| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,200,964.81 | $1,200,964.81 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $400,000.00 | $800,000.00 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $86,393,550.47 | $105,895,727.21 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $46,283,896.80 | $46,283,896.80 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $63,092,770.75 | $67,107,795.56 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,305,956.61 | $2,882,445.76 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $45,408,600.00 | $47,592,888.00 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $2,770,827.94 | $211,574,223.86 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,284,265.74 | $2,917,784.18 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $267,862.64 | $334,828.30 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $18,408,600.00 | $18,408,600.00 |
| Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $2,581,782.41 | $3,227,228.01 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $284,424.20 | $355,530.25 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $647,327.48 | $809,159.34 |
| Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $8,127.64 | $10,159.56 |
| Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA | Utilities | $220.23 | $275.28 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA | Utilities | $17,539.77 | $21,924.72 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,815,263.05 | $4,865,078.85 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,127,667.16 | $3,887,787.93 |
| Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $47,903.26 | $59,879.04 |
| Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $494,768.46 | $1,599,169.84 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $56,764,095.78 | $151,673,397.71 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $4,188,185.43 | $5,698,394.25 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $9,499,981.18 | $25,647,726.03 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $244.71 | |
| Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $119,278.82 | $322,024.91 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $635,227.67 | $794,034.60 |
| Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $34,965.26 | $54,671.03 |
| Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,737,900.70 | $11,164,476.57 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $57,245.07 | $71,556.35 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $16,134.98 | $20,168.72 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $767,405.56 | $965,877.68 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $209,802.41 | $264,063.06 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $3,332,062.29 | $4,242,036.71 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,821,432.41 | $15,049,831.66 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,553,556.68 | $3,177,810.37 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $719,382.39 | $895,363.47 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $295,784.94 | $7,382,002.43 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $82,015.06 | $2,078,151.60 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,176,382.27 | $4,277,882.47 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $702,150.07 | $1,510,527.07 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,061.08 | $2,061.08 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $7,538.92 | $7,538.92 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,252,898.35 | $1,566,122.94 |
| Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,451,743.47 | $5,564,679.34 |
| Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $59,210.10 | $74,012.63 |
| Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,137,639.00 | $1,422,048.75 |
| Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,326.60 | $14,326.60 |
| Indiana | 0500432 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,839.88 | $2,839.88 |
| Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $17,986,725.91 | $22,496,555.14 |
| Indiana | 0500432 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $3,322,862.44 | $32,828,259.29 |
| Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $16,763,191.60 | $115,385,787.57 |
| Indiana | 0500432 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $171,191.76 | $8,818,008.00 |
| Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $501,188.24 | $11,442,271.82 |
| Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $83,840.00 | $104,800.00 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $3,913,917.44 | $4,348,797.15 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $4,594,165.23 | $5,104,628.04 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $12,426.77 | $13,190,793.55 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,573.23 | $15,469,482.92 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $207,112.90 | $460,250.89 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $242,887.10 | $539,749.11 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $89.62 | $99.58 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,252,811.66 | $2,193,200.45 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,068,198.72 | $1,869,951.19 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $8,283.26 | $9,203.62 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1.26 | $1.40 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $9,715.48 | $10,794.98 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $13,115.90 | $14,573.22 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,184.10 | $12,426.78 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $49,373,363.79 | $49,377,193.53 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $57,901,525.09 | $57,906,016.34 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,114,480.91 | $2,643,101.13 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $2,480,015.89 | $3,100,019.86 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $4,269,433.92 | $5,181,716.07 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $5,006,884.58 | $6,076,743.38 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Rail/Hwy Crossing | $3,106.70 | $4,602.52 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Rail/Hwy Crossing | $3,643.30 | $5,397.48 |
| Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $213,704.47 | $237,449.41 |
| Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $252,124.73 | $280,138.59 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $970,540.00 | $1,213,175.00 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $52,882.45 | $66,103.06 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,538,146.12 | $1,922,682.66 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $11,404,374.94 | $14,255,468.67 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,611,318.20 | $2,014,147.75 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $72,014.40 | $90,018.00 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $49,200.00 | $61,500.00 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,026,251.20 | $2,532,814.00 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $139,826.71 | $174,783.39 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $511,075.11 | $638,843.89 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $62,887.28 | $78,609.10 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $727,926.46 | $910,908.08 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $103,517.64 | |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $53,500.00 | |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,566,649.91 | $2,233,512.39 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Rail/Hwy Crossing | $20,000.00 | $25,000.00 |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $531,245.76 | |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Right of Way | $545,902.48 | |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Utilities | $110,000.00 | |
| Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $257,080.00 | $321,350.00 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,400,000.00 | $1,750,000.00 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $508,616.55 | $635,770.69 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,849,879.48 | $2,312,349.34 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Historic Preservation | $10,014,720.00 | $12,518,400.00 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $17,310,490.78 | $21,638,113.46 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $4,759,619.19 | $5,949,523.99 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $628.46 | $785.58 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $17,347,595.39 | $21,684,494.24 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,868,886.56 | $2,336,108.18 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,797,291.42 | $8,496,614.28 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,547,452.27 | $6,934,315.34 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $2,511.21 | $3,139.02 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $690.45 | $863.06 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $27.63 | $34.54 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,554,647.96 | $3,193,309.91 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $9,293,839.30 | $11,617,299.16 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $30,042,899.97 | $37,553,624.98 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $11,187,590.00 | $13,984,487.51 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,413,677.00 | $1,767,096.25 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,141,657.56 | $6,427,071.95 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $545,840.67 | $682,300.83 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $155.73 | |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $6,609,153.89 | |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $24,037,871.11 | |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $92,584.33 | |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $25,455.67 | |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Right of Way | $0.01 | |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $78,518.49 | |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $285,578.00 | |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $2,602,314.57 | |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $715,495.44 | |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $8,254,074.34 | $10,317,592.92 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $400,000.00 | $500,000.00 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,613,661.60 | $4,517,077.00 |
| Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $450.77 | $563.47 |
| Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,639.51 | $2,049.38 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $467,683.61 | |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $141,335.03 | $157,038.93 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $110,000.00 | |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $78,306.73 | $906,153.22 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | $225,900.00 | $330,200.00 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $88,707.60 | $326,292.52 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | $77,534.35 | $86,149.28 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | HIGHWAY BRIDGE PROGRAM (PLUS) | Right of Way | $455.00 | $700.00 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $81,889.32 | $90,988.13 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $961,426.50 | $1,068,251.67 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $16,155.00 | $35,900.00 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $10,080.00 | $22,400.00 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $351,995.12 | $488,882.11 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $652,604.36 | $725,115.96 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $55,671.62 | $61,857.36 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $521,283.00 | $579,203.33 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $11,311,306.06 | $13,625,315.17 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $81,259.00 | $90,287.78 |
| Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $14,141,076.89 | $15,712,307.65 |
| Indiana | 1400034 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,160.00 | $4,800.00 |
| Indiana | 1400073 | Marion | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $14,172,804.23 | |
| Indiana | 1400073 | Marion | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,125,000.00 | $8,604,987.00 |
| Indiana | 1400073 | Marion | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $1,336,826.59 | |
| Indiana | 1400073 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,021,010.40 | $32,885,981.98 |
| Indiana | 1400073 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,802,814.27 | $2,992,675.00 |
| Indiana | 1400073 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,021,000.00 | |
| Indiana | 1400073 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,343,519.49 | $3,715,021.66 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,043,397.92 | $20,301,815.31 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $94,628.92 | $283,978.92 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $38,800.00 | $48,500.00 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $39,760.00 | $49,700.00 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $28,937.91 | $36,172.39 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,058,804.95 | $1,323,506.19 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Rail/Hwy Crossing | $8,000.00 | $10,000.00 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $511,252.08 | |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Construction Engineering | $17,187.43 | |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $1,712,510.00 | $1,734,210.00 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $280,720.00 | |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $34,159.81 | |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $10,000.00 | $10,000.00 |
| Indiana | 1592421 | Tipton | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Utilities | $441,600.00 | |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $31,700.71 | $35,223.01 |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $37,271.65 | $37,271.65 |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $733.32 | $1,629.60 |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,645,291.21 | $58,105,056.67 |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,631,590.56 | $1,745,999.73 |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,922,480.54 | $4,072,308.60 |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $57,402.80 | |
| Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $42,362.27 | $47,069.19 |
| Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $31,486,868.83 | $35,382,582.96 |
| Indiana | 1592433 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,506,893.39 | $5,049,060.42 |
| Indiana | 1592433 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $15,881.94 | $17,646.60 |
| Indiana | 1592433 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $373,969.46 | $426,670.17 |
| Indiana | 1592433 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $79.41 | $88.23 |
| Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,528,855.67 | $4,027,902.20 |
| Indiana | 1592433 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $12.95 | $605.54 |
| Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $25,209.56 | $1,169,002.41 |
| Indiana | 1592433 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,626.71 | $168,170.25 |
| Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $110,900.00 | |
| Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,070,422.18 | $3,411,580.20 |
| Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $29,391.52 | $32,657.24 |
| Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $87,608.48 | $97,342.76 |
| Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,114,977.44 | $9,031,876.45 |
| Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $24,188,641.03 | $26,921,670.88 |
| Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $102,033.51 | $113,166.60 |
| Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $304,130.48 | $337,314.81 |
| Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $239,828.35 | $551,282.12 |
| Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $80,464.93 | $184,954.30 |
| Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $16.72 | $18.58 |
| Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $232,849.40 | $258,721.55 |
| Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $78,118.48 | $86,798.32 |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $884,435.10 | $1,105,543.87 |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $352,890.00 | |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $164,384.00 | $205,480.00 |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $44,000.00 | $55,000.00 |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $115,564.90 | $24,124,902.22 |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $135,495.00 | $1,745,780.00 |
| Indiana | 1593230 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $2,000.00 | |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $385,393.02 | $481,741.28 |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,022,789.87 | $21,164,520.65 |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $661,987.42 | $855,984.27 |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $304,248.00 | $2,433,155.66 |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,681,000.00 | |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Rehabilitation - Added Capacity | $1,244,648.73 | $1,244,648.73 |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $1,918,285.69 | |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,000.00 | $100,000.00 |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $299,800.00 | |
| Indiana | 1600500 | Porter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $17,020,502.00 | |
| Indiana | 1600808 | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $149,317,455.20 | $149,317,455.20 |
| Indiana | 1600808 | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $87,300.00 | $97,000.00 |
| Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $124,402,598.26 | $215,073,142.04 |
| Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,669,682.10 | $22,941,556.27 |
| Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,851,003.76 | $54,954,944.37 |
| Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $555,158.96 | $618,509.96 |
| Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $683,377.17 | $5,579,348.72 |
| Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | $1,118,306.78 | $1,242,563.09 |
| Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $545,007.32 | $681,259.15 |
| Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Preliminary Engineering | $135,000.00 | $150,000.00 |
| Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Rail/Hwy Crossing | $60,948.04 | $67,720.04 |
| Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Utilities | $273,813.90 | $304,237.67 |
| Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | $2,605,932.54 | $2,605,932.54 |
| Indiana | 1600808 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $15,470,307.90 | $17,189,231.00 |
| Indiana | 1600808 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $29,452.68 | $32,725.20 |
| Indiana | 1600808 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,026,719.03 | $1,140,798.93 |
| Indiana | 1601066 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,019,776.67 | $27,524,720.84 |
| Indiana | 1601066 | Vanderburgh | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $295,224.13 | |
| Indiana | 1601066 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $6,641,715.33 | $8,307,404.36 |
| Indiana | 1601066 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,918,940.24 | $2,398,675.30 |
| Indiana | 1700135 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $108,821,196.99 | |
| Indiana | 1700135 | Scott | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $83,946,496.89 | |
| Indiana | 1700135 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,988,223.50 | |
| Indiana | 1700135 | Scott | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,476,499.93 | |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Rail/Hwy Crossing | $28,149.19 | $31,276.88 |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $51,140,218.75 | |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,950,000.00 | $87,905,007.25 |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,498,912.74 | $16,769,586.56 |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $521,564.50 | $14,992,545.00 |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $634,816.73 | $800,351.92 |
| Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | TRAN COMM SYS PRES PILOT-TEA21 | Rail/Hwy Crossing | $1,900.96 | $2,376.20 |
| Indiana | 1800082 | Johnson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,000,000.00 | $41,601,675.16 |
| Indiana | 1800082 | Johnson | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,259,125.00 | |
| Indiana | 1800082 | Johnson | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $260,544.00 | $4,889,325.69 |
| Indiana | 1800984 | Daviess | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,088,584.94 | $21,279,140.00 |
| Indiana | 1800984 | Daviess | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,919,860.00 | $1,919,860.00 |
| Indiana | 1800984 | Daviess | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $871,360.00 | $871,360.00 |
| Indiana | 1800984 | Daviess | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $217,840.00 | $217,840.00 |
| Indiana | 1800984 | Daviess | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,861,500.00 | $1,861,500.00 |
| Indiana | 1800984 | Daviess | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,325,000.00 | $1,325,000.00 |
| Indiana | 1801246 | Posey | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $6,242,524.41 | $6,936,138.23 |
| Indiana | 1801246 | Posey | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $16,772,473.59 | $27,136,081.77 |
| Indiana | 1801246 | Posey | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,300,000.00 | |
| Indiana | 1801247 | Posey | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $23,014,998.00 | $34,072,220.00 |
| Indiana | 1801421 | Hamilton | >= 200,000 | Local | CONGESTION AIR QUALITY | Safety | $4,750,000.00 | $19,298,783.48 |
| Indiana | 1801421 | Hamilton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $4,750,000.00 | $5,937,500.00 |
| Indiana | 1801695 | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $0.11 | $0.11 |
| Indiana | 1801695 | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $29,282,322.74 | $36,602,903.43 |
| Indiana | 1801695 | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $897,929.67 | $1,122,412.09 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $100,000.00 | $100,000.00 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,078,152.84 | $42,122,991.05 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $103,485.46 | |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $59,045,250.53 | $73,806,563.16 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $49,860,475.19 | $449,344,607.00 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $313,280.00 | $391,600.00 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,411,112.50 | $3,013,890.62 |
| Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $17,657,339.90 | $111,307,752.95 |
| Indiana | 1801695 | Marion | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,931.63 | $2,414.54 |
| Indiana | 1801695 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $76,157.31 | $95,196.64 |
| Indiana | 1801695 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $97,548,952.61 | $121,936,190.76 |
| Indiana | 1801695 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,800,000.00 | $3,500,000.00 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $450,400.00 | $563,000.00 |
| Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,780,218.27 | $2,225,272.86 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,429,652.70 | $14,287,065.88 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,559,781.73 | $6,949,727.14 |
| Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $2,984,324.00 | $6,141,663.22 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,167,475.48 | $33,170,530.60 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $9,320,312.15 | $19,180,966.30 |
| Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $65,069.81 | $1,928,207.74 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $325,685.00 | |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $203,218.19 | $6,021,944.32 |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $14,040,399.26 | |
| Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,495,683.95 | |
| Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,315,078.13 | $6,654,571.09 |
| Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $44,905,786.05 | |
| Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $8,418,207.96 | $10,522,759.95 |
| Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $18,000.00 | $20,000.00 |
| Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $14,805.07 | $16,450.08 |
| Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $608,579.84 | $930,030.93 |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,022,000.00 | $1,916,250.00 |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $98,000.00 | $183,750.00 |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $11,071,450.38 | $13,839,312.98 |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,061,645.93 | $1,327,057.41 |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $115,992.00 | $3,155,283.50 |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,233,268.97 | |
| Indiana | 1900292 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $165,102.40 | $6,144,873.49 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $406,320.28 | $507,900.35 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $49.00 | $61.25 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,714.01 | $2,142.51 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,763.01 | $2,203.76 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $40,000.00 | $65,000.00 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,404,048.00 | $1,755,060.00 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $34,635,705.24 | |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $465,676.99 | $4,569,088.24 |
| Indiana | 1900308 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,840,918.00 | |
| Indiana | 1901357 | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $73,521.39 | $91,901.74 |
| Indiana | 1901357 | Lake | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Restoration & Rehabilitation | $113.79 | $142.24 |
| Indiana | 1901357 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $5,170,417.92 | $6,558,049.79 |
| Indiana | 1901357 | Lake | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | $711,060.49 | $711,060.49 |
| Indiana | 1901357 | Lake | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $6,299,264.51 | $19,550,486.07 |
| Indiana | 1901381 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $371,339.16 | $6,115,210.27 |
| Indiana | 1901381 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $40,777,643.41 | $50,972,054.25 |
| Indiana | 1901381 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $637,090.68 | $796,363.35 |
| Indiana | 1901381 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $960,492.68 | $1,200,615.85 |
| Indiana | 1901383 | Morgan | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $466,014.10 | |
| Indiana | 1901383 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $16,388,024.48 | $65,206,431.54 |
| Indiana | 1901890 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $549,407.76 | $686,759.70 |
| Indiana | 1901890 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $18,134,708.51 | $25,177,883.59 |
| Indiana | 1901890 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,417,605.60 | $2,737,882.00 |
| Indiana | 1901890 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $193,360.00 | $1,177,700.00 |
| Indiana | 2000579 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $28,798,964.28 | $31,998,849.20 |
| Indiana | 2001172 | Tippecanoe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $4,395.52 | $5,494.40 |
| Indiana | 2001172 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,876,192.09 | $46,625,041.41 |
| Indiana | 2001172 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,681,983.41 | $7,221,522.55 |
| Indiana | 2001172 | Tippecanoe | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $1,876,192.09 | $2,345,240.11 |
| Indiana | 2001172 | Tippecanoe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $104,184.27 | $130,230.34 |
| Indiana | 2001843 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,695,437.05 | $30,386,192.22 |
| Indiana | 2001843 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $722,183.40 | $3,281,569.00 |
| Indiana | 2001844 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $31,408,666.86 | $34,898,518.73 |
| Indiana | 2001869 | Shelby | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Highway Infrastructure Preventive Maintenance | $29,225,537.03 | |
| Indiana | 2001869 | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Highway Infrastructure Preventive Maintenance | $1,471,424.61 | |
| Indiana | 2001869 | Rush | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Highway Infrastructure Preventive Maintenance | $106,979.36 | |
| Indiana | 2001869 | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $45,402.77 | $50,447.52 |
| Indiana | 2001869 | Rush | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,300.25 | $3,666.94 |
| Indiana | 2001869 | Shelby | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $902,048.39 | $1,002,276.00 |
| Indiana | 2001869 | Shelby | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,412,633.40 | $1,762,448.16 |
| Indiana | 2001869 | Decatur | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $71,060.10 | $88,661.24 |
| Indiana | 2001869 | Rush | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,170.69 | $6,451.14 |
| Indiana | 2001917 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $26,800.00 | $33,500.00 |
| Indiana | 2001917 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $70,518,206.52 | |
| Indiana | 2001917 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $447,212.11 | $6,674,190.14 |
| Indiana | 2002313 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,909,820.52 | $4,375,322.43 |
| Indiana | 2002313 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,337,543.93 | $2,011,184.52 |
| Indiana | 2002313 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $331,315.51 | $1,314,148.33 |
| Indiana | 2002313 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $720,793.29 | $2,859,033.67 |
| Indiana | 2002313 | Tipton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $7,559,319.21 | $11,489,341.70 |
| Indiana | 2002313 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,474,753.99 | $5,281,244.80 |
| Indiana | 2002423 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $158,457,974.74 | $187,934,282.18 |
| Indiana | 2002423 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,000.00 | $180,000.00 |
| Indiana | 2002423 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Added Capacity | $68,030,947.12 | $114,554,943.73 |
| Indiana | 2002423 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $16,000,000.00 | |
| Indiana | 2002423 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Right of Way | $17,200.00 | $21,500.00 |
| Indiana | 2002424 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $60,759,628.30 | $116,565,698.11 |
| Indiana | 2002424 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $12,633,308.10 | $25,598,709.00 |
| Indiana | 2002424 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - Restoration & Rehabilitation | $24,794,310.89 | |
| Indiana | 2002530 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $74,148,608.09 | |
| Indiana | 2002530 | Hamilton | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | 4R - No Added Capacity | $35,013.36 | |
| Indiana | 2002966 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $34,643,146.95 | $38,492,385.50 |
| Indiana | 2101318 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $160,000.00 | $8,814,600.00 |
| Indiana | 2101318 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $29,123,885.81 | $36,404,857.27 |
| Indiana | 2101318 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $880,000.00 | $1,100,000.00 |
| Indiana | 2101318 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $40,000.00 | |
| Indiana | 2101318 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $2,218,013.86 | $61,473,287.57 |
| Indiana | 2101318 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,400,000.00 | $11,150,700.00 |
| Indiana | 2200176 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,525,563.80 | $1,932,376.18 |
| Indiana | 2200176 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $35,858,857.38 | $41,462,897.18 |
| Indiana | 2200176 | Boone | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $839,280.35 | $1,049,100.43 |
| Indiana | 2200176 | Boone | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $653.15 | $816.44 |
| Indiana | 2201152 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $24,452,734.53 | $44,495,827.80 |
| Indiana | 2201154 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,714,721.62 | $13,393,402.02 |
| Indiana | 2201154 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,000,000.00 | $18,652,238.32 |
| Indiana | 2201156 | Vanderburgh | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $5,338,876.92 | $6,673,596.15 |
| Indiana | 2201156 | Vanderburgh | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | New Construction Roadway | $643,210.00 | $804,012.50 |
| Indiana | 2201156 | Vanderburgh | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,030,090.22 | $19,758,400.58 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,164,678.13 | $1,179,000.46 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $6,121,987.52 | $6,126,491.81 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,256,538.75 | $2,322,683.13 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $1,180,480.96 | $1,441,262.99 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $176,280.00 | $220,350.00 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $1,171,712.00 | $1,301,902.22 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $197,224.20 | $246,530.24 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,372,371.42 | $5,465,464.28 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,398,199.01 | $1,744,823.75 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $558,412.04 | $698,015.05 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $87,035.69 | $105,127.11 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,293,010.80 | $5,347,513.50 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $50,780.00 | $63,475.00 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $7,625.79 | $9,532.24 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | SURF TRANS PROJ | Preliminary Engineering | $30,017.40 | $30,017.40 |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | SURF TRANS PROJ | Preliminary Engineering | $145,900.00 | |
| Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | SURF TRANS PROJ | Utilities | $37,607.15 | $47,008.94 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $55,886,200.33 | $98,915,824.64 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,470,455.41 | $4,259,405.88 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $13,604,875.65 | $23,456,682.14 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,784,700.00 | $4,255,000.00 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $6,700,423.39 | $11,552,454.12 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $67,296.19 | $116,027.92 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $22,500,000.00 | $41,152,326.89 |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Rehabilitation - Added Capacity | $34,551.52 | |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,172,885.58 | |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Other | $54,297.34 | |
| Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $40,630.00 | $70,051.72 |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $5,520,471.31 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $103,036,994.00 | $199,042,750.71 |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $16,551,361.78 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,997,948.20 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $35,680,086.03 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $3,786,937.60 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $8,431,707.00 | |
| Indiana | CN42570 | Owen | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,380,827.61 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $549,037.23 | |
| Indiana | CN42570 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,871,592.89 | |
| Indiana | CN42894 | Clark | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $8,417,239.20 | $11,923,389.72 |
| Indiana | CN42894 | Floyd | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $596,216.99 | $662,463.32 |
| Indiana | CN42894 | Floyd | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $1,104,877.30 | $1,235,966.71 |
| Indiana | CN42894 | Clark | >= 50,000 AND < 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $455,277.21 | $505,863.57 |
| Indiana | CN42894 | Floyd | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Resurfacing | $6,029,387.37 | $6,982,055.48 |
| Indiana | CN42894 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $557,316.28 | $619,240.32 |
| Indiana | CN42894 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | $166,189.71 | $184,655.22 |
| Indiana | CN42894 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,643,400.00 | $1,826,000.00 |
| Indiana | CN42894 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $3,533,648.73 | $3,926,276.36 |
| Indiana | CN42894 | Clark | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Resurfacing | $550,000.00 | $550,000.00 |
| Indiana | CN43518 | Allen | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $6,409,730.11 | $14,803,071.84 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $38,257,378.64 | $88,354,223.19 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,094,303.77 | $38,155,381.54 |
| Indiana | CN43518 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,696,477.05 | $6,392,641.27 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $16,188,871.29 | $38,006,244.24 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,693,760.19 | $8,692,137.57 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $38,769.94 | $106,022.59 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,675,245.94 | $12,821,719.36 |
| Indiana | CN43518 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,118,386.21 | $2,148,180.64 |
| Indiana | CN43518 | Marion | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $69,560.46 | $160,646.70 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $88,838.72 | $244,255.98 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $179,586.32 | $414,746.35 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $6,341,622.38 | $14,648,766.28 |
| Indiana | CN43518 | Allen | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $5,525,653.96 | $12,761,243.73 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $32,980,645.40 | $76,167,283.98 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,450.10 | $3,295.68 |
| Indiana | CN43518 | Allen | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $242.95 | $552.16 |
| Indiana | CN43518 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $430.06 | $977.41 |
| Indiana | CN43518 | Marion | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Other | $227,567.55 | $227,567.55 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - No Added Capacity | $25,332,891.25 | $60,316,407.74 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,108,753.32 | $5,000,000.00 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,063,508.87 | $20,407,822.94 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $2,840,997.02 | $3,231,663.36 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $21,087.53 | $171,499.14 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,882,023.68 | $9,362,630.04 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $5,955.40 | |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $3,300.00 | |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $40,149,267.16 | $96,930,591.51 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $4,152,626.69 | $9,846,165.17 |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - Added Capacity | $79,451.87 | |
| Indiana | CPIG121 | Marion | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Traffic Management/Engineering - HOV | $167,412.21 | |
| Indiana | CPIG121 | Marion | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $121,891.00 | $135,434.44 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $669,011.37 | $1,846,524.19 |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $183,941.86 | $507,771.35 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $826,651.84 | |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $227,271.16 | |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,519,437.50 | |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $692,517.84 | |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $29,088.61 | |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $105,768.15 | |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,603,088.31 | $7,003,860.39 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,386,756.35 | $25,483,445.44 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $534,973.52 | $668,716.90 |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $27,097,991.51 | $33,872,489.37 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $60,298,039.55 | $75,372,549.44 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $98,596,658.78 | $123,245,823.49 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $936,450.98 | $1,170,563.72 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,596,796.01 | $6,995,995.01 |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,538,702.09 | $1,923,377.62 |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $299,660.85 | $374,576.06 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,090,322.83 | $1,362,903.54 |
| Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,075,673.94 | $1,344,592.42 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,913,864.09 | $4,892,330.12 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $177,499.81 | $221,874.76 |
| Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $2,068,842.84 | $2,586,053.55 |
| Indiana | NCBG018 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,412,962.01 | $43,298,847.05 |
| Indiana | NCBG018 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,517,770.60 | $2,811,119.50 |
| Indiana | NCBG018 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $20,000,000.00 | $41,747,207.40 |
| Indiana | SCBG018 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $363,870.00 | $404,300.00 |
| Indiana | SCBG018 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,535,588.06 | $3,928,431.18 |
| Indiana | SCBG018 | Bartholomew | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $20,000,000.00 | $47,722,651.59 |
| Indiana | SCBG018 | Bartholomew | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $1,079,922.54 | |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,250,194.20 | $13,224,271.49 |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $411,414.52 | $591,424.86 |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $10,530.00 | $12,476.95 |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,181,558.10 | $2,373,451.10 |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,099,354.06 | $11,226,052.11 |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $1,065,033.94 | |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $1,097,068.84 | $3,335,050.85 |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $742,985.62 | |
| Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $14,902,931.16 | $43,285,576.20 |