 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $7,029,091.06 | $8,786,363.83 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $321,539.03 | $401,923.79 |
| Georgia | 0015445 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $633,802.88 | $792,253.60 |
| Georgia | 0016054 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $7,000,000.00 | $31,711,200.00 |
| Georgia | 0016054 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $47,251,062.56 | $67,313,828.20 |
| Georgia | 0016054 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0016054 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,840,000.00 | $2,300,000.00 |
| Georgia | 0016054 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $17,209,692.89 | $21,512,116.11 |
| Georgia | 0016054 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $9,721,507.11 | $12,151,883.89 |
| Georgia | 0016054 | DeKalb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0016506 | Bartow | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $12,446.70 | $15,558.38 |
| Georgia | 0016506 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,633,123.68 | $23,291,404.60 |
| Georgia | 0016506 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $459,467.58 | $574,334.48 |
| Georgia | 0016506 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,554,744.84 | $1,943,431.05 |
| Georgia | 0016506 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $133,126.18 | $166,407.72 |
| Georgia | 0017129 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $27,829,792.80 | $35,312,241.00 |
| Georgia | 0017129 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $1,212,356.00 | $21,973,204.00 |
| Georgia | 0017129 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $240,000.00 | $300,000.00 |
| Georgia | 0017129 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,023,495.01 | $1,649,368.76 |
| Georgia | 0017130 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $32,128,116.63 | $43,696,472.84 |
| Georgia | 0017130 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $240,000.00 | $300,000.00 |
| Georgia | 0017130 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $840,000.00 | $1,050,000.00 |
| Georgia | 0017130 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,000,000.00 | $1,250,000.00 |
| Georgia | 0017411 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,463,829.41 | |
| Georgia | 0017411 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $612,000.00 | $765,000.00 |
| Georgia | 0017411 | Statewide | N/A | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $20,625,000.00 | |
| Georgia | 0018191 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $104,130,702.72 | |
| Georgia | 0018191 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,494,044.54 | |
| Georgia | 0018191 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,813,341.75 | $6,016,677.19 |
| Georgia | 0018192 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $77,552,995.37 | |
| Georgia | 0018192 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,858,099.06 | |
| Georgia | 0018192 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,366,475.06 | $5,458,093.83 |
| Georgia | 0018192 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $60,000.00 | |
| Georgia | 0018193 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $54,993,091.90 | $68,741,364.87 |
| Georgia | 0018193 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $74,341,555.09 | $92,926,943.87 |
| Georgia | 0018193 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,795,586.35 | $2,244,482.94 |
| Georgia | 0018193 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,328,259.08 | $1,660,323.85 |
| Georgia | 0018193 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,401,776.86 | $3,045,331.07 |
| Georgia | 0018193 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,776,679.75 | $2,252,739.69 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $188,888.00 | $236,110.00 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $211,112.00 | $263,890.00 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $31,878,571.58 | $39,848,214.48 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $35,629,309.46 | $44,536,636.82 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,080,000.00 | $7,600,000.00 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $679,996.80 | $849,996.00 |
| Georgia | 0018361 | Morgan | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $760,003.20 | $950,004.00 |
| Georgia | 0019022 | Rabun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,019,222.80 | $57,168,376.89 |
| Georgia | 0019022 | Rabun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $281,245.88 | $1,395,192.47 |
| Georgia | 0019022 | Rabun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,296,814.57 | |
| Georgia | 0019023 | Rabun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,046,694.66 | $7,558,368.32 |
| Georgia | 0019023 | Rabun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,804,380.06 | $2,255,475.07 |
| Georgia | 0019023 | Rabun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,840,453.11 | $6,050,566.39 |
| Georgia | 0019023 | Rabun | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $7,404,744.00 | $9,255,930.00 |
| Georgia | 0019023 | Rabun | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $60,000,000.00 | $75,000,000.00 |
| Georgia | 0019219 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $217,443,114.40 | $271,803,893.00 |
| Georgia | 0019219 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $800,000.00 | $1,000,000.00 |
| Georgia | 0019219 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $14,556,885.60 | $18,196,107.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | Local | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $945,460.80 | $1,181,826.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $494,539.20 | $618,174.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,505,120.00 | $13,131,400.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,494,880.00 | $6,868,600.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF TIFIA FUNDS | New Construction Roadway | $5,538,309.14 | $6,922,886.43 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | Local | REDISTRIBUTION OF TIFIA FUNDS | New Construction Roadway | $10,588,147.90 | $13,235,184.87 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $262,628.00 | $328,285.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $137,372.00 | $171,715.00 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,115,670.44 | $16,777,188.01 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $13,985,939.20 | $32,552,390.69 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,680,819.20 | $3,538,890.54 |
| Georgia | 0019451 | Bryan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $879,180.80 | $1,851,076.32 |
| Georgia | 0019545 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $27,257,058.56 | $27,257,058.56 |
| Georgia | 0019545 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $664,931.66 | $664,931.66 |
| Georgia | 0019545 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Utilities | $55,870.11 | $111,469.19 |
| Georgia | 0019546 | Towns | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HIGHWAY SYSTEM | 4R - Added Capacity | $78,427.24 | $78,427.24 |
| Georgia | 0019546 | Union | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HIGHWAY SYSTEM | 4R - Added Capacity | $78,427.24 | $78,427.24 |
| Georgia | 0019546 | Towns | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA PRGM | 4R - Added Capacity | $8,662,924.00 | $8,662,924.00 |
| Georgia | 0019546 | Union | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA PRGM | 4R - Added Capacity | $8,662,924.00 | $8,662,924.00 |
| Georgia | 0019546 | Union | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA-IIJA | 4R - Added Capacity | $16,827,402.37 | $16,827,402.37 |
| Georgia | 0019546 | Towns | >= 5,000 AND < 50,000 | State | APPALACHIAN DEV HWY INFRA-IIJA | 4R - Added Capacity | $16,827,402.38 | $16,827,402.38 |
| Georgia | 0019546 | Union | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $8,078,228.70 | $8,078,228.70 |
| Georgia | 0019546 | Towns | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $6,301,452.62 | $6,301,452.62 |
| Georgia | 0019546 | Towns | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $672,895.61 | $672,895.61 |
| Georgia | 0019546 | Union | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $929,236.79 | $929,236.79 |
| Georgia | 0019546 | Union | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Utilities | $637,535.90 | $637,535.90 |
| Georgia | 0019546 | Towns | >= 5,000 AND < 50,000 | State | APPALACHIAN DEVEL HWY | Utilities | $461,663.93 | $461,663.93 |
| Georgia | 0019550 | Statewide | N/A | State | CARBON REDUCTION PROGRAM | Other | $12,450,187.93 | $15,562,734.91 |
| Georgia | 0019550 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $400,000.00 | $500,000.00 |
| Georgia | 0019550 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $78,090,868.07 | $97,613,585.09 |
| Georgia | 0019551 | Statewide | N/A | State | CARBON REDUCTION PROGRAM | Other | $11,202,529.53 | $14,003,161.91 |
| Georgia | 0019551 | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $47,386,254.07 | $59,232,817.59 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | $198,900.27 | $248,625.34 |
| Georgia | 0026051 | Hall | >= 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | $228,760.68 | $285,950.85 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | N/A | DONOR STATE BONUS | Preliminary Engineering | $104,000.00 | $130,000.00 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,431,112.03 | $8,038,890.04 |
| Georgia | 0026051 | Hall | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,936,164.52 | $13,670,205.65 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $412,546.63 | $515,683.29 |
| Georgia | 0026051 | Hall | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $412,546.63 | $515,683.29 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $440,329.36 | $621,121.38 |
| Georgia | 0026051 | Hall | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $996,870.71 | $1,406,169.48 |
| Georgia | 0026051 | Hall | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $13,281,328.22 | $16,601,660.28 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $6,809,616.90 | $8,512,021.12 |
| Georgia | 0026051 | Hall | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,005,000.00 | $1,256,250.00 |
| Georgia | 0026051 | Hall | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $801,783.67 | $1,002,229.60 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $359,538.06 | $449,422.57 |
| Georgia | 0026051 | Hall | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $800,800.00 | $1,001,000.00 |
| Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $120,611.55 | $6,550,285.02 |
| Georgia | 0026051 | Hall | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $279,388.45 | $15,173,289.33 |
| Georgia | 0033053 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,854,538.76 | $8,568,173.45 |
| Georgia | 0033053 | Clarke | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $316,362.85 | $395,453.55 |
| Georgia | 0033053 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $918,561.24 | $1,148,201.56 |
| Georgia | 0033053 | Clarke | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $200,000.00 | $250,000.00 |
| Georgia | 0033053 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,236,825.80 | $1,546,032.25 |
| Georgia | 0033053 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $892,176.94 | $1,115,221.17 |
| Georgia | 0033053 | Clarke | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $426,245.06 | $532,806.33 |
| Georgia | 0033053 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $44,812,085.08 | $56,015,106.35 |
| Georgia | 0033053 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,258,575.69 | $1,573,219.61 |
| Georgia | 0033053 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,376,000.00 | $5,470,000.00 |
| Georgia | 0033053 | Clarke | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $10,111,379.20 | $12,639,224.00 |
| Georgia | 0033053 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,246,216.72 | $4,057,770.90 |
| Georgia | 0092092 | Glynn | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,439,840.00 | $1,799,800.00 |
| Georgia | 0092092 | Glynn | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,036,101.90 | $25,045,127.38 |
| Georgia | 0092092 | Glynn | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $489,096.31 | $611,370.39 |
| Georgia | 0092092 | Glynn | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $268,000.00 | $335,000.00 |
| Georgia | 0092092 | Glynn | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,932,000.00 | $4,298,698.45 |
| Georgia | 0092092 | Glynn | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,008,160.00 | $3,760,200.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | $851,609.18 | $1,064,511.47 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $870,800.00 | $1,088,500.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $3,160,000.00 | $3,950,000.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $970,000.00 | $1,212,500.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $303,663.82 | $379,579.78 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $680,000.00 | $850,000.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $886,486.90 | $1,108,108.63 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $36,181,737.00 | $45,227,171.24 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,283,094.05 | $2,853,867.57 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,548,000.00 | $4,435,000.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $310,000.00 | $387,500.00 |
| Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,687,927.38 | $2,109,909.23 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | $1,563,416.57 | $1,563,416.57 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE 4R | Preliminary Engineering | $27,000.00 | $30,000.00 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $4,967,106.46 | $5,532,896.07 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $52,388,124.28 | $65,636,773.40 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,253,607.07 | $1,567,008.84 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,640,000.00 | $4,550,000.00 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,518,550.52 | $10,648,188.15 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $102,476.14 | $128,095.18 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,490,159.68 | $5,066,965.09 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $9,240,000.00 | $11,550,000.00 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $235,654.09 | $294,567.61 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $3,370,050.91 | $4,212,563.64 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,092,000.00 | $3,865,000.00 |
| Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,074,800.00 | $1,343,516.04 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | $2,551,606.65 | $2,551,606.65 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $181,914.68 | $227,393.35 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $4,002,675.86 | $5,003,344.83 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $75,936,795.62 | $94,920,994.52 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,745,051.67 | $2,181,314.59 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $546,400.00 | $686,372.94 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,792,472.31 | $3,490,590.39 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $1,020,188.93 | $1,275,236.16 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $60,000.00 | $75,000.00 |
| Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $758,314.68 | $947,893.35 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | $722,580.52 | $722,580.52 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Rehabilitation - Added Capacity | $1,193,864.76 | $1,193,864.76 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $117,910,000.12 | $147,387,500.15 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,876,217.59 | $3,595,271.99 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $903,403.41 | $1,534,043.37 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $660,800.00 | $826,000.00 |
| Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $326,000.00 | $407,500.00 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $191,128.74 | $238,910.92 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $344,771.26 | $430,964.08 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $14,415,682.01 | $18,019,602.52 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $7,991,533.36 | $9,989,416.70 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $21,969.64 | $292,096.35 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $39,630.36 | $526,903.65 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $298,085.93 | $1,030,022.05 |
| Georgia | 0181067 | Carroll | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $537,708.08 | $1,858,025.20 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $2,296,128.00 | $2,296,128.00 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $142,181.41 | $177,726.76 |
| Georgia | 0202117 | Richmond | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $314,729.91 | $349,699.90 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,870,922.02 | $2,078,802.25 |
| Georgia | 0202117 | Haralson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $26,093,609.78 | $31,521,226.54 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $49,550,738.17 | $54,978,354.94 |
| Georgia | 0202117 | Haralson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,676,171.25 | $2,095,214.06 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,460,178.43 | $4,879,221.24 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | $325,039.00 | $406,298.75 |
| Georgia | 0202117 | Richmond | >= 200,000 | State | REPURPOSED SPECIAL | Preliminary Engineering | $2,879,681.00 | $3,599,601.25 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $3,161,235.00 | $3,951,543.75 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | New Construction Roadway | $2,303,084.46 | $2,878,855.58 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Utilities | $408,915.54 | $511,144.42 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $745,456.76 | $931,820.95 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $6,080,223.06 | $35,283,568.82 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $388,000.00 | $485,000.00 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | TRANSPORTATION IMP PROJ | New Construction Roadway | $155,576.00 | $194,470.00 |
| Georgia | 0263056 | Liberty | >= 50,000 AND < 200,000 | State | TRANSPORTATION IMP PROJ | Right of Way | $846,765.00 | $1,058,456.25 |
| Georgia | 0351033 | Rockdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,874,230.40 | $80,254,314.62 |
| Georgia | 0351033 | Rockdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,967,977.08 | |
| Georgia | 0351033 | Rockdale | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $800,000.00 | $1,000,000.00 |
| Georgia | 0351033 | Rockdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,572,295.86 | $4,465,369.82 |
| Georgia | 0351033 | Rockdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $20,544,000.00 | $25,680,000.00 |
| Georgia | 0351033 | Rockdale | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,362,243.30 | |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $15,104,823.00 | $18,881,028.75 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $2,480,000.00 | $3,100,000.00 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $363,600.00 | $363,600.00 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,257,724.44 | $4,072,155.55 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $410,349.61 | $512,937.01 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $718,352.96 | $1,643,075.49 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,000,000.00 | $7,500,000.00 |
| Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,467,849.44 | $2,899,135.81 |
| Georgia | 0562029 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEV HWY INFRA-IIJA | Right of Way | $12,200,000.00 | $12,200,000.00 |
| Georgia | 0562029 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | 4R - Added Capacity | $112,965,898.41 | $112,965,898.41 |
| Georgia | 0562029 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Construction Engineering | $2,774,424.40 | $2,774,424.40 |
| Georgia | 0562029 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Preliminary Engineering | $6,255,270.78 | $17,495,341.47 |
| Georgia | 0562029 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Right of Way | $45,910,776.23 | $45,912,910.54 |
| Georgia | 0562029 | Walker | >= 50,000 AND < 200,000 | State | APPALACHIAN DEVEL HWY | Utilities | $1,240,586.22 | $1,240,586.22 |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | $16,096.04 | $16,096.04 |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $2,988,720.00 | $3,735,900.00 |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $135,214,794.97 | |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,363,769.62 | |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $80,000.00 | $100,000.00 |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,801,692.83 | |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,175,530.32 | $1,469,412.91 |
| Georgia | 0752177 | Bibb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,884.37 | $6,105.46 |
| Georgia | 1551023 | Twiggs | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $960,000.00 | $1,200,000.00 |
| Georgia | 1551023 | Twiggs | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $3,136,000.00 | $3,920,000.00 |
| Georgia | 1551023 | Twiggs | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $22,000,000.00 | $70,526,110.35 |
| Georgia | 1551023 | Twiggs | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,618,858.86 | |
| Georgia | 1551023 | Twiggs | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $1,316,316.65 | |
| Georgia | 1551023 | Twiggs | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,473,262.58 | $1,841,578.23 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,984,000.00 | $2,480,000.00 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $27,644,890.70 | $34,556,113.38 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $691,938.32 | $864,922.90 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,707,930.77 | $2,134,913.46 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $191,578.07 | $239,472.59 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $11,108,000.00 | $13,885,000.00 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $100,000.00 | $125,000.00 |
| Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,781,196.58 | $2,226,495.72 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $406,952.62 | $406,952.62 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $576,975.38 | $576,975.38 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $492,135.31 | $615,169.14 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $347,113.17 | $433,891.46 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,410,651.19 | $10,513,313.97 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $13,079,847.58 | $16,349,809.49 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $323,762.43 | $404,703.04 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $400,000.00 | $500,000.00 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $504,952.71 | $631,190.89 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,184,000.00 | $7,734,256.58 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $69,579.56 | $86,974.45 |
| Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $98,649.56 | $123,311.95 |
| Georgia | 2851346 | Clayton | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $2,667,512.32 | $2,963,902.58 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $294,835.00 | $327,594.44 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $50,144,608.35 | $62,680,760.44 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,528,264.63 | $1,910,330.79 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $199,988.22 | $222,209.13 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,361,920.00 | $4,202,400.00 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $104,002.28 | $130,002.85 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $1,911,103.43 | $2,388,879.29 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $121,891.00 | $152,363.75 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $5,836,736.74 | $7,295,920.92 |
| Georgia | 2851346 | Clayton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,600,000.00 | $7,000,000.00 |
| Georgia | 2851352 | DeKalb | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,965,355.69 | $4,956,694.61 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,965,355.68 | $4,956,694.60 |
| Georgia | 2851352 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,718,800.00 | $4,132,000.00 |
| Georgia | 2851352 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,331,882.73 | $59,164,853.42 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,502,526.72 | $38,128,158.39 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $168,415.21 | $210,519.01 |
| Georgia | 2851352 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $261,336.03 | $326,670.04 |
| Georgia | 2851352 | DeKalb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $90,000.00 | $100,000.00 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,120,000.00 | $3,650,000.00 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $18,184,000.00 | $22,730,000.00 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $177,677.66 | $222,097.07 |
| Georgia | 2851352 | DeKalb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $275,708.90 | $344,636.13 |
| Georgia | 2851352 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $3,000,000.00 | $3,750,000.00 |
| Georgia | 2851352 | DeKalb | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $560,000.00 | $700,000.00 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $298,274.90 | $372,843.63 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $1,253,180.69 | $1,566,475.87 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $1,251,431.58 | $1,564,289.47 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | $2,028,215.66 | $2,535,269.57 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $13,723,334.19 | $17,154,167.74 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $50,510,163.46 | $63,137,704.33 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,437,186.44 | $1,796,483.05 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,826,484.20 | $2,283,105.26 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $179,668.52 | $224,585.65 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $9,150,603.65 | $11,438,254.57 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,880,000.00 | $3,600,000.00 |
| Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,964,302.72 | $3,705,378.40 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $9,080,498.00 | $11,350,622.50 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,492,431.75 | $10,615,539.69 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $428,370.00 | $535,462.50 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $260,000.00 | $325,000.00 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $948,800.00 | $1,396,401.35 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,870,916.00 | $8,588,645.00 |
| Georgia | 3711009 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,469,241.50 | $2,762,883.95 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $5,438,139.58 | $6,797,674.47 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $633,240.99 | $791,551.25 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $3,779,580.96 | $4,724,476.20 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | MIN ALLOC 90%-SUB TO LIM-STEA | Right of Way | $88,000.00 | $110,000.00 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,105,684.02 | $1,382,105.03 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $251,343.39 | $23,307,662.24 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,367,334.10 | $1,709,167.62 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,011,791.20 | $2,514,739.00 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $17,072,077.38 | $21,340,096.74 |
| Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,478,877.19 | $3,098,596.49 |
| Georgia | 9108004 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,545,739.20 | $21,991,590.80 |
| Georgia | 9108004 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,800,888.80 | $7,251,111.00 |
| Georgia | 9108004 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $108,000.00 | $135,000.00 |
| Georgia | M006062 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,493,414.10 | $17,214,904.56 |
| Georgia | M006062 | Gordon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $7,230,865.90 | $8,034,295.44 |
| Georgia | M006062 | Gordon | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $72,308.66 | $80,342.96 |
| Georgia | M006062 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $154,934.14 | $172,149.04 |
| Georgia | M006167 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $18,875,128.13 | $20,972,364.59 |
| Georgia | M006167 | Cherokee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $31,794,996.52 | $35,327,773.91 |
| Georgia | M006167 | Cherokee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $317,905.28 | $353,228.09 |
| Georgia | M006167 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $188,724.75 | $209,694.17 |
| Georgia | M006448 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $6,787,573.41 | $7,541,748.23 |
| Georgia | M006448 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $32,042,938.07 | $35,603,264.52 |
| Georgia | M006448 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $322,311.20 | $358,123.56 |
| Georgia | M006448 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $68,274.36 | $75,860.40 |
| Georgia | M006448 | Fulton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $209,091.46 | $209,091.46 |
| Georgia | M006448 | Clayton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $44,291.31 | $44,291.31 |